CN207452687U - A kind of section assembling balance swivel gate pier - Google Patents

A kind of section assembling balance swivel gate pier Download PDF

Info

Publication number
CN207452687U
CN207452687U CN201721462768.6U CN201721462768U CN207452687U CN 207452687 U CN207452687 U CN 207452687U CN 201721462768 U CN201721462768 U CN 201721462768U CN 207452687 U CN207452687 U CN 207452687U
Authority
CN
China
Prior art keywords
swivel
pier stud
pier
section
stud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721462768.6U
Other languages
Chinese (zh)
Inventor
刘彦明
吴少海
陈应陶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201721462768.6U priority Critical patent/CN207452687U/en
Application granted granted Critical
Publication of CN207452687U publication Critical patent/CN207452687U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of section assemblings to balance swivel gate pier, including swivel pier stud and non-swivel pier stud;Rotary ball hinge is provided between swivel pier stud and pier stud basis;Non- swivel pier stud pier top is provided with movable bearing support;Precast Concrete Segmental Bridges bent cap is provided between the pier top of swivel pier stud and non-swivel pier stud, opposite side is provided with the counterweight beam section balanced therewith;Using Rotary ball hinge, swivel implements the balanced structure being made of swivel pier stud, Precast Concrete Segmental Bridges bent cap, counterweight beam section, by being turned along gate pier span line direction to non-swivel pier stud, completes construction.The utility model is due to using section assembling balance swivel concrete structure, it designes and constructes simple and convenient, minimum to span line Influence to operation, the duration of a project is saved in precast assembly construction, greatly reduce maintenance work and the difficulty in later stage, more economical rationality again simultaneously.

Description

A kind of section assembling balance swivel gate pier
Technical field
The utility model is related to technical field of bridge engineering, and in particular to a kind of section assembling balance swivel gate pier.
Background technology
In recent years, China's traffic base engineering construction development is swift and violent, particularly using Line for Passenger Transportation as the high-speed railway of representative And the development of highway engineering high speed highway is especially prominent, circuit and existing busy trunk lines railway, existing busy trunk lines highway Inevitable multiple crossings on different level, when the two angle is smaller, gate pier becomes a kind of selection of economical rationality, it can be big The big span reduced across existing road and bridge, cost saving, economic benefit clearly, obtain in Practical Project It widely applies.
Mostly using support cast-in-place concrete in situ in existing gate pier design(Lid)Beam or steel(Lid)The type of attachment of beam.It is former Position cast-in-place concrete(Lid)Beam needs set up stent, casting concrete above existing road, and the duration is longer and to existing road The operation on road produces bigger effect, its influence is especially prominent for existing busy trunk lines, particularly across existing railway when, Embodiment is difficult to obtain the accreditation of existing wire management side;Operation to reduce to existing road is disturbed, and amplifies out another door Type pier-steel(Lid)Beam scheme, the program is lighter using steel construction, dead weight, and generally using lifting construction, but there are engineerings for the program It is of high cost, late maintaining heavy workload, and it is present in existing road(To existing railway in high-voltage contact net)Top checks dimension Repair the shortcomings such as difficulty.
The content of the invention
The purpose of this utility model is to provide a kind of section assembling balance swivel gate pier and its construction method, avoids original position Support cast-in-place concrete(Lid)Beam or steel(Lid)The deficiency of beam in the case where reducing to span line operation interference, saves work Phase reduces project cost.
Technical solution is used by the utility model:
A kind of section assembling balance swivel gate pier, it is characterised in that:
Including swivel pier stud and non-swivel pier stud;
Pier stud bottom is turned as pier stud basis, turns and is provided with Rotary ball hinge between pier stud and pier stud basis;
Non- swivel pier stud bottom is pier stud basis, and non-swivel pier stud pier top is provided with movable bearing support;
Precast Concrete Segmental Bridges bent cap is provided between the pier top of swivel pier stud and non-swivel pier stud.
Swivel pier stud pier top is symmetrical with Precast Concrete Segmental Bridges bent cap and is provided with counterweight beam section, and before swivel, prefabricated subsection is spelled Capping beam and counterweight beam section form balanced structure compared with swivel pier stud.
Precast Concrete Segmental Bridges bent cap is formed by being segmented prefabricated section assembling.
Counterweight beam section is formed by being segmented prefabricated section assembling.
Steel beam hole road is reserved in Precast Concrete Segmental Bridges bent cap and is disposed with steel beam, steel beam includes permanent steel beam and temporary steel Beam.
Steel beam hole road is reserved in counterweight beam section and is disposed with steel beam, steel beam is temporary steel beam.
Non- swivel pier stud top is connected with Precast Concrete Segmental Bridges bent cap end underrun movable bearing support.
The utility model has the following advantages:
1st, Precast Concrete Segmental Bridges bent cap is installed using along gate pier span line direction, balances rotator construction, greatly save It is the construction period above existing road, minimum to existing road operation interference effect, due to being constructed using Precast Concrete Segmental Bridges, more It can guarantee construction quality, while can further save the construction period with pier stud parallel construction;
2nd, cast-in-place concrete stent and the protecting canopy frame above existing road are eliminated, building height can be reduced, effectively Reduce the elevation of circuit;
3 and steel(Lid)Beam is compared, and due to using concrete structure, greatly reduces maintenance work and the hardly possible in later stage It is apparent to save construction investment for degree.
The utility model is due to using section assembling balance swivel concrete structure, greatling save and being applied above existing road The work duration, the influence to span line operation interference is minimum, and precast assembly ensures beam section quality, and parallel construction can be saved the duration, The elevation of circuit is effectively reduced, saves construction investment, while greatly reduces maintenance work and the difficulty in later stage again, is more passed through Ji is reasonable.
Description of the drawings
Fig. 1 is the utility model structure chart.
Fig. 2 is the structure chart before swivel.
Fig. 3 is structure chart after swivel dismounting counterweight section.
In figure, 1- pier studs basis, 2- Rotary ball hinges, 3- swivel pier studs, 4- Precast Concrete Segmental Bridges bent caps, 5- counterweight beam sections, The permanent steel beam of the first batch of tensioning of 6-, remaining permanent steel beam of 7-, 8- temporary steel beams, the non-swivel pier studs of 9-, 10- movable bearing supports.
Specific embodiment
The utility model is described in detail With reference to embodiment.
The utility model is related to section assembling balance swivel gate pier, including swivel pier stud 3 and it is non-swivel pier stud 9, point It Wei Yu not existing line both sides.It is pier stud basis 1 to turn 3 bottom of pier stud, is provided with and turns between swivel pier stud 3 and pier stud basis 1 Body flexural pivot 2.9 bottom of non-swivel pier stud is pier stud basis 1, and non-swivel 9 pier top of pier stud is provided with movable bearing support 10, non-swivel pier stud 9 tops are connected with 4 end underrun movable bearing support 10 of Precast Concrete Segmental Bridges bent cap.Turn the pier of pier stud 3 and non-swivel pier stud 9 Precast Concrete Segmental Bridges bent cap 4 is provided between top.
Swivel 3 pier top of pier stud is symmetrical with Precast Concrete Segmental Bridges bent cap 4 and is provided with counterweight beam section 5, before swivel, prefabricated subsection Assembled bent cap 4 and counterweight beam section 5 form balanced structure compared with swivel pier stud 3.
Precast Concrete Segmental Bridges bent cap 4 is formed by being segmented prefabricated section assembling.Steel is reserved in Precast Concrete Segmental Bridges bent cap 4 Beam hole road is simultaneously disposed with steel beam, and steel beam includes permanent steel beam and temporary steel beam.
Counterweight beam section 5 is also formed by being segmented prefabricated section assembling.Steel beam hole road is reserved in counterweight beam section 5 and is disposed with Steel beam, steel beam are temporary steel beam.
The construction method of above-mentioned section assembling balance swivel gate pier, comprises the following steps:
Step 1:The pier stud basis 1 of swivel pier stud 3 and non-swivel pier stud 9 is performed in existing line arranged on left and right sides;Then Non- swivel pier stud 9 is performed, along gate pier span line direction, Rotary ball hinge 2 is installed between swivel pier stud 3 and pier stud basis 1; Then construction swivel pier stud 3;
Step 2:Each segment of prefabricated counterweight beam section 5 and Precast Concrete Segmental Bridges bent cap 4 at the construction field (site), and reserved steel Beam hole road;After maintenance reaches intensity, along gate pier span line direction, prefabricated section is symmetrically installed paragraph by paragraph in 3 both sides of swivel pier stud The assembled bent cap 4 of section and counterweight beam section 5, tensioning temporary steel beam 8, makes prefabricated section in Precast Concrete Segmental Bridges bent cap 4 and counterweight beam section 5 The assembled bent cap 4 of section and counterweight beam section 5 form balanced structure compared with swivel pier stud 3;
Step 3:10 hole of movable bearing support is reserved on 9 top of non-swivel pier stud, releases being fixed temporarily at Rotary ball hinge 2 Measure, using Rotary ball hinge 2, swivel implements the balance being made of swivel pier stud 3, Precast Concrete Segmental Bridges bent cap 4 and counterweight beam section 5 Structure, by being turned along gate pier span line direction to non-swivel pier stud 9;
Step 4:The permanent steel beam 6 of tensioning in Precast Concrete Segmental Bridges bent cap 4 is removed counterweight beam section 5 and all is faced paragraph by paragraph When steel beam 8, in non-swivel 9 top installation activity bearing 10 of pier stud, make between Precast Concrete Segmental Bridges bent cap 4 and non-swivel pier stud 9 Form connection;
Step 5:Consolidation measure and the prestress hole path pressure grouting of Rotary ball hinge 2 are carried out afterwards, are completed section assembling balance and are turned The construction of body gate pier.
Counterweight beam section 5 can be reused in remaining gate pier, can also be according to construction site situation, using angle bar frame The counterweight mode of counterweight sandbag or water tank is placed, flexible processing forms balanced structure.Due to the part, concrete construction exists It is carried out outside existing road gauge, does not influence the operation of existing road.Prefabricated subsection can further be saved with pier stud parallel construction The about duration.
The content of the utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality Type specification and to any equivalent conversion that technical solutions of the utility model are taken, be the claim institute of the utility model Cover.

Claims (7)

1. a kind of section assembling balance swivel gate pier, it is characterised in that:
Including turning pier stud(3)With non-swivel pier stud(9);
Turn pier stud(3)Bottom is pier stud basis(1), turn pier stud(3)With pier stud basis(1)Between be provided with Rotary ball hinge (2);
Non- swivel pier stud(9)Bottom is pier stud basis(1), non-swivel pier stud(9)Pier top is provided with movable bearing support(10);
Turn pier stud(3)With non-swivel pier stud(9)Pier top between be provided with Precast Concrete Segmental Bridges bent cap(4).
2. a kind of section assembling balance swivel gate pier according to claim 1, it is characterised in that:
Turn pier stud(3)Pier top is symmetrical with Precast Concrete Segmental Bridges bent cap(4)It is provided with counterweight beam section(5), before swivel, prefabricated section The assembled bent cap of section(4)With counterweight beam section(5)Compared with swivel pier stud(3)Form balanced structure.
3. a kind of section assembling balance swivel gate pier according to claim 1, it is characterised in that:
Precast Concrete Segmental Bridges bent cap(4)It is made of the section assembling for being segmented prefabricated.
4. a kind of section assembling balance swivel gate pier according to claim 2, it is characterised in that:
Counterweight beam section(5)It is made of the section assembling for being segmented prefabricated.
5. a kind of section assembling balance swivel gate pier according to claim 1, it is characterised in that:
Precast Concrete Segmental Bridges bent cap(4)In be reserved with steel beam hole road and be disposed with steel beam, steel beam includes permanent steel beam and temporary steel Beam.
6. a kind of section assembling balance swivel gate pier according to claim 2, it is characterised in that:
Counterweight beam section(5)In be reserved with steel beam hole road and be disposed with steel beam, steel beam is temporary steel beam.
7. a kind of section assembling balance swivel gate pier according to claim 1, it is characterised in that:
Non- swivel pier stud(9)Top and Precast Concrete Segmental Bridges bent cap(4)End underrun movable bearing support(10)Connection.
CN201721462768.6U 2017-11-06 2017-11-06 A kind of section assembling balance swivel gate pier Active CN207452687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721462768.6U CN207452687U (en) 2017-11-06 2017-11-06 A kind of section assembling balance swivel gate pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721462768.6U CN207452687U (en) 2017-11-06 2017-11-06 A kind of section assembling balance swivel gate pier

Publications (1)

Publication Number Publication Date
CN207452687U true CN207452687U (en) 2018-06-05

Family

ID=62254007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721462768.6U Active CN207452687U (en) 2017-11-06 2017-11-06 A kind of section assembling balance swivel gate pier

Country Status (1)

Country Link
CN (1) CN207452687U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974930A (en) * 2017-11-06 2018-05-01 中铁第勘察设计院集团有限公司 Section assembling balance swivel gate pier and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974930A (en) * 2017-11-06 2018-05-01 中铁第勘察设计院集团有限公司 Section assembling balance swivel gate pier and its construction method

Similar Documents

Publication Publication Date Title
CN110820594B (en) Symmetrical cantilever construction process suitable for expansion joint bridge pier
CN103255726B (en) A kind of construction method of continuous beam arch combination bridge
CN103046476A (en) Railway long-span rotator T-shaped bridge construction method
CN103981803B (en) The combined gate pier of precast assembly and construction method thereof
CN106702909B (en) A kind of double width steel box-girder entirety swivel structure and construction method
CN209652741U (en) Across the rail yard large span overpass of one kind
CN113279324A (en) Semi-prefabricated UHPC-NC combined cover beam connecting structure and assembling method
CN105714681B (en) Implementation method of suspension type monorail traffic rigid frame system
CN107780337B (en) Cast-in-situ balance swivel door-shaped pier and construction method thereof
CN110409318B (en) Assembling and erecting method for large-span simply-supported steel-concrete composite beam
CN207452687U (en) A kind of section assembling balance swivel gate pier
CN207582282U (en) A kind of cast-in-place balance swivel gate pier
CN211141349U (en) Track panel well gantry crane foundation fixing structure
CN103556567B (en) Double four battered leg steel work transom piers
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN203878459U (en) Box type prestressed concrete cap beam structure applied to gate-type pier
CN207904783U (en) Rotary body device in the middle part of the pier shaft of high-altitude
CN105672145A (en) Structure for broadening bridge by additionally arranging steel cap beam on top of pier
CN203834337U (en) Elevated rail traffic station integrated bridge structure
CN107974930A (en) Section assembling balance swivel gate pier and its construction method
WO2021232644A1 (en) Bridge erecting machine
CN213682477U (en) Upper cover structure system applied to track operation line
CN210482000U (en) Limiting device for jacking construction of large-span steel pipe concrete tied arch bridge
CN203782540U (en) Elevated section structure for straddle type monorail transit
CN203295955U (en) Composite bridge for railway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant