CN107974930A - Section assembling balance swivel gate pier and its construction method - Google Patents

Section assembling balance swivel gate pier and its construction method Download PDF

Info

Publication number
CN107974930A
CN107974930A CN201711078532.7A CN201711078532A CN107974930A CN 107974930 A CN107974930 A CN 107974930A CN 201711078532 A CN201711078532 A CN 201711078532A CN 107974930 A CN107974930 A CN 107974930A
Authority
CN
China
Prior art keywords
swivel
pier stud
pier
section
bent cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711078532.7A
Other languages
Chinese (zh)
Other versions
CN107974930B (en
Inventor
刘彦明
吴少海
陈应陶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201711078532.7A priority Critical patent/CN107974930B/en
Publication of CN107974930A publication Critical patent/CN107974930A/en
Application granted granted Critical
Publication of CN107974930B publication Critical patent/CN107974930B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/08Methods or apparatus specially adapted for erecting or assembling bridges by rotational movement of the bridge or bridge sections
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to section assembling to balance swivel gate pier and its construction method, including swivel pier stud and non-swivel pier stud;Rotary ball hinge is provided between swivel pier stud and pier stud basis;Non- swivel pier stud pier top is provided with movable bearing support;Precast Concrete Segmental Bridges bent cap is provided between the pier top of swivel pier stud and non-swivel pier stud, opposite side is provided with the counterweight beam section balanced therewith;Using Rotary ball hinge, swivel implements the balanced structure being made of swivel pier stud, Precast Concrete Segmental Bridges bent cap, counterweight beam section, by being turned along gate pier span line direction to non-swivel pier stud, completes construction.The present invention is since using section assembling balance swivel concrete structure, design and construction are simple and convenient, minimum to span line Influence to operation, and the duration of a project is saved in precast assembly construction, while greatly reduce maintenance work and the difficulty in later stage, more economical rationality again.

Description

Section assembling balance swivel gate pier and its construction method
Technical field
The present invention relates to technical field of bridge engineering, and in particular to a kind of section assembling balance swivel gate pier and its construction Method.
Background technology
In recent years, China's traffic base engineering construction development is swift and violent, the high-speed railway particularly using Line for Passenger Transportation as representative And the development of highway engineering high speed highway is especially prominent, circuit and existing busy trunk lines railway, existing busy trunk lines highway Inevitable multiple crossings on different level, when both angles are smaller, gate pier becomes a kind of selection of economical rationality, it can be big The big span reduced across existing road and bridge, cost saving, its economic benefit clearly, obtain in Practical Project Widely apply.
It is more using support cast-in-place concrete in situ in existing gate pier design(Lid)Beam or steel(Lid)The type of attachment of beam.It is former Position cast-in-place concrete(Lid)Beam needs to set up stent, casting concrete above existing road, its duration is longer and to existing road The operation on road produces considerable influence, its influence is especially prominent for existing busy trunk lines, particularly across existing railway when, its Embodiment is difficult to obtain the accreditation of existing wire management side;To reduce the operation interference to existing road, another door is amplified out Type pier-steel(Lid)Beam scheme, the program is lighter using steel construction, dead weight, and generally using lifting construction, but there are engineering for the program It is of high cost, late maintaining heavy workload, and it is present in existing road(To existing railway in high-voltage contact net)Top checks dimension Repair the shortcomings such as difficulty.
The content of the invention
The object of the present invention is to provide a kind of section assembling to balance swivel gate pier and its construction method, avoids stent in situ Cast-in-place concrete(Lid)Beam or steel(Lid)The deficiency of beam, in the case where reducing to span line operation interference, is saved the duration, drop Low project cost.
The technical solution adopted in the present invention is:
Section assembling balance swivel gate pier, it is characterised in that:
Including swivel pier stud and non-swivel pier stud;
Pier stud bottom is turned as pier stud basis, turns and is provided with Rotary ball hinge between pier stud and pier stud basis;
Non- swivel pier stud bottom is pier stud basis, and non-swivel pier stud pier top is provided with movable bearing support;
Precast Concrete Segmental Bridges bent cap is provided between the pier top of swivel pier stud and non-swivel pier stud.
Swivel pier stud pier top is symmetrical with Precast Concrete Segmental Bridges bent cap and is provided with counterweight beam section, and before swivel, prefabricated subsection is spelled Capping beam and counterweight beam section form balanced structure relative to swivel pier stud.
Precast Concrete Segmental Bridges bent cap is formed by being segmented prefabricated section assembling.
Counterweight beam section is formed by being segmented prefabricated section assembling.
Steel beam hole road is reserved with Precast Concrete Segmental Bridges bent cap and is disposed with steel beam, steel beam includes permanent steel beam and temporary steel Beam.
Steel beam hole road is reserved with counterweight beam section and is disposed with steel beam, steel beam is temporary steel beam.
Non- swivel pier stud top is connected with Precast Concrete Segmental Bridges bent cap end underrun movable bearing support.
The construction method of section assembling balance swivel gate pier, it is characterised in that:
Comprise the following steps:
Step 1:The pier stud basis of swivel pier stud and non-swivel pier stud is performed in existing line arranged on left and right sides;Then non-turn is performed Body pier stud, along gate pier span line direction, Rotary ball hinge is installed between swivel pier stud and pier stud basis;Then construction swivel Pier stud;
Step 2:Each segment of prefabricated counterweight beam section and Precast Concrete Segmental Bridges bent cap at the construction field (site), and reserved steel beam hole road; After maintenance reaches intensity, along gate pier span line direction, Precast Concrete Segmental Bridges lid is symmetrically installed paragraph by paragraph in swivel pier stud both sides Beam and counterweight beam section, the tensioning temporary steel beam in Precast Concrete Segmental Bridges bent cap and counterweight beam section, make Precast Concrete Segmental Bridges bent cap and Counterweight beam section forms balanced structure relative to swivel pier stud;
Step 3:Movable bearing support hole is reserved on non-swivel pier stud top, the interim fixation at Rotary ball hinge is released, utilizes Rotary ball hinge, swivel implements the balanced structure being made of swivel pier stud, Precast Concrete Segmental Bridges bent cap and counterweight beam section, by along gate Pier span line direction is turned to non-swivel pier stud;
Step 4:The permanent steel beam of tensioning in Precast Concrete Segmental Bridges bent cap, removes counterweight beam section and all temporary steel beams paragraph by paragraph, The installation activity bearing at the top of non-swivel pier stud, makes to form connection between Precast Concrete Segmental Bridges bent cap and non-swivel pier stud;
Step 5:Consolidation measure and the prestress hole path pressure grouting of Rotary ball hinge are carried out afterwards, complete section assembling balance swivel door The construction of type pier.
The present invention has the following advantages:
1st, Precast Concrete Segmental Bridges bent cap is installed using along gate pier span line direction, balances rotator construction, greatly save both There is the construction period above road, it is minimum to existing road operation interference effect, due to being constructed using Precast Concrete Segmental Bridges, can more protect Construction quality is demonstrate,proved, while can further save the construction period with pier stud parallel construction;
2nd, cast-in-place concrete stent and the protecting canopy frame above existing road are eliminated, building height can be reduced, is effectively reduced The elevation of circuit;
3 and steel(Lid)Beam is compared, due to using concrete structure, greatly reducing maintenance work and the difficulty in later stage, saving About construction investment is obvious.
The present invention is due to using section assembling balance swivel concrete structure, greatling save work of constructing above existing road Phase, the influence to span line operation interference is minimum, and precast assembly ensures beam section quality, and parallel construction can be saved the duration, effectively The elevation of circuit is reduced, saves construction investment, while greatly reduces maintenance work and the difficulty in later stage again, it is more economical to close Reason.
Brief description of the drawings
Fig. 1 is structure chart of the present invention.
Fig. 2 is the structure chart before swivel.
Fig. 3 is structure chart after swivel dismounting counterweight section.
In figure, 1- pier studs basis, 2- Rotary ball hinges, 3- swivel pier studs, 4- Precast Concrete Segmental Bridges bent caps, 5- counterweight beam sections, The permanent steel beam of the first batch of tensioning of 6-, remaining permanent steel beam of 7-, 8- temporary steel beams, the non-swivel pier studs of 9-, 10- movable bearing supports.
Embodiment
With reference to embodiment, the present invention will be described in detail.
Section assembling balance swivel gate pier of the present invention, including swivel pier stud 3 and non-swivel pier stud 9, difference position In existing line both sides.It is pier stud basis 1 to turn 3 bottom of pier stud, turns and is provided with swivel ball between pier stud 3 and pier stud basis 1 Hinge 2.9 bottom of non-swivel pier stud is pier stud basis 1, and non-swivel 9 pier top of pier stud is provided with movable bearing support 10, and non-swivel pier stud 9 pushes up End is connected with 4 end underrun movable bearing support 10 of Precast Concrete Segmental Bridges bent cap.Turn the pier top of pier stud 3 and non-swivel pier stud 9 Between be provided with Precast Concrete Segmental Bridges bent cap 4.
Swivel 3 pier top of pier stud is symmetrical with Precast Concrete Segmental Bridges bent cap 4 and is provided with counterweight beam section 5, before swivel, prefabricated subsection Assembled bent cap 4 and counterweight beam section 5 form balanced structure relative to swivel pier stud 3.
Precast Concrete Segmental Bridges bent cap 4 is formed by being segmented prefabricated section assembling.Steel is reserved with Precast Concrete Segmental Bridges bent cap 4 Beam hole road is simultaneously disposed with steel beam, and steel beam includes permanent steel beam and temporary steel beam.
Counterweight beam section 5 is also formed by being segmented prefabricated section assembling.Steel beam hole road is reserved with counterweight beam section 5 and is disposed with Steel beam, steel beam are temporary steel beam.
The construction method of above-mentioned section assembling balance swivel gate pier, comprises the following steps:
Step 1:The pier stud basis 1 of swivel pier stud 3 and non-swivel pier stud 9 is performed in existing line arranged on left and right sides;Then perform Non- swivel pier stud 9, along gate pier span line direction, installs Rotary ball hinge 2 between swivel pier stud 3 and pier stud basis 1;Then Construction swivel pier stud 3;
Step 2:Each segment of prefabricated counterweight beam section 5 and Precast Concrete Segmental Bridges bent cap 4 at the construction field (site), and reserved steel beam hole Road;After maintenance reaches intensity, along gate pier span line direction, prefabricated subsection is symmetrically installed paragraph by paragraph in 3 both sides of swivel pier stud and is spelled Capping beam 4 and counterweight beam section 5, tensioning temporary steel beam 8, spells prefabricated subsection in Precast Concrete Segmental Bridges bent cap 4 and counterweight beam section 5 Capping beam 4 and counterweight beam section 5 form balanced structure relative to swivel pier stud 3;
Step 3:10 hole of movable bearing support is reserved on 9 top of non-swivel pier stud, releases the interim fixation at Rotary ball hinge 2, Using Rotary ball hinge 2, swivel implements the balanced structure being made of swivel pier stud 3, Precast Concrete Segmental Bridges bent cap 4 and counterweight beam section 5, By being turned along gate pier span line direction to non-swivel pier stud 9;
Step 4:The permanent steel beam 6 of tensioning in Precast Concrete Segmental Bridges bent cap 4, removes counterweight beam section 5 and all temporary steels paragraph by paragraph Beam 8, in non-swivel 9 top installation activity bearing 10 of pier stud, makes to be formed between Precast Concrete Segmental Bridges bent cap 4 and non-swivel pier stud 9 Connection;
Step 5:Consolidation measure and the prestress hole path pressure grouting of Rotary ball hinge 2 are carried out afterwards, complete section assembling balance swivel door The construction of type pier.
Counterweight beam section 5 can be reused in remaining gate pier, can also be according to construction site situation, using angle bar frame The counterweight mode of counterweight sandbag or water tank is placed, flexible processing forms balanced structure.Due to the part, concrete construction exists Carried out outside existing road gauge, do not influence the operation of existing road.Prefabricated subsection can further be saved with pier stud parallel construction The about duration.
Present disclosure is not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention And any equivalent conversion taken technical solution of the present invention, it is that claim of the invention is covered.

Claims (8)

1. section assembling balance swivel gate pier, it is characterised in that:
Including turning pier stud(3)With non-swivel pier stud(9);
Turn pier stud(3)Bottom is pier stud basis(1), turn pier stud(3)With pier stud basis(1)Between be provided with Rotary ball hinge (2);
Non- swivel pier stud(9)Bottom is pier stud basis(1), non-swivel pier stud(9)Pier top is provided with movable bearing support(10);
Turn pier stud(3)With non-swivel pier stud(9)Pier top between be provided with Precast Concrete Segmental Bridges bent cap(4).
2. section assembling balance swivel gate pier according to claim 1, it is characterised in that:
Turn pier stud(3)Pier top is symmetrical with Precast Concrete Segmental Bridges bent cap(4)It is provided with counterweight beam section(5), before swivel, prefabricated section The assembled bent cap of section(4)With counterweight beam section(5)Relative to swivel pier stud(3)Form balanced structure.
3. section assembling balance swivel gate pier according to claim 1, it is characterised in that:
Precast Concrete Segmental Bridges bent cap(4)It is made of the section assembling for being segmented prefabricated.
4. section assembling balance swivel gate pier according to claim 2, it is characterised in that:
Counterweight beam section(5)It is made of the section assembling for being segmented prefabricated.
5. section assembling balance swivel gate pier according to claim 1, it is characterised in that:
Precast Concrete Segmental Bridges bent cap(4)In be reserved with steel beam hole road and be disposed with steel beam, steel beam includes permanent steel beam and temporary steel Beam.
6. section assembling balance swivel gate pier according to claim 2, it is characterised in that:
Counterweight beam section(5)In be reserved with steel beam hole road and be disposed with steel beam, steel beam is temporary steel beam.
7. section assembling balance swivel gate pier according to claim 1, it is characterised in that:
Non- swivel pier stud(9)Top and Precast Concrete Segmental Bridges bent cap(4)End underrun movable bearing support(10)Connection.
8. the construction method of section assembling balance swivel gate pier, it is characterised in that:
Comprise the following steps:
Step 1:Swivel pier stud is performed in existing line arranged on left and right sides(3)With non-swivel pier stud(9)Pier stud basis(1);Connect And perform non-swivel pier stud(9), along gate pier span line direction, in swivel pier stud(3)With pier stud basis(1)Between installation turn Body flexural pivot(2);Then construction swivel pier stud(3);
Step 2:Prefabricated counterweight beam section at the construction field (site)(5)With Precast Concrete Segmental Bridges bent cap(4)Each segment, and reserved steel Beam hole road;After maintenance reaches intensity, along gate pier span line direction, in swivel pier stud(3)Both sides are symmetrically installed prefabricated paragraph by paragraph Section assembling bent cap(4)With counterweight beam section(5), in Precast Concrete Segmental Bridges bent cap(4)With counterweight beam section(5)Middle tensioning temporary steel beam (8), make Precast Concrete Segmental Bridges bent cap(4)With counterweight beam section(5)Relative to swivel pier stud(3)Form balanced structure;
Step 3:In non-swivel pier stud(9)Reserve movable bearing support in top(10)Hole, releases Rotary ball hinge(2)That locates is interim solid Set down measures, utilize Rotary ball hinge(2), swivel implementation is by swivel pier stud(3), Precast Concrete Segmental Bridges bent cap(4)With counterweight beam section(5) The balanced structure of composition, by being turned along gate pier span line direction to non-swivel pier stud(9)On;
Step 4:In Precast Concrete Segmental Bridges bent cap(4)The middle permanent steel beam of tensioning(6), counterweight beam section is removed paragraph by paragraph(5)With it is all Temporary steel beam(8), in non-swivel pier stud(9)Top installation activity bearing(10), make Precast Concrete Segmental Bridges bent cap(4)With non-swivel Pier stud(9)Between formed connection;
Step 5:Rotary ball hinge is carried out afterwards(2)Consolidation measure and prestress hole path pressure grouting, complete section assembling balance swivel The construction of gate pier.
CN201711078532.7A 2017-11-06 2017-11-06 Segment-assembled balance swivel gate-shaped pier and construction method thereof Active CN107974930B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711078532.7A CN107974930B (en) 2017-11-06 2017-11-06 Segment-assembled balance swivel gate-shaped pier and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711078532.7A CN107974930B (en) 2017-11-06 2017-11-06 Segment-assembled balance swivel gate-shaped pier and construction method thereof

Publications (2)

Publication Number Publication Date
CN107974930A true CN107974930A (en) 2018-05-01
CN107974930B CN107974930B (en) 2023-04-11

Family

ID=62013085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711078532.7A Active CN107974930B (en) 2017-11-06 2017-11-06 Segment-assembled balance swivel gate-shaped pier and construction method thereof

Country Status (1)

Country Link
CN (1) CN107974930B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026542A (en) * 2021-03-22 2021-06-25 中国铁路设计集团有限公司 Frame pier structure with one end fixedly connected and one end movable and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200241295Y1 (en) * 2001-01-11 2001-09-26 한국토지공사 Pier revolution apparatus and T-type pier construction structure using the same
CN102154984A (en) * 2011-01-24 2011-08-17 中国土木工程集团有限公司 Method for constructing overpass gate-type pier spanning over electrified railway
CN103981803A (en) * 2014-05-30 2014-08-13 中铁第一勘察设计院集团有限公司 Prefabricated assembled combination type door-shaped pillar and construction method thereof
CN203878459U (en) * 2014-05-30 2014-10-15 中铁第一勘察设计院集团有限公司 Box type prestressed concrete cap beam structure applied to gate-type pier
CN107100087A (en) * 2017-06-26 2017-08-29 中铁西南科学研究院有限公司 Simply supported beam rotator construction technique
CN207452687U (en) * 2017-11-06 2018-06-05 中铁第一勘察设计院集团有限公司 A kind of section assembling balance swivel gate pier

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200241295Y1 (en) * 2001-01-11 2001-09-26 한국토지공사 Pier revolution apparatus and T-type pier construction structure using the same
CN102154984A (en) * 2011-01-24 2011-08-17 中国土木工程集团有限公司 Method for constructing overpass gate-type pier spanning over electrified railway
CN103981803A (en) * 2014-05-30 2014-08-13 中铁第一勘察设计院集团有限公司 Prefabricated assembled combination type door-shaped pillar and construction method thereof
CN203878459U (en) * 2014-05-30 2014-10-15 中铁第一勘察设计院集团有限公司 Box type prestressed concrete cap beam structure applied to gate-type pier
CN107100087A (en) * 2017-06-26 2017-08-29 中铁西南科学研究院有限公司 Simply supported beam rotator construction technique
CN207452687U (en) * 2017-11-06 2018-06-05 中铁第一勘察设计院集团有限公司 A kind of section assembling balance swivel gate pier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026542A (en) * 2021-03-22 2021-06-25 中国铁路设计集团有限公司 Frame pier structure with one end fixedly connected and one end movable and construction method thereof

Also Published As

Publication number Publication date
CN107974930B (en) 2023-04-11

Similar Documents

Publication Publication Date Title
CN103255726B (en) A kind of construction method of continuous beam arch combination bridge
CN103046476A (en) Railway long-span rotator T-shaped bridge construction method
JP5047680B2 (en) Construction method of continuous viaduct
CN110820594B (en) Symmetrical cantilever construction process suitable for expansion joint bridge pier
CN103981803B (en) The combined gate pier of precast assembly and construction method thereof
CN107237257B (en) A kind of precast assembly guardrail construction connection method
CN106702909B (en) A kind of double width steel box-girder entirety swivel structure and construction method
CN106758871A (en) A kind of full cantilever construction prestressed concrete continuous rigid-framed bridge and its construction method
CN209652741U (en) Across the rail yard large span overpass of one kind
CN107780337B (en) Cast-in-situ balance swivel door-shaped pier and construction method thereof
CN103711082A (en) Construction method for elevated section used for straddle type single-track transportation
CN210657934U (en) Non-prestressed simply-supported-rotating continuous bridge
CN103711071B (en) The overhead segment structure of cross-saddle single-track traffic
CN207452687U (en) A kind of section assembling balance swivel gate pier
CN107974930A (en) Section assembling balance swivel gate pier and its construction method
CN109371852A (en) A kind of high-level bridge construction method across rail yard
CN113373815A (en) Construction method for on-site wet joint of prefabricated bent cap
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN207582282U (en) A kind of cast-in-place balance swivel gate pier
CN103556567B (en) Double four battered leg steel work transom piers
CN105672145A (en) Structure for broadening bridge by additionally arranging steel cap beam on top of pier
CN203603036U (en) Double-row four-inclined-leg steel structure gate-type pier
CN203782540U (en) Elevated section structure for straddle type monorail transit
CN213682477U (en) Upper cover structure system applied to track operation line
WO2022083380A1 (en) Overhead cover structure system applicable in operational railway line and implementation method for system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant