CN203603036U - Double-row four-inclined-leg steel structure gate-type pier - Google Patents
Double-row four-inclined-leg steel structure gate-type pier Download PDFInfo
- Publication number
- CN203603036U CN203603036U CN201320733532.7U CN201320733532U CN203603036U CN 203603036 U CN203603036 U CN 203603036U CN 201320733532 U CN201320733532 U CN 201320733532U CN 203603036 U CN203603036 U CN 203603036U
- Authority
- CN
- China
- Prior art keywords
- pier stud
- pier
- row
- pier column
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Abstract
The utility model belongs to the technical field of bridge pier columns, and particularly relates to a double-row four-inclined-leg steel structure gate-type pier. The double-row four-inclined-leg steel structure gate-type pier comprises a number zero block and a steel cover beam. The two ends of the bottom of the steel cover beam are connected with a left-row pier column and a right-row pier column respectively. The bottom of the left-row pier column and the bottom of the right-row pier column are provided with a left bearing platform and a right bearing platform respectively. The left-row pier column comprises a first left pier column and a second left pier column. The top of the first left pier column and the top of the second left pier column intersect with each other at one end of the bottom of the steel cover beam, the bottom of the first left pier column and the bottom of the second left pier column are connected with the two ends of the left bearing platform respectively. The right-row pier column comprises a first right pier column and a second right pier column. The top of the first right pier column and the top of the second right pier column intersect with each other at the other end of the bottom of the steel cover beam, the bottom of the first right pier column and the bottom of the second right pier column are connected with the two ends of the right bearing platform respectively. According to the double-row four-inclined-leg steel structure gate-type pier, a long-span bright structure can be eliminated, investment is reduced, the construction progress is accelerated, and the interference with an existing road is reduced.
Description
Technical field
The utility model belongs to bridge pier column technical field, is specifically related to a kind of double four battered leg steel work gate-type piers.
Background technology
The bridge pier of existing continuous rigid frame and beam portion material are concrete structure, and mostly are only post bridge pier.While crossing over road interchange in city, partial continuous rigid frame bridge pier adopts concrete gate-type pier, but mostly is medium and small span continuous rigid frame.In the time that continuous rigid frame span increases, because pier load in continuous rigid frame is large, high to deformation requirements, concrete gate-type pier can not meet stressed and deformation requirements.Simultaneously, because No. 0 piece of continuous rigid frame is concrete structure, when construction, need set up falsework, take existing road under bridge, existing road is disturbed greatly, for addressing this problem, existing often according to road interchange need to adopt longspan structure cross over, be arranged in outside road by bridge pier, and the construction space of reserved No. 0 piece, but can increase like this bridge cost and difficulty of construction.
Summary of the invention
The purpose of this utility model is exactly the deficiency existing in order to solve above-mentioned background technology, the double four battered leg steel work gate-type piers that a kind of cost is low, construction speed is fast are provided, when it is applied to complicated Interchange Ramp, can reduce main span bridge span, avoid adopting the interference of long-span bridge girder construction to existing road.
The technical solution adopted in the utility model is: a kind of double four battered leg steel work gate-type piers, comprise that No. 0 piece and one end are horizontally through the steel bent cap at No. 0 piece middle part, two ends, described steel bent cap bottom are connected with respectively a left side hesitate pier stud and right row's pier stud, pier stud and the right row's pier stud bottom of hesitating, a described left side is respectively equipped with left cushion cap and right cushion cap, the described left side pier stud of hesitating comprises the first left pier stud and the second left pier stud, and described the first left pier stud is connected with left cushion cap two ends respectively in one end, steel bent cap bottom, bottom with the second left pier stud roof intersection; Described right row's pier stud comprises the first right pier stud and the second right pier stud, and described the first right pier stud is connected with right cushion cap two ends respectively in the steel bent cap bottom other end, bottom with the second right pier stud roof intersection.
Further, the spacing that hesitate between pier stud and right row's pier stud top in a described left side is less than the spacing of hesitating between pier stud and right row's pier stud bottom in a left side.
Further, between described the first left pier stud and the second left pier stud, between the first right pier stud and the second right pier stud, between the first left pier stud and the first right pier stud, the middle part between the second left pier stud and the second right pier stud is equipped with middle cross beam.
Further, on described left cushion cap and right cushion cap, be equipped with pre-embedded bolt, the described left side pier stud of hesitating is connected with left cushion cap and right cushion cap respectively by pre-embedded bolt with right row's pier stud bottom.
Double four battered leg steel work gate-type piers of the present utility model, ride over institute across on existing ring road when construction, avoided dexterously complicated Interchange Ramp; The bent cap of bridge pier and four pier studs form the stool of similar four leg, stressed clear and definite, have solved pier in existing Long Span Continuous Rigid-Frame Structure and adopt the problem of the stressed and modified difference of concrete gate-type pier; Steel work gate-type pier crossbeam adopts steel-concrete combined structure simultaneously, the double operation platform doing as No. 0 piece of beam portion of steel bent cap base plate, permanent structure and temporary structure are effectively combined, not only guarantee the rigidity of structure, and avoid the cast-in-place essential support of piece No. 0, avoid sealing ring road, in work progress, still can guarantee the unobstructed of ring road under bridge.
To complicated urban Interchange, in the time planning to build circuit and be inclined cross existing road, adopt the utility model can avoid long-span bridge girder construction, reduce investment, accelerating construction progress, reduces the interference to existing road, has wider application prospect in inter-city passenger rail.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is lateral view of the present utility model.
Fig. 3 is the top view of No. 0 piece of the utility model and steel bent cap.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail, is convenient to be well understood to the utility model, but they do not form and limit the utility model.
As Figure 1-3, the utility model comprises that No. 0 piece 1 and one end are horizontally through the steel bent cap 2 at No. 0 piece middle part, described steel bent cap 2 two ends, bottom are connected with respectively a left side hesitate pier stud 3 and right row's pier stud 4, hesitate pier stud 3 and right row's pier stud 4 bottoms, a described left side are respectively equipped with left cushion cap 7 and right cushion cap 8, on left cushion cap 7 and right cushion cap 8, be equipped with pre-embedded bolt 6, the described left side pier stud 3 of hesitating is connected with left cushion cap 7 and right cushion cap 8 respectively by pre-embedded bolt 6 with right row's pier stud 4 bottoms.The spacing of hesitating between pier stud 3 and right row's pier stud 4 tops in a described left side is less than the spacing of hesitating between pier stud 3 and right row's pier stud 4 bottoms in a left side, and hesitate pier stud and right row's pier stud of a left side is relative tilt and arranges.
The described left side pier stud 3 of hesitating comprises the first left pier stud 31 and the second left pier stud 32, and described the first left pier stud 31 is connected with left cushion cap 7 two ends respectively in steel bent cap 2 one end, bottom, bottom with the second left pier stud 32 roof intersection; Described right row's pier stud 4 comprises that the first right pier stud and the second right pier stud are (with the first left pier stud 31 and the second left pier stud 32 positioned opposite, in figure, do not show), described the first right pier stud is connected with right cushion cap 8 two ends respectively in the steel bent cap 2 bottom other ends, bottom with the second right pier stud roof intersection, four pier studs are disperses layout, supporting & stablizing is stressed stronger.Middle part between described the first left pier stud and the second left pier stud, between the first right pier stud and the second right pier stud, between the first left pier stud and the first right pier stud, between the second left pier stud and the second right pier stud is equipped with middle cross beam 5, in order to strengthen pier stud support strength.
Double four battered leg pillar steel work gate-type piers, pier stud is longitudinally herringbone, be laterally battered leg portal-rigid frames, whole bridge pier is as the stool of four legs, and on existing ring road, bent cap is steel work bent cap, pier stud is steel case concrete structure, perfusion C60 slightly expanded concrete in steel case pier column, the steel battered leg pier of pier stud adopts prefabrication, and Site Welding is installed.
The content not being described in detail in this manual belongs to the known prior art of professional and technical personnel in the field.
Claims (4)
1. double four battered leg steel work gate-type piers, comprise that No. 0 piece (1) and one end are horizontally through the steel bent cap (2) at No. 0 piece middle part, two ends, described steel bent cap (2) bottom are connected with respectively a left side hesitate pier stud (3) and right row's pier stud (4), pier stud (3) and right row's pier stud (4) bottom of hesitating, a described left side is respectively equipped with left cushion cap (7) and right cushion cap (8), it is characterized in that: the described left side pier stud (3) of hesitating comprises the first left pier stud (31) and the second left pier stud (32), described the first left pier stud (31) and the second left pier stud (32) roof intersection are in one end, steel bent cap (2) bottom, bottom is connected with left cushion cap (7) two ends respectively, described right row's pier stud (4) comprises the first right pier stud and the second right pier stud, and described the first right pier stud is connected with right cushion cap two ends respectively in the steel bent cap bottom other end, bottom with the second right pier stud roof intersection.
2. double four battered leg steel work gate-type piers according to claim 1, is characterized in that: the spacing of hesitating between pier stud (3) and right row's pier stud (4) top in a described left side is less than the spacing of hesitating between pier stud (3) and right row's pier stud (4) bottom in a left side.
3. double four battered leg steel work gate-type piers according to claim 1, is characterized in that: the middle part between described the first left pier stud and the second left pier stud, between the first right pier stud and the second right pier stud, between the first left pier stud and the first right pier stud, between the second left pier stud and the second right pier stud is equipped with middle cross beam (5).
4. double four battered leg steel work gate-type piers according to claim 1, it is characterized in that: on described left cushion cap (7) and right cushion cap (8), be equipped with pre-embedded bolt (6), pier stud (3) and right row's pier stud (4) bottom of hesitating, a described left side is connected with left cushion cap and right cushion cap respectively by pre-embedded bolt (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320733532.7U CN203603036U (en) | 2013-11-19 | 2013-11-19 | Double-row four-inclined-leg steel structure gate-type pier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320733532.7U CN203603036U (en) | 2013-11-19 | 2013-11-19 | Double-row four-inclined-leg steel structure gate-type pier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203603036U true CN203603036U (en) | 2014-05-21 |
Family
ID=50715718
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320733532.7U Withdrawn - After Issue CN203603036U (en) | 2013-11-19 | 2013-11-19 | Double-row four-inclined-leg steel structure gate-type pier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203603036U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556567A (en) * | 2013-11-19 | 2014-02-05 | 中铁第四勘察设计院集团有限公司 | Double-row four-slanting-leg steel-structure gate-type pier |
CN104863045A (en) * | 2015-05-29 | 2015-08-26 | 重庆大学 | Steel tube confinement reinforced concrete bridge pier system |
CN108867345A (en) * | 2018-09-11 | 2018-11-23 | 中建五局土木工程有限公司 | A kind of Steel Bridge stealth bent cap structure and its construction method for saving Urban Bridge down space |
-
2013
- 2013-11-19 CN CN201320733532.7U patent/CN203603036U/en not_active Withdrawn - After Issue
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103556567A (en) * | 2013-11-19 | 2014-02-05 | 中铁第四勘察设计院集团有限公司 | Double-row four-slanting-leg steel-structure gate-type pier |
CN103556567B (en) * | 2013-11-19 | 2015-09-16 | 中铁第四勘察设计院集团有限公司 | Double four battered leg steel work transom piers |
CN104863045A (en) * | 2015-05-29 | 2015-08-26 | 重庆大学 | Steel tube confinement reinforced concrete bridge pier system |
CN104863045B (en) * | 2015-05-29 | 2017-01-11 | 重庆大学 | Steel tube confinement reinforced concrete bridge pier system |
CN108867345A (en) * | 2018-09-11 | 2018-11-23 | 中建五局土木工程有限公司 | A kind of Steel Bridge stealth bent cap structure and its construction method for saving Urban Bridge down space |
CN108867345B (en) * | 2018-09-11 | 2023-12-29 | 中建五局土木工程有限公司 | Steel bridge invisible bent cap structure capable of saving space under urban bridge and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Qin et al. | Developments and prospects of long-span high-speed railway bridge technologies in China | |
Yan et al. | Recent development of design and construction of short span high-speed railway bridges in China | |
Hu et al. | Recent development of design and construction of medium and long span high-speed railway bridges in China | |
CN106702909B (en) | A kind of double width steel box-girder entirety swivel structure and construction method | |
CN103046476A (en) | Railway long-span rotator T-shaped bridge construction method | |
CN203603036U (en) | Double-row four-inclined-leg steel structure gate-type pier | |
CN105714681B (en) | Implementation method of suspension type monorail traffic rigid frame system | |
CN202347446U (en) | Supporting structure for construction of zero block of reinforced concrete continuous beam | |
CN103556567B (en) | Double four battered leg steel work transom piers | |
Reis et al. | Composite truss bridges: new trends, design and research | |
JP4369506B2 (en) | How to rebuild the pier | |
CN206706545U (en) | The bridge arrangement of highway and rail traffic building jointly | |
CN206956533U (en) | A kind of railway and the horizontal multiple bay frame pier of track traffic | |
CN112359712A (en) | Three-column prestressed concrete gate pier for rail transit and construction method thereof | |
CN206328669U (en) | The narrow composite beam of steel box of new concrete | |
CN105568785B (en) | Implementation method of bottom plate overhanging combined box type track beam rigid frame system | |
CN206376180U (en) | High-speed railway steel concrete assembled pier | |
CN2758321Y (en) | Continuous rigid structure flexible arch combining bridge | |
CN206956534U (en) | A kind of railway and track traffic suspended beam type Frame Pier | |
CN207452687U (en) | A kind of section assembling balance swivel gate pier | |
CN1483896A (en) | Overhead bridge interval structure for track traffic | |
CN209652662U (en) | A kind of magnetic levitation track traffic 3 in Curve Segment building-brick type support rail beam | |
CN203834338U (en) | Integrated road and track bridge | |
CN208415074U (en) | It is constructed on a kind of large span Deck Arch Bridges arch | |
CN208501466U (en) | A kind of mitre minor radius multitower Curved Stayed-cable Bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20140521 Effective date of abandoning: 20150916 |
|
RGAV | Abandon patent right to avoid regrant |