CN1483896A - Overhead bridge interval structure for track traffic - Google Patents

Overhead bridge interval structure for track traffic Download PDF

Info

Publication number
CN1483896A
CN1483896A CNA03141754XA CN03141754A CN1483896A CN 1483896 A CN1483896 A CN 1483896A CN A03141754X A CNA03141754X A CN A03141754XA CN 03141754 A CN03141754 A CN 03141754A CN 1483896 A CN1483896 A CN 1483896A
Authority
CN
China
Prior art keywords
bridge
pier
interval structure
concrete
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA03141754XA
Other languages
Chinese (zh)
Inventor
葛竞辉
丁光国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CNA03141754XA priority Critical patent/CN1483896A/en
Publication of CN1483896A publication Critical patent/CN1483896A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a track transportation viaduct interval structure, and is characterized by that the transverse bridge section of the reinforced concrete pier column is made into the form of H type and Y type, and on the reinforced concrete pier column the precast prestressed concrete double small box beam is mounted. Said invention has the following technical features: its track transportation viaduct interval structure is more reasonable and beautiful, track beam is low in weight and the transverse section of the pier column is made into the form of upper-wide and lower-narrow curve, so that its floor area is small, and it is favorable for layout of pipeline and ground traffic management, etc.

Description

A kind of orbit traffic overhead bridge interval structure
Technical field:
The present invention is the technical field of the related bridge engineering of civil engineering, is specifically related to a kind of interval structure pattern of orbit traffic overhead bridge.
Background technology:
The orbit traffic overhead bridge has the branch of two-wire and single line, at present, the bridge pier of the orbit traffic overhead bridge that China has implemented, in all linearly only post of shape or moulding of twin columns pier shaft of direction across bridge, distance is generally between 25~30m between pier, interval girder pattern has a single box single chamber (being called for short big case beam) or two single box single chambers (being called for short little case beam) prestress box beam, and the whole viaduct structure of composition shows as: the bridge pier moulding is more single, and direction across bridge has only post, twin columns; Girder is made the job practices that all adopts support cast-in-place, and construction period is bigger to the surrounding enviroment influence, and the duration is also longer.
Summary of the invention:
The object of the present invention is to provide the orbit traffic overhead bridge interval structure of a kind of view grace, easy construction.
To achieve these goals, technical scheme of the present invention is: a kind of orbit traffic overhead bridge interval structure, it mainly comprises foundation platform, be cast in the steel bar concrete pier stud on the foundation platform and be arranged on prestress concrete prefabricated case beam on the steel bar concrete pier stud, it is characterized in that: the direction across bridge of steel bar concrete pier stud is H type, Y type, is provided with precast prestressed concrete double small case beam on the steel bar concrete pier stud.
The orbit traffic overhead bridge interval structure that above-mentioned feature of the present invention constitutes has following technical characterstic, one, little case beam of track and direction across bridge are the bridge pier of H type, Y type, and pier stud is the abduction shaped form, and the orbit traffic overhead bridge interval structure that is constituted is more coordinated rationally, novel and beautiful; The rail beam that its two, two single box single chamber prestress concrete Small Precast Box beams are formed, its single little case beam in light weight makes rail beam prefabrication and lifting form of construction work become feasible, thereby accelerated construction progress, and the duration shortens, and has reduced the influence to environment and traffic; Its three, bridge pier pier stud direction across bridge is shaped form wide at the top and narrow at the bottom, its occupation of land is less, is beneficial to the laying and the traffic above-ground tissue of pipeline; Its four, adapt to the railway line spacing and change bridge pier and have firm structure system of one's own and can satisfy the every technical requirements of track traffic fully; Its five, it more can adapt to the development and the variation of orbit traffic overhead bridge, further satisfies view, construction, economic demand, reaches novel unique, the construction purpose of civilization fast.
Description of drawings:
Fig. 1 is orbit traffic overhead bridge interval structure cross section (two-wire) schematic diagram that the present invention forms
Fig. 2 is a lateral view shown in Figure 1
The specific embodiment:
The invention will be further described below in conjunction with drawings and Examples.
The present invention mainly comprises the basis, this basis is made up of steel bar concrete cushion cap 5, stake 6, be cast in the steel bar concrete pier stud on the foundation platform and be arranged on prestress concrete prefabricated case beam on the steel bar concrete pier stud, it is characterized in that: the direction across bridge of steel bar concrete pier stud 1 is H type, Y type, is provided with precast prestressed concrete double small case beam 2 on the steel bar concrete pier stud.The upper pillar stand that the bridge pier direction across bridge is H type, Y type pier stud in the enforcement is the abduction shaped form, and lower pillar stand is vertical shape or abduction shaped form, and its inclination angle is controlled at 〉=70 degree; Precast prestressed concrete double small case beam is that two little case beams of single box single chamber are formed rail beam 3, little case beam is the prefabrication and lifting construction, two little case beams are fused by Cast-in-place concrete, bridge pier pier shaft direction across bridge is shaped form wide at the top and narrow at the bottom, its occupation of land is less, and the laying and the traffic above-ground pseudometaplasia railway line spacing that are beneficial to pipeline change, and are provided with bearing on the pier shaft of bridge pier, rail beam is two single box single chamber prestress concrete Small Precast Box beams, and places bridge pier pier shaft bearing.
Technical characterstic of the present invention reduces:
1. interval structure pattern, bridge pier pier stud direction across bridge is H type, Y type, and the steel bar concrete pier stud is the abduction shaped form.
2. interval structure pattern, rail beam is two single box single chamber prestress concrete Small Precast Box beams, and places on the bridge pier pier shaft bearing 4.
3. rail beam is the prestress concrete prefabricated units, and striding the footpath scope of application is 20~35m.
4. the basis is made up of steel bar concrete cushion cap, stake, and pile foundation has reinforcing bar concrete square pile, PHC pile tube, bored pile.
The orbit traffic overhead bridge interval structure pattern of present embodiment is made up of shaped form H type steel bar concrete pier stud 1 and basis, prestress concrete pre-track beam 3 and bearing 4.
It is bridge pier control primary structure member that the pier shaft upper pillar stand is the abduction shaped form, and the angle of its inclination directly influences or control the force-bearing situation of bridge pier, is considering to take into account its facade moulding in stressed (controlling its tensile stress).Its inclination angle promptly is controlled at the angle of level 〉=70 degree.
Job practices of the present invention is fast convenient, and in the pier stud construction, it is prefabricated to carry out the prestress concrete rail beam, after the pier stud concrete reaches intensity, carry out rail beam and start shipment lifting, behind the hoisted in position, finally finish cast-in-place section concrete of rail beam and build, constitute whole rail traffic viaduct interval structure.

Claims (5)

1, a kind of orbit traffic overhead bridge interval structure, it mainly comprises foundation platform, be cast in the steel bar concrete pier stud on the foundation platform and be arranged on prestress concrete prefabricated case beam on the steel bar concrete pier stud, it is characterized in that: the direction across bridge of steel bar concrete pier stud is H type, Y type, is provided with precast prestressed concrete double small case beam on the steel bar concrete pier stud.
2, by the described orbit traffic overhead bridge of claim 1 interval structure, it is characterized in that: the upper pillar stand that the bridge pier direction across bridge is H type, Y type pier stud is the abduction shaped form, and lower pillar stand is vertical shape or abduction shaped form, and its inclination angle is controlled at 〉=70 degree.
3, by the described orbit traffic overhead bridge of claim 1 interval structure, it is characterized in that: precast prestressed concrete double small case beam is that two little case beams of single box single chamber are formed rail beam, and little case beam is the prefabrication and lifting construction, and two little case beams are fused by Cast-in-place concrete.
4. by the described orbit traffic overhead bridge of claim 1 interval structure, it is characterized in that: bridge pier pier shaft direction across bridge is shaped form wide at the top and narrow at the bottom.
5. by the described orbit traffic overhead bridge of claim 1 interval structure, it is characterized in that: be provided with bearing on the pier shaft of bridge pier, rail beam is two single box single chamber prestress concrete Small Precast Box beams, and places bridge pier pier shaft bearing.
CNA03141754XA 2003-07-22 2003-07-22 Overhead bridge interval structure for track traffic Pending CN1483896A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA03141754XA CN1483896A (en) 2003-07-22 2003-07-22 Overhead bridge interval structure for track traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA03141754XA CN1483896A (en) 2003-07-22 2003-07-22 Overhead bridge interval structure for track traffic

Publications (1)

Publication Number Publication Date
CN1483896A true CN1483896A (en) 2004-03-24

Family

ID=34155436

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA03141754XA Pending CN1483896A (en) 2003-07-22 2003-07-22 Overhead bridge interval structure for track traffic

Country Status (1)

Country Link
CN (1) CN1483896A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605709A (en) * 2012-03-12 2012-07-25 北京市市政工程设计研究总院 Structure of simply support and continuous bridge with pier similar to inverted triangle
CN103015329A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 I-section steel girder reinforcement small box girder structure
CN103669201A (en) * 2013-12-29 2014-03-26 长安大学 Y-shaped pier used for steel pipe concrete truss girder
CN104988951B (en) * 2015-07-08 2017-01-04 中铁工程设计咨询集团有限公司 Straddle monorail underground section track wall construction and construction method thereof
CN108221509A (en) * 2018-02-09 2018-06-29 北京交通大学 A kind of cross-saddle single-track traffic pre-track beam of ribbed plate
CN108678438A (en) * 2018-07-12 2018-10-19 中铁四院集团西南勘察设计有限公司 Overhead station
CN109680601A (en) * 2019-01-30 2019-04-26 河南省交通规划设计研究院股份有限公司 A kind of landscape bridge and its construction method applied to city slow-vehicle system
CN110306424A (en) * 2018-03-20 2019-10-08 比亚迪股份有限公司 It is used to support support column of track girder and preparation method thereof, the track with it

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605709A (en) * 2012-03-12 2012-07-25 北京市市政工程设计研究总院 Structure of simply support and continuous bridge with pier similar to inverted triangle
CN102605709B (en) * 2012-03-12 2015-03-18 北京市市政工程设计研究总院有限公司 Structure of simply support and continuous bridge with pier similar to inverted triangle
CN103015329A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 I-section steel girder reinforcement small box girder structure
CN103669201A (en) * 2013-12-29 2014-03-26 长安大学 Y-shaped pier used for steel pipe concrete truss girder
CN103669201B (en) * 2013-12-29 2015-06-10 长安大学 Y-shaped pier used for steel pipe concrete truss girder
CN104988951B (en) * 2015-07-08 2017-01-04 中铁工程设计咨询集团有限公司 Straddle monorail underground section track wall construction and construction method thereof
CN108221509A (en) * 2018-02-09 2018-06-29 北京交通大学 A kind of cross-saddle single-track traffic pre-track beam of ribbed plate
CN110306424A (en) * 2018-03-20 2019-10-08 比亚迪股份有限公司 It is used to support support column of track girder and preparation method thereof, the track with it
CN108678438A (en) * 2018-07-12 2018-10-19 中铁四院集团西南勘察设计有限公司 Overhead station
CN109680601A (en) * 2019-01-30 2019-04-26 河南省交通规划设计研究院股份有限公司 A kind of landscape bridge and its construction method applied to city slow-vehicle system

Similar Documents

Publication Publication Date Title
CN101215819B (en) Separated double-layer bridge-floor cable stayed bridge
CN201077951Y (en) Track traffic overhead viaduct interval structure
CN2878478Y (en) Fabricated grooved beam for rear extending pre-stress segment pre-formation
CN113279324A (en) Semi-prefabricated UHPC-NC combined cover beam connecting structure and assembling method
CN101074553A (en) Medium-spanning steel-pipe concrete truss bridge
CN106012872B (en) Continuous rigid frame bridge without dorsal funciculus oblique pull reinforcement system and construction method
CN111502347A (en) Three-layer single-column assembled elevated station for rail transit
EA037464B1 (en) Composite bridge deck and method of construction of composite bridge deck (embodiments)
JP2008115645A (en) Grade separated crossing structure and construction method of grade separated crossing structure
CN200974956Y (en) Prestressed concrete box girder
CN1635224A (en) Bridge structure and construction method therefor
CN1483896A (en) Overhead bridge interval structure for track traffic
CN107905084B (en) RPC steel truss combined bridge deck and continuous beam bridge
CN100427683C (en) Wide pier with canopy beam
CN201786045U (en) House structure with combined steel beam and pretensioning method prestress laminated beam
CN111502348A (en) Three-layer double-column assembly type elevated station for rail transit
CN112878171A (en) Large-span steel structure arch bridge and construction method
CN202989755U (en) Integral-casting and fabricated prestressing force bridge structure
KR102202263B1 (en) Precast Concrete Pedestrian Bridge And Construciton Method Thereof
CN111877812B (en) Elevated single-column station
CN111963203B (en) Elevated single-column station in high-intensity area and construction method thereof
CN112012095A (en) Beam slab in-situ prefabricating and mounting system and construction method thereof
CN217266879U (en) Gate-type pier viaduct
CN219690281U (en) Large-span combined structure landscape bridge
CN212836935U (en) Three-layer double-column assembly type elevated station for rail transit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication