CN102936968A - Inner steel frame reinforced structure of pseudo-classic architecture and construction method thereof - Google Patents

Inner steel frame reinforced structure of pseudo-classic architecture and construction method thereof Download PDF

Info

Publication number
CN102936968A
CN102936968A CN201210468611XA CN201210468611A CN102936968A CN 102936968 A CN102936968 A CN 102936968A CN 201210468611X A CN201210468611X A CN 201210468611XA CN 201210468611 A CN201210468611 A CN 201210468611A CN 102936968 A CN102936968 A CN 102936968A
Authority
CN
China
Prior art keywords
steel
column
roof
new
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210468611XA
Other languages
Chinese (zh)
Other versions
CN102936968B (en
Inventor
董有
鞠树森
谢建明
甄进平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YADU CONSTRUCTION GROUP Co.,Ltd.
Original Assignee
BEIJING ZHUFU CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHUFU CONSTRUCTION ENGINEERING Co Ltd filed Critical BEIJING ZHUFU CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201210468611.XA priority Critical patent/CN102936968B/en
Publication of CN102936968A publication Critical patent/CN102936968A/en
Application granted granted Critical
Publication of CN102936968B publication Critical patent/CN102936968B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides an inner steel frame reinforced structure of pseudo-classic architecture and a construction method thereof. The steel frame reinforced structure comprises novel edge steel columns, novel angle steel columns, novel edge steel beams, novel horizontal steel beams and roof steel inner ring beams, the novel edge steel columns are attached to the inner walls of original walls and arranged oppositely to the novel edge steel columns of wall bodies correspondingly, the novel angle steel columns are arranged at corners of the original walls and attached to the inner walls of the original walls, the roof steel inner ring beams are arranged on the top surfaces of the novel edge steel columns and the novel angle steel columns and butt against a roof to form a novel supporting steel frame of the roof, the novel edge steel beams are arranged between two adjacent novel edge steel columns or between the novel edge steel columns and the novel angle steel columns and attached to the original walls, and the novel edge steel beams are connecting with the original walls in drawing mode through bolts. A novel inner steel structure device replaces the wall bodies to bear all vertical load of the original architecture. The inner steel frame reinforced structure of the pseudo-classic architecture improves anti-seismic property of the pseudo-classic architecture, does not influence internal space and external sensory effect, and can be widely applied to anti-seismic and reinforcing reconstruction of the pseudo-classic architecture.

Description

Steelframe ruggedized construction and job practices thereof in building in the style of the ancients
Technical field
The present invention relates to a kind of old building ruggedized construction and job practices thereof of structural engineering, particularly a kind of ruggedized construction of building in the style of the ancients and job practices thereof.
Background technology
Qin brick and Han tile, the building types of the unique distinct Chinese characteristics such as carved beams and painted rafter, make Chinese ancient architecture occupy unique historical role and realistic meaning on the international building history, therefore, have the building in the style of the ancients (or local-style dwelling houses) that shows national characters in China, building in the style of the ancients is in the majority mainly with the post and panel structure form greatly, and along with improving constantly of social production and living standard, the seismic hardening of building in the style of the ancients in city (or local-style dwelling houses) has become the weak link of urban renewal engineering.Building in the style of the ancients (or local-style dwelling houses) exists the potential safety hazards such as structural seismic is low, structure bad connection, globality is poor, according to related data, show, post and panel structure is when earthquake, strenuous vibration due to earthquake, below making, blockwork is askew splits or the distortion that is distorted, or the displacement of recurring structure side direction horizontal is excessive, in the time can not bearing upper load, total will be collapsed.At present, the Shockproof reinforcing method commonly used to post and panel structure mainly contains: the ring beam and construction column reinforcing pull rod, the steel concrete board wall, exterior wall pastes steel, the reinforcement measures such as outer wall pasting carbon fiber, above-mentioned reinforcement measure can reach consolidation effect preferably for common building, if these building in the style of the ancientss of monofilament carry out seismic hardening according to traditional reinforcement means, will destroy the outer facade of existing building, because building in the style of the ancients is all often the emphasis of going sightseeing in a city, affect the whole visual effect of building in the style of the ancients, will cause economy and the social image loss that can't estimate to city.Therefore; existing seismic hardening technology requires stricter historical protective building to satisfy the demand for elevation of building; this just needs to find a kind of new reinforcement means, makes these building in the style of the ancientss can play the effect of seismic hardening, can accomplish again to protect the effect of the outer facade of original building.
Summary of the invention
In order to overcome the problems referred to above, the present invention proposes steelframe ruggedized construction and job practices thereof in a kind of building in the style of the ancients, solved the technical problem of existing building in the style of the ancients poor seismic behavior, also solve existing reinforcement means and form of structure, while applying in building in the style of the ancients, the inside sensory effects outside the damage building in the style of the ancients, weaken the problems such as its sight.
To achieve these goals, the present invention has taked following technical scheme:
Steelframe ruggedized construction in a kind of building in the style of the ancients, comprise new edged steel column, newly add the column of angles, new edged girder steel, newly add horizontal girder steel and roof steel inner ring beam, described new edged steel column is close to former inner wall setting and the corresponding setting of new edged steel column of body of wall relatively, describedly newly add the bight that the column of angles is arranged on former wall, and be adjacent to former inner wall, described roof steel inner ring beam is arranged on the end face of new edged steel column and the Xin Jia column of angles, and hold out against and form the supporting steel frame that roof is new with roof, described new edged girder steel is arranged between adjacent two new edged steel columns or new edged steel column and newly add between the column of angles, and be close to former wall, simultaneously by bolt and former wall drawknot, described newly adding between the new edged steel column that horizontal girder steel is arranged on the correspondence between relative body of wall.
Describedly newly add horizontal girder steel middle position and be equipped with Xin Jia center steel column, describedly newly add the side that horizontal girder steel is connected to Xin Jia center steel column, simultaneously, between the steel column of described Xin Jia center, be provided with and newly add vertical girder steel.
Described new edged steel column, newly to add the column of angles, new edged girder steel, newly add horizontal girder steel, roof steel inner ring beam, newly add vertical girder steel He Xinjia center steel column be i iron, channel-section steel, H shaped steel or above-mentioned any combination.
Described new edged girder steel is with together with the horizontal girder steel of Xin Jia is at least.
Be lined with billet between the nut of described bolt and former wall.
The job practices of steelframe ruggedized construction in described building in the style of the ancients, it is characterized in that: step is as follows:
Step 1, according to design drawing, install the position well in advance steel-column foundation of new edged steel column ,Xin Jia center steel column and the Xin Jia column of angles at the first floor of original building;
Step 2, install the position correspondence of new edged steel column ,Xin Jia center steel column and the Xin Jia column of angles and open installing hole at the every floor plate of original building;
Step 3, bottom, roof at original building arranges roof steel inner ring beam, confirm that the position of roof steel inner ring beam can all contain and bear the whole load on roof, roof steel inner ring beam is close to roof simultaneously simultaneously, and carries out the interior collar tie beam of roof steel system and pre-fix;
Step 4, according to design drawing, be close to the former inner wall installation first floor new edged steel column ,Xin Jia center steel column and the Xin Jia column of angles, and all steel columns bottom is being connected with steel-column foundation, all steel columns top is being passed in to the installing hole that the every floor plate of original building is offered in advance;
Step 5, according to design drawing, new edged steel column ,Xin Jia center steel column successively is installed, newly adds the column of angles and new edged girder steel is set on demand between each layer of steel column, newly add the vertical girder steel of horizontal girder steel and Xin Jia, on described new edged girder steel, interval is welded with screw rod, and described screw rod runs through former wall and exposes former wall;
Step 6, by using metal wedge key jam-pack between the column cap of the new edged steel column ,Xin Jia center steel column of top layer and the Xin Jia column of angles and roof steel inner ring beam, all drop on new bearing wall and frame structure system roof load;
Step 7, be fixedly connected with the column cap of the new edged steel column ,Xin Jia center steel column of top layer and the Xin Jia column of angles with roof steel inner ring beam, so far, former wall no longer bears the vertical load on roof, is only the peripheral structure of new structural system;
Step 8, exposing on the screw rod of former wall nutting by the former wall of each layer and, what the former wall of each layer and nut 10 carried out is fastenedly connected.So just make former wall 7 and new edged girder steel drawknot be integrated, between described nut and former wall, be lined with billet.
In described step 5, the former wall thickness of the Length Ratio of screw rod is 20cm greatly at least.
The present invention and traditional ruggedized construction and method have following beneficial effect:
The present invention by interiorly establishing new edged steel column ,Xin Jia center steel column, newly add the column of angles, newly add horizontal girder steel and roof steel inner ring beam forms new structure-bearing system---steel structure device, can bear the whole vertical loads of existing building.Using the body of wall of an existing building peripheral structure as new architecture.The change of this form of structure, by original body of wall load-bearing, be converted into all interior steelframe load-bearing preferably of globality and bearing capacity, both reduced the requirement to age original structure body of wall for a long time, do not affect inside usage space and the outside sensory effects of building in the style of the ancients simultaneously.
Load system after the present invention transforms; steel frame construction in adopting; because steel work has ductility, plasticity and toughness preferably; intensity is high; anti-seismic performance is good, and makes the advantages such as simple, that the construction period is short, with the stylish interior steel frame construction added and former wall, by bolt, tightly links together; make building in the style of the ancients can play the effect of seismic hardening, can accomplish again to protect the effect of the outer facade of original building.It is little that this technology is implemented difficulty, can be effectively cost-saving, can not produce destruction to the original building exterior wall simultaneously, and there is significant economic benefit and social benefit.
The accompanying drawing explanation
Fig. 1 is ruggedized construction floor map of the present invention.
The A-A sectional view that Fig. 2 is Fig. 1.
Fig. 3 is Yuan Qiang and new edged girder steel drawknot detail drawing.
The a that Fig. 4 is Fig. 3 is to view.
In figure, 1: new edged steel column; 2: newly add horizontal girder steel; 3: Xin Jia center steel column; 4: new edged girder steel; 5: newly add the column of angles; 6: newly add vertical girder steel; 7: former wall; 8: roof; 9: screw rod; 10: nut; 11: billet; 12: roof steel inner ring beam.
The specific embodiment
As Figure 1-4, steelframe ruggedized construction in a kind of building in the style of the ancients, comprise new edged steel column 1, newly add the column of angles 5, new edged girder steel 4, newly add horizontal girder steel 2 and roof steel inner ring beam 12, described new edged steel column 1 is close to former wall 7 inwall settings and the corresponding setting of new edged steel column 1 of body of wall relatively, describedly newly add the bight that the column of angles 5 is arranged on former wall 7, and be adjacent to former wall 7 inwalls, described roof steel inner ring beam 12 is arranged on the end face of new edged steel column 1 and the Xin Jia column of angles 5, and hold out against and form the supporting steel frame that roof 8 is new with roof 8, described new edged girder steel 4 is arranged between adjacent two new edged steel columns 1 or new edged steel column 1 and newly adding between the column of angles 5, and be close to former wall 7, simultaneously by bolt and former wall 7 drawknots, described newly adding between the new edged steel column 1 that horizontal girder steel 2 is arranged on the correspondence between relative body of wall.
Describedly newly add horizontal girder steel 2 middle positions and be equipped with Xin Jia center steel column 3, describedly newly add the side that horizontal girder steel 2 is connected to Xin Jia center steel column 3, simultaneously, between described Xin Jia center steel column 3, be provided with and newly add vertical girder steel 6.
Described new edged steel column 1, newly to add the column of angles 5, new edged girder steel 4, newly add horizontal girder steel 2, roof steel inner ring beam 12, newly add vertical girder steel 6 He Xinjia center steel columns 3 be i iron, channel-section steel, H shaped steel or above-mentioned any combination.
Described new edged girder steel 4 is with together with the horizontal girder steel 2 of Xin Jia is at least.
Be lined with billet 11 between the nut 10 of described bolt and former wall 7.
The job practices of steelframe ruggedized construction in described building in the style of the ancients, step is as follows:
Step 1, according to design drawing, install the position well in advance steel-column foundation of new edged steel column 1 ,Xin Jia center steel column 3 and the Xin Jia column of angles 5 at the first floor of original building;
Step 2, install the position correspondence of new edged steel column 1 ,Xin Jia center steel column 3 and the Xin Jia column of angles 5 and open installing hole at the every floor plate of original building;
Step 3, in 8 bottoms, roof of original building, roof steel inner ring beam 12 is set, confirm that the position of roof steel inner ring beam 12 can all contain and bear the whole load on roof 8, roof steel inner ring beam 12 is close to roof 8 simultaneously simultaneously, and carries out collar tie beam 12 in roof steel system and pre-fix;
Step 4, according to design drawing, be close to new edged steel column 1 ,Xin Jia center steel column 3 and the Xin Jia column of angles 5 of the former wall 7 inwalls installation first floor, and all steel columns bottom is being connected with steel-column foundation, all steel columns top is being passed in to the installing hole that the every floor plate of original building is offered in advance;
Step 5, according to design drawing, new edged steel column 1 ,Xin Jia center steel column 3 successively is installed, newly adds the column of angles 5 and new edged girder steel 4 is set on demand between each layer of steel column, newly add the vertical girder steel 6 of horizontal girder steel 2 and Xin Jia, on described new edged girder steel 4, interval is welded with screw rod 9, and described screw rod 9 runs through former wall 7 and exposes former wall 7; Former wall 7 thickness of the Length Ratio of screw rod 9 are 20cm greatly at least.
Step 6, by using metal wedge key jam-pack between the column cap of the new edged steel column of top layer 1 ,Xin Jia center steel column 3 and the Xin Jia column of angles 5 and roof steel inner ring beam 12, all drop on new bearing wall and frame structure system roof load;
Step 7, be fixedly connected with the column cap of the new edged steel column of top layer 1 ,Xin Jia center steel column 3 and the Xin Jia column of angles 5 with roof steel inner ring beam 12, so far, former wall 7 no longer bears the vertical load on roof 8, is only the peripheral structure of new structural system;
Step 8, on the screw rod 9 that exposes former wall 7, nutting 10 is by former wall 7 Hes of each layer, and what former wall 7 and the nut 10 of each layer carried out is fastenedly connected.So just make former wall 7 and new edged girder steel 4 drawknots be integrated, between described nut 10 and former wall 7, be lined with billet 11.
Be more than an exemplary embodiments of the present invention, enforcement of the present invention is not limited to this.

Claims (7)

1. steelframe ruggedized construction in a building in the style of the ancients, it is characterized in that: comprise new edged steel column (1), newly add the column of angles (5), new edged girder steel (4), newly add horizontal girder steel (2) and roof steel inner ring beam (12), described new edged steel column (1) is close to former wall (7) inwall setting and the corresponding setting of new edged steel column (1) of body of wall relatively, describedly newly add the bight that the column of angles (5) is arranged on former wall (7), and be adjacent to former wall (7) inwall, described roof steel inner ring beam (12) is arranged on new edged steel column (1) and newly adds the end face of the column of angles (5), and hold out against and form the supporting steel frame that roof (8) is new with roof (8), described new edged girder steel (4) is arranged between adjacent two new edged steel columns (1) or new edged steel column (1) and newly adding between the column of angles (5), and be close to former wall (7), simultaneously by bolt and Yuan Qiang (7) drawknot, described newly adding between the new edged steel column (1) that horizontal girder steel (2) is arranged on the correspondence between relative body of wall.
2. steelframe ruggedized construction in building in the style of the ancients according to claim 1, it is characterized in that: described horizontal girder steel (2) middle position that newly adds is equipped with Xin Jia center steel column (3), describedly newly add the side that horizontal girder steel (2) is connected to Xin Jia center steel column (3), simultaneously, be provided with between described Xin Jia center steel column (3) and newly add vertical girder steel (6).
3. steelframe ruggedized construction in building in the style of the ancients according to claim 2 is characterized in that: described new edged steel column (1), newly add the column of angles (5), new edged girder steel (4), newly add horizontal girder steel (2), roof steel inner ring beam (12), newly add vertical girder steel (6) He Xinjia center steel column (3) for i iron, channel-section steel, H shaped steel or above-mentioned any combination.
4. steelframe ruggedized construction in building in the style of the ancients according to claim 1 is characterized in that: described new edged girder steel (4) and newly add horizontal girder steel (2) and be at least one.
5. steelframe ruggedized construction in building in the style of the ancients according to claim 1, is characterized in that: between the nut of described bolt (10) and former wall (7), be lined with billet (11).
6. according to the job practices of steelframe ruggedized construction in the described building in the style of the ancients of claim 1 to 5 any one, it is characterized in that: step is as follows:
Step 1, according to design drawing, install new edged steel column (1) ,Xin Jia center steel column (3) and newly add the position well in advance steel-column foundation of the column of angles (5) at the first floor of original building;
Step 2, the position correspondence of at the every floor plate of original building, new edged steel column (1) ,Xin Jia center steel column (3) being installed and newly adding the column of angles (5) is opened installing hole;
Step 3, bottom, roof (8) at original building arranges roof steel inner ring beam (12), the whole load of roof (8) can all be contained and bear in the position of simultaneously confirming roof steel inner ring beam (12), simultaneously roof steel inner ring beam (12) is close to roof (8), and carries out collar tie beam (12) in roof steel system and pre-fix;
Step 4, according to design drawing, be close to former wall (7) the inwall installation new edged steel column of the first floor (1) ,Xin Jia center steel column (3) and newly adding the column of angles (5), and all steel columns bottom is connected with steel-column foundation, all steel columns top is passed in to the installing hole that the every floor plate of original building is offered in advance;
Step 5, according to design drawing, new edged steel column (1) ,Xin Jia center steel column (3) successively is installed, newly adds the column of angles (5) and new edged girder steel (4) is set on demand between each layer of steel column, newly add horizontal girder steel (2) and newly add vertical girder steel (6), the upper interval of described new edged girder steel (4) is welded with screw rod (9), and described screw rod (9) runs through Yuan Qiang (7) and exposes former wall (7);
Step 6, by new edged steel column (1) the ,Xin Jia center steel column (3) of top layer and newly add the column cap of the column of angles (5) and roof steel inner ring beam (12) between with metal wedge key jam-pack, roof load is all dropped on new bearing wall and frame structure system;
Step 7, new edged steel column (1) the ,Xin Jia center steel column (3) of top layer is fixedly connected with roof steel inner ring beam (12) with the column cap that newly adds the column of angles (5), so far, former wall (7) no longer bears the vertical load of roof (8), is only the peripheral structure of new structural system;
Step 8, at the upper nutting (10) of the screw rod that exposes former wall (7) (9) by the former wall (7) of each layer and, the former wall (7) of each layer and being fastenedly connected that nut 10 carries out, so just make former wall 7 and new edged girder steel (4) drawknot be integrated, be lined with billet (11) between described nut (10) He Yuanqiang (7).
7. the job practices of steelframe ruggedized construction in building in the style of the ancients according to claim 6, it is characterized in that: in described step 5, the former wall of Length Ratio (7) thickness of screw rod (9) is 20cm greatly at least.
CN201210468611.XA 2012-11-15 2012-11-15 Construction method of inner steel frame reinforced structure of pseudo-classic architecture Active CN102936968B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210468611.XA CN102936968B (en) 2012-11-15 2012-11-15 Construction method of inner steel frame reinforced structure of pseudo-classic architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210468611.XA CN102936968B (en) 2012-11-15 2012-11-15 Construction method of inner steel frame reinforced structure of pseudo-classic architecture

Publications (2)

Publication Number Publication Date
CN102936968A true CN102936968A (en) 2013-02-20
CN102936968B CN102936968B (en) 2015-06-03

Family

ID=47695887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210468611.XA Active CN102936968B (en) 2012-11-15 2012-11-15 Construction method of inner steel frame reinforced structure of pseudo-classic architecture

Country Status (1)

Country Link
CN (1) CN102936968B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526952A (en) * 2013-10-12 2014-01-22 北京筑福国际工程技术有限责任公司 Adjustable sliding block inclined beam steel frame canopy guard structure for bricked residence and construction method thereof
CN103993751A (en) * 2014-05-20 2014-08-20 东南大学 Wall reinforcing structure and method for improving integrality of historic buildings
CN104895346A (en) * 2015-06-30 2015-09-09 郑州大学 Reinforcing system for preventing local soil mass collapse of vault of earth-sheltered dwelling and construction process thereof
CN105926975A (en) * 2016-06-28 2016-09-07 辽宁工程技术大学 Earthquake resistant reinforcing device for grotto upright column rock mass cultural relic
CN106592995A (en) * 2016-11-01 2017-04-26 中国建筑第八工程局有限公司 Installation method for tension cantilever steel-structure stress system
CN107460972A (en) * 2017-09-15 2017-12-12 江苏省建筑科学研究院有限公司 A kind of assembled steel support frame Strengthened Masonry Walls load bearing wall and reinforced construction method
CN112081248A (en) * 2020-08-03 2020-12-15 上海建工一建集团有限公司 Roof integral lifting system and roof integral lifting method
CN112081251A (en) * 2020-08-03 2020-12-15 上海建工一建集团有限公司 Integral house jacking system and integral house jacking method
CN112081250A (en) * 2020-08-03 2020-12-15 上海建工一建集团有限公司 House integral lifting system and house integral lifting method
CN112081249A (en) * 2020-08-03 2020-12-15 上海建工一建集团有限公司 Roof integral jacking system and roof integral jacking method
CN112696042A (en) * 2020-12-11 2021-04-23 华南理工大学 Repairing method for Hakka soil building structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05141118A (en) * 1991-11-21 1993-06-08 Mitsubishi Steel Mfg Co Ltd Earthquake-proof structure of steel frame system prefabricated house
JPH09242183A (en) * 1996-03-11 1997-09-16 Tomoe Corp Earthquake-resistant frame structure
JPH09302952A (en) * 1996-05-10 1997-11-25 Shimizu Corp Earthquake-resistant reinforcing method and earthquake-resistant reinforcing structure of existing building
JP2815331B2 (en) * 1995-11-13 1998-10-27 株式会社山菱 Reinforcement structure of wooden building
US20030009964A1 (en) * 2001-06-21 2003-01-16 Shear Force Wall Systems Inc. Prefabricated shearwall having improved structural characteristics
CN101798877A (en) * 2009-03-09 2010-08-11 吕西林 Novel earthquake-proof skeleton system of masonry structure
CN202945820U (en) * 2012-11-15 2013-05-22 北京筑福国际工程技术有限责任公司 Inner steel frame reinforced structure of pseudo-classic architecture

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05141118A (en) * 1991-11-21 1993-06-08 Mitsubishi Steel Mfg Co Ltd Earthquake-proof structure of steel frame system prefabricated house
JP2815331B2 (en) * 1995-11-13 1998-10-27 株式会社山菱 Reinforcement structure of wooden building
JPH09242183A (en) * 1996-03-11 1997-09-16 Tomoe Corp Earthquake-resistant frame structure
JPH09302952A (en) * 1996-05-10 1997-11-25 Shimizu Corp Earthquake-resistant reinforcing method and earthquake-resistant reinforcing structure of existing building
US20030009964A1 (en) * 2001-06-21 2003-01-16 Shear Force Wall Systems Inc. Prefabricated shearwall having improved structural characteristics
CN101798877A (en) * 2009-03-09 2010-08-11 吕西林 Novel earthquake-proof skeleton system of masonry structure
CN202945820U (en) * 2012-11-15 2013-05-22 北京筑福国际工程技术有限责任公司 Inner steel frame reinforced structure of pseudo-classic architecture

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
敬登虎等: "民国老礼堂加固设计方案", 《建筑技术》 *
王东等: "钢结构支撑在某框架结构厂房抗震加固设计中的应用", 《建筑设计》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526952A (en) * 2013-10-12 2014-01-22 北京筑福国际工程技术有限责任公司 Adjustable sliding block inclined beam steel frame canopy guard structure for bricked residence and construction method thereof
CN103526952B (en) * 2013-10-12 2015-09-09 北京筑福国际工程技术有限责任公司 Masonry residence adjustable slipper block cant beam steelframe protects roof construction and construction method thereof
CN103993751A (en) * 2014-05-20 2014-08-20 东南大学 Wall reinforcing structure and method for improving integrality of historic buildings
CN103993751B (en) * 2014-05-20 2016-01-13 东南大学 A kind of wall reinforcement structure and method strengthening ancient building globality
CN104895346A (en) * 2015-06-30 2015-09-09 郑州大学 Reinforcing system for preventing local soil mass collapse of vault of earth-sheltered dwelling and construction process thereof
CN105926975B (en) * 2016-06-28 2017-12-19 辽宁工程技术大学 A kind of anti-vibration reinforced device of rock cave column rock historical relic
CN105926975A (en) * 2016-06-28 2016-09-07 辽宁工程技术大学 Earthquake resistant reinforcing device for grotto upright column rock mass cultural relic
CN106592995A (en) * 2016-11-01 2017-04-26 中国建筑第八工程局有限公司 Installation method for tension cantilever steel-structure stress system
CN106592995B (en) * 2016-11-01 2018-10-26 中国建筑第八工程局有限公司 Open the installation method of overarm steel construction stress system
CN107460972A (en) * 2017-09-15 2017-12-12 江苏省建筑科学研究院有限公司 A kind of assembled steel support frame Strengthened Masonry Walls load bearing wall and reinforced construction method
CN112081248A (en) * 2020-08-03 2020-12-15 上海建工一建集团有限公司 Roof integral lifting system and roof integral lifting method
CN112081251A (en) * 2020-08-03 2020-12-15 上海建工一建集团有限公司 Integral house jacking system and integral house jacking method
CN112081250A (en) * 2020-08-03 2020-12-15 上海建工一建集团有限公司 House integral lifting system and house integral lifting method
CN112081249A (en) * 2020-08-03 2020-12-15 上海建工一建集团有限公司 Roof integral jacking system and roof integral jacking method
CN112081251B (en) * 2020-08-03 2021-12-03 上海建工一建集团有限公司 Integral house jacking system and integral house jacking method
CN112696042A (en) * 2020-12-11 2021-04-23 华南理工大学 Repairing method for Hakka soil building structure

Also Published As

Publication number Publication date
CN102936968B (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN102936968B (en) Construction method of inner steel frame reinforced structure of pseudo-classic architecture
CN203049832U (en) Assembling type shear wall structure
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN205444446U (en) Assembled industrialization steel construction house
CN202945820U (en) Inner steel frame reinforced structure of pseudo-classic architecture
CN107217747A (en) A kind of novel fabricated connector for building
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN203213591U (en) Beam-free turbinate column cap structure template system
CN207499427U (en) Assembly integrated precast superimposed sheet support system
CN105133731B (en) A kind of assembled steel performance
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN208415293U (en) Integral prefabricated assembled main transformer foundation for indoor substation
CN201756799U (en) Large mold plate for rollover construction of hollow thin-wall high piers
CN104141317A (en) Basement tower crane foundation construction method and structure adopting reverse construction method
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN204098487U (en) Gear-like curved wall pilaster template
CN207211869U (en) A kind of basic digging-free assembled tower-type space garage
CN203701386U (en) Steel-structure floor slab group
CN204000562U (en) The compound rigid frame bridge of a kind of vertical prestressing steel-concrete
CN207121922U (en) A kind of foundation structure in digging-free assembled stereoscopic garage
CN208088494U (en) A kind of assembled architecture component
CN207582282U (en) A kind of cast-in-place balance swivel gate pier
CN207761168U (en) A kind of combination flat tube column
CN205101038U (en) Be applied to wall structure in ground capable district of rail
CN203684477U (en) Floor main body frame for steel structure building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building

Applicant after: Beijing Aeido International Engineering Technology Co., Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building

Applicant before: Beijing Zhufu Construction Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: BEIJING AEIDO CONSTRUCTION ENGINEERING CO., LTD. TO: BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Du Lihong

Inventor before: Dong You

Inventor before: Ju Shusen

Inventor before: Xie Jianming

Inventor before: Zhen Jinping

CB03 Change of inventor or designer information
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171030

Address after: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee after: Beijing Yong Bo Science and Technology Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building

Patentee before: Beijing Aeido International Engineering Technology Co., Ltd.

TR01 Transfer of patent right

Effective date of registration: 20171227

Address after: 401220 Chongqing City longevity zone, saddle saddle Green square 1 unit 2-4

Patentee after: Li Wenkang

Address before: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee before: Beijing Yong Bo Science and Technology Ltd.

TR01 Transfer of patent right
CP02 Change in the address of a patent holder

Address after: 210024 1 Xikang Road, Gulou District, Nanjing, Jiangsu

Patentee after: Li Wenkang

Address before: 401220 1 unit 2-4, riding saddle Green square, Changshou District, Chongqing

Patentee before: Li Wenkang

CP02 Change in the address of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190529

Address after: 202172 Room 1260, No. 495 Yuejin South Road, Xinhai Town, Chongming District, Shanghai (Guangming Rice Industry Economic Park)

Patentee after: Advocating Creation (Shanghai) Consulting Management Firm

Address before: 210024 1 Xikang Road, Gulou District, Nanjing, Jiangsu

Patentee before: Li Wenkang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210104

Address after: No. 68, Zhenxing Road, Tudian Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee after: YADU CONSTRUCTION GROUP Co.,Ltd.

Address before: Room 1260, building 5, No. 495, Yuejin South Road, Xinhai Town, Chongming District, Shanghai 202172

Patentee before: Advocating Creation (Shanghai) Consulting Management Firm

TR01 Transfer of patent right