CN207553599U - Build concrete pours pipeline preformed hole mold - Google Patents
Build concrete pours pipeline preformed hole mold Download PDFInfo
- Publication number
- CN207553599U CN207553599U CN201721536573.1U CN201721536573U CN207553599U CN 207553599 U CN207553599 U CN 207553599U CN 201721536573 U CN201721536573 U CN 201721536573U CN 207553599 U CN207553599 U CN 207553599U
- Authority
- CN
- China
- Prior art keywords
- fixed link
- nosing
- cover board
- sleeve pipe
- described sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
A kind of build concrete pours pipeline preformed hole mold, the mold includes the casing (1) of bell shape, the fixed link (2) being arranged at described sleeve pipe (1) axis, the cover board (6) of described sleeve pipe (1) oral area is arranged on, locating ring (3) is set respectively at the cover board (6) and at the bottom plate of described sleeve pipe (1) on the fixed link (2).Above-mentioned casing is in bell shape, is easier to remove mold after mixed mud pours.Casing is provided with bottom plate, can effectively prevent the entrance of mud and avoid the trouble that ordinary casing pipe domestic demand has filler material to fill.
Description
Technical field
Mould applications are poured the utility model is related to build concrete more particularly to when a kind of build concrete pours
Pipeline preformed hole mold.
Background technology
Conventional concrete pours pipeline preformed hole mostly using drilling through or embedding pipe fittings, exists:Reservation member is not easy to remove,
And reaming-iron flash is needed in subsequent installation pipeline, and casing domestic demand fill material prevents mud from entering, more take and
Labor intensive, limit is irregular, and increases the possibility of displacement, and former recycling property of reservation member difference causes the technologies such as waste of material to lack
It falls into.
Invention content
The purpose of this utility model is to provide a kind of build concrete and pours pipeline preformed hole mold, to solve existing skill
At least one of above-mentioned technological deficiency existing for art.
In order to achieve the above object, the technical solution adopted in the utility model is as follows:
A kind of build concrete pours pipeline preformed hole mold, and the mold includes the casing (1) of bell shape, if
The fixed link (2) at described sleeve pipe (1) axis is put, is arranged on the cover board (6) of described sleeve pipe (1) oral area, the fixed link (2)
On at the cover board (6) and/or at the bottom plate of described sleeve pipe (1) set locating ring (3).
Preferably, one end of the fixed link (2) it is tapered and in tapered portion set thread tapping tooth, the fixed link it is another
One end setting laterally screws handle (21).
Preferably, the inner wall of the openend of described sleeve pipe (1) sets inside nosing (11), and the cover board (6) is set to
On the nosing (11), cushion rubber (5) is set between the cover board (6) and the nosing (11).
Preferably, sleeve is formed at the bottom plate center of described sleeve pipe (1), the fixed link (2) is arranged in the sleeve
In.
Preferably, the locating ring (3) is welded with the fixed link (2).
Preferably, one end of the fixed link (2) it is tapered and in tapered portion set thread tapping tooth, the fixed link it is another
One end setting laterally screws handle (21);The inner wall of the openend of described sleeve pipe (1) sets inside nosing (11), the cover board
(6) it is set in the nosing (11), cushion rubber (5) is set between the cover board (6) and the nosing (11).
Preferably, one end of the fixed link (2) it is tapered and in tapered portion set thread tapping tooth, the fixed link it is another
One end setting laterally screws handle (21);The inner wall of the openend of described sleeve pipe (1) sets inside nosing (11), the cover board
(6) it is set in the nosing (11), cushion rubber (5) is set between the cover board (6) and the nosing (11);Described sleeve pipe (1)
Bottom plate center at form sleeve, the fixed link (2) is arranged in the sleeve.
Preferably, one end of the fixed link (2) it is tapered and in tapered portion set thread tapping tooth, the fixed link it is another
One end setting laterally screws handle (21);The locating ring (3) is welded with the fixed link (2);The openend of described sleeve pipe (1)
Inner wall inside nosing (11) is set, the cover board (6) is set in the nosing (11), the cover board (6) and described is dashed forward
Setting cushion rubber (5) between along (11);Sleeve is formed at the bottom plate center of described sleeve pipe (1), the fixed link (2) is arranged in institute
It states in sleeve.
Preferably, the inner wall of the openend of described sleeve pipe (1) sets inside nosing (11), and the cover board (6) is set to
On the nosing (11), cushion rubber (5) is set between the cover board (6) and the nosing (11);The bottom plate center of described sleeve pipe (1)
Place forms sleeve, and the fixed link (2) is arranged in the sleeve.
Preferably, the inner wall of the openend of described sleeve pipe (1) sets inside nosing (11), and the cover board (6) is set to
On the nosing (11), cushion rubber (5) is set between the cover board (6) and the nosing (11);The bottom plate center of described sleeve pipe (1)
Place forms sleeve, and the fixed link (2) is arranged in the sleeve;The locating ring (3) is welded with the fixed link (2).
Compared with prior art, the utility model at least has the advantages that:
Due to the casing using bell shape, it is easier to remove mold after mixed mud pours.Using with bottom plate
Casing, the entrance of mud can be effectively prevent and avoid ordinary casing pipe domestic demand have filler material fill trouble.In fixation
Bar is provided with locating ring, can effectively avoid being subjected to displacement.
Since fixed link one end is set as taper and setting thread tapping tooth, mold can be fixed by the thread tapping tooth
In on formwork for placing, can accomplishing fast accurate positioning and not have the generation of deviation or displacement.
Upper cover edge sets cushion rubber, more effectively mud can be avoided to enter.
Description of the drawings
Fig. 1 is the structure diagram that some embodiment build concretes pour pipeline preformed hole mold;
Fig. 2 is its sectional view;
Fig. 3 removes the structure diagram after decannulation for it.
Specific embodiment
The utility model is described further with reference to the accompanying drawings and examples.
Referring to figs. 1 to Fig. 3, some embodiment build concretes pour pipeline preformed hole mold and include:Bell shape
Casing 1, the fixed link 2 being arranged at 1 axis of described sleeve pipe is arranged on the cover board 6 of 1 oral area of described sleeve pipe, the fixed link 2
On locating ring 3 is set respectively at the cover board 6 and at the bottom plate of described sleeve pipe 1.
Further, one end of the fixed link 2 is tapered and in tapered portion setting thread tapping tooth (with reference to Fig. 2), described solid
The other end setting of fixed pole laterally screws handle 21.It designs whereby, mold can be fixed on by the thread tapping tooth and pour mould
Plate can accomplish fast accurate positioning and not have the generation of deviation or displacement.
Further, the inner wall of the openend of described sleeve pipe 1 sets inside nosing 11, and the cover board 6 is set to described prominent
Along along 11, water stop gel ring 5 is set between the cover board 6 and the nosing 11.It designs whereby, can more efficiently avoid mud
Into.
Further, sleeve is formed at the bottom plate center of described sleeve pipe 1, the fixed link 2 is arranged in the sleeve.It borrows
This design, more reliably can be supported and position to casing 1.Further it is also provided between locating ring 3 and sleeve
Water stop gel ring.
The locating ring 3 is welded with the fixed link 2, and the screw-in that can control fixed link 2 by locating ring 3 will pour
The length of template.
The utility model is described in detail above by specific embodiment, these detailed description are only limited to
The content of the utility model is helped skilled in the art to understand, the limit to scope of protection of the utility model can not be interpreted as
System.Those skilled in the art should all wrap the various retouchings of said program progress, equivalent transformation etc. under the utility model design
Containing within the protection scope of the present utility model.
Claims (10)
1. a kind of build concrete pours pipeline preformed hole mold, it is characterised in that:The mold includes bell shape
Casing (1), the fixed link (2) being arranged at described sleeve pipe (1) axis are arranged on the cover board (6) of described sleeve pipe (1) oral area, institute
It states and locating ring (3) is set in fixed link (2) at the cover board (6) and/or at the bottom plate of described sleeve pipe (1).
2. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:The fixed link
(2) one end is tapered and sets thread tapping tooth in tapered portion, and the other end setting of the fixed link laterally screws handle (21).
3. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:Described sleeve pipe
(1) inner wall of openend sets inside nosing (11), and the cover board (6) is set in the nosing (11), the cover board
(6) cushion rubber (5) is set between the nosing (11).
4. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:Described sleeve pipe
(1) sleeve is formed at bottom plate center, the fixed link (2) is arranged in the sleeve.
5. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:The locating ring
(3) it is welded with the fixed link (2).
6. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:The fixed link
(2) one end is tapered and sets thread tapping tooth in tapered portion, and the other end setting of the fixed link laterally screws handle (21);
The inner wall of the openend of described sleeve pipe (1) sets inside nosing (11), and the cover board (6) is set in the nosing (11),
Cushion rubber (5) is set between the cover board (6) and the nosing (11).
7. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:The fixed link
(2) one end is tapered and sets thread tapping tooth in tapered portion, and the other end setting of the fixed link laterally screws handle (21);
The inner wall of the openend of described sleeve pipe (1) sets inside nosing (11), and the cover board (6) is set in the nosing (11),
Cushion rubber (5) is set between the cover board (6) and the nosing (11);Sleeve is formed at the bottom plate center of described sleeve pipe (1), institute
Fixed link (2) is stated to be arranged in the sleeve.
8. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:The fixed link
(2) one end is tapered and sets thread tapping tooth in tapered portion, and the other end setting of the fixed link laterally screws handle (21);
The locating ring (3) is welded with the fixed link (2);The inner wall of the openend of described sleeve pipe (1) sets inside nosing (11),
The cover board (6) is set in the nosing (11), and cushion rubber (5) is set between the cover board (6) and the nosing (11);It is described
Sleeve is formed at the bottom plate center of casing (1), the fixed link (2) is arranged in the sleeve.
9. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:Described sleeve pipe
(1) inner wall of openend sets inside nosing (11), and the cover board (6) is set in the nosing (11), the cover board
(6) cushion rubber (5) is set between the nosing (11);Sleeve, the fixed link are formed at the bottom plate center of described sleeve pipe (1)
(2) it is arranged in the sleeve.
10. build concrete according to claim 1 pours pipeline preformed hole mold, it is characterised in that:Described sleeve pipe
(1) inner wall of openend sets inside nosing (11), and the cover board (6) is set in the nosing (11), the cover board
(6) cushion rubber (5) is set between the nosing (11);Sleeve, the fixed link are formed at the bottom plate center of described sleeve pipe (1)
(2) it is arranged in the sleeve;The locating ring (3) is welded with the fixed link (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721536573.1U CN207553599U (en) | 2017-11-17 | 2017-11-17 | Build concrete pours pipeline preformed hole mold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721536573.1U CN207553599U (en) | 2017-11-17 | 2017-11-17 | Build concrete pours pipeline preformed hole mold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207553599U true CN207553599U (en) | 2018-06-29 |
Family
ID=62680401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721536573.1U Expired - Fee Related CN207553599U (en) | 2017-11-17 | 2017-11-17 | Build concrete pours pipeline preformed hole mold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207553599U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057327A (en) * | 2018-08-24 | 2018-12-21 | 山西省工业设备安装集团有限公司 | A kind of toilet pipe preformed hole sleeve die and construction method |
CN109262825A (en) * | 2018-11-09 | 2019-01-25 | 上海宝冶集团有限公司 | A method of making built-in electrical spool preformed hole |
CN110847059A (en) * | 2019-12-16 | 2020-02-28 | 中铁五局集团第六工程有限责任公司 | Cover plate tool for pouring of T-shaped beam water drainage hole and using method thereof |
-
2017
- 2017-11-17 CN CN201721536573.1U patent/CN207553599U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057327A (en) * | 2018-08-24 | 2018-12-21 | 山西省工业设备安装集团有限公司 | A kind of toilet pipe preformed hole sleeve die and construction method |
CN109262825A (en) * | 2018-11-09 | 2019-01-25 | 上海宝冶集团有限公司 | A method of making built-in electrical spool preformed hole |
CN110847059A (en) * | 2019-12-16 | 2020-02-28 | 中铁五局集团第六工程有限责任公司 | Cover plate tool for pouring of T-shaped beam water drainage hole and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207553599U (en) | Build concrete pours pipeline preformed hole mold | |
CN204112604U (en) | The slip casting rebar connector of band cone tail | |
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN202391019U (en) | End part thickened grouting connector of steel bar | |
JP6168361B2 (en) | Mass concrete part placement method | |
CN103590541A (en) | Grout sleeve for connecting prefabricated member steel bars and construction method of grout sleeve | |
CN108612224A (en) | Exposed inversion reinforcing bar grout sleeve concrete shear force wall and construction method | |
CN107571389A (en) | A kind of wallboard hanging piece device detachably reused | |
CN206267521U (en) | Precast concrete installs node with cast-in-place structural mortar leakage prevention | |
CN207714628U (en) | A kind of branch sleeve, prefabricated components and its connection structure without independent grout outlet | |
CN104911999A (en) | Construction method for deeply burying anchor | |
CN107762053A (en) | Prefabricated basement pipeline module and preparation method thereof | |
CN103835421B (en) | Leakage-proof floor and anti-seepage construction method | |
CN205637571U (en) | Do not have outside secret building wall who is detained pipe and pour template | |
CN109629821A (en) | The support construction of concrete overhanging component top scaffold outlet steel pipe | |
CN209876194U (en) | Drain pipe pre-embedding device | |
CN209211649U (en) | A kind of pre-buried anchor ear casing | |
CN207526109U (en) | Hole device is blocked up around through the erect riser of floor | |
CN209294573U (en) | A kind of water sealing structure of self-stabilization type building standpipe antiseepage leak-stopping | |
CN208396309U (en) | A kind of concrete component formwork opposite-pulling device and concrete component template component | |
CN205276697U (en) | Integral connection grout cover tubular construction | |
CN106545168A (en) | Infilled wall tie bar connection construction method | |
CN101122174A (en) | Architecture pipeline preformed hole production method | |
CN206233381U (en) | A kind of structure roof discharge jacket pipe reserved opening blocks system | |
CN201358582Y (en) | Shear wall template internal stay used for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180629 Termination date: 20181117 |