CN207553137U - 缓倾角岩层大跨度地下厂房顶拱锚固结构 - Google Patents
缓倾角岩层大跨度地下厂房顶拱锚固结构 Download PDFInfo
- Publication number
- CN207553137U CN207553137U CN201721389106.0U CN201721389106U CN207553137U CN 207553137 U CN207553137 U CN 207553137U CN 201721389106 U CN201721389106 U CN 201721389106U CN 207553137 U CN207553137 U CN 207553137U
- Authority
- CN
- China
- Prior art keywords
- crown
- power house
- underground power
- anchor
- caverns
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型涉及一种缓倾角岩层大跨度地下厂房顶拱锚固结构。本实用新型的目的是提供一种缓倾角岩层大跨度地下厂房顶拱锚固结构,以减小缓倾结构面对顶拱的不利影响,提高地下厂房顶拱拱圈成型,保证地下厂房顶拱的承载能力。本实用新型的技术方案是:一种缓倾角岩层大跨度地下厂房顶拱锚固结构,地下厂房顶拱部位分成位于中间的顶拱中导洞和位于中导洞两侧的顶拱扩挖部位进行开挖,地下厂房上方布置两条厂顶锚固洞,两条厂顶锚固洞均沿着地下厂房纵轴线布置且分布于地下厂房顶拱上下游侧;厂顶锚固洞内向下对应顶拱中导洞设置有系统锚索Ⅰ,厂顶锚固洞内向下对应同侧的顶拱扩挖部位设置有系统锚索Ⅱ。本实用新型适用于水电、水利等地下空间工程。
Description
技术领域
本实用新型涉及一种缓倾角岩层大跨度地下厂房顶拱锚固结构。适用于水电、水利等地下空间工程。
背景技术
西部水电开发受地形、地貌等条件限制,水电站厂房多采用地下结构型式。近年来随着水电站装机容量的不断增加,受水轮发电机设备尺寸影响,地下厂房跨度也不断增加。而地下厂房顶拱是最先被开挖揭露的,同时顶拱作为主要承载结构,将上部岩体的荷载通过拱圈传至两侧拱脚岩体,因此地下厂房顶拱是否安全可靠直接影响水电站的建设工期,甚至影响整个电站的发电效益。
现有技术对地下厂房顶拱锚固的施工方法是:掌子面开挖后先初喷混凝土,再挂网喷混凝土,最后施工系统锚索及锚索。当地下厂房顶拱跨度较大时,从掌子面岩体开挖揭露至顶拱系统支护完成历时较长,地下厂房所处岩层为缓倾角时,这个缺点就会放大,导致顶拱岩体受地应力调整及结构面影响不断地松弛、开裂、掉块,影响顶拱的开挖成型,继而影响整个顶拱的承载结构,危及厂房安全。
发明内容
本实用新型要解决的技术问题是:针对上述存在的问题,提供一种缓倾角岩层大跨度地下厂房顶拱锚固结构,以减小缓倾结构面对顶拱的不利影响,提高地下厂房顶拱拱圈成型,保证地下厂房顶拱的承载能力。
本实用新型所采用的技术方案是:一种缓倾角岩层大跨度地下厂房顶拱锚固结构,地下厂房顶拱部位分成位于中间的顶拱中导洞和位于中导洞两侧的顶拱扩挖部位进行开挖,其特征在于:所述地下厂房上方布置两条厂顶锚固洞,两条厂顶锚固洞均沿着地下厂房纵轴线布置且分布于地下厂房顶拱上下游侧;所述厂顶锚固洞内向下对应顶拱中导洞设置有系统锚索Ⅰ,厂顶锚固洞内向下对应同侧的顶拱扩挖部位设置有系统锚索Ⅱ。
两条厂顶锚固洞间净距为所述地下厂房跨度的一半。
所述厂顶锚固洞底板距离地下厂房顶拱30m。
所述厂顶锚固洞宽4m,高4.5m,洞型为城门洞型。
所述厂顶锚固洞利用原有施工支洞施工而成。
本实用新型的有益效果是:本实用新型利用原有施工支洞预先施工两条厂顶锚固洞,提前施工锚索孔,减少地下厂房顶拱锚索施工时间,提早形成锚固力,提高厂房顶拱承载能力,保证地下厂房的围岩稳定及安全,使缓倾岩层条件下修建大跨度地下厂房成为可行性方案。
附图说明
图1为实施例的剖面图。
图2为实施例的俯视图。
图3为实施例中厂顶锚固洞的断面图。
具体实施方式
如图1、图2所示,本实施例为一种缓倾角岩层大跨度地下厂房顶拱锚固结构,在地下厂房1上方利用原有施工支洞8施工两条厂顶锚固洞3,两条厂顶锚固洞3均沿着地下厂房纵轴线布置,且两厂顶锚固洞3分布于地下厂房顶拱上下游侧。两条厂顶锚固洞3间净距为地下厂房跨度的一半,厂顶锚固洞3底板距离地下厂房顶拱30m。为确保锚索设备进入及方便锚索孔施工,厂顶锚固洞3宽4m,高4.5m,洞型为城门洞型。
地下厂房顶拱部位分区进行开挖,分成位于中间的顶拱中导洞4和位于中导洞两侧的顶拱扩挖部位6。地下厂房1上方的厂顶锚固洞3内向下对应顶拱中导洞设置有系统锚索Ⅰ5,厂顶锚固洞3内向下对应同侧的顶拱扩挖部位设置有系统锚索Ⅱ7。
本实施例的具体施工步骤如下:
1、在地下厂房1开挖前利用已开挖的排水廊道施工支洞8,沿着地下厂房纵轴线、在地下厂房顶拱上下游侧提前施工两条厂顶锚固洞3;
2、在厂顶锚固洞3内按照设计提供的锚索孔位及孔向预先施工锚索孔;
3、地下厂房1的顶拱中导洞4开挖时,通过厂顶锚固洞3紧跟掌子面及时施工中导洞顶拱范围两排系统锚索Ⅰ5,中导洞开挖完成,中导洞顶拱范围的系统锚索Ⅰ6也随之施工完成,形成最初锚固力;
4、厂房中顶拱导洞开挖完成,随两侧顶拱扩挖部位6的开挖及时通过厂顶锚固洞3施工顶拱扩挖部位范围两排系统锚索Ⅱ7,尽早提供顶拱锚固力,确保顶拱成型效果。
系统锚索Ⅰ5及系统锚索Ⅱ7施工完成后,厂顶锚固洞3可以兼做排水廊道。
当然,上述说明并非对本实用新型的限制,本实用新型也并不限于上述举例,本技术领域的普通技术人员,在本实用新型的范围内,做出的变化、添加或替换,都应属于本实用新型的保护范围。
Claims (5)
1.一种缓倾角岩层大跨度地下厂房顶拱锚固结构,地下厂房(1)顶拱部位分成位于中间的顶拱中导洞(4)和位于中导洞两侧的顶拱扩挖部位(6)进行开挖,其特征在于:所述地下厂房(1)上方布置两条厂顶锚固洞(3),两条厂顶锚固洞(3)均沿着地下厂房(1)纵轴线布置且分布于地下厂房顶拱上下游侧;所述厂顶锚固洞(3)内向下对应顶拱中导洞(4)设置有系统锚索Ⅰ(5),厂顶锚固洞(3)内向下对应同侧的顶拱扩挖部位设置有系统锚索Ⅱ(7)。
2.根据权利要求1所述的缓倾角岩层大跨度地下厂房顶拱锚固结构,其特征在于:两条厂顶锚固洞(3)间净距为所述地下厂房(1)跨度的一半。
3.根据权利要求2所述的缓倾角岩层大跨度地下厂房顶拱锚固结构,其特征在于:所述厂顶锚固洞(3)底板距离地下厂房顶拱30m。
4.根据权利要求1所述的缓倾角岩层大跨度地下厂房顶拱锚固结构,其特征在于:所述厂顶锚固洞(3)宽4m,高4.5m,洞型为城门洞型。
5.根据权利要求1所述的缓倾角岩层大跨度地下厂房顶拱锚固结构,其特征在于:所述厂顶锚固洞(3)利用原有施工支洞(8)施工而成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721389106.0U CN207553137U (zh) | 2017-10-25 | 2017-10-25 | 缓倾角岩层大跨度地下厂房顶拱锚固结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721389106.0U CN207553137U (zh) | 2017-10-25 | 2017-10-25 | 缓倾角岩层大跨度地下厂房顶拱锚固结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207553137U true CN207553137U (zh) | 2018-06-29 |
Family
ID=62673918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721389106.0U Active CN207553137U (zh) | 2017-10-25 | 2017-10-25 | 缓倾角岩层大跨度地下厂房顶拱锚固结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207553137U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111412002A (zh) * | 2020-04-21 | 2020-07-14 | 中铁二院工程集团有限责任公司 | 一种锚索对拉型支护结构体系及施工方法 |
CN114320340A (zh) * | 2021-12-28 | 2022-04-12 | 中铁第六勘察设计院集团有限公司 | 基于超前导洞及对拉锚索的大跨无柱地下隧洞结构及方法 |
-
2017
- 2017-10-25 CN CN201721389106.0U patent/CN207553137U/zh active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111412002A (zh) * | 2020-04-21 | 2020-07-14 | 中铁二院工程集团有限责任公司 | 一种锚索对拉型支护结构体系及施工方法 |
CN111412002B (zh) * | 2020-04-21 | 2024-08-20 | 中铁二院工程集团有限责任公司 | 一种锚索对拉型支护结构体系的施工方法 |
CN114320340A (zh) * | 2021-12-28 | 2022-04-12 | 中铁第六勘察设计院集团有限公司 | 基于超前导洞及对拉锚索的大跨无柱地下隧洞结构及方法 |
CN114320340B (zh) * | 2021-12-28 | 2023-09-12 | 中铁第六勘察设计院集团有限公司 | 基于超前导洞及对拉锚索的大跨无柱地下隧洞结构及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101775988B (zh) | 软弱围岩斜井转正洞的施工方法 | |
CN104863597B (zh) | 一种浅埋暗挖大型地下空间的施工方法‑横向洞盖法 | |
US20170138194A1 (en) | Method for removing hydraulic support for solid filling coal mining | |
CN105201001A (zh) | 一种岩溶地区大型溶洞的复合防渗结构及其施工方法 | |
CN207553137U (zh) | 缓倾角岩层大跨度地下厂房顶拱锚固结构 | |
CN106639346A (zh) | 一种利用斜撑托换结构的既有建筑向下增层施工方法 | |
CN103775095A (zh) | 山岭软基隧道超前双导洞及其施工方法 | |
CN104074534A (zh) | 一种综采/综放工作面的沿空留巷方法 | |
CN106930768B (zh) | 隧洞施工方法及应用 | |
CN104631469B (zh) | 用于深大基坑的无柱钢筋混凝土支撑构架及其搭建方法 | |
CN205062827U (zh) | 一种岩溶地区大型溶洞的复合防渗结构 | |
CN105865281A (zh) | 一种紧邻电站、升压站横向明挖控制爆破施工方法 | |
CN104047607B (zh) | 盾构机围护结构条件下吊出工法 | |
CN202731927U (zh) | 隧道施工装置 | |
CN210239677U (zh) | 一种控制地铁盾构隧道变形的结构体系 | |
CN104632246B (zh) | 一种大跨度地下结构 | |
CN204825919U (zh) | 支护基坑围檩抗剪结构 | |
CN202108030U (zh) | 一种窑洞式拱坝坝肩槽结构 | |
CN203716985U (zh) | 一种山岭软基隧道超前双导洞 | |
CN104100290A (zh) | 一种煤层掘进巷道贯通中瓦斯防治工艺 | |
CN210737552U (zh) | 同一基坑不同施工阶段的施工结构 | |
CN210152658U (zh) | 一种结构相互独立多舱并列综合管廊隧道 | |
CN209670973U (zh) | 一种轨道交通与综合管廊合建结构 | |
CN107060845B (zh) | 地下空间结构建造施工方法及应用 | |
CN208501694U (zh) | 一种针对紧邻型基坑的预制式构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |