CN105865281A - 一种紧邻电站、升压站横向明挖控制爆破施工方法 - Google Patents
一种紧邻电站、升压站横向明挖控制爆破施工方法 Download PDFInfo
- Publication number
- CN105865281A CN105865281A CN201610272155.XA CN201610272155A CN105865281A CN 105865281 A CN105865281 A CN 105865281A CN 201610272155 A CN201610272155 A CN 201610272155A CN 105865281 A CN105865281 A CN 105865281A
- Authority
- CN
- China
- Prior art keywords
- district
- blasting
- power station
- open cut
- excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D5/00—Safety arrangements
- F42D5/04—Rendering explosive charges harmless, e.g. destroying ammunition; Rendering detonation of explosive charges harmless
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Earth Drilling (AREA)
Abstract
本发明公开了一种紧邻电站、升压站横向明挖控制爆破施工方法,包括如下步骤:在明挖渠道与电站、升压站相邻侧安装型钢防护排架;临基坑侧排架上铺设拦截爆破飞石的竹笆;将明挖渠道沿着明挖渠道与电站、升压站的远端边至近端边横向分区,每区竖向分层;开挖时,自远端区至近端区横向开挖,自上至下竖向开挖;开挖过程中采用小直径浅孔控制爆破方法;每区第1层开挖时在地表采取覆盖措施,第1层爆破之前使用竹笆覆盖爆破区域,并使用钢丝绳将竹笆串联起来。本发明安全可靠,施工期间电站和升压站正常运行,不会因施工造成停止发电;技术路线明确,投入的防护设施简单,成本低廉,经济效益明显。
Description
技术领域:
本发明涉及爆破施工技术领域,尤其涉及一种紧邻电站、升压站横向明挖控制爆破施工方法。
背景技术:
许多水电站由于受到当初建设时的技术和经济条件制约,存在防洪等能力不足问题。随着时代发展,需要对原有水电站提高防洪标准,常常需要增建泄洪隧洞,一般情况下,泄洪隧洞位于水电站左岸或右岸,泄洪隧洞出口与电站厂房、升压站相邻,距离较近,这给隧洞出口明渠段开挖带来较大困难。该处明挖施工常采取以下措施,且有不足之处:
1)、采取停止发电措施,这样比较稳妥,但损失了发电效益。
2)、隧洞出口明渠段常采取沿明渠轴线方向纵向开挖措施,该方法难以控制爆破产生的飞石方向,对现有设施的影响较大。
发明内容:
为了弥补现有技术问题,本发明的目的是提供一种紧邻电站、升压站横向明挖控制爆破施工方法,施工期间电站和升压站正常运行,不会因施工造成停止发电;技术路线明确,投入的防护设施简单,成本低廉,经济效益明显。
本发明的技术方案如下:
紧邻电站、升压站横向明挖控制爆破施工方法,其特征在于,包括如下步骤:
(1)、预先采取防护措施:在明挖渠道与电站、升压站相邻侧安装型钢防护排架;临基坑侧排架上铺设拦截爆破飞石的竹笆;
(2)、明挖方法:
1)、正式爆破前进行试验爆破,确定爆破最大单响起爆药量;
2)、横向分区及横向开挖,将明挖渠道横向分割成1区、2区、3区……,1区、2区、3区……沿着明挖渠道与电站、升压站的远端边至近端边依次分布;开挖时,按照先开挖1区,再依次开挖2区、3区、……,在每区开挖后相应形成1区空间,1区和2区空间,1区、2区和3区空间,……;
3)、竖向分层及竖向开挖,将明挖渠道按照竖向分为第1层、第2层、第3层……;开挖时,每区采取自上而下分层开挖方法;
4)、控制爆破方法:采用小直径浅孔控制爆破方法;所述小直径浅孔爆破作业分层高度0.5~3.5m,钻孔直径40~45mm,炮孔深度0.6~4.0m,炮孔间距0.5~2.0m,炮孔排距0.5~1.5m,钻孔布置方式为梅花形布置,平行于分区面钻眼;炮眼装药量0.30~2.50kg,装药长度0.30~2.40m;堵塞长度0.6~1.50m;
5)、对每区第1层开挖时在地表采取覆盖措施,第1层爆破之前使用竹笆覆盖爆破区域,并使用钢丝绳将竹笆串联起来。
紧邻电站、升压站横向明挖控制爆破施工方法,其特征在于,包括如下步骤:
(1)、预先采取防护措施:在明挖渠道与电站、升压站相邻侧安装型钢防护排架;临基坑侧排架上铺设拦截爆破飞石的竹笆;
(2)、明挖方法:
1)、正式爆破前进行试验爆破,确定爆破最大单响起爆药量;
2)、横向分区及横向开挖,将明挖渠道横向分割成1区、2区、3区……,1区、2区、3区……沿着明挖渠道与电站、升压站的远端边至近端边依次分布;开挖时,按照先开挖1区,再依次开挖2区、3区、……,在每区开挖后相应形成1区空间,1区和2区空间,1区、2区和3区空间,……;
3)、竖向分层及竖向开挖,将明挖渠道按照竖向分为第1层、第2层、第3层……;开挖时,每区采取自上而下分层开挖方法;
4)、控制爆破方法:采用小直径浅孔控制爆破方法;所述小直径浅孔爆破作业分层高度1.0~3.0m,钻孔直径42mm,炮孔深度1.1~3.5m,炮孔间距1.0~1.5m,炮孔排距0.8~1.2m,钻孔布置方式为梅花形布置,平行于分区面钻孔;炮孔装药量0.35~2.40kg,装药长度0.35~2.30m;堵塞长度0.8~1.20m;
4)、控制爆破方法:采用小直径浅孔控制爆破方法;所述小直径浅孔爆破作业分层高度1.0~3.0m,钻孔直径40~45mm,炮孔深度1.1~3.5m,炮孔间距1.0~1.5m,炮孔排距0.8~1.2m,钻孔布置方式为梅花形布置,平行于分区面钻孔;炮孔装药量0.35~2.40kg,装药长度0.35~2.30m;堵塞长度0.8~1.20m;
5)、对每区第1层开挖时在地表采取覆盖措施,第1层爆破之前使用竹笆覆盖爆破区域,并使用钢丝绳将竹笆串联起来。
本发明的优点是:
1、本发明改变传统爆破施工方法,由纵向开挖改为横向开挖,改变爆破后的抛石方向;
2、本发明采取可靠的防护措施,减少或避免抛石对现在设施的破坏作用;
3、本发明采用控制爆破方法,减少振动波对现有设施的影响和破坏;
4、本发明安全可靠,施工期间电站和升压站正常运行,不会因施工造成停止发电;
5、本发明该方法技术路线明确,投入的防护设施简单,成本低廉,经济效益明显。
附图说明:
图1为本发明的爆破原理图。
具体实施方式:
参见附图:
紧邻电站、升压站横向明挖控制爆破施工方法,包括如下步骤:
(1)、预先采取防护措施:在明挖渠道与电站、升压站相邻侧安装型钢防护排架采用型钢制作排架,排架支杆打入地下,两排立杆之间用剪刀撑固定,并用斜撑确保排架支撑稳定;临基坑侧排架上铺设拦截爆破飞石的竹笆,该防护设施主要是拦截爆破时的飞石,有效保护电站和升压站;
(2)、明挖方法:
1)、正式爆破前进行试验爆破,确定爆破最大单响起爆药量;
2)、横向分区及横向开挖,将明挖渠道横向分割成1区、2区、3区……,1区、2区、3区……沿着明挖渠道与电站、升压站的远端边至近端边依次分布;开挖时,按照先开挖1区,再依次开挖2区、3区、……,在每区开挖后相应形成1区空间,1区和2区空间,1区、2区和3区空间,……;
3)、竖向分层及竖向开挖,将明挖渠道按照竖向分为第1层、第2层、第3层……;开挖时,每区采取自上而下分层开挖方法;
4)、控制爆破方法:采用小直径浅孔控制爆破方法;所述小直径浅孔爆破作业分层高度0.5~3.5m,钻孔直径40~45mm,炮孔深度0.6~4.0m,炮孔间距0.5~2.0m,炮孔排距0.5~1.5m,钻孔布置方式为梅花形布置,平行于分区面钻眼;炮眼装药量0.30~2.50kg,装药长度0.30~2.40m;堵塞长度0.6~1.50m;
5)、对每区第1层开挖时在地表采取覆盖措施,第1层爆破之前使用竹笆覆盖爆破区域,并使用钢丝绳将竹笆串联起来。
紧邻电站、升压站横向明挖控制爆破施工方法,包括如下步骤:
(1)、预先采取防护措施:在明挖渠道与电站、升压站相邻侧安装型钢防护排架采用型钢制作排架,排架支杆打入地下,两排立杆之间用剪刀撑固定,并用斜撑确保排架支撑稳定;临基坑侧排架上铺设拦截爆破飞石的竹笆,该防护设施主要是拦截爆破时的飞石,有效保护电站和升压站;
(2)、明挖方法:
1)、正式爆破前进行试验爆破,确定爆破最大单响起爆药量;
2)、横向分区及横向开挖,将明挖渠道横向分割成1区、2区、3区……,1区、2区、3区……沿着明挖渠道与电站、升压站的远端边至近端边依次分布;开挖时,按照先开挖1区,再依次开挖2区、3区、……,在每区开挖后相应形成1区空间,1区和2区空间,1区、2区和3区空间,……;这样的开挖方法,在背向电站、升压站方向形成作业临空面,爆破时的飞石方向远离电站和升压站,开挖的石碴落入每区开挖后的空间内,有利于清碴作业;
3)、竖向分层及竖向开挖,将明挖渠道按照竖向分为第1层、第2层、第3层……;开挖时,每区采取自上而下分层开挖方法;
4)、控制爆破方法:采用小直径浅孔控制爆破方法;所述小直径浅孔爆破作业分层高度1.0~3.0m,钻孔直径42mm,炮孔深度1.1~3.5m,炮孔间距1.0~1.5m,炮孔排距0.8~1.2m,钻孔布置方式为梅花形布置,平行于分区面钻孔;炮孔装药量0.35~2.40kg,装药长度0.35~2.30m;堵塞长度0.8~1.20m;
5)、对每区第1层开挖时在地表采取覆盖措施,在地表采取覆盖措施,以减少飞石,确保安全,第1层爆破之前使用竹笆覆盖爆破区域,并使用钢丝绳将竹笆串联起来,提高防止飞石效果。
实施例:
某水电站位于山区,增设的泄洪隧洞出口紧邻电站和升压站,出口明渠开挖采用了该方法,很好地解决了爆破飞石问题。经监测,爆破产生的振动波控制在规范规定的范围之内。整个明挖过程工作顺利、安全可靠。
Claims (2)
1.一种紧邻电站、升压站横向明挖控制爆破施工方法,其特征在于,包括如下步骤:
(1)、预先采取防护措施:在明挖渠道与电站、升压站相邻侧安装型钢防护排架;临基坑侧排架上铺设拦截爆破飞石的竹笆;
(2)、明挖方法:
1)、正式爆破前进行试验爆破,确定爆破最大单响起爆药量;
2)、横向分区及横向开挖,将明挖渠道横向分割成1区、2区、3区……,1区、2区、3区……沿着明挖渠道与电站、升压站的远端边至近端边依次分布;开挖时,按照先开挖1区,再依次开挖2区、3区、……,在每区开挖后相应形成1区空间,1区和2区空间,1区、2区和3区空间,……;
3)、竖向分层及竖向开挖,将明挖渠道按照竖向分为第1层、第2层、第3层……;开挖时,每区采取自上而下分层开挖方法;
4)、控制爆破方法:采用小直径浅孔控制爆破方法;所述小直径浅孔爆破作业分层高度0.5~3.5m,钻孔直径40~45mm,炮孔深度0.6~4.0m,炮孔间距0.5~2.0m,炮孔排距0.5~1.5m,钻孔布置方式为梅花形布置,平行于分区面钻眼;炮眼装药量0.30~2.50kg,装药长度0.30~2.40m;堵塞长度0.6~1.50m;
5)、对每区第1层开挖时在地表采取覆盖措施,第1层爆破之前使用竹笆覆盖爆破区域,并使用钢丝绳将竹笆串联起来。
2.根据权利要求1所述的紧邻电站、升压站横向明挖控制爆破施工方法,其特征在于,包括如下步骤:
(1)、预先采取防护措施:在明挖渠道与电站、升压站相邻侧安装型钢防护排架;临基坑侧排架上铺设拦截爆破飞石的竹笆;
(2)、明挖方法:
1)、正式爆破前进行试验爆破,确定爆破最大单响起爆药量;
2)、横向分区及横向开挖,将明挖渠道横向分割成1区、2区、3区……,1区、2区、3区……沿着明挖渠道与电站、升压站的远端边至近端边依次分布;开挖时,按照先开挖1区,再依次开挖2区、3区、……,在每区开挖后相应形成1区空间,1区和2区空间,1区、2区和3区空间,……;
3)、竖向分层及竖向开挖,将明挖渠道按照竖向分为第1层、第2层、第3层……;开挖时,每区采取自上而下分层开挖方法;
4)、控制爆破方法:采用小直径浅孔控制爆破方法;所述小直径浅孔爆破作业分层高度1.0~3.0m,钻孔直径42mm,炮孔深度1.1~3.5m,炮孔间距1.0~1.5m,炮孔排距0.8~1.2m,钻孔布置方式为梅花形布置,平行于分区面钻孔;炮孔装药量0.35~2.40kg,装药长度0.35~2.30m;堵塞长度0.8~1.20m;
5)、对每区第1层开挖时在地表采取覆盖措施,第1层爆破之前使用竹笆覆盖爆破区域,并使用钢丝绳将竹笆串联起来。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610272155.XA CN105865281A (zh) | 2016-04-27 | 2016-04-27 | 一种紧邻电站、升压站横向明挖控制爆破施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610272155.XA CN105865281A (zh) | 2016-04-27 | 2016-04-27 | 一种紧邻电站、升压站横向明挖控制爆破施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105865281A true CN105865281A (zh) | 2016-08-17 |
Family
ID=56628667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610272155.XA Pending CN105865281A (zh) | 2016-04-27 | 2016-04-27 | 一种紧邻电站、升压站横向明挖控制爆破施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105865281A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108562198A (zh) * | 2018-06-26 | 2018-09-21 | 武汉科技大学 | 一种用于爆破飞石及爆破振动的协同防护方法 |
CN109555158A (zh) * | 2018-12-29 | 2019-04-02 | 贵州建工安顺建筑工程有限公司 | 一种管廊施工方法 |
CN110132078A (zh) * | 2019-05-29 | 2019-08-16 | 五冶集团上海有限公司 | 一种紧邻高压电线杆的路堑控制爆破方法 |
CN110260732A (zh) * | 2019-06-20 | 2019-09-20 | 中冶建工集团有限公司 | 临近居民区山体排危开挖的施工工艺 |
CN114508979A (zh) * | 2022-03-04 | 2022-05-17 | 中电建十一局工程有限公司 | 一种长距离深窄管沟石方开挖及防护方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101532807A (zh) * | 2008-12-18 | 2009-09-16 | 湖北白莲河抽水蓄能有限公司 | 抽水蓄能电站尾水预留岩坎爆破安全防护方法 |
CN101793487A (zh) * | 2010-03-30 | 2010-08-04 | 武汉科技大学 | 小净距隧道施工控制爆破技术 |
CN103123247A (zh) * | 2013-01-07 | 2013-05-29 | 重庆建工集团股份有限公司 | 用于陡倾小交角层状围岩小净距隧道开挖的减震爆破方法 |
CN103629980A (zh) * | 2013-12-16 | 2014-03-12 | 中铁二十三局集团第四工程有限公司 | 邻近既有线陡峻山体松动控制爆破施工方法 |
CN204007366U (zh) * | 2014-06-05 | 2014-12-10 | 马鞍山矿山研究院爆破工程有限责任公司 | 一种柔性可调爆破飞石防护网 |
CN104457466A (zh) * | 2014-12-08 | 2015-03-25 | 上海市政工程设计研究总院(集团)有限公司 | 一种隧道明挖段的爆破方法 |
CN104634198A (zh) * | 2014-12-13 | 2015-05-20 | 中铁十九局集团第二工程有限公司 | 临近高速公路边山体开挖中控制爆破施工方法 |
CN104930937A (zh) * | 2015-02-15 | 2015-09-23 | 中国铁建大桥工程局集团有限公司 | 能够有效控制爆破振速的环向分次爆破隧道施工方法 |
CN104930936A (zh) * | 2015-06-24 | 2015-09-23 | 中交一公局第五工程有限公司 | 高速公路拱型跨线天桥控制爆破快速拆除方法 |
CN205002687U (zh) * | 2015-08-14 | 2016-01-27 | 中铁港航局集团有限公司 | 一种景区爆破施工漂流河道防护棚 |
-
2016
- 2016-04-27 CN CN201610272155.XA patent/CN105865281A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101532807A (zh) * | 2008-12-18 | 2009-09-16 | 湖北白莲河抽水蓄能有限公司 | 抽水蓄能电站尾水预留岩坎爆破安全防护方法 |
CN101793487A (zh) * | 2010-03-30 | 2010-08-04 | 武汉科技大学 | 小净距隧道施工控制爆破技术 |
CN103123247A (zh) * | 2013-01-07 | 2013-05-29 | 重庆建工集团股份有限公司 | 用于陡倾小交角层状围岩小净距隧道开挖的减震爆破方法 |
CN103629980A (zh) * | 2013-12-16 | 2014-03-12 | 中铁二十三局集团第四工程有限公司 | 邻近既有线陡峻山体松动控制爆破施工方法 |
CN204007366U (zh) * | 2014-06-05 | 2014-12-10 | 马鞍山矿山研究院爆破工程有限责任公司 | 一种柔性可调爆破飞石防护网 |
CN104457466A (zh) * | 2014-12-08 | 2015-03-25 | 上海市政工程设计研究总院(集团)有限公司 | 一种隧道明挖段的爆破方法 |
CN104634198A (zh) * | 2014-12-13 | 2015-05-20 | 中铁十九局集团第二工程有限公司 | 临近高速公路边山体开挖中控制爆破施工方法 |
CN104930937A (zh) * | 2015-02-15 | 2015-09-23 | 中国铁建大桥工程局集团有限公司 | 能够有效控制爆破振速的环向分次爆破隧道施工方法 |
CN104930936A (zh) * | 2015-06-24 | 2015-09-23 | 中交一公局第五工程有限公司 | 高速公路拱型跨线天桥控制爆破快速拆除方法 |
CN205002687U (zh) * | 2015-08-14 | 2016-01-27 | 中铁港航局集团有限公司 | 一种景区爆破施工漂流河道防护棚 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108562198A (zh) * | 2018-06-26 | 2018-09-21 | 武汉科技大学 | 一种用于爆破飞石及爆破振动的协同防护方法 |
CN109555158A (zh) * | 2018-12-29 | 2019-04-02 | 贵州建工安顺建筑工程有限公司 | 一种管廊施工方法 |
CN110132078A (zh) * | 2019-05-29 | 2019-08-16 | 五冶集团上海有限公司 | 一种紧邻高压电线杆的路堑控制爆破方法 |
CN110260732A (zh) * | 2019-06-20 | 2019-09-20 | 中冶建工集团有限公司 | 临近居民区山体排危开挖的施工工艺 |
CN110260732B (zh) * | 2019-06-20 | 2021-11-23 | 中冶建工集团有限公司 | 临近居民区山体排危开挖的施工工艺 |
CN114508979A (zh) * | 2022-03-04 | 2022-05-17 | 中电建十一局工程有限公司 | 一种长距离深窄管沟石方开挖及防护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2018330958B2 (en) | Method for rock burst prevention by active support reinforcement and active pressure relief | |
CN108661643B (zh) | 一种采煤工作面末采回撤通道切顶卸压护巷方法 | |
CN104763432B (zh) | 一种高应力巷道围岩卸压控制大变形的方法 | |
CN105865281A (zh) | 一种紧邻电站、升压站横向明挖控制爆破施工方法 | |
CN110374633B (zh) | 隧道穿越松散体的洞口段施工方法 | |
CN104532818A (zh) | 一种露天矿采空区的治理方法 | |
CN111271064B (zh) | 一种富水地层隧道稳定掌子面的开挖施工方法 | |
CN104564085B (zh) | 城市超浅埋条件下超大断面隧道开挖综合施工方法 | |
CN104913696A (zh) | 边坡开挖光面爆破法施工方法 | |
CN105781560A (zh) | 一种超近距叠线隧道远距离导坑先行控制爆破的施工方法 | |
CN106869966A (zh) | 一种离层水补给源的封堵方法 | |
CN111140279A (zh) | 一种厚煤层上分层受小窑破坏复采条件下老空水防治方法 | |
CN104806249A (zh) | 一种短竖井导井掘进施工方法 | |
CN102692164A (zh) | 纵向结构面结构性强岩爆区应力卸载注水钻爆法 | |
Xingen et al. | Study and application of roof cutting pressure releasing technology in retracement channel roof of Halagou 12201 working face | |
CN109211041A (zh) | 一种预留岩坎围堰爆破拆除方法及其应用 | |
CN112377241A (zh) | 顶板抽采巷穿层钻孔预裂爆破结合多分支定向孔抽采方法 | |
CN103216265B (zh) | 一种高应力巷道围岩变形控制方法 | |
CN104457466A (zh) | 一种隧道明挖段的爆破方法 | |
Wu et al. | Rock mechanical problems and optimization for the long and deep diversion tunnels at Jinping II hydropower station | |
CN111023930A (zh) | 隧道的台阶法开挖方法 | |
CN204495211U (zh) | 一种隧道明挖段的爆破炮孔布置系统 | |
CN111022050B (zh) | 一种注浆改造复合顶板的全闭合爆破卸压及自留巷方法 | |
CN103233739A (zh) | 充填体包裹下厚大矿柱开采方法 | |
CN110030001B (zh) | 一种山岭隧道出洞的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160817 |
|
RJ01 | Rejection of invention patent application after publication |