CN207513202U - Construction discharging platform - Google Patents

Construction discharging platform Download PDF

Info

Publication number
CN207513202U
CN207513202U CN201721311117.7U CN201721311117U CN207513202U CN 207513202 U CN207513202 U CN 207513202U CN 201721311117 U CN201721311117 U CN 201721311117U CN 207513202 U CN207513202 U CN 207513202U
Authority
CN
China
Prior art keywords
cross bar
crossbearer
discharging platform
longitudinal rail
railing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721311117.7U
Other languages
Chinese (zh)
Inventor
李荣健
陈淑珍
刘燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Vocational Institute of Engineering
Original Assignee
Chongqing Vocational Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Vocational Institute of Engineering filed Critical Chongqing Vocational Institute of Engineering
Priority to CN201721311117.7U priority Critical patent/CN207513202U/en
Application granted granted Critical
Publication of CN207513202U publication Critical patent/CN207513202U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

This patent is related to construction ancillary equipment field, disclose a kind of construction discharging platform, including paralell, flat bogie, track and railing, the paralell includes crossbearer and vertical frame, track installation is on the upper surface of level frame, railing is mounted in the circumferential direction of level frame, flat bogie is mounted on sliding rail, the railing includes one of front rail and twice longitudinal rail, twice longitudinal rail is separately positioned on the opposite both sides of crossbearer, longitudinal rail includes the first cross bar and several first montants, first montant both ends are respectively hinged on the first cross bar and crossbearer, adjacent two first montants and the first cross bar, parallelogram is formed between crossbearer, the front rail includes the second cross bar and several second montants, second montant both ends are hinged on crossbearer and the second cross bar, second cross bar is detachably connected on the first cross bar.This patent is intended to provide a kind of construction discharging platform, in favor of carrying the construction material that length is more than discharging platform width.

Description

Construction discharging platform
Technical field
The utility model is related to construction ancillary equipment fields.
Background technology
Discharging platform is common temporary construction platform in high-building construction, usually rides upon building one to overhanging Side, will construct material requested and apparatus of tower crane are hung to discharging platform from ground and then are again transported material and apparatus by discharging platform To building.
There are following limitations for traditional discharging platform:It needs manually to transport the material on discharging platform during having bad luck Into or transport, consume a large amount of artificial, and efficiency is low.Some existing discharging platforms have carried out this some improvement, such as public The number of opening is that the Chinese utility model of CN201520605446.7 discloses a kind of pulley-type overhanging unloading platform, with flat car and rail The efficiency of material is had bad luck to be promoted in road.But when having bad luck the longer construction material of reinforcing bar, scaffolding steel pipe equal length, length The typically larger than width of discharging platform, and due to being typically provided with railing on discharging platform to protect the personal safety of worker and oblique pull Rope is to reinforce discharging platform, and railing and suspension cable block having bad luck for the length construction material bigger than the width of discharging platform, greatly It is big to reduce having bad luck efficiency or even easily material being made to fall from discharging platform for material, initiation safety accident.
Utility model content
The utility model is intended to provide a kind of construction discharging platform, wide more than discharging platform in favor of carrying length The construction material of degree.
Construction discharging platform in this programme, including paralell, flat bogie, track and railing, the platform Frame includes crossbearer and vertical frame, and crossbearer is horizontally disposed with, and vertical frame perpendicular to crossbearer is fixed on the lower section of crossbearer, and track installation is in level On the upper surface of frame, railing is mounted in the circumferential direction of level frame, and flat bogie is mounted on sliding rail, and the railing includes horizontal together To railing and twice longitudinal rail, twice longitudinal rail is separately positioned on the opposite both sides of crossbearer, and longitudinal rail is put down with track Row, longitudinal rail include the first cross bar and several first montants, and the first montant both ends are respectively hinged on the first cross bar and crossbearer, Form parallelogram between adjacent two first montants and the first cross bar, crossbearer, the front rail include the second cross bar and Several second montants, the second montant lower end are hinged on crossbearer, and the second montant upper end is fixed on the second cross bar, the second cross bar two End is detachably connected on respectively on the both ends of the first cross bar of twice longitudinal rail.
It the technical principle of this programme and has the beneficial effect that:Entire discharging platform is fixed on the vertical wall of building by vertical frame On, track is extended in wall, vertical frame fix after, crossbearer is flatly horizontal to be chosen in wall outer side, without use suspension cable into Row is reinforced.When the second cross bar both ends of front rail are connected to the end of two first cross bars and the first montant is in vertical state When, front rail and longitudinal rail form protection to the region above discharging platform crossbearer.But it is more than in carrying carrying length and unloads When expecting the construction material of berm width, the second cross bar both ends are dismantled from longitudinal rail, front rail falls down, due to first perpendicular It forms parallelogram between bar and the first cross bar, crossbearer, pushes the first cross bar that the first montant can be allowed to topple over to homonymy, by the One cross bar is overlayed on the first montant, and the first montant is overlayed on crossbearer, substantially reduces the height of longitudinal rail, and longitudinal rail is Protective action is lost, while also loses the barrier effect to construction material, it is small can be placed directly into tablet for construction material at this time Above vehicle, directly construction material is transported in wall along track.
This programme is avoided using suspension cable, while by dismountable front rail and can be changed to the longitudinal direction of superposed state Railing avoids the blocking of construction material that railing carries needs, can carry the Building wood that length is more than discharging platform width Material.
Further, the second cross bar both ends are equipped with connector, and connector includes seat cylinder and lantern ring, and lantern ring internal diameter is more than First cross bar diameter, is fixed with screw rod on lantern ring, on the present cylinder of screw flight connection, sets of holes is provided on seat cylinder, set bore dia is big In the second cross bar diameter.Lantern ring is sleeved on the first cross bar, and seat jacket casing is on the second cross bar, and then rotation seat cylinder, screw rod is tightened On present cylinder, you can complete being detachably connected between the first cross bar and the second cross bar.
Further, the height when height of the flat bogie is more than the longitudinal rail superposed state.It avoids stacking shape Longitudinal rail during state, which forms construction material, to be stopped.
Further, it is fixedly connected with strut between the crossbearer and vertical frame.Make the structure between vertical frame and crossbearer more firm, Improve the bearing capacity of paralell.
Further, column, the rotatable direction of column are hinged on the side far from the front rail on the crossbearer Vertical with the axis direction of the first cross bar, the column is in inverted T shapes, and column includes transverse end and vertical end, in vertical end It is provided with and the matched through-hole of the first cross bar.The hinged setting of column causes column to can be at upright state and state of falling, and stands When column is in upright state, the end of the first cross bar is inserted into through-hole, longitudinal rail can be avoided to topple over, the transverse end of column can be kept away Exempt from column along the direction of the first cross bar to topple over.The column that needs to fall, column blocking is avoided to carry construction material when, the first cross bar It is detached from from through-hole, column falls down to the direction far from track.
Description of the drawings
Fig. 1 is the structure diagram of the utility model embodiment construction discharging platform;
Fig. 2 is the structure diagram of connector.
Specific embodiment
The utility model is described in further detail below by specific embodiment:
Reference numeral in Figure of description includes:Crossbearer 1, vertical frame 2, track 3, supporting rod 4, the first cross bar 5, first are perpendicular Bar 6, the second cross bar 7, the second montant 8, flat bogie 9, seat cylinder 10, lantern ring 11, screw rod 12, wall 13.
Embodiment construction with discharging platform substantially as shown in Figure 1:Including paralell, flat bogie 9,3 and of track Railing, paralell include crossbearer 1 and vertical frame 2, and crossbearer 1 is horizontally disposed, and vertical frame 2 is fixed on perpendicular to 1 ground of crossbearer under crossbearer 1 Side is fixedly connected with strut between crossbearer 1 and vertical frame 2, track 3 is mounted on the upper surface of level frame, and railing is mounted on level In the circumferential direction of frame, flat bogie 9 is mounted on sliding rail, and railing includes one of front rail and twice longitudinal rail, twice longitudinal direction Railing is separately positioned on the opposite both sides of crossbearer 1, and longitudinal rail is parallel with track 3, if longitudinal rail include the first cross bar 5 and Dry first montant 6,6 both ends of the first montant are respectively hinged on the first cross bar 5 and crossbearer 1, adjacent two first montants 6 and first Parallelogram is formed between cross bar 5, crossbearer 1, front rail includes the second cross bar 7 and several second montants 8, the second montant 8 Lower end is hinged on crossbearer 1, and 8 upper end of the second montant is fixed on the second cross bar 7, and 7 both ends of the second cross bar are equipped with connector, even It connects device and includes seat cylinder 10 and lantern ring 11,11 internal diameter of lantern ring is more than 5 diameter of the first cross bar, screw rod 12, screw rod are fixed on lantern ring 11 12 are threadedly coupled on present cylinder 10, and sets of holes are provided on seat cylinder 10, and set bore dia is more than 7 diameter of the second cross bar;Far from horizontal on crossbearer 1 Column is hinged on the side of railing, the rotatable direction of column is vertical with the axis direction of the first cross bar 5, and column is in inversion T shapes, column includes transverse end and vertical end, is provided with and 5 matched through-hole of the first cross bar in vertical end;Flat bogie 9 Highly it is more than height during longitudinal rail superposed state.
It is in the protective action for needing railing, column, front rail and longitudinal rail is all cocked, and by the set of connector Ring 11 is sleeved on the first cross bar 5, and seat cylinder 10 is sleeved on the second cross bar 7, then rotation seat cylinder 10, and screw rod 12 is tightened present cylinder 10 On, front rail is allowed to link together with longitudinal rail, the end of the first cross bar 5 is inserted into the through-hole on column, then can be made Front rail and longitudinal rail form protective action all in stable vertical state to discharging platform.
When carrying length and being more than the construction material of discharging platform width, rotation seat cylinder 10, by screw rod 12 from seat cylinder Back-out in 10, the first cross bar 5 is made to be detached with the second cross bar 7, front rail is under the effect of gravity to far from longitudinal rail Side fall down, then will be moved in through-hole of first cross bar 5 from column, allow longitudinal rail to front rail roll fall, First cross bar 5 is overlayed on the first montant 6, the first montant 6 is overlayed on crossbearer 1, substantially reduces the height of longitudinal rail, is indulged Protective action is lost, while also lose the barrier effect to construction material to railing, construction material can be placed directly at this time To above flat bogie 9, directly construction material is transported in wall 13 along track 3.
Above-described is only the embodiment of the utility model, and the common sense such as well known concrete structure and characteristic are herein in scheme It does not describe excessively.It should be pointed out that for those skilled in the art, in the premise for not departing from the utility model structure Under, several modifications and improvements can also be made, these should also be considered as the scope of protection of the utility model, these are not all interfered with The effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim Subject to, the records such as specific embodiment in specification can be used for explaining the content of claim.

Claims (5)

1. construction discharging platform, including paralell, flat bogie, track and railing, the paralell include crossbearer and Vertical frame, crossbearer are horizontally disposed with, and vertical frame perpendicular to crossbearer is fixed on the lower section of crossbearer, and track installation is in the upper surface of level frame On, railing is mounted in the circumferential direction of level frame, and flat bogie is mounted on sliding rail, it is characterised in that:The railing is included together Front rail and twice longitudinal rail, twice longitudinal rail are separately positioned on the opposite both sides of crossbearer, longitudinal rail and track Parallel, longitudinal rail includes the first cross bar and several first montants, and the first montant both ends are respectively hinged at the first cross bar and crossbearer On, parallelogram is formed between adjacent two first montants and the first cross bar, crossbearer, the front rail includes the second cross bar With several second montants, the second montant lower end is hinged on crossbearer, and the second montant upper end is fixed on the second cross bar, the second cross bar Both ends are detachably connected on respectively on the both ends of the first cross bar of twice longitudinal rail.
2. construction discharging platform according to claim 1, it is characterised in that:The second cross bar both ends are equipped with Connector, connector include seat cylinder and lantern ring, and lantern ring internal diameter is more than the first cross bar diameter, screw rod, screw rod spiral shell are fixed on lantern ring On the present cylinder of line connection, sets of holes are provided on seat cylinder, set bore dia is more than the second cross bar diameter.
3. construction discharging platform according to claim 1, it is characterised in that:The height of the flat bogie is more than Height during the longitudinal rail superposed state.
4. construction discharging platform according to claim 1, it is characterised in that:It is fixed between the crossbearer and vertical frame It is connected with strut.
5. construction discharging platform according to claim 1, it is characterised in that:Far from the transverse direction on the crossbearer Column is hinged on the side of railing, the rotatable direction of column is vertical with the axis direction of the first cross bar, and the column is in The T shapes put, column include transverse end and vertical end, are provided with and the matched through-hole of the first cross bar in vertical end.
CN201721311117.7U 2017-10-12 2017-10-12 Construction discharging platform Expired - Fee Related CN207513202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721311117.7U CN207513202U (en) 2017-10-12 2017-10-12 Construction discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721311117.7U CN207513202U (en) 2017-10-12 2017-10-12 Construction discharging platform

Publications (1)

Publication Number Publication Date
CN207513202U true CN207513202U (en) 2018-06-19

Family

ID=62534252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721311117.7U Expired - Fee Related CN207513202U (en) 2017-10-12 2017-10-12 Construction discharging platform

Country Status (1)

Country Link
CN (1) CN207513202U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409845A (en) * 2019-08-01 2019-11-05 舜元建设(集团)有限公司 A kind of discharging platform and its construction method of automatic moving
CN111005578A (en) * 2019-12-25 2020-04-14 朱蓓 Construction is with platform of unloading

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409845A (en) * 2019-08-01 2019-11-05 舜元建设(集团)有限公司 A kind of discharging platform and its construction method of automatic moving
CN110409845B (en) * 2019-08-01 2024-05-28 舜元建设(集团)有限公司 Self-moving discharging platform and construction method thereof
CN111005578A (en) * 2019-12-25 2020-04-14 朱蓓 Construction is with platform of unloading

Similar Documents

Publication Publication Date Title
CN207513202U (en) Construction discharging platform
CN204000932U (en) Lower channel in safety in a kind of deep foundation pit construction operation
CN208121575U (en) A kind of operating platform for bridge tower thwart beam construction
CN110805249A (en) Indoor scaffold with protection structure
CN208251586U (en) A kind of construction scaffold
CN207794654U (en) Construction safety device
CN206358796U (en) Water conservancy culvert pipe conveying arrangement
CN207452685U (en) A kind of bridge with embedded climbing structures
CN207160604U (en) Architectural engineering assembled bearing
CN206621673U (en) Regularization escape device for temporary building
CN205330195U (en) Safety device of outer wall scaffold
CN106760468A (en) The suspension platform that a kind of construction site uses
CN207597842U (en) It is a kind of can transported material scaffold
CN207194484U (en) A kind of assembled level chooses net support system
CN208701507U (en) A kind of bridge construction telescopic support device
CN207158625U (en) The device removed for suspension bracket
CN106088638A (en) A kind of special building method for high-voltage line protection safety frame
CN208899978U (en) A kind of safe construction guardrail
CN207314892U (en) One kind aids in huge pillar height sky to face side construction external hanging type protective platform
CN220267171U (en) Building scaffold with detachable structure
CN201924319U (en) Portable self-help levee
CN107673203A (en) A kind of herringbone suspension bracket decomposition method
CN206768617U (en) One kind, which builds a bridge, uses scaffold
CN209241839U (en) Cement bin
CN107816204A (en) The outer protective frame of skyscraper staggered floor balcony also serves as operating platform erection method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

Termination date: 20181012