CN208251586U - A kind of construction scaffold - Google Patents
A kind of construction scaffold Download PDFInfo
- Publication number
- CN208251586U CN208251586U CN201820757407.2U CN201820757407U CN208251586U CN 208251586 U CN208251586 U CN 208251586U CN 201820757407 U CN201820757407 U CN 201820757407U CN 208251586 U CN208251586 U CN 208251586U
- Authority
- CN
- China
- Prior art keywords
- plate
- outlet slot
- scaffold
- upper support
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model relates to build equipment technology field, in particular a kind of construction scaffold, including support rod, it is mounted on the lower bracing frame of support rod bottom side and is mounted on the upper support frame of support rod top side, connection ladder is installed between lower bracing frame and upper support frame, upper support frame is internally provided with bearing plate, bearing plate is provided with outlet slot close to terraced side is connected, the inner wall of outlet slot is equipped with snap-gauge, outlet slot is internally provided with cover board, the bottom end of connection ladder is provided with clamp ring, lower bracing frame side is welded with magnet plate, the construction scaffold, pass through setting connection ladder, construction personnel is facilitated to carry out construction operation at the top of entrance scaffold, the mode climbed from side is avoided to enter scaffold top, lead to the phenomenon that security risk occur;Absorption fixation is carried out to connection ladder by setting magnet plate, avoids connection ladder from occupying larger space when carrying, and conveniently connection ladder is fixed.
Description
Technical field
The utility model relates to build equipment technology field, specially a kind of construction scaffold.
Background technique
Scaffold is to guarantee each work progress is gone on smoothly and is set up workbench.It is divided by the position set up outer
Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;It is divided by structural form vertical
Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold
Frame.
When in use, worker often enters scaffold top from the mode that side is climbed to existing scaffold, but is climbing
When being easy to happen falling accident during climbing, while climbing, it is easy to cause scaffold gravity center instability, causes security risk.In view of
This, it is proposed that a kind of construction scaffold.
Utility model content
The purpose of this utility model is to provide a kind of construction scaffolds, to solve to propose in above-mentioned background technique
Worker often using climbing by the way of enter scaffold top, be easy to cause scaffold gravity center instability, cause security risk
The problem of.
To achieve the above object, the utility model provides the following technical solutions:
A kind of construction scaffold including support rod, is mounted on the lower bracing frame and peace of the support rod bottom side
Upper support frame mounted in the support rod top side, the bottom of the support rod are equipped with firm pad, the lower bracing frame and described
Connection ladder is installed, the connection ladder includes side plate and several ladders being mounted between the side plate between upper support frame
The top of plate, the stepped plate is equipped with fixed ring;
The top surrounding of the upper support frame is mounted on connecting column, is provided with several shields between two connecting columns
Railing, the upper support frame are internally provided with bearing plate, and the bearing plate is provided with outlet slot close to the terraced side of the connection, institute
The inner wall for stating outlet slot is equipped with snap-gauge, and the outlet slot is internally provided with cover board, and one end of the cover board is equipped with hinge.
Preferably, the firm pad and the support rod are welded and fixed.
Preferably, the cover board and the snap-gauge are engaged by clamping.
Preferably, the hinge is bolted on the outlet slot inner wall.
Preferably, the bottom end of the connection ladder is provided with clamp ring, and the both ends of the clamp ring are provided with mounting plate, the peace
The surface of loading board is provided with mounting hole, and fastening bolt is equipped with inside the mounting hole, and the lower bracing frame side is welded with suction
Iron-stone plate.
Preferably, the fastening bolt and the mounting hole are threadedly coupled.
Preferably, the mounting plate and the clamp ring are an integral molding structure.
Compared with prior art, the utility model has the beneficial effects that the construction scaffold, is connected by setting
Ladder facilitates construction personnel to carry out construction operation at the top of entrance scaffold, the mode climbed from side is avoided to enter scaffold
Top leads to the phenomenon that security risk occur;Absorption fixation is carried out to connection ladder by setting magnet plate, connection ladder is avoided to exist
Larger space is occupied when carrying, and conveniently connection ladder is fixed.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the connection ladder structural schematic diagram of the utility model;
Fig. 3 is the upper support frame structural schematic diagram of the utility model;
Fig. 4 is the bearing plate Structure explosion diagram of the utility model;
Fig. 5 is structure enlargement diagram at A in Fig. 2 of the utility model.
In figure: 1, support rod;11, pad is consolidated;2, lower bracing frame;21, magnet plate;3, upper support frame;31, connecting column;
32, guard rail rod;33, bearing plate;34, outlet slot;35, snap-gauge;36, cover board;37, hinge;4, connection ladder;41, side plate;42, rank
Gangboard;43, fixed ring;44, clamp ring;45, mounting plate;46, mounting hole;47, fastening bolt.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width
Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside",
The orientation or positional relationship of the instructions such as " clockwise ", " counterclockwise " be based on the orientation or positional relationship shown in the drawings, be only for
Convenient for description the utility model and simplify description, rather than the equipment of indication or suggestion meaning or element must have specifically
Orientation is constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Fig. 1-5 is please referred to, the utility model provides a kind of technical solution:
A kind of construction scaffold including support rod 1, is mounted under 1 bottom side of support rod as depicted in figs. 1 and 2
Support frame 2 and the upper support frame 3 for being mounted on 1 top side of support rod, the bottom of support rod 1 are equipped with firm pad 11, lower bracing frame 2
Connection ladder 4 is installed between upper support frame 3, connection ladder 4 includes side plate 41 and several ranks being mounted between side plate 41
Gangboard 42, the top of stepped plate 42 are equipped with fixed ring 43, and firm pad 11 and support rod 1 are welded and fixed.
In the present embodiment, firm pad 11 is made of cast iron quality, and firm pad 11 with a thickness of 2cm so that firm pad
11 support effects are good, high abrasion resistance.
It is welded to form specifically, upper support frame 3 and lower bracing frame 2 are all made of four steel pipe head and the tail, so that upper support frame 3
Rectangular frame is formed with lower bracing frame 2, it is structural strong.
Further, fixed ring 43 is socketed in upper support frame 3 on the steel pipe of 34 side of outlet slot, and fixed ring 43 is straight
Diameter is greater than, diameter of steel tube, convenient to have certain rotation space on upper support frame 3 to fixed ring 43.
In specific implementation, in order to facilitate scaffold above and below worker, we offer outlet slot 34 on 33 surface of bearing plate,
As a kind of preferred embodiment, as shown in Figure 3 and Figure 4, the top surrounding of upper support frame 3 is mounted on connecting column 31, two companies
It connects and is provided with several guard rail rods 32 between column 31, upper support frame 3 is internally provided with bearing plate 33, and bearing plate 33 is close to connection ladder
4 sides are provided with outlet slot 34, and the inner wall of outlet slot 34 is equipped with snap-gauge 35, and outlet slot 34 is internally provided with cover board 36, lid
One end of plate 36 is equipped with hinge 37, and cover board 36 and snap-gauge 35 are engaged by clamping, and hinge 37 is bolted in outlet slot 34
Wall.
In the present embodiment, bearing plate 33 and upper support frame 3 are welded and fixed, and facilitate upper support frame 3 being fixed on upper support frame 3
It is interior.
Specifically, the specification of cover board 36 and the specification of outlet slot 34 are adapted, so that outlet slot 34 has sufficient space for lid
Plate 36 rotates.
In specific implementation, in order to facilitate scaffold entirety convenient transportation, we improve connection ladder 4, as one
Kind preferred embodiment, as shown in Figure 2 and Figure 5, the bottom end of connection ladder 4 are provided with clamp ring 44, and the both ends of clamp ring 44 are provided with peace
Loading board 45, the surface of mounting plate 45 are provided with mounting hole 46, and fastening bolt 47, lower bracing frame 2 one are equipped with inside mounting hole 46
Side is welded with magnet plate 21, and fastening bolt 47 and mounting hole 46 are threadedly coupled, and mounting plate 45 and clamp ring 44 are integrally formed knot
Structure.
In the present embodiment, clamp ring 44 and opposite 2 steel pipe of lower bracing frame of magnet plate 21 are engaged by clamping, so that connection ladder 4
Bottom is easy for removal and installation.
Specifically, clamp ring 44 is made of aluminum alloy material, facilitates and clamp ring 44 snapped into steel tube surface, and to steel pipe into
Row clamping.
When in use with scaffold, construction personnel is upward by the stepped plate 42 of connection ladder 4 for the construction of the present embodiment
The movement of 2 side of support frame, and cover board 36 firmly will be pushed up, cover board 36 is released by hinge 37 from outlet slot 34, is constructed
Personnel enter bearing plate 33 from outlet slot 34, and snap-gauge 35 is snapped onto again in outlet slot 34, using snap-gauge 35 to cover board
36 are limited, and construction personnel carries out construction operation on bearing plate 33 at this time, and the mode climbed from side is avoided to enter foot
At the top of hand cradle, lead to the phenomenon that security risk occur;
By fastening bolt 47, spiral shell goes out out of mounting hole 46, and clamp ring 44 is pulled from lower bracing frame 2, pushes connection ladder 4 at this time
So that fixed ring 43 rotates in upper support frame 3, connection ladder 4 is pushed to 21 side of magnet plate, it is right using magnet plate 21
Connection ladder 4 carries out absorption fixation, and is tightened ladder 4 is connected in 1 side of support rod with connecting rope, avoids connection ladder 4 when carrying
Larger space is occupied, and conveniently connection ladder 4 is fixed.
In above embodiments, by setting connection ladder 4, construction personnel is facilitated to carry out construction work at the top of entrance scaffold
Industry avoids the mode climbed from side from entering scaffold top, leads to the phenomenon that security risk occur;By the way that magnet is arranged
21 pairs of connection ladders 4 of plate carry out absorption fixation, avoid connection ladder 4 from occupying larger space when carrying, and conveniently carry out to connection ladder 4
It is fixed.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row
The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments
Be only the utility model preference, be not intended to limit the utility model, do not departing from the spirit and scope of the utility model
Under the premise of, the utility model also has various changes and improvements, these changes and improvements both fall within claimed it is practical
In novel range.The protection scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
1. a kind of construction scaffold, including support rod (1), it is mounted on the lower bracing frame (2) of the support rod (1) bottom side
And it is mounted on the upper support frame (3) of the support rod (1) top side, it is characterised in that: the bottom of the support rod (1) is equipped with
Firm pad (11), is equipped with connection ladder (4) between the lower bracing frame (2) and the upper support frame (3), the connection is terraced (4)
Including side plate (41) and several stepped plates (42) being mounted between the side plate (41), the top of the stepped plate (42)
Fixed ring (43) are installed;
The top surrounding of the upper support frame (3) is mounted on connecting column (31), is provided between two connecting columns (31)
Several guard rail rods (32), the upper support frame (3) are internally provided with bearing plate (33), and the bearing plate (33) is close to the company
It connects terraced (4) side to be provided with outlet slot (34), the inner wall of the outlet slot (34) is equipped with snap-gauge (35), the outlet slot (34)
Be internally provided with cover board (36), one end of the cover board (36) is equipped with hinge (37).
2. construction scaffold according to claim 1, it is characterised in that: firm pad (11) and the support
Bar (1) is welded and fixed.
3. construction scaffold according to claim 1, it is characterised in that: the cover board (36) and the snap-gauge
(35) it is engaged by clamping.
4. construction scaffold according to claim 1, it is characterised in that: the hinge (37) is bolted
In the outlet slot (34) inner wall.
5. construction scaffold according to claim 1, it is characterised in that: the bottom end setting for connecting terraced (4)
Have clamp ring (44), the both ends of the clamp ring (44) are provided with mounting plate (45), and the surface of the mounting plate (45) is provided with peace
It fills hole (46), is equipped with fastening bolt (47) inside the mounting hole (46), lower bracing frame (2) side is welded with magnet
Plate (21).
6. construction scaffold according to claim 5, it is characterised in that: the fastening bolt (47) and the peace
Hole (46) are filled to be threadedly coupled.
7. construction scaffold according to claim 5, it is characterised in that: the mounting plate (45) and the clamp ring
(44) it is an integral molding structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820757407.2U CN208251586U (en) | 2018-05-21 | 2018-05-21 | A kind of construction scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820757407.2U CN208251586U (en) | 2018-05-21 | 2018-05-21 | A kind of construction scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208251586U true CN208251586U (en) | 2018-12-18 |
Family
ID=66480943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820757407.2U Expired - Fee Related CN208251586U (en) | 2018-05-21 | 2018-05-21 | A kind of construction scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208251586U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080509A (en) * | 2019-03-27 | 2019-08-02 | 浙江卓元建设有限公司 | A kind of construction scaffold |
CN111794484A (en) * | 2020-07-13 | 2020-10-20 | 程良 | Scaffold for building |
CN112138844A (en) * | 2019-06-29 | 2020-12-29 | 辽宁翔逸科技有限公司 | Replacing device for fixed cone lining plate of gyratory crusher |
-
2018
- 2018-05-21 CN CN201820757407.2U patent/CN208251586U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080509A (en) * | 2019-03-27 | 2019-08-02 | 浙江卓元建设有限公司 | A kind of construction scaffold |
CN110080509B (en) * | 2019-03-27 | 2021-06-08 | 浙江卓元建设有限公司 | Scaffold for building construction |
CN112138844A (en) * | 2019-06-29 | 2020-12-29 | 辽宁翔逸科技有限公司 | Replacing device for fixed cone lining plate of gyratory crusher |
CN111794484A (en) * | 2020-07-13 | 2020-10-20 | 程良 | Scaffold for building |
CN111794484B (en) * | 2020-07-13 | 2022-02-08 | 济南京华金属制品有限公司 | Mounting method of scaffold for building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208251586U (en) | A kind of construction scaffold | |
CN111395728B (en) | Aluminum alloy attached lifting scaffold | |
CN207144428U (en) | A kind of easy-to-dismount building scaffold | |
CN110805249A (en) | Indoor scaffold with protection structure | |
CN212773388U (en) | Novel all-steel lifting scaffold | |
CN208121575U (en) | A kind of operating platform for bridge tower thwart beam construction | |
CN214302811U (en) | Self-adaptive all-steel attached lifting scaffold in micro-tilt building | |
CN207513202U (en) | Construction discharging platform | |
CN217151113U (en) | Scaffold with freely adjustable height | |
CN207620384U (en) | Jack device for discharging | |
CN214424055U (en) | Attached lifting scaffold platform of unloading | |
CN214462401U (en) | Double-layer protection frame with novel structure | |
CN207436477U (en) | For the sleigh of installation photovoltaic component | |
CN208702128U (en) | High and big die plate construction steel pipe scaffold fast dismounting device | |
CN211775631U (en) | Anticollision hanging flower basket for construction | |
CN106760468A (en) | The suspension platform that a kind of construction site uses | |
CN107642241A (en) | The stress supporting construction and construction method of a kind of prefabricated balcony | |
CN109203218B (en) | Prefabricated T roof beam concrete placement protection canopy of railway | |
CN216616754U (en) | Scaffold for building engineering | |
CN219821693U (en) | Light storage rack for preventing ligature rod from falling | |
CN112249038B (en) | Tunnel hanging bracket for coal mine overhead manned device | |
CN215948837U (en) | Scaffold convenient to workman climbs | |
CN110748140A (en) | Track beam hanging basket special for stepped curtain wall | |
CN209761312U (en) | Construction is with four enclose safe cat ladders | |
CN218623192U (en) | Temporary lap joint climbing frame for construction engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181218 Termination date: 20210521 |
|
CF01 | Termination of patent right due to non-payment of annual fee |