CN207512618U - A kind of bridge construction bracing means - Google Patents

A kind of bridge construction bracing means Download PDF

Info

Publication number
CN207512618U
CN207512618U CN201721378306.6U CN201721378306U CN207512618U CN 207512618 U CN207512618 U CN 207512618U CN 201721378306 U CN201721378306 U CN 201721378306U CN 207512618 U CN207512618 U CN 207512618U
Authority
CN
China
Prior art keywords
bridge
arch
pier
grid
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721378306.6U
Other languages
Chinese (zh)
Inventor
郭腾
李学东
石磊
杜昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721378306.6U priority Critical patent/CN207512618U/en
Application granted granted Critical
Publication of CN207512618U publication Critical patent/CN207512618U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge construction bracing means, including bridge floor, concrete wall and chain sling, the left end of the bridge floor is provided with gear column, discharge pipe is provided on the right side of the gear column, spanning is provided with below the discharge pipe, bridge connecting hole is provided in the spanning, arch is provided with below the bridge connecting hole, counterfort is provided on the arch, and abutment is provided with below arch;Arch is provided on original bridge, chain sling is provided in arch, spanning and bridge pier are attached, change bridge and change structural system, the stress system for changing structure is acted on by hybrid structure of arch and beam, improve the force-bearing situation of structure, to improve the ability that bridge bears mobile load, bridge pier backplate is added to impaired concrete pier, grid clamping steel plate is poured using what multilayer mortar poured, passes through concrete wall filling cracks, outside setting Jiao Bi, reduce the corrosion of water, bridge pier is helped to share stress, improve bridge service life.

Description

A kind of bridge construction bracing means
Technical field
The utility model belongs to bridge inspection and maintenance technical field, and in particular to a kind of bridge construction bracing means.
Background technology
Bridge is erected in rivers,lakes and seas, the building for making traffic etc. that can smoothly pass through, to adapt to Modern High-Speed The transportation industry of development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic needs and set up make pass through More easily building, bridge strengthening refer generally to be restored or improve by the reinforcement to component and the improvement of structural behaviour The bearing capacity of existing highway bridge to extend its service life, adapts to the requirement of Modern Traffic transport
Original bridge construction bracing means needs to consume a large amount of material when reinforcing old bridge, reinforces Device uses concrete casting, and concrete cover is relatively thin, and consolidation effect is not good enough, it is impossible to effective to share answering suffered by bridge pier Power, has the pedestrian on bridge and vehicle some potential safety problems, and bridge may occur because of because concrete strengthening device damages Collapse, influence the normal use of people.
Utility model content
The purpose of this utility model is to provide a kind of bridge construction bracing means, to solve to propose in above-mentioned background technology Original bridge construction bracing means need to consume a large amount of material when reinforcing old bridge, bracing means is adopted With concrete casting, concrete cover is relatively thin, and consolidation effect is not good enough, it is impossible to the effective stress shared suffered by bridge pier, it is right Pedestrian and vehicle on bridge have some potential safety problems, and bridge may collapse because of because of the damage of concrete strengthening device, The problem of influencing the normal use of people.
To achieve the above object, the utility model provides following technical solution:A kind of bridge construction bracing means, including bridge Face, concrete wall and chain sling, the left end of the bridge floor is provided with gear column, discharge pipe is provided on the right side of the gear column, described to let out Spanning is provided with below big vast pipe, bridge connecting hole is provided in the spanning, arch is provided with below the bridge connecting hole Frame is provided with counterfort, and abutment is provided with below arch on the arch, and bridge pier is provided with above the left end of the abutment, Bridge pier backplate is provided on the bridge pier, the concrete wall is mounted on the top of bridge pier backplate, and is set below concrete wall It is equipped with and pours grid, described pour is provided with mortar and pours slot, and pour and steel plate double wall is provided with below grid on grid, institute It states and lower grid is provided with below steel plate double wall, rubber cushion is provided with below the lower grid, the chain sling is mounted on counterfort Inside, and link block is provided with above the right side of chain sling, angle seat is provided on the right side of the link block, under the angle seat Side is provided with buckle.
Preferably, there are two the bridge pier is set altogether, and two bridge piers are separately mounted to above the left and right ends of abutment, institute It states there are two bridge pier backplate sets altogether, and two bridge pier backplates are corresponding respectively is mounted on bridge pier.
Preferably, it is fixedly connected between the concrete wall and steel plate double wall by pouring grid, the rubber cushion and steel plate It is fixedly connected between double wall by lower grid, described pour is fixedly connected between grid and lower grid by steel plate double wall.
Preferably, it is fixedly connected between the arch and spanning by link block, passes through card between the arch and bridge pier Button is fixedly connected, and there are two the angle seat is set altogether, and two angle seats are separately mounted to the top left and right ends of arch, institute It states and is fixedly connected between bridge pier and spanning by angle seat.
Preferably, it is bolted to connection between the counterfort and chain sling.
Compared with prior art, the beneficial effects of the utility model are:The utility model is scientific and reasonable for structure, safe to use It is convenient, arch is provided on original bridge, chain sling is provided in arch, spanning and bridge pier is attached, changes bridge Change structural system, the stress system for changing structure is acted on by hybrid structure of arch and beam, improve the force-bearing situation of structure, to improve bridge The ability of mobile load is born, bridge pier backplate is added to impaired concrete pier, grid clamping is poured using what multilayer mortar poured Steel plate, by concrete wall filling cracks, setting Jiao Bi in outside reduces the corrosion of water, bridge pier is helped to share stress, improves bridge Service life.
Description of the drawings
Fig. 1 is the bridge structure schematic diagram of the utility model;
Fig. 2 is the bridge pier guard board structure schematic diagram of the utility model;
Fig. 3 is the arch frame structure schematic diagram of the utility model;
In figure:1- arches, 2- counterforts, 3- abutments, 4- bridge piers, 5- bridge piers backplate, 6- spannings, 7- gears column, 8- discharge pipes, 9- Bridge connecting hole, 10- bridge floors, 11- concrete walls, 12- mortars pour slot, 13- pours grid, grid under 14-, 15- rubber cushions, 16- steel plates double wall, 17- chain slings, 18- link blocks, 19- angle seats, 20- buckles.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of bridge construction bracing means, including bridge floor 10th, concrete wall 11 and chain sling 17, the left end of bridge floor 10 are provided with gear column 7, and the right side on gear column 7 is provided with discharge pipe 8, discharge pipe 8 lower section is provided with spanning 6, and bridge connecting hole 9 is provided in spanning 6, and the lower section of bridge connecting hole 9 is provided with arch 1, arch Counterfort 2 is provided on 1, and the lower section of arch 1 is provided with abutment 3, is provided with bridge pier 4 above the left end of abutment 3, is set on bridge pier 4 Bridge pier backplate 5 is equipped with, concrete wall 11 is mounted on the top of bridge pier backplate 5, and the lower section of concrete wall 11 is provided with and pours net Lattice 13 pour and mortar is provided on grid 13 pours slot 12, and the lower section for pouring grid 13 is provided with steel plate double wall 16, steel plate folder The lower section of wall 16 is provided with lower grid 14, and the lower section of lower grid 14 is provided with rubber cushion 15, and chain sling 17 is mounted on the inside of counterfort 2, And link block 18 is provided with above the right side of chain sling 17, the right side of link block 18 is provided with angle seat 19, the lower section of angle seat 19 It is provided with buckle 20.
In order to enable bridge obtains better consolidation effect, in the present embodiment, it is preferred that bridge pier 4 is altogether there are two settings, and Two bridge piers 4 are separately mounted to above the left and right ends of abutment 3, and bridge pier backplate 5 is altogether there are two settings, and two bridge pier backplates 5 It is corresponding respectively to be mounted on bridge pier 4.
In order to enable bridge pier backplate 5 is firmer, it can preferably disperse the power suffered by bridge pier 4, in the present embodiment, preferably , it is fixedly connected by pouring grid 13 between concrete wall 11 and steel plate double wall 16, led between rubber cushion 15 and steel plate double wall 16 It crosses down grid 14 to be fixedly connected, pours and be fixedly connected between grid 13 and lower grid 14 by steel plate double wall 16.
In order to enable preferably being connected between bridge pier 4 and spanning 6, preferably disperse the pressure from bridge floor 10, this implementation In example, it is preferred that it is fixedly connected between arch 1 and spanning 6 by link block 18, it is solid by buckle 20 between arch 1 and bridge pier 4 Fixed connection, angle seat 19 is altogether there are two settings, and two angle seats 19 are separately mounted to the top left and right ends of arch 1, bridge pier 4 It is fixedly connected between spanning 6 by angle seat 19.
In order to enable preferably connected between counterfort 2 and chain sling 17, in the present embodiment, it is preferred that counterfort 2 and chain sling 17 it Between be bolted to connection.
The operation principle and process for using of the utility model:After the utility model installs, by pre-configured sand Slurry, which is cast in, to be poured the mortar of grid 13 and lower grid 14 and pours in slot 12, steel plate double wall 16 is clamped in the grid that has poured it Between, grid is attached by concrete wall 11 and bridge pier 4, the grid in 4 outside of bridge pier is attached with rubber cushion 15, reduces rain The possibility that water corrodes bridge pier backplate 5 improves the bearing capacity of bridge pier 4 by bridge pier backplate 5, will lead between arch 1 and spanning 6 It crosses link block 18 to connect, will be fixedly connected between arch 1 and bridge pier 4 by buckle 20, it will be between arch 1, bridge pier 4 and spanning 6 Be fixedly connected by angle seat 19, be provided with chain sling 17 in the counterfort 2 on arch 1, the stress that arch 1 disperses by chain sling 17 into Row conduction makes bridge more firm, improves bridge service life.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of bridge construction bracing means, including bridge floor (10), concrete wall (11) and chain sling (17), it is characterised in that:Institute The left end for stating bridge floor (10) is provided with gear column (7), and discharge pipe (8), the discharge pipe (8) are provided on the right side of gear column (7) Lower section be provided with spanning (6), bridge connecting hole (9), the lower section of the bridge connecting hole (9) are provided on the spanning (6) Arch (1) is provided with, counterfort (2) is provided on the arch (1), and abutment (3), the bridge are provided with below arch (1) Bridge pier (4) is provided with above the left end of base (3), bridge pier backplate (5), the concrete wall (11) are provided on the bridge pier (4) It is provided with mounted on the top of bridge pier backplate (5), and below concrete wall (11) and pours grid (13), it is described to pour grid (13) mortar is provided on and pours slot (12), and pours and steel plate double wall (16) is provided with below grid (13), the steel plate folder Lower grid (14) is provided with below wall (16), rubber cushion (15), the chain sling (17) are provided with below the lower grid (14) Mounted on the inside of counterfort (2), and link block (18), the right side of the link block (18) are provided with above the right side of chain sling (17) Angle seat (19) is provided with, buckle (20) is provided with below the angle seat (19).
2. a kind of bridge construction bracing means according to claim 1, it is characterised in that:The bridge pier (4) is provided with altogether Two, and two bridge piers (4) are separately mounted to above the left and right ends of abutment (3), the bridge pier backplate (5) is provided with two altogether It is a, and two bridge pier backplates (5) are corresponding on bridge pier (4) respectively.
3. a kind of bridge construction bracing means according to claim 1, it is characterised in that:The concrete wall (11) and steel It is fixedly connected between plate double wall (16) by pouring grid (13), by off line between the rubber cushion (15) and steel plate double wall (16) Lattice (14) are fixedly connected, and described pour is fixedly connected between grid (13) and lower grid (14) by steel plate double wall (16).
4. a kind of bridge construction bracing means according to claim 1, it is characterised in that:The arch (1) and spanning (6) Between be fixedly connected by link block (18), between the arch (1) and bridge pier (4) by be buckled (20) be fixedly connected, it is described Angle seat (19) is altogether there are two settings, and two angle seats (19) are separately mounted to the top left and right ends of arch (1), the bridge It is fixedly connected between pier (4) and spanning (6) by angle seat (19).
5. a kind of bridge construction bracing means according to claim 1, it is characterised in that:The counterfort (2) and chain sling (17) it is bolted to connection between.
CN201721378306.6U 2017-10-24 2017-10-24 A kind of bridge construction bracing means Expired - Fee Related CN207512618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721378306.6U CN207512618U (en) 2017-10-24 2017-10-24 A kind of bridge construction bracing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721378306.6U CN207512618U (en) 2017-10-24 2017-10-24 A kind of bridge construction bracing means

Publications (1)

Publication Number Publication Date
CN207512618U true CN207512618U (en) 2018-06-19

Family

ID=62535070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721378306.6U Expired - Fee Related CN207512618U (en) 2017-10-24 2017-10-24 A kind of bridge construction bracing means

Country Status (1)

Country Link
CN (1) CN207512618U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112979236A (en) * 2021-01-28 2021-06-18 藤县生隆建材贸易有限公司 Concrete for corrosion prevention of bridge pier and production process thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112979236A (en) * 2021-01-28 2021-06-18 藤县生隆建材贸易有限公司 Concrete for corrosion prevention of bridge pier and production process thereof

Similar Documents

Publication Publication Date Title
CN109667377A (en) The construction method and prestressed concrete overlapped slab of prestressed concrete overlapped slab
CN207619856U (en) A kind of replaceable combination girder segment for bridge construction
CN201512345U (en) Multifunctional integrated lifting frame
CN211572573U (en) Bottom template suspension structure of integral seam of two-way prefabricated superimposed sheet
CN109281249A (en) A kind of UHPC-NC overlapping trestle deck structrue and its construction method
CN109914244A (en) A kind of weak support system and its operating method poured suitable for high tower steel reinforced concrete combination crossbeam Steel Structure Installation and bottom, concrete roof
CN107237270A (en) A kind of construction method of girder construction
CN102900024A (en) Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN207512618U (en) A kind of bridge construction bracing means
CN206815199U (en) A kind of Bridge Crack bracing means
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN205530888U (en) Utilize built -in cast in situ concrete superstructure structure that supports pipe die of NZ
CN101906757A (en) Assembly method for replacing plate type rubber support on abutment of highway bridge
CN210343359U (en) Prevent pressing of tunnel invert uplift and float structure
CN209873803U (en) Seawater corrosion resistant reinforced concrete structure and construction structure
CN201132941Y (en) Self floating lower carrying pole beam of moveable formwork
CN208899347U (en) A kind of box bracket suitable for Sarasota overarm brace
CN109252448B (en) Prepressing construction method of bridge tower column cross beam support
CN101324094A (en) Ball type relief component cast-in-situ hollow building roof and construction method thereof
CN210947410U (en) Prestressed recycled concrete hollow composite beam
CN209384101U (en) A kind of UHPC-NC overlapping trestle deck structrue
CN208168087U (en) A kind of dismountable floor plates system
CN210621625U (en) Device for preventing concrete inclined plane template from floating upwards
CN105863261A (en) Universally-adjustable suspension formwork system
CN209703806U (en) A kind of prestressed concrete overlapped slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

Termination date: 20191024

CF01 Termination of patent right due to non-payment of annual fee