CN101324094A - Ball type relief component cast-in-situ hollow building roof and construction method thereof - Google Patents

Ball type relief component cast-in-situ hollow building roof and construction method thereof Download PDF

Info

Publication number
CN101324094A
CN101324094A CNA2008101385148A CN200810138514A CN101324094A CN 101324094 A CN101324094 A CN 101324094A CN A2008101385148 A CNA2008101385148 A CN A2008101385148A CN 200810138514 A CN200810138514 A CN 200810138514A CN 101324094 A CN101324094 A CN 101324094A
Authority
CN
China
Prior art keywords
loading
spherical
cast
ball formula
loading component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101385148A
Other languages
Chinese (zh)
Inventor
王军艇
王凯隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2008101385148A priority Critical patent/CN101324094A/en
Publication of CN101324094A publication Critical patent/CN101324094A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to the field of general building construction, in particular to a ball-typed off-loading component cast-in-situ hollow floor and a construction method. The invention adopts the technical proposal that the invention comprises off-loading components which are fixed between an upper layer reinforcement and a lower layer reinforcement by a fixed connecting part; the concrete is filled in the gaps between the off-loading component and the reinforcement in the whole floor and between the off-loading components; the off-loading component are spherical off-loading cells and/or ball-typed off-loading raft sheets which are intermittently or compactly arranged; the floor adopts the spherical off-loading components, forms the optimum section shapes and improves the force-bearing performance of the floor; furthermore, the spherical off-loading component can be arranged in an integration type, thus improving the construction efficiency.

Description

A kind of ball formula off-loading component cast-in-situ hollow building roof and job practices thereof
Technical field
The invention belongs to buildings in general structure field, be specially a kind of ball formula off-loading component cast-in-situ hollow building roof with and job practices.
Background technology
Because himself characteristics of cast-in-situ hollow floor plate, can alleviate dead load, economical with materials, optimize the cross section, improve building heat preserving performance, sound insulation value and supporting capacity etc., obtain more and more widely popularization and use at present building field, so the application of off-loading component in hollow building cover is also extensive thereupon.The tubular off-loading component is most widely used general at present, but the bidirectional stress of cylindrical member is in bad order, be not suitable for than higher superstructure for force request, do not reach engine request, and for box-like off-loading component, the cost of making this member is higher, and it is long to fix and put time of off-loading component during building operations, thereby makes the engineering time prolong.
Summary of the invention
The objective of the invention is at the defective of above-mentioned existence and a kind of ball formula off-loading component cast-in-situ hollow building roof and job practices thereof are provided, the present invention adopts and to comprise by fixed connecting piece and be fixed in off-loading component between top reinforcement and the lower floor's reinforcing bar, concrete is filled between interior off-loading component of whole superstructure and the reinforcing bar and the space between the off-loading component, described off-loading component is spherical off-loading monomer and/or ball formula off-loading raft sheet interval or compact arranged technical scheme, this superstructure adopts spherical off-loading component, form the cross sectional shape of optimizing, the stress performance of superstructure improves, and can adopt the all-in-one-piece placement of spherical off-loading component, improve efficiency of construction.
In the present invention, the implication of so-called " closely arranging " is, adjacent off-loading monomer or ball formula off-loading raft sheet contact with each other, and this way of contact can contact for line, face contact, some contact.
The present invention realizes in the following manner, comprise by fixed connecting piece and be fixed in off-loading component between top reinforcement and the lower floor's reinforcing bar, concrete is filled between interior off-loading component of whole superstructure and the reinforcing bar and the space between the off-loading component, and described off-loading component is that spherical off-loading monomer and/or ball formula off-loading raft sheet are arranged at interval or closely.
The characteristics of technical scheme of the present invention also have: described ball formula off-loading raft sheet is for connecting tight or spaced spherical off-loading monomer or forming by the gel rubber material bonding connection by fixture; Described spherical off-loading monomer is whole rectangular evenly distributed or radial evenly distributed in superstructure; Described spherical off-loading monomer is spherical shape, oval spherical or oblate spheroid shape spheroid; Described spherical off-loading monomer is thin-walled hard hollow body or light foam body or gas cell; Described spherical off-loading monomer is isometrical or not isometrical spheroid.
The characteristics of technical scheme of the present invention also have, and when described ball formula off-loading raft length of a film and wide during all more than or equal to 600mm, are provided with sprue gate or pouring basin on combination raft sheet; On same ball formula off-loading raft sheet, the distance between described sprue gate or the pouring basin is smaller or equal to 600mm; The form of described sprue gate or pouring basin is formed by spherical off-loading combination of monomers.
The job practices of ball formula off-loading component cast-in-situ hollow building roof of the present invention comprises two big steps, and is specific as follows:
(1) formwork is laid step:
A side form bed die is set layer reinforcing bar or reinforced mesh on the bed die upper berth, colligation beam, girt strip reinforcing bar earlier; Settle the warm and draft tube liner of pre-buried water power; Lay cushion block then, lay and locate spherical off-loading monomer or ball formula off-loading raft sheet; With iron wire or wire gauze described off-loading component being fixed on lower floor has on the reinforcing bar or the braced structures under the template of reliable drawknot; Lay colligation top reinforcement or reinforced mesh;
(2) cast step:
Direction in order,, priority laminated pouring vibrated concrete, at first by beam, girt strip reinforcing bar space, sprue gate or pouring basin, the cast lower-layer concrete of vibrating, and observe confirm the lower-layer concrete cast full closely knit after, fill shutoff sprue gate or pouring basin with concrete or light material, then, layer concrete in the cast; Between concrete filling and off-loading member and the reinforcing bar and space between the off-loading component and vibration compacting, wipe off floating to design thickness; Maintenance to intensity reaches designing requirement length of time, form removal, obtains superstructure product of the present invention.
Beneficial effect of the present invention can be by obtaining above-mentioned description, off-loading component adopts the ball formula off-loading raft sheet of spherical off-loading monomer or spherical off-loading combination of monomers or off-loading monomer and off-loading raft sheet to use simultaneously, adopt this kind off-loading monomer to form the cross sectional shape of optimizing, form " worker " font stress point easily, improve the support stress-bearing capability of superstructure, thereby can reduce the consumption of concrete, reinforcing bar etc., improve porosity.Off-loading component can be carried out interval or closely arrangement as required, according to requirement of engineering such as stressed in different regional flexible arrangement, it is rectangular evenly distributed or radial evenly distributed etc. to carry out integral body, realized the combination of premium properties of the off-loading monomer of different structure form, optimize the cross section, make that the bidirectional stress situation of superstructure is good, can further increase porosity again.Ball formula off-loading raft sheet is tight or spaced spherical off-loading monomer to be connected by fixture or form by the gel rubber material bonding connection, before construction, can earlier the raft sheet be ready to, form whole, can be according to the needs reasonable disposition personnel's that construct work, fixing and putting the time when significantly reducing construction, increase work efficiency, reduce working strength of workers.The shape spherical shape of off-loading monomer, oval spherical or oblate spheroid shape spheroid, and be isometrical or not isometrical spheroid, be applicable in the different superstructures that require and use, this spherical off-loading monomer is thin-walled hard hollow body or light foam body or gas cell, can also be the combination of two hemisphere, for the combination of gas cell and hemisphere, significantly reduce the difficulty and the cost of transportation.When described ball formula off-loading raft length of a film and wide during all more than or equal to 600mm, on combination raft sheet, be provided with sprue gate or pouring basin, this sprue gate or pouring basin can also be as peep hole, air-vent and steam vents, guaranteed concrete casting quality under the macroporosity situation, handled easily, the form of described sprue gate or pouring basin is formed by spherical off-loading combination of monomers.In a word, superstructure of the present invention, stressed section optimal, and alleviate the building structure deadweight, increase the void content of superstructure, reduce the cost of transportation of off-loading component, improve workman's efficiency of construction, reduce construction costs on the whole, this shows, the present invention possesses outstanding substantive distinguishing features and obvious improvement.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the front view of off-loading raft sheet fixture of the present invention;
Another structural front view of Fig. 3 off-loading raft of the present invention sheet fixture;
Fig. 4 is the whole radial a kind of front view of off-loading monomer of the present invention;
Fig. 5 is the structural representation of oval spherical off-loading monomer;
Fig. 6 is the structural representation of oblate spheroid shape off-loading monomer;
Wherein, 1 is spherical off-loading monomer, and 2 is sprue gate or pouring basin, and 3 is lower floor's reinforcing bar, and 4 is top reinforcement, and 5 is fixed connecting piece, and 6 is beam or dark beam or rib.
The specific embodiment
Below in conjunction with accompanying drawing technical scheme of the present invention is described in detail.
As can be seen from Figure 1, cast-in-situ hollow building roof of the present invention, comprise by fixed connecting piece 5 and be fixed in off-loading component between top reinforcement 4 and the lower floor's reinforcing bar 3, concrete is filled between interior off-loading component of whole superstructure and the reinforcing bar and the space between the off-loading component, and described off-loading component is that spherical off-loading monomer 1 and/or ball formula off-loading raft sheet are arranged at interval or closely.
Ball formula off-loading raft sheet of the present invention is for connecting tight or spaced spherical off-loading monomer or forming by the gel rubber material bonding connection by fixture.Fig. 2, Fig. 3 are two kinds of form of structure of fixture, the off-loading raft sheet that forms, be respectively tight arrangement and spaced off-loading raft sheet, shown fixture can be for plastic material, also can be woven into for reinforcing bar and iron wire, the diameter of the circle of this fixture less than or the diameter that is slightly less than the off-loading monomer be advisable.When boning by gel rubber material, this gel rubber material can be for cement etc., in order to reach spaced purpose, and can be by light foam material as intermediate connector.Before construction, can be off-loading raft sheet with the off-loading combination of monomers in advance, be convenient to construction, increase work efficiency.Slit and groove can be filled with cementitious material or light material between combination raft sheet, are more conducive to increase the filler volume, optimize the cross section.
Spherical off-loading monomer of the present invention overall alignment form in superstructure can be provided with as required flexibly, and is for example rectangular evenly distributed or radial evenly distributed, and Fig. 4 is a kind of form of radial arrangement.
Spherical off-loading monomer of the present invention can be spherical shape, oval spherical, oblate spheroid shape spheroid, and Fig. 5, Fig. 6 are structural representation.Spherical off-loading monomer is thin-walled hard hollow body or light foam body or gas cell, as the off-loading monomer of hollow body, can be the combining form of two hemisphere.Spherical off-loading monomer can also be isometrical spheroid or waney spheroid.
Off-loading raft sheet of the present invention, long and wide during when it all more than or equal to 600mm, on combination raft sheet, be provided with sprue gate or pouring basin 2, the form of this sprue gate or pouring basin 2 is formed by spherical off-loading combination of monomers, it is the gap after the spherical off-loading combination of monomers, perhaps be that a spherical off-loading monomer is taken away the gap that the back forms, according to varying in size of the spherical off-loading monomer that uses, can be in different ways.The diverse in function of this sprue gate or pouring basin can be peep hole, air-vent and steam vent, promptly satisfies the engineering construction requirement, is convenient to constructing operation again, and sprue gate or pouring basin 8 be available concrete or light material filling shutoff after cast.On same ball formula off-loading raft sheet, the distance between described sprue gate or the pouring basin satisfies the closely knit requirement of cast smaller or equal to 600mm.
Job practices of the present invention is divided into two big steps:
(1) formwork is laid step:
A side form bed die is set layer reinforcing bar or reinforced mesh on the bed die upper berth, colligation beam, girt strip reinforcing bar earlier; Settle the warm and draft tube liner of pre-buried water power; Lay cushion block then, lay and locate spherical off-loading monomer or ball formula off-loading raft sheet; With iron wire or wire gauze described off-loading component being fixed on lower floor has on the reinforcing bar or the braced structures under the template of reliable drawknot; Lay colligation top reinforcement or reinforced mesh;
The cast-in-situ floor bigger to span, its template should be by the designing requirement arch camber; Pre-buried horizontal pipeline should be arranged between dark Liang Chu or close girt strip according to the caliber size as far as possible; To lay frame plate at any time in the off-loading component installation course, reinforcing bar, off-loading component finished product are protected; Off-loading component lay and reservation work is laid gluten after all finishing, and carry out colligation with the rib steel muscle; Off-loading component is laid and is finished, and after the gluten colligation, directly contacts with off-loading component for preventing gluten, can also place pad in the crosspoint of gluten in length and breadth and be placed between crosspoint and the off-loading component; Measure of anti float is generally established the anti-floating point, and the distance of anti-floating point surely can be in length and breadth every 1500mm-2000mm; In the work progress, the set aside pre-embedded work of installing engineering must intersect parallel carrying out with operations such as laying of reinforcing bar binding, thin-wall box body;
(2) cast step:
Direction in order,, priority laminated pouring vibrated concrete, at first by beam, girt strip reinforcing bar space, sprue gate or pouring basin, the cast lower-layer concrete of vibrating, and observe confirm the lower-layer concrete cast full closely knit after, fill shutoff sprue gate or pouring basin with concrete or light material, then, layer concrete in the cast; Between concrete filling and off-loading member and the reinforcing bar and space between the off-loading component and vibration compacting, wipe off floating to design thickness; Maintenance to intensity reaches designing requirement length of time, form removal, obtains superstructure product of the present invention.
Concrete pouring should be adopted pumping, one-time cast-forming, the cast direction of propulsion along girt strip axis direction or sprue gate or pouring basin carry out by easy stages, pouring out concrete should be even, prevent to pile up too high and the damage off-loading component, utilize the sphere of action of vibration, make concrete get into the off-loading component bottom, guarantee the closely knit of infiltration of lower-layer concrete mortar and girt strip, can carry out shutoff or make concrete fill sprue gate or pouring basin with light material for sprue gate or pouring basin by pouring into a mould layer concrete, form strong braced structures, strengthen the superstructure stressing conditions.
The present invention can pass through existing techniques in realizing without the technical characterictic of describing; certainly; above-mentioned explanation is not to be limitation of the present invention; the present invention also is not limited in above-mentioned giving an example; variation, remodeling, interpolation or replacement that those skilled in the art are made in essential scope of the present invention also should belong to protection scope of the present invention.

Claims (10)

1. ball formula off-loading component cast-in-situ hollow building roof, comprise by fixed connecting piece and be fixed in off-loading component between top reinforcement and the lower floor's reinforcing bar, concrete is filled between interior off-loading component of whole superstructure and the reinforcing bar and the space between the off-loading component, it is characterized in that: described off-loading component is that spherical off-loading monomer and/or ball formula off-loading raft sheet are arranged at interval or closely.
2. ball formula off-loading component cast-in-situ hollow building roof according to claim 1 is characterized in that, described ball formula off-loading raft sheet is for connecting tight or spaced spherical off-loading monomer or forming by the gel rubber material bonding connection by fixture.
3. ball formula off-loading component cast-in-situ hollow building roof according to claim 1 is characterized in that, described spherical off-loading monomer is whole rectangular evenly distributed or radial evenly distributed in superstructure.
4. ball formula off-loading component cast-in-situ hollow building roof according to claim 1 and 2 is characterized in that, described spherical off-loading monomer is spherical shape, oval spherical or oblate spheroid shape spheroid.
5. ball formula off-loading component cast-in-situ hollow building roof according to claim 1 and 2 is characterized in that, described spherical off-loading monomer is thin-walled hard hollow body or light foam body or gas cell.
6. ball formula off-loading component cast-in-situ hollow building roof according to claim 1 and 2 is characterized in that, described spherical off-loading monomer is isometrical or not isometrical spheroid.
7. ball formula off-loading component cast-in-situ hollow building roof according to claim 1 and 2 is characterized in that, when described ball formula off-loading raft length of a film and wide during all more than or equal to 600mm, is provided with sprue gate or pouring basin on combination raft sheet.
8. ball formula off-loading component cast-in-situ hollow building roof according to claim 7 is characterized in that, on same ball formula off-loading raft sheet, the distance between described sprue gate or the pouring basin is smaller or equal to 600mm.
9. ball formula off-loading component cast-in-situ hollow building roof according to claim 7 is characterized in that the form of described sprue gate or pouring basin is formed by spherical off-loading combination of monomers.
10. the job practices of a ball formula off-loading component cast-in-situ hollow building roof according to claim 1 is characterized in that:
(1) formwork is laid step:
A side form bed die is set layer reinforcing bar or reinforced mesh on the bed die upper berth, colligation beam, girt strip reinforcing bar earlier; Settle the warm and draft tube liner of pre-buried water power; Lay cushion block then, lay and locate spherical off-loading monomer or ball formula off-loading raft sheet; With iron wire or wire gauze described off-loading component being fixed on lower floor has on the reinforcing bar or the braced structures under the template of reliable drawknot; Lay colligation top reinforcement or reinforced mesh;
(2) cast step:
Direction in order,, priority laminated pouring vibrated concrete, at first by beam, girt strip reinforcing bar space, sprue gate or pouring basin, the cast lower-layer concrete of vibrating, and observe confirm the lower-layer concrete cast full closely knit after, fill shutoff sprue gate or pouring basin with concrete or light material, then, layer concrete in the cast; Between concrete filling and off-loading member and the reinforcing bar and space between the off-loading component and vibration compacting, wipe off floating to design thickness; Maintenance to intensity reaches designing requirement length of time, form removal, obtains superstructure product of the present invention.
CNA2008101385148A 2008-07-17 2008-07-17 Ball type relief component cast-in-situ hollow building roof and construction method thereof Pending CN101324094A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101385148A CN101324094A (en) 2008-07-17 2008-07-17 Ball type relief component cast-in-situ hollow building roof and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101385148A CN101324094A (en) 2008-07-17 2008-07-17 Ball type relief component cast-in-situ hollow building roof and construction method thereof

Publications (1)

Publication Number Publication Date
CN101324094A true CN101324094A (en) 2008-12-17

Family

ID=40187784

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101385148A Pending CN101324094A (en) 2008-07-17 2008-07-17 Ball type relief component cast-in-situ hollow building roof and construction method thereof

Country Status (1)

Country Link
CN (1) CN101324094A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321411A (en) * 2013-07-03 2013-09-25 武汉理工大学 Concrete pore structure design and control method based on internal form
CN103321412A (en) * 2013-06-07 2013-09-25 温博 Hollow floor air bag and construction method of cast-in-place hollow floors
CN105821999A (en) * 2016-03-23 2016-08-03 吉林建筑大学 Design method for cast-in-place concrete bidirectional hollow floor
CN110402313A (en) * 2017-03-07 2019-11-01 Nxt知识产权有限公司 Building system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321412A (en) * 2013-06-07 2013-09-25 温博 Hollow floor air bag and construction method of cast-in-place hollow floors
CN103321411A (en) * 2013-07-03 2013-09-25 武汉理工大学 Concrete pore structure design and control method based on internal form
CN105821999A (en) * 2016-03-23 2016-08-03 吉林建筑大学 Design method for cast-in-place concrete bidirectional hollow floor
CN110402313A (en) * 2017-03-07 2019-11-01 Nxt知识产权有限公司 Building system

Similar Documents

Publication Publication Date Title
CN101324093A (en) Combined type relief component cast-in-situ hollow building roof and construction method thereof
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN109184198A (en) Armored concrete girder construction, the method for permanent template and its composition
CN101324094A (en) Ball type relief component cast-in-situ hollow building roof and construction method thereof
CN214531150U (en) Novel connection structure of superimposed sheet and cast-in-place roof beam
CN201202194Y (en) Assembled tube type relief member cast-in-situ hollow building roof
CN109610338B (en) Construction method for preventing slurry leakage at bottom opening of tower column of suspension bridge
CN205776986U (en) A kind of BRT Lightweight core mould close rib composite floor plate
CN205840082U (en) A kind of BRT Lightweight core mould close rib composite floor structure
CN112647469B (en) Construction method of self-waterproof water channel structure with complex section
CN100535309C (en) Hollow slab in reinforcing steel bar concrete
CN104234432B (en) Shed deckhead construction method
CN201224936Y (en) Ball type relief component cast-in-situ hollow building roof
CN111335530A (en) Variable cross-section one-way hollow prefabricated slab for block building laminated slab
CN211368416U (en) Prefabricated decking is with pouring template and decking
CN100535307C (en) Light mould member for cast-in-situ concrete
CN211007284U (en) Mould shell for filling cast-in-place concrete hollow slab
CN107288028A (en) Large volume concrete structural and its construction method
CN101280608B (en) Assembled tube type off-loading component cast-in-situ hollow building roof and construction method thereof
CN111236554B (en) One-step forming pouring method for cornice
CN201358535Y (en) Prefabricated slab used for cast-in-situ floorslab
CN105908884A (en) Construction technology of BRT light mandrel dense rib composite floor
CN100467771C (en) Cavity construction member
CN100455738C (en) Light matrix member for in-situ cast concrete
CN100419177C (en) Steel concrete hollow plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20081217