CN207452932U - A kind of foundation stake component - Google Patents
A kind of foundation stake component Download PDFInfo
- Publication number
- CN207452932U CN207452932U CN201721369602.XU CN201721369602U CN207452932U CN 207452932 U CN207452932 U CN 207452932U CN 201721369602 U CN201721369602 U CN 201721369602U CN 207452932 U CN207452932 U CN 207452932U
- Authority
- CN
- China
- Prior art keywords
- pile
- raked
- joist
- piles
- plumb
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of foundation stake components, belong to foundation treatment technology field, the foundation stake component includes rigid pile, rigid pile includes multiple plumb piles, multiple first raked piles and multiple second raked piles, multiple plumb piles set two rows along ground is longitudinally spaced, multiple first raked piles are horizontally arranged at interval in a row along ground respectively with multiple second raked piles, and first the bottom of raked pile tilted towards the second raked pile, the bottom of second raked pile is tilted towards the first raked pile, the soil body is provided between rigid pile, the soil body includes Soft Soil Layer and hard stratum, plumb pile, first raked pile and the second raked pile consolidate after vertically passing through Soft Soil Layer with hard stratum.The utility model is related to foundation stake component on the basis of ground stability is ensured, plumb pile of the prior art is partially improved the raked pile being oppositely arranged to enhance foundation bearing capacity, construction efficiency is improved, reduces environmental pollution, reduces project cost.
Description
Technical field
The utility model is related to foundation treatment technology fields, and in particular to a kind of foundation stake component.
Background technology
Processing of the prior art for the adverse soil mass ground such as weak soil, is usually taken overly conservative way, in weak soil etc.
Adverse soil mass surface of stratum vertically squeezes into substantial amounts of rigid pile, although such way ensure that firm after Soft Ground
Property, but there is also all many deficiencies, these insufficient aspects mainly have:(1) low construction efficiency:It has required in the prior art
Into a large amount of pile foundation constructions, these pile foundation constructions need to expend substantial amounts of material and manpower, long construction period;(2) environmental pollution weight:
Pile foundation construction process can generate noise, dust and sewage etc., these noises, dust and sewage cause the environment on building site periphery dirty
Dye;(3) project cost is high:Pile foundation construction not only expends substantial amounts of material and manpower, it is also necessary to use mechanical equipment, these materials
Increase with manpower consumption's cost and mechanical equipment use cost all as pile foundation quantity increases.
Utility model content
The purpose of this utility model is to provide a kind of foundation stake component, to solve in the prior art apply
The problems such as work efficiency rate is low, environmental pollution is heavy, project cost is high.
To achieve the above object, the utility model discloses a kind of foundation stake component, the foundation stake components
Including rigid pile (1), the rigid pile (1) includes multiple plumb piles (101), multiple first raked piles (102) and multiple second
Raked pile (103), the multiple plumb pile (101) set two rows of, the multiple first raked pile along ground is longitudinally spaced
(102) it is obliquely installed respectively along ground lateral separation between two rows of plumb piles (101) with the multiple second raked pile (103)
It is in a row, and the lower part of first raked pile (102) is tilted towards the second raked pile (103), second raked pile (103)
Lower part is tilted towards the first raked pile (102);The soil body is provided between the rigid pile (1), the soil body includes Soft Soil Layer
(501) it is located at hard stratum (502), the hard stratum (502) below Soft Soil Layer (501), it is the plumb pile (101), described
It is solid with hard stratum (502) afterwards that first raked pile (102) and second raked pile (103) vertically pass through Soft Soil Layer (501)
Knot.
Preferably, the bottom cross section center of circle of several first raked piles (102) and several second raked piles
(103) the bottom cross section center of circle is located along the same line.
Further, joist (2), bearing sheet (3) and artificial back fill course (4), institute are provided with above the rigid pile (1)
It states and is provided with joist (2) at the top of rigid pile (1), Soft Soil Layer (501), joist (2) bottom are provided between the joist (2)
Joist bed course (201) has been filled between portion and lower section Soft Soil Layer (501);The joist (2) is provided with bearing sheet (3), institute above
It states and has filled bearing sheet bed course (301) between bearing sheet (3) bottom and the Soft Soil Layer (501) of lower section;The bearing sheet (3) is above
It is backfilled with artificial back fill course (4).
Further, the joist (2) includes a plurality of horizontal joist (21), and every horizontal joist (21) may be contained within horizontal stroke
To the top of two opposite plumb piles (101), the top of the first raked pile (102) and the top of the second raked pile (103) point
It does not extend upwardly in outermost two horizontal joists (21).
Further, the joist (2) includes two longitudinal joists (22), and every longitudinal joist (22) may be contained within two
The top of plumb pile (101) is arranged, the longitudinal direction joist (22) connects with horizontal joist (21).
Preferably, longitudinal joist (22) is identical with the top surface absolute altitude of horizontal joist (21).
Further, the top of the plumb pile (101) is rigidly connected with horizontal joist (21) and longitudinal joist (22).
Further, the top of first raked pile (102) and the top of second raked pile (103) with horizontal stroke
It is rigidly connected to joist (21).
Preferably, first raked pile (102) and second raked pile (103) are steel-pipe pile.
Preferably, the plumb pile (101) is steel-pipe pile or bored concrete pile.
The utility model has the following advantages that:
Foundation stake component provided by the utility model needs reinforcement for some without takes overly conservative do
Method waits adverse soil mass ground, and on the basis of ground stability is ensured, plumb pile of the prior art is partially improved as phase
Foundation bearing capacity is enhanced to the raked pile of setting, the structure improves construction efficiency, reduces environmental pollution, reduces work
Journey cost
Description of the drawings
Fig. 1 is the schematic longitudinal section of foundation stake component.
Fig. 2 is the elevation of rigid pile distribution.
Fig. 3 be Fig. 1 A-A to cross section view.
Fig. 4 is the elevation that joist is set at the top of rigid pile.
Fig. 5 is the elevation that bearing sheet is set above joist.
Fig. 6 is the cross section view of the B-B direction of Fig. 1.
Specific embodiment
The following examples illustrate the utility model, but is not intended to limit the scope of the present invention.
Embodiment 1
The structure of the utility model is described in detail with reference to figure.
With reference to figure 1, foundation stake component disclosed in the utility model, the foundation stake component includes:Rigid pile
1st, joist 2, bearing sheet 3 and artificial back fill course 4, include Soft Soil Layer between the rigid pile 1 filled with the soil body, the soil body
501 and hard stratum 502, hard stratum 502 is located at the lower section of Soft Soil Layer 501, rigid pile 1 vertically pass through after Soft Soil Layer 501 with it is hard
Soil layer 502 consolidates;The top of rigid pile 1 is provided with joist 2, and Soft Soil Layer 501 is provided between joist 2;Joist 2 is set above
There is bearing sheet 3;Bearing sheet 3 is backfilled with artificial back fill course 4 above.
With reference to figure 2, the rigid pile 1 includes multiple plumb piles 101, multiple first raked piles 102 and multiple second tilt
Stake 103, the multiple plumb pile 101 set two rows of, the multiple first raked pile 102 and the multiple along ground is longitudinally spaced
Second raked pile 103 be obliquely installed respectively along ground lateral separation between two rows of plumb piles 101 it is in a row, and described first
The lower part of raked pile 102 is tilted towards the second raked pile 103, and the lower part of second raked pile 103 is inclined towards the first raked pile 102
Tiltedly.
Preferably, the bottom cross section center of circle of the first raked pile 102 and the bottom cross section center of circle position of the second raked pile 103
In on same straight line.
Preferably, first raked pile 102 and second raked pile 103 are steel-pipe pile, and the plumb pile 101 is steel
Pile pile or bored concrete pile.
With reference to figure 3 and Fig. 4, the joist 2 includes a plurality of horizontal joist 21, and every horizontal joist 21 may be contained within transverse direction
Prolong upwards respectively on the top of the top of two opposite plumb piles 101, the top of the first raked pile 102 and the second raked pile 103
It extends in outermost two horizontal joists 21, joist bed course has been filled between transverse direction 21 bottom of joist and Soft Soil Layer 501
201。
With reference to figure 4 and Fig. 5, the joist 2 further includes two longitudinal joists 22, and every longitudinal joist 22 may be contained within two rows
The top of plumb pile 101, the longitudinal direction joist 22 connect with horizontal joist 21, longitudinal direction 22 bottom of joist and Soft Soil Layer 501
Between filled joist bed course 201.
Preferably, longitudinal joist 22 is identical with the top surface absolute altitude of horizontal joist 21.
Preferably, the top of the plumb pile 101 is rigidly connected with horizontal joist 21, longitudinal joist 22.
Preferably, the top of first raked pile 102, second raked pile 103 top with horizontal joist 21
Rigid connection
With reference to figure 5 and Fig. 6, the joist 2 is provided with bearing sheet 3 above, and bearing sheet 3 is backfilled with artificial back fill course above
4, fill bearing sheet bed course 301 between 3 bottom of bearing sheet and Soft Soil Layer 501.
Although above having made detailed description to the utility model with generality explanation and specific embodiment,
On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art
's.Therefore, the these modifications or improvements on the basis of without departing from the utility model spirit, belonging to the utility model will
Seek the scope of protection.
Claims (9)
1. a kind of foundation stake component, which is characterized in that the foundation stake component includes rigid pile (1), the rigidity
Stake (1) includes multiple plumb piles (101), multiple first raked piles (102) and multiple second raked piles (103), the multiple to hang down
Straight stake (101) sets two rows of, the multiple first raked pile (102) and the multiple second raked pile along ground is longitudinally spaced
(103) it is obliquely installed in a row, and first raked pile along ground lateral separation respectively between two rows of plumb piles (101)
(102) lower part is tilted towards the second raked pile (103), and the lower part of second raked pile (103) is inclined towards the first raked pile (102)
Tiltedly;The soil body is provided between the rigid pile (1), the soil body includes Soft Soil Layer (501) and hard stratum (502), the pan soil
Layer (502) is located at below Soft Soil Layer (501), and the plumb pile (101), first raked pile (102) and described second incline
Taper pile (103) vertically passes through Soft Soil Layer (501) and is consolidated afterwards with hard stratum (502).
2. foundation stake component as described in claim 1, which is characterized in that the bottom of first raked pile (102) is horizontal
The section center of circle and the bottom cross section center of circle of second raked pile (103) are located along the same line.
3. foundation stake component as described in claim 1, which is characterized in that be provided with joist at the top of the rigid pile (1)
(2), Soft Soil Layer (501) is provided between the joist (2), is filled out between joist (2) bottom and the Soft Soil Layer (501) of lower section
Joist bed course (201) is built;The joist (2) is provided with bearing sheet (3) above, bearing sheet (3) bottom and lower section it is soft
Bearing sheet bed course (301) is filled between soil layer (501), the bearing sheet (3) is backfilled with artificial back fill course (4) above.
4. foundation stake component as claimed in claim 3, which is characterized in that the joist (2) includes a plurality of horizontal joist
(21), every horizontal joist (21) may be contained within the top of of laterally opposite two plumb piles (101), the first raked pile (102)
Top and the top of the second raked pile (103) extend upwardly to respectively in outermost two horizontal joists (21).
5. foundation stake component as claimed in claim 4, which is characterized in that the joist (2) includes two longitudinal joists
(22), every longitudinal joist (22) may be contained within the top of two rows of plumb piles (101), the longitudinal direction joist (22) and horizontal joist
(21) connect.
6. foundation stake component as claimed in claim 5, which is characterized in that the top of the plumb pile (101) with horizontal stroke
It is rigidly connected to joist (21) and longitudinal joist (22).
7. foundation stake component as claimed in claim 4, which is characterized in that the top of first raked pile (102) and
The top of second raked pile (103) is rigidly connected with horizontal joist (21).
8. the foundation stake component as described in claim 1 or 2 or 4 or 7, which is characterized in that first raked pile (102)
It is steel-pipe pile with second raked pile (103).
9. the foundation stake component as described in claim 1 or 4 or 5, which is characterized in that the plumb pile (101) is steel pipe
Stake or bored concrete pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721369602.XU CN207452932U (en) | 2017-10-23 | 2017-10-23 | A kind of foundation stake component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721369602.XU CN207452932U (en) | 2017-10-23 | 2017-10-23 | A kind of foundation stake component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207452932U true CN207452932U (en) | 2018-06-05 |
Family
ID=62281224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721369602.XU Expired - Fee Related CN207452932U (en) | 2017-10-23 | 2017-10-23 | A kind of foundation stake component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207452932U (en) |
-
2017
- 2017-10-23 CN CN201721369602.XU patent/CN207452932U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207003475U (en) | Eco-friendly barrier wall structure for covering layer slope | |
DE202020106244U1 (en) | Single pile composite foundation structure for offshore wind power | |
CN102864789A (en) | Retaining wall drainage system and construction method thereof | |
CN205046541U (en) | Composite foundation | |
CN205576637U (en) | Processing closes on roadbed structure of existing line soft soil foundation | |
CN204551490U (en) | A kind of suspension type reinforced concrete fortifield village purlin | |
CN112854260B (en) | Ecological concrete rock-soil slope protection structure and construction method | |
CN111622240B (en) | Trapezoidal toe-added drainage slide-resistant pile and construction method thereof | |
CN207295756U (en) | Coating subgrade strengthening structure | |
CN207452932U (en) | A kind of foundation stake component | |
CN203270559U (en) | Roadbed structure of screw pile network structure composite foundation | |
CN102943480B (en) | Loess foundation pit supporting method | |
CN106400649A (en) | Permeable clogging-preventing pavement structure | |
CN203716273U (en) | Multifunctional ecological draining gutter | |
CN206428538U (en) | Sea sand road structure | |
CN205420939U (en) | Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw | |
CN208933944U (en) | Relative settlement optimal control structure | |
CN208701738U (en) | A kind of solid reinforcement combination of rigidity and flexibility ecology retaining wall | |
CN208009393U (en) | A kind of non-dankly base manure slot backfill structure based on sponge city | |
CN207974143U (en) | Applied to the stake Torquay beam barricade in steep slope subgrade | |
CN207727558U (en) | A kind of pile foundation quality control system | |
CN102926375A (en) | Sludge discharge field constructing method for speeding up dehydration, solidification and stabilization of dredged sediment | |
CN207608922U (en) | A kind of architectural engineering retaining wall | |
CN206438481U (en) | Barricade | |
CN205296193U (en) | Karst depression curved surface secretly oozes drainage structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180605 Termination date: 20181023 |
|
CF01 | Termination of patent right due to non-payment of annual fee |