CN207974143U - Applied to the stake Torquay beam barricade in steep slope subgrade - Google Patents

Applied to the stake Torquay beam barricade in steep slope subgrade Download PDF

Info

Publication number
CN207974143U
CN207974143U CN201820055473.5U CN201820055473U CN207974143U CN 207974143 U CN207974143 U CN 207974143U CN 201820055473 U CN201820055473 U CN 201820055473U CN 207974143 U CN207974143 U CN 207974143U
Authority
CN
China
Prior art keywords
barricade
pile foundation
joist
reinforcement
torquay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820055473.5U
Other languages
Chinese (zh)
Inventor
苗贵华
张光明
张瑞斌
李庆贺
王国栋
池育源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201820055473.5U priority Critical patent/CN207974143U/en
Application granted granted Critical
Publication of CN207974143U publication Critical patent/CN207974143U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The stake Torquay beam barricade being applied in steep slope subgrade of the utility model, including pile foundation, joist and barricade, are characterized in that:Barricade is fixedly connected with joist through equally distributed spiral, the side of barricade towards roadbed be provided with meet native inclined-plane, horizontal bearing face and under meet native inclined-plane;Pile foundation is by pile foundation steel bar cage, pile foundation coagulation local soil type at pile foundation steel bar cage is made of vertical reinforcement, and vertical reinforcement is from top to bottom provided with spiral reinforcement and lower spiral reinforcement, and the diameter of upper spiral reinforcement from top to bottom is gradually reduced.The stake Torquay beam barricade of the utility model, barricade are fixed on through spaced spiral on joist, ensure that barricade has stronger stability;Barricade can realize the excellent support to roadbed and ground, ensure that the stability of formed roadbed so that the roadbed safeguarded, road surface are durable, and a kind of effective retaining structure is provided for high steep roadbed construction.

Description

Applied to the stake Torquay beam barricade in steep slope subgrade
Technical field
The utility model is related to a kind of Torquay beam barricades, more specifically, more particularly to a kind of applied to steep slope subgrade In stake Torquay beam barricade.
Background technology
In highway, railway bed process of construction, it is frequently encountered the situation constructing roadbed in steep slope region.As especially In China western mountainous areas, landform cutting is violent, and there are Valley Development, ravines and guillies criss-cross, landform horizontal slope is steeper, occur stability compared with Poor high steep roadbed.To prevent from banketing or soil deformation unstability, stablizes the roadbed on abrupt slope, need that slope supporting structure, mesh is arranged Before, roadbed side slope retaining structure form is numerous, but can not only have been solved foundation bearing capacity using pile foundation joist retaining wall but also can have been reinforced Side slope is reduced and is interfered slopes.And save the area, obtain good engineering and economic effect.
Invention content
The shortcomings that the utility model is in order to overcome above-mentioned technical problem provides a kind of stake support applied in steep slope subgrade Base beam barricade.
The stake Torquay beam barricade being applied in steep slope subgrade of the utility model, including pile foundation(1), joist(2)And barricade (3), pile foundation is located at abrupt slope(5)Ground among, joist is fixed in pile foundation;It is characterized in that:Barricade is with joist through uniformly dividing The spiral of cloth(4)It is fixedly connected, the lower section of barricade is the lower surface being in contact with joist(25), barricade towards roadbed one Side, which is from top to bottom disposed with, meets native inclined-plane(27), horizontal bearing face(28)Native inclined-plane is met under(29);The pile foundation by Pile foundation steel bar cage(8)With the pile foundation concrete for pouring portion in the inner and periphery(9)Composition, pile foundation steel bar cage are followed successively by from the bottom to top Tip section(11), middle part cylindrical section(10)With support section(12);Pile foundation steel bar cage is by the vertical reinforcement that is distributed according to annular space (17)Composition, vertical reinforcement are from top to bottom provided with spiral reinforcement(13)With lower spiral reinforcement(14), upper spiral reinforcement is by upper Diameter under is gradually reduced, and lower spiral reinforcement is by cylindrical section(20)With the closing in section positioned at cylindrical section lower end(21)Composition.
The stake Torquay beam barricade being applied in steep slope subgrade of the utility model, the pile foundation steel bar cage(8)On by up to Under 2m is provided with annulus(15), the periphery of each annulus is provided with 4 auxiliary bars being fixed on steel reinforcement cage(16), Auxiliary bar is by bending section(23)With the vertical section for being fixed on its both ends(22)Composition.
The stake Torquay beam barricade being applied in steep slope subgrade of the utility model, the joist(2)In be provided with joist steel Muscle cage(24), spiral(4)Lower part be fixed on joist steel reinforcement cage(24)On.
The stake Torquay beam barricade being applied in steep slope subgrade of the utility model, the vertical reinforcement(17)By the straight of middle part Line segment and the upper bending part for being fixed thereon lower both ends(18)With lower bending part(19)Composition.
The utility model has the beneficial effects that:The stake Torquay beam barricade of the utility model, by pile foundation, joist and barricade group At barricade is fixed on through spaced spiral on joist, ensure that barricade has stronger stability;Barricade is towards road The side of base be provided with meet native inclined-plane, horizontal bearing face and under meet native inclined-plane, it can be achieved that excellent support to roadbed and ground, It ensure that the stability of formed roadbed.Pile foundation steel bar cage is from top to bottom divided into support section, middle part cylindrical section and tip section, and steel Muscle cage is made of vertical reinforcement and upper and lower spiral reinforcement, is effectively guaranteed the intensity of formed steel bar concrete pile, favorably In forming firm stake Torquay beam barricade so that the roadbed safeguarded, road surface are durable, to be built in loess plateau area Road provides a kind of effective stake Torquay beam barrier wall structure.
Description of the drawings
Fig. 1 is the structural schematic diagram of the stake Torquay beam barricade of the utility model;
Fig. 2 is the structural schematic diagram of the utility model pile foundation steel reinforcement cage;
Fig. 3 is the structural schematic diagram of vertical reinforcement in the utility model;
Fig. 4 is the structural schematic diagram of upper bolt reinforcing bar in the utility model;
Fig. 5 is the structural schematic diagram of lower bolt reinforcing bar in the utility model;
Fig. 6 is the structural schematic diagram of annulus in the utility model;
Fig. 7 is the structural schematic diagram of auxiliary bar in the utility model;
Fig. 8 is the front view of joist in the utility model;
Fig. 9 is the vertical view of joist in the utility model;
Figure 10 is the structural schematic diagram of barricade in the utility model.
In figure:1 pile foundation, 2 joists, 3 barricades, 4 spirals, 5 abrupt slopes, 6 roadbeds, 7 road surfaces, 8 pile foundation steel bar cages, 9 pile foundations Concrete, 10 middle part cylindrical sections, 11 tip sections, 12 support sections, spiral reinforcement on 13,14 times spiral reinforcements, 15 annulus, 16 auxiliary Reinforcing bar, 17 vertical reinforcements, bending part on 18,19 times bending parts, 20 cylindrical sections, 21 closing in sections, 22 vertical sections, 23 bending sections, 24 Joist steel reinforcement cage, 25 lower surfaces, 26 lateral surfaces meet native inclined-plane on 27,28 horizontal bearing faces, and native inclined-plane is met under 29.
Specific implementation mode
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1, the structural schematic diagram of the stake Torquay beam barricade of the utility model is given, by pile foundation 1, joist 2 It is formed with barricade 3, pile foundation 1 is inserted among the ground on abrupt slope 5, in order to ensure the stability of formed pile foundation 1, the lower end of pile foundation 1 To be located on sandstone, sequentially pass through farinose argillic horizon and powder soil horizon from the bottom to top.Joist 2 is fixed on the upper end of pile foundation 1, for reality The setting of two rows can be used in existing firm support of the pile foundation 1 to joist 2, pile foundation 1, and the pile foundation 1 in often going is spaced apart.Shown barricade 3 Spiral 4 through being spaced apart is fixed with 2 phase of joist, and the upper end of spiral 4 is stretched into barricade 3, the lower end of spiral 4 Be inserted among joist 2, thereby realize being fixedly secured in joist 2 of barricade 3, be conducive to barricade 3 to roadbed 6 and abrupt slope 5 into Row support.
As shown in Fig. 2, giving the structural schematic diagram of the utility model pile foundation steel reinforcement cage 8, pile foundation steel bar cage 8 is generally Cylinder is made of spaced vertical reinforcement 17, as shown in figure 3, giving vertical reinforcement 17 in the utility model Structural schematic diagram, shown in vertical reinforcement by middle part straightway and be fixed on the upper bending part 18 and lower bending part 19 at its both ends Composition.Vertical reinforcement 17 according to upper bending part 18 outwardly, lower bending part 19 inwardly form arrangement, material is thus formed by up to Under be followed successively by the pile foundation steel bar cage 8 of support section 12, middle part cylindrical section 10 and tip section 11, support section 12.
The support section 12 of pile foundation steel bar cage 8 is upper coarse and lower fine truncated cone shape, and spiral steel is provided in support section 12 Muscle 13, as shown in figure 4, give in the utility model the structural schematic diagram of spiral reinforcement 13, shown in spiral reinforcement 13 by Diameter under is gradually reduced.It is provided with lower spiral reinforcement 14 on the middle part cylindrical section 10 and tip section 11 of pile foundation steel bar cage 8, As shown in figure 5, the structural schematic diagram of lower spiral reinforcement 14 in the utility model is given, by 21 groups of cylindrical section 20 and closing in section At cylindrical section 20 is corresponding with middle part cylindrical section 10, and closing in section 21 is corresponding with tip section 11.
Every a distance on pile foundation steel bar cage 8(Such as 2m)With regard to an annulus 15 is arranged, annulus 15 is bound in vertical reinforcement On 17.The periphery of each annulus 15 is evenly arranged with multiple(Such as 4)Auxiliary bar 16 provides respectively as shown in Figure 6 and Figure 7 The structural schematic diagram of annulus 15 and auxiliary bar 16 in the utility model, auxiliary bar is by bending section 23 and is fixed on bending section The vertical section 22 at both ends forms, and vertical section 22 is bound on the vertical reinforcement 17 of 15 both sides of annulus.In this way, in pile foundation steel bar cage 8 It is inside and outside to pour pile foundation concrete 9, you can to form firm pile foundation 1.
As shown in Figure 8 and Figure 9, the front view and vertical view of joist in the utility model is set forth, shown in joist 2 In be provided with joist steel reinforcement cage 24, the inside and periphery of joist steel reinforcement cage 24 have poured concrete, to form firm joist 2. The interval of shown spiral 4 is fixed on joist steel reinforcement cage 24, plays the role of connecting joist 2 and barricade 3.
As shown in Figure 10, give the structural schematic diagram of barricade 3 in the utility model, shown in barricade 3 through spiral 4 It is fixed on joist 2, the lower surface 25 of barricade 3 is in contact with joist 2, and barricade 3 is lateral surface 26, court backwards to the side of roadbed 6 From top to bottom be followed successively by the side of roadbed meet native inclined-plane 27, horizontal bearing face 28 and under meet native inclined-plane 29, with realize to oblique Slope 5 and roadbed 6 carries out firm support on slope 5.

Claims (4)

1. a kind of stake Torquay beam barricade applied in steep slope subgrade, including pile foundation(1), joist(2)And barricade(3), pile foundation position In abrupt slope(5)Ground among, joist is fixed in pile foundation;It is characterized in that:Barricade is with joist through equally distributed screw-thread steel Muscle(4)It is fixedly connected, the lower section of barricade is the lower surface being in contact with joist(25), barricade towards the side of roadbed from top to bottom It is disposed with and meets native inclined-plane(27), horizontal bearing face(28)Native inclined-plane is met under(29);The pile foundation is by pile foundation steel bar cage (8)With the pile foundation concrete for pouring portion in the inner and periphery(9)Composition, pile foundation steel bar cage are followed successively by tip section from the bottom to top (11), middle part cylindrical section(10)With support section(12);Pile foundation steel bar cage is by the vertical reinforcement that is distributed according to annular space(17)Group At vertical reinforcement is from top to bottom provided with spiral reinforcement(13)With lower spiral reinforcement(14), upper spiral reinforcement is from top to bottom Diameter is gradually reduced, and lower spiral reinforcement is by cylindrical section(20)With the closing in section positioned at cylindrical section lower end(21)Composition.
2. the stake Torquay beam barricade according to claim 1 applied in steep slope subgrade, it is characterised in that:The pile foundation steel Muscle cage(8)On 2m is from top to bottom provided with annulus(15), the periphery of each annulus is provided with 4 be fixed on steel reinforcement cage A auxiliary bar(16), auxiliary bar is by bending section(23)With the vertical section for being fixed on its both ends(22)Composition.
3. the stake Torquay beam barricade according to claim 1 or 2 applied in steep slope subgrade, it is characterised in that:The support Beam(2)In be provided with joist steel reinforcement cage(24), spiral(4)Lower part be fixed on joist steel reinforcement cage(24)On.
4. the stake Torquay beam barricade according to claim 1 or 2 applied in steep slope subgrade, it is characterised in that:It is described perpendicular To reinforcing bar(17)By middle part straightway and be fixed thereon the upper bending part at lower both ends(18)With lower bending part(19)Composition.
CN201820055473.5U 2018-01-15 2018-01-15 Applied to the stake Torquay beam barricade in steep slope subgrade Expired - Fee Related CN207974143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820055473.5U CN207974143U (en) 2018-01-15 2018-01-15 Applied to the stake Torquay beam barricade in steep slope subgrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820055473.5U CN207974143U (en) 2018-01-15 2018-01-15 Applied to the stake Torquay beam barricade in steep slope subgrade

Publications (1)

Publication Number Publication Date
CN207974143U true CN207974143U (en) 2018-10-16

Family

ID=63768926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820055473.5U Expired - Fee Related CN207974143U (en) 2018-01-15 2018-01-15 Applied to the stake Torquay beam barricade in steep slope subgrade

Country Status (1)

Country Link
CN (1) CN207974143U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197516A (en) * 2020-09-17 2022-03-18 云南宏图工程设计有限公司 Integrated anti-sliding pile foundation joist retaining wall and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197516A (en) * 2020-09-17 2022-03-18 云南宏图工程设计有限公司 Integrated anti-sliding pile foundation joist retaining wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
GB2138057A (en) Method of building strengthened, embanked foundation
CN106702840B (en) Anchor-pull type pile-bearing reinforced earth retaining wall embankment for treating soft soil roadbed on shoreside
CN202466620U (en) Reinforced concrete buttress retaining wall
CN106835880A (en) Highway lateral support type peg board formula is without earth roadbed
CN207974143U (en) Applied to the stake Torquay beam barricade in steep slope subgrade
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN207295756U (en) Coating subgrade strengthening structure
CN203270559U (en) Roadbed structure of screw pile network structure composite foundation
CN210766863U (en) Multi-arch rib anchoring plate retaining wall
CN215977211U (en) Structure is handled to compound foundation of tubular pile combination cement mixing pile
CN102352582A (en) Reinforced soil-cement pile strengthening structure of railway roadbed
CN110206020A (en) Prefabricated snowflake type concrete steel sheet pile and its construction method
CN210507503U (en) Pile-raft composite foundation structure
CN108660886B (en) High embankment structure built on landslide body
CN202187263U (en) Ribbed cement soil piling reinforcement structure of railway roadbed
CN210104765U (en) High and large retaining structure of soft geological side slope
CN208151788U (en) Complex foundation Modified airport runway device
CN207862947U (en) A kind of enclosure structure of foundation pit of subway station support
CN206503171U (en) Concrete-pile
RU2796132C1 (en) Culvert structure with the use of rod structures of multifaceted structure
CN206376270U (en) Prefabricated assembled ground
CN218951867U (en) Composite reinforced roadbed widening structure for road widening
CN214362916U (en) Modular cast-in-place box girder supporting structure
CN205576663U (en) Highway weak soil layer stake composite foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181016

Termination date: 20200115

CF01 Termination of patent right due to non-payment of annual fee