CN207408823U - A kind of train braking system debugs platform - Google Patents

A kind of train braking system debugs platform Download PDF

Info

Publication number
CN207408823U
CN207408823U CN201721453581.XU CN201721453581U CN207408823U CN 207408823 U CN207408823 U CN 207408823U CN 201721453581 U CN201721453581 U CN 201721453581U CN 207408823 U CN207408823 U CN 207408823U
Authority
CN
China
Prior art keywords
console
braking system
data terminal
data
train braking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721453581.XU
Other languages
Chinese (zh)
Inventor
朱西深
徐晟航
沈华波
王中方
赵建博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Zhongche Sifang Maintenance Center Co Ltd
CRRC Qingdao Sifang Co Ltd
Original Assignee
CRRC Qingdao Sifang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Qingdao Sifang Co Ltd filed Critical CRRC Qingdao Sifang Co Ltd
Priority to CN201721453581.XU priority Critical patent/CN207408823U/en
Application granted granted Critical
Publication of CN207408823U publication Critical patent/CN207408823U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model is related to a kind of train braking system debug platform, including multiple data terminals, for connecting train braking system acquisition real time data and realizing realtime curve and Drawing of Curve, history curve inquiry;Console, for controlling the working condition of each data terminal, brake signal, braking-distance figures, car status information concentrated collection, management, analysis, archive;It is connected between the multiple data terminal and console by TCP/IP communication agreement.The utility model data terminal is furnished with local monitor, the data such as displaying data in real-time terminal operating status, test data, test type, TCP/IP communication protocol networking is used between console and data terminal, console centralized Control EMU total data terminal, it is connected up between reduction system, increases system flexibility, reliability.

Description

A kind of train braking system debugs platform
Technical field
The utility model is related to a kind of debugging platform, more particularly to a kind of train braking system debugging platform.
Background technology
With rapid development of the high-speed railway in China, bullet train speed is getting faster, as nine high point of bullet train One of key technology, braking system can reliable and stable work be directly related to the safe and stable operation of bullet train.In order to prevent Trigger serious accident due to high-speed train braking system failure, ensure the reliability of braking system, it is necessary to high-speed train braking System carries out test adjustment.
Existing high ferro Braking System for Multiple Units pilot system to need manual operation there are experiment process, record, and can not gather The problems such as car status information, debugging semiotic function multiplexing, the test requirements document of various forms marshalling EMU can not be met.
Utility model content
The technical issues of main purpose of the utility model is to solve in the prior art, providing one kind can record automatically Experiment process, the rail vehicle braking system debugging monitoring system of collection vehicle state.
To achieve the above object, the technical solution of the utility model is:
A kind of train braking system debugs platform, real for connecting train braking system acquisition including multiple data terminals When data and realize realtime curve and Drawing of Curve, history curve inquiry;
Console, for controlling the working condition of each data terminal, brake signal, braking-distance figures, car status information collection Middle acquisition, management, analysis, archive;
It is connected between the multiple data terminal and console by TCP/IP communication agreement.
Further, including multiple consoles and central monitoring center, the multiple console and central monitoring Centrally through network connection.
Further, the console includes DSP control system and is shown with the human-computer interaction that the DSP control system is connected Screen, the DSP control system are connected by TCP/IP communication agreement with multiple data terminals, are set in the DSP control system It is equipped with the working condition for controlling each data terminal, the comprehensive management module for realizing different braking mode.
Further, mobile terminal is further included, the mobile terminal passes through wireless network connection with the DSP control system.
Further, the mobile terminal is tablet computer or smart mobile phone.
Further, each data terminal connects a touch-screen.
A kind of to sum up content, train braking system debugging platform described in the utility model, has the following advantages that:
(1), data terminal is furnished with local monitor, displaying data in real-time terminal operating status, test data, test type etc. Data.
(2), TCP/IP communication protocol networking is used between console and data terminal, console centralized Control EMU is complete Portion's data terminal is connected up between reduction system, increases system flexibility, reliability.
(3), console and mobile terminal device meet commissioning staff detection and control at a distance using WIFI wireless communications System.
Description of the drawings
Fig. 1 is the utility model debugging platform structure schematic diagram;
Fig. 2 is Tthe utility model system wind path structure schematic diagram.
As depicted in figs. 1 and 2, data terminal 1, proportional controller 2,3 position-5 way solenoid valve 3, pressure sensor 4, outside Wind regime import 5, empty spring pressure entrance 6, brake pressure entrance 7.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings:
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, is further elaborated the utility model.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
As shown in Figure 1, a kind of train braking system debugging platform, including a central monitoring center, multigroup console, more A data terminal 1.
Wherein central monitoring center is for the working condition of whole brake system test platforms, vehicle in the enterprise of monitoring at any time The information such as experimental data, experiment progress.Multigroup console and central monitoring center pass through network connection.
Every group of console corresponds to a set of train braking system, and multiple data terminals 1 correspond to each of train braking system respectively Subsystem, such as wind path, anti-skidding, auxiliary braking etc..Wind path design as shown in Figure 2, data terminal 1 are set using modularization, Data terminal 1 possesses external wind regime import 5, empty spring pressure entrance 6, brake pressure entrance 7, including proportional controller 2, three five Three-way electromagnetic valve 3, pressure sensor 4, external wind regime import 5 are connected with the entrance of proportional controller 2, the outlet of proportional controller 2 3 position-5 way solenoid valve 3 is connected, empty spring pressure 6 connects 3 position-5 way solenoid valve 3.Data terminal 1 is excellent with miniaturization, facilitation Point.
Data terminal 1 connect a touch-screen, data terminal 1 for gather real time data and realize realtime curve and Drawing of Curve, history curve inquiry.Console is used to control the working condition of each data terminal of a set of train braking system, system Dynamic signal, braking-distance figures, car status information concentrated collection, management, analysis, archive.Between multiple data terminals 1 and console It is connected by TCP/IP communication agreement, the data terminal 1 of a set of train braking system of console centralized Control, cloth between reduction system Line increases system flexibility, reliability.
Console includes DSP control system and the man-machine interaction display screen being connected with DSP control system, DSP control system It is connected with multiple data terminals 1 by TCP/IP communication agreement, is provided with to control each data terminal in DSP control system Working condition, realize different braking mode comprehensive management module.
DSP control system has 8 road voltage and current sampling channels, 16 railway digital amount I/O channels, 8 tunnel optical drive letters Number I/O channel, RS485 and CAN communication interface channel.
For DSP control system also with mobile terminal by wireless network connection, mobile terminal is tablet computer or smart mobile phone, Meet the remote Detection & Controling of commissioning staff.DSP control system can realize the selection of different braking mode, parameter setting, song The functions such as line importing, realize one key of retardation test, intelligence.The working condition of each data terminal 1 is set by console, it is full The various vehicle marshalling forms of foot.The information such as brake signal, braking-distance figures, vehicle-state concentrated collection, management, analysis, archive are protected Demonstrate,prove data visualization.
As described above, the plan content with reference to given by attached drawing, can derive similar technical solution.In every case it is not de- Content from technical solutions of the utility model is made above example according to the technical essence of the utility model any simple Modification, equivalent variations and modification, in the range of still falling within technical solutions of the utility model.

Claims (6)

1. a kind of train braking system debugs platform, it is characterised in that:Including multiple data terminals, for connecting train braking system System acquisition real time data simultaneously realizes realtime curve and Drawing of Curve, history curve inquiry;
Console, for controlling the working condition of each data terminal, brake signal, braking-distance figures, car status information concentration are adopted Collection, management, analysis, archive;
It is connected between the multiple data terminal and console by TCP/IP communication agreement.
2. a kind of train braking system debugging platform according to claim 1, it is characterised in that:Including multiple controls Platform and central monitoring center, the multiple console and central monitoring center pass through network connection.
3. a kind of train braking system debugging platform according to claim 1, it is characterised in that:The console includes DSP control system and the man-machine interaction display screen being connected with the DSP control system, the DSP control system and multiple data Terminal is connected by TCP/IP communication agreement, is provided with to control the work of each data terminal in the DSP control system State, the comprehensive management module for realizing different braking mode.
4. a kind of train braking system debugging platform according to claim 3, it is characterised in that:Further include mobile terminal, The mobile terminal passes through wireless network connection with the DSP control system.
5. a kind of train braking system debugging platform according to claim 4, it is characterised in that:The mobile terminal is flat Plate computer or smart mobile phone.
6. a kind of train braking system debugging platform according to claim 1, it is characterised in that:Each data terminal Connect a touch-screen.
CN201721453581.XU 2017-11-03 2017-11-03 A kind of train braking system debugs platform Active CN207408823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721453581.XU CN207408823U (en) 2017-11-03 2017-11-03 A kind of train braking system debugs platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721453581.XU CN207408823U (en) 2017-11-03 2017-11-03 A kind of train braking system debugs platform

Publications (1)

Publication Number Publication Date
CN207408823U true CN207408823U (en) 2018-05-25

Family

ID=62318089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721453581.XU Active CN207408823U (en) 2017-11-03 2017-11-03 A kind of train braking system debugs platform

Country Status (1)

Country Link
CN (1) CN207408823U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111674428A (en) * 2020-06-05 2020-09-18 中车青岛四方车辆研究所有限公司 Train brake control unit Ethernet joint debugging system and joint debugging method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111674428A (en) * 2020-06-05 2020-09-18 中车青岛四方车辆研究所有限公司 Train brake control unit Ethernet joint debugging system and joint debugging method

Similar Documents

Publication Publication Date Title
CN102545387B (en) Integrated information platform of intelligent substation
CN102913278B (en) Modularization-based universal intelligent coal mine underground belt transport monitoring and controlling system
CN201620916U (en) Intelligent safety monitoring system applied on inclined hoisting shafts of coal mines
CN103618297A (en) High-efficiency and high-reliability fault processing method aiming at complex power distribution network
CN103036625A (en) Design method of detecting system for telecontrol remote terminal unit (RTU) and information channel
CN110450819A (en) A kind of onboard ATC equipment operational system based on non-contact data acquisition
CN207408823U (en) A kind of train braking system debugs platform
CN205158035U (en) Wireless Intelligence supplies distribution management system
CN207817514U (en) The system of long-distance monitor and control PLC terminal devices
CN201937334U (en) Centralized type protecting, overhauling and mistaken-operation-preventing system
CN209542699U (en) Monitoring of stray current device based on data acquisition server
CN202939660U (en) Rail-transit automatic fare collection system station control center passenger flow monitoring system
CN202772610U (en) Monitoring system for battery management systems of electric vehicles
CN203840058U (en) Substation secondary equipment monitoring system
CN105523064A (en) Interlocking host and trackside equipment communication device
CN202939658U (en) Rail-transit automatic fare collection (AFC) system equipment operation state monitoring system
CN107453789A (en) A kind of constructing tunnel personnel positioning managing device
CN102897619A (en) Remote monitoring device of elevator traction machine
CN102426445A (en) Train inspection warehouse dual-redundancy intelligence safety guarantee and interlocking monitoring system
CN202661846U (en) Underground gas consumption monitoring equipment based on sensor network
CN202939769U (en) Rail-transit automatic fare collection (AFC) system equipment operation fault alarm system
CN203261351U (en) Intelligent power distribution terminal with digital signature authentication
CN203705913U (en) System for controlling asphalt mixture stirring equipment
CN202935381U (en) Interface device of centre interface disc and integrated reserve control disc in rail transit platform screen door
CN105501260A (en) Emergency communication device for train and train control center

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181126

Address after: 266111 Jinhong Road, Chengyang District, Qingdao, Shandong Province, No. 88

Co-patentee after: Wuhan Zhongche Sifang Maintenance Center Co., Ltd.

Patentee after: CRRC QINGDAO SIFANG CO., LTD.

Address before: 266111 Jinhong Road, Chengyang District, Qingdao, Shandong Province, No. 88

Patentee before: CRRC QINGDAO SIFANG CO., LTD.

TR01 Transfer of patent right