CN207276083U - A kind of skyscraper overlay device unit hanging apparatus - Google Patents

A kind of skyscraper overlay device unit hanging apparatus Download PDF

Info

Publication number
CN207276083U
CN207276083U CN201721244535.9U CN201721244535U CN207276083U CN 207276083 U CN207276083 U CN 207276083U CN 201721244535 U CN201721244535 U CN 201721244535U CN 207276083 U CN207276083 U CN 207276083U
Authority
CN
China
Prior art keywords
cable wind
fixedly connected
top layer
wind rope
skyscraper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721244535.9U
Other languages
Chinese (zh)
Inventor
宣根
俞晶晶
钟斌
谢欢
戚柳沙
赵吉烽
陈建浩
周杨斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHUAN CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG ZHUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHUAN CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG ZHUAN CONSTRUCTION GROUP CO Ltd
Priority to CN201721244535.9U priority Critical patent/CN207276083U/en
Application granted granted Critical
Publication of CN207276083U publication Critical patent/CN207276083U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to construction hanging device field, disclose a kind of skyscraper overlay device unit hanging apparatus, including the gin pole being hinged on the top layer, skyscraper includes top layer and mechanical floor, cable wind rope system is provided between the gin pole and the top layer, the cable wind rope system includes some the first connection cable wind ropes being fixedly connected on the gin pole, some the second connection cable wind ropes being fixedly connected on the top layer, the first cucurbit being arranged between the first connection cable wind rope and the second connection cable wind rope, the utility model has the following advantages and effect:This programme utilizes new mechanical structure, by setting more first connection cable wind ropes and the second connection cable wind rope, the first cucurbit is set between the first connection cable wind rope and the second connection cable wind rope, adjust the angle between gin pole and top plate, enable a device to, as far as possible close to mechanical floor, facilitate conveying of the worker to equipment.

Description

A kind of skyscraper overlay device unit hanging apparatus
Technical field
A kind of construction hanging device is the utility model is related to, more specifically, it relates to a kind of skyscraper top layer Equipment unit hanging apparatus.
Background technology
The reconstruction of the old city town of modernization, often makes newly-built high buildings and large mansions stand erect among high stored building group, and the road on periphery Road, vehicle, the stream of people often than comparatively dense, so cause narrow and small adverse circumstances to construction.Large-scale Architectural Equipment is high-rise Essential important component, especially technology layer are located at more than hundred meters of high-rise building, required equipment in mansion Unit piece weight and overall volume are all bigger, and can not be split;It is difficult to enter construction site and applies in large-scale hoisting machinery Then need to complete the lifting of large scale equipment with regard to position/task using small-sized hoisting machine tool under conditions of work environment complexity.
At present, notification number is that the Chinese patent of CN202594664U discloses a kind of high-rise building electromechanical equipment masts type Hanging apparatus, it includes hoist engine, runs rope and fixed pulley group and a people formed by three seamless steel pipes by flange welding Word mast, has socketed cable wind rope at the top of bipod mast, and the bottom bar of the bipod mast is fixed between the grip block of left and right, It is connected, is fixed between the grip block and bottom plate by ribs, the bottom plate passes through with bottom plate below the left and right grip block Expansion bolt is fixed on the top layer of lifting layer, and the bottom bar termination of the bipod mast is equipped with baffle, the bottom Cross bar has a rotary motion trace between the baffle.
This high-rise building electromechanical equipment masts type hanging apparatus, by hoist engine, runs rope and fixed pulley group by equipment On lifting to skyscraper, hoist engine startup, which pulls, runs rope movement, and the direction that race rope changes power by the effect of fixed pulley makes to set It is standby to lift to skyscraper, but when equipment is smaller, is easy to cause equipment and the distance between skyscraper is excessive, need To make cargo close to skyscraper by rotating bipod mast, but the rotation of bipod mast has certain radius, after rotation easily Cause installation site not corresponding, it is necessary to readjust installation site, reduce work efficiency.
Utility model content
In view of the deficienciess of the prior art, the utility model lies in that provide a kind of skyscraper overlay device unit lifting Device, has the effect for improving work efficiency.
To achieve the above object, the utility model provides following technical solution:A kind of skyscraper overlay device unit Hanging apparatus, including the gin pole being hinged on the top layer, skyscraper include top layer and mechanical floor, and the mast rises Cable wind rope system is provided between heavy-duty machine and the top layer, the cable wind rope system is fixedly connected on the mast including some First on crane connects cable wind rope, some the second connection cable wind ropes being fixedly connected on the top layer, is arranged on institute State the first cucurbit between the first connection cable wind rope and the second connection cable wind rope.
By using above-mentioned technical proposal, worker is lifted by crane equipment by gin pole, is set when equipment is lifted to After standby layer, hoist engine can be stopped at this time, and the first connection cable wind rope and the second connection cable wind rope are adjusted by the first cucurbit The distance between, so that the angle between gin pole and top layer changes, make equipment close to mechanical floor, worker can be compared with For convenience by equipment conveying to mechanical floor, improve work efficiency.
The utility model is further arranged to:The gin pole is hinged by articulation piece and the top layer, the hinge Fitting include be fixedly connected on the gin pole rotating part, be fixedly connected on the top layer firm banking, Through the rotating part and the lateral pin of firm banking.
By using above-mentioned technical proposal, rotating part can be on firm banking along the axis rotation of lateral pin, so that mast Angle between crane and top layer changes, and the equipment for making to be lifted on gin pole facilitates work close to mechanical floor The transport of people.
The utility model is further arranged to:Rotation traction traction system is provided with the gin pole, the rotation is led Draw system to connect cable wind rope including the both ends are fixedly connected on the top layer the 3rd, be arranged on the 3rd connection cable wind rope Tackle pulley, be connected between the gin pole and tackle pulley be used for drive equipment rotate linkage steel wire rope.
By using above-mentioned technical proposal, worker makes length of the tackle pulley along the 3rd connection cable wind rope by movable block group Direction movement is spent, so as to drive the pulley rotation in tackle pulley, pulley rotation drives linkage steel wire rope movement, and link rope belt The equipment lifted on dynamic gin pole rotates, and converts the position of equipment, facilitates follow-up installation.
The utility model is further arranged to:The gin pole is provided with cable wire control system, the cable wire control System includes some cable wires being fixedly connected between the gin pole and ground, the steel loop being set on the cable wire, The steel loop is fixedly connected with equipment.
By using above-mentioned technical proposal:After equipment is lifted by crane, equipment is kept vertically under self gravitation effect, and and steel Rope contacts, and steel loop is fixedly connected with equipment, makes equipment is relatively stable to be moved on cable wire, and risen necessarily to the moving direction of equipment Guiding function.
The utility model is further arranged to:Wherein it is provided with two cable wires for adjusting the cable wire tensioning Second cucurbit.
By using above-mentioned technical proposal, worker adjusts the tensioning of cable wire by the second cucurbit so that equipment and high level The distance between building changes, and makes equipment be not easy to collide with skyscraper, reduces the probability of equipment damage.
The utility model is further arranged to:The cable wire control system, which further includes, is fixedly connected on the gin pole On control cable wind rope, it is described control cable wind rope be fixedly connected by the 3rd cucurbit with top layer.
By using above-mentioned technical proposal, worker by adjusting the 3rd cucurbit, between control cable wind rope and top layer away from From being adjusted, so that gin pole be adjusted so that maintained a certain distance between equipment and skyscraper.
The utility model is further arranged to:The hoist engine for being pulled to equipment is provided with the mechanical floor.
By using above-mentioned technical proposal, hoist engine can to reach mechanical floor equipment draw, enable a device to compared with Quickly to enter in mechanical floor, the labor intensity of worker is reduced.
The utility model is further arranged to:Several are provided with the mechanical floor to be used for and the conflict of the lower surface of equipment Rolling bar.
By using above-mentioned technical proposal, the setting of rolling bar makes the frictional force between equipment and mechanical floor by force of sliding friction It is changed into force of rolling friction, reduces the frictional force between equipment and mechanical floor, makes equipment not easily damaged and improve conevying efficiency.
In conclusion the utility model has the advantages that:
1st, by setting more first connection cable wind ropes and the second connection cable wind rope, connect in the first connection cable wind rope and second Connect and the first cucurbit is set between cable wind rope, adjust the angle between gin pole and top plate so that equipment can be use up Possible close mechanical floor, facilitates conveying of the worker to equipment;
2nd, by setting cable wire control system so that maintained a certain distance between equipment and skyscraper, make equipment not Easily collide with skyscraper, reduce equipment damaged probability.
Brief description of the drawings
Fig. 1 is the external structure schematic diagram of the utility model;
Fig. 2 is the attachment structure schematic diagram for embodying supporting rod and first crossbeam;
Fig. 3 is enlarged drawing at the A of Fig. 2, embodies the connection structure of bottom plate and side plate;
Fig. 4 is the attachment structure schematic diagram for embodying the first connection cable wind rope and the first cucurbit;
Fig. 5 is the attachment structure schematic diagram for embodying the 3rd connection cable wind rope and tackle pulley;
Fig. 6 is the attachment structure schematic diagram for embodying hoist engine and mechanical floor;
Fig. 7 is enlarged drawing at the B of Fig. 6, embodies the connection structure of cable wire and steel loop.
Reference numeral:1st, gin pole;11st, supporting rod;12nd, first crossbeam;13rd, second cross beam;14th, electric hoist;15、 Rotating wheel;21st, top layer;22nd, mechanical floor;3rd, articulation piece;31st, rotating part;311st, bottom plate;312nd, side plate;313rd, connecting plate;315、 Cambered surface;32nd, firm banking;321st, fixed plate;322nd, articulated slab;323rd, reinforcing rib;324th, the second hinge hole;33rd, lateral pin;4th, cable Wind rope system;41st, the first connection cable wind rope;42nd, the second connection cable wind rope;43rd, the first cucurbit;5th, rotation traction traction system;51st, Three connection cable wind ropes;52nd, tackle pulley;53rd, link steel wire rope;6th, cable wire control system;61st, cable wire;611st, first connecting portion; 612nd, second connecting portion;62nd, steel loop;63rd, cable wind rope is controlled;64th, the 3rd cucurbit;65th, the second cucurbit;7th, hoist engine;8th, rolling bar.
Embodiment
The utility model is described further referring to the drawings.
As depicted in figs. 1 and 2, a kind of skyscraper overlay device unit hanging apparatus, including gin pole 1, it is high-rise Building includes top layer 21 and mechanical floor 22.Gin pole 1 is hinged on top layer 21, and gin pole 1 includes two supporting rods 11st, first crossbeam 12, second cross beam 13 and electric hoist 14, two supporting rods 11 are obliquely installed and are hinged on top layer 21, two The one end of supporting rod 11 away from top layer 21 is adjacent to each other, and the both ends of first crossbeam 12 are fixedly connected with two supporting rods 11 respectively, The both ends of second cross beam 13 are also fixedly connected with two supporting rods 11 respectively, and second support bar 11 is located under first support bar 11 It is square, rotating wheel 15 is rotatably connected on first crossbeam 12, the one end of rotating wheel 15 away from first crossbeam 12 is fixed with electric hoist 14 Connection.
As shown in Figures 2 and 3, supporting rod 11 is hinged by articulation piece 3 and top layer 21, and articulation piece 3 includes rotating part 31, consolidates Determine base 32 and lateral pin 33, rotating part 31 is fixedly connected on the one end of supporting rod 11 away from first crossbeam 12, and rotating part 31 includes Bottom plate 311, side plate 312 and connecting plate 313, are fixedly connected in the bottom plate 311 of cylindrical shape with supporting rod 11, and two pieces parallel to each other And the side plate 312 that section is rectangle is fixedly connected with the one end of bottom plate 311 away from supporting rod 11, side plate 312 is away from bottom plate 311 Side offer cambered surface 315.The connecting plate 313 that two pieces of sections are rectangle is between two blocks of side plates 312 and both ends are distinguished It is fixedly connected with side plate 312, two pieces of connecting plates 313 are located at the both ends of side plate 312.Firm banking 32 includes fixed plate 321, is hinged Plate 322 and reinforcing rib 323, fixed plate 321 are fixedly connected by bolt with top layer 21, and two pieces of articulated slabs 322 parallel to each other are solid Surely it is connected to side of the fixed plate 321 away from top layer 21.The side of articulated slab 322 away from each other has been respectively fixedly connected with two pieces and has cut Face reinforcing rib 323 triangular in shape.Lateral pin 33 passes through articulated slab 322 and connecting plate 313, and supporting rod 11 can be along the axle center of lateral pin 33 Rotate.
As shown in Figure 1 and Figure 4, cable wind rope system 4 is provided between supporting rod 11 and top layer 21, cable wind rope system 4 includes Four first connection cable wind ropes 41 and second connect 42, four the first cucurbits 43 of cable wind rope, the both ends of the first cucurbit 43 respectively with First connection cable wind rope 41 is fixedly connected with the second connection cable wind rope 42, and first connects one of cable wind rope 41 away from the first cucurbit 43 End is fixedly connected with supporting rod 11, and second one end of connection cable wind rope 42 away from the first cucurbit 43 is fixedly connected with top layer 21, and two Two first connection cable wind ropes 41 have been respectively fixedly connected with a supporting rod 11.Worker can adjust first by the first cucurbit 43 Connect cable wind rope 41 and second and connect the distance between cable wind rope 42, become the angle between supporting rod 11 and top layer 21 Change, facilitate worker that equipment is sent into mechanical floor 22.
As shown in figure 5, being provided with rotation traction traction system 5 between gin pole 1 and top layer 21, rotation traction traction system 5 is wrapped The 3rd connection cable wind rope 51, tackle pulley 52 and linkage steel wire rope 53 are included, the both ends of the 3rd connection cable wind rope 51 are fixedly connected on top On layer 21, tackle pulley 52 is installed on the 3rd connection cable wind rope 51, and the pulley of tackle pulley 52 is connected cable wind rope 51 with the 3rd and pushes against, Linkage steel wire rope 53 is looped around between the pulley and rotating wheel of tackle pulley 52.Worker is by driving tackle pulley 52 in the 3rd connecting line Moved on wind rope 51, band movable pulley moves, and since the pulley in tackle pulley 52 is linkage, another pulley rotation drives linkage Steel wire rope 53 moves, and the linkage movement of steel wire rope 53 drives rotating wheel 15 to rotate, and rotating wheel 15, which rotates, drives electric hoist 14 to rotate, electricity Cucurbit 14, which rotates, drives equipment to rotate, and the position of equipment is changed.
As shown in Figure 6 and Figure 7,61 control system 6 of cable wire is additionally provided with supporting rod 11,61 control system 6 of cable wire includes Four 62, two articles of the steel loops of cable wire 61, four control 63 and the 3rd cucurbit 64 of cable wind rope, one end of four cable wires 61 and second cross beam 13 are fixedly connected, and the other end is fixedly connected on the ground, and a steel loop 62, steel loop 62 and equipment are arranged with per pass cable wire 61 It is fixedly connected.The second cucurbit 65 is in series with two cable wires 61 at middle part, this two cable wires 61 include first connecting portion 611 and second connecting portion 612, first connecting portion 611 and second connecting portion 612 it is adjacent to each other one end it is solid by the second cucurbit 65 Fixed connection.Two control cable wind rope 63 be fixedly connected on second cross beam 13, control cable wind rope 63 away from second cross beam 13 one End is fixed by the 3rd cucurbit 64 and is fixedly connected with top layer 21.
The surface of mechanical floor 22 is fixedly connected with the hoist engine 7 for being useful for drawing equipment, and the surface of mechanical floor 22 is set The rolling bar 8 of more length direction distributions parallel to each other and along mechanical floor 22 is equipped with, hoist engine 7 pulls equipment to be moved up in rolling bar 8 It is dynamic.
In conclusion worker first passes through loop wheel machine is lifted to certain altitude by equipment, the bottom of equipment and steel loop 62 are fixed Connection, by equipment hoisting to electric hoist 14.Worker starts electric hoist 14, and equipment is lifted, while worker's monitoring device The distance between skyscraper, makes the tensioning of cable wire 61 change, by adjusting the 3rd calabash by adjusting the second cucurbit 65 The position of gin pole 1 is adjusted in reed 64, so that it is guaranteed that the distance between equipment and skyscraper are in proper states. After equipment reaches mechanical floor 22, worker adjusts the angle between gin pole 1 and top layer 21 by the first cucurbit 43, makes to set Standby proximity device layer 22, worker pull tackle pulley 52, and the pulley in tackle pulley 52 passes through the steel wire rope 53 that links and drives rotating wheel 15 Rotate, rotating wheel 15, which rotates, drives electric hoist 14 to rotate, so that the angle of equipment changes, worker is by hoist engine 7 at this time Steel wire rope be fixedly connected in equipment, start hoist engine 7, hoist engine 7 pulls in equipment in mechanical floor 22, while under equipment Surface is contacted with the outer wall of rolling bar 8, and equipment is entered under the drive of hoist engine 7 and rolling bar 8 in mechanical floor 22.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical solutions belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (8)

1. a kind of skyscraper overlay device unit hanging apparatus, including the gin pole (1) being hinged on top layer (21), high Layer building includes top layer (21) and mechanical floor (22), it is characterized in that:Set between the gin pole (1) and the top layer (21) Cable wind rope system (4) is equipped with, the cable wind rope system (4) is fixedly connected on the gin pole (1) including some First connection cable wind rope (41), some the second connection cable wind ropes (42) being fixedly connected on the top layer (21), be arranged on The first connection cable wind rope (41) is connected the first cucurbit (43) between cable wind rope (42) with second.
2. a kind of skyscraper overlay device unit hanging apparatus according to claim 1, it is characterized in that:The mast rises Heavy-duty machine (1) is hinged by articulation piece (3) and the top layer (21), and the articulation piece (3) includes being fixedly connected on the mast Rotating part (31) on heavy-duty machine (1), the firm banking (32) being fixedly connected on the top layer (21), through the rotating part (31) and firm banking (32) lateral pin (33).
3. a kind of skyscraper overlay device unit hanging apparatus according to claim 1, it is characterized in that:The mast rises Rotation traction traction system (5) is provided with heavy-duty machine (1), the rotation traction traction system (5) is fixedly connected on the top layer including both ends (21) the on the 3rd connects cable wind rope (51), the tackle pulley (52) being arranged on the 3rd connection cable wind rope (51), is connected to The linkage steel wire rope (53) for being used to drive equipment to rotate between the gin pole (1) and tackle pulley (52).
4. a kind of skyscraper overlay device unit hanging apparatus according to claim 1, it is characterized in that:The mast rises Heavy-duty machine (1) is provided with cable wire control system (6), and the cable wire control system (6) includes being fixedly connected on the gin pole (1) some cable wires (61) between ground, the steel loop (62) being set on the cable wire (61), the steel loop (62) and equipment It is fixedly connected.
5. a kind of skyscraper overlay device unit hanging apparatus according to claim 4, it is characterized in that:Two of which institute State the second cucurbit (65) being provided with cable wire (61) for adjusting the cable wire (61) tensioning.
6. a kind of skyscraper overlay device unit hanging apparatus according to claim 4, it is characterized in that:The cable wire control System (6) processed further includes the control cable wind rope (63) being fixedly connected on the gin pole (1), the control cable wind rope (63) it is fixedly connected by the 3rd cucurbit (64) with top layer (21).
7. a kind of skyscraper overlay device unit hanging apparatus according to claim 1, it is characterized in that:The mechanical floor (22) hoist engine (7) for being pulled to equipment is provided with.
8. a kind of skyscraper overlay device unit hanging apparatus according to claim 1, it is characterized in that:The mechanical floor (22) several rolling bars (8) for being used to contradict with the lower surface of equipment are provided with.
CN201721244535.9U 2017-09-26 2017-09-26 A kind of skyscraper overlay device unit hanging apparatus Active CN207276083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721244535.9U CN207276083U (en) 2017-09-26 2017-09-26 A kind of skyscraper overlay device unit hanging apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721244535.9U CN207276083U (en) 2017-09-26 2017-09-26 A kind of skyscraper overlay device unit hanging apparatus

Publications (1)

Publication Number Publication Date
CN207276083U true CN207276083U (en) 2018-04-27

Family

ID=61982076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721244535.9U Active CN207276083U (en) 2017-09-26 2017-09-26 A kind of skyscraper overlay device unit hanging apparatus

Country Status (1)

Country Link
CN (1) CN207276083U (en)

Similar Documents

Publication Publication Date Title
CN101434366B (en) Hoisting tool and hoisting method for column component
CN100519396C (en) Gin pole integrated dismounting method for tower crane
CN111017734A (en) Running mechanism of monorail hoisting and transporting equipment
CN101559905A (en) Deck unit erection gantry
CN206034277U (en) Bridge pier column maintenance plastic film wraps up construction equipment
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN104925673A (en) Auxiliary slinging device and method through combination process of a plurality of cranes
CN206538126U (en) The large-scale overweight equipment handling constructing device of Super High
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN100417586C (en) Integral lifting method of large bridge crane and its appts
CN105970981A (en) High slope construction lifting platform and construction method thereof
CN105645275B (en) Cable hoist and its construction method
CN110397289B (en) All-dimensional beam erecting equipment standing on top of house column and having automatic walking function
CN207276083U (en) A kind of skyscraper overlay device unit hanging apparatus
CN107881926B (en) Combined hanging basket with full-rotation crane and construction method thereof
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN105819352B (en) Lifting device for detachable door type mast building and construction method thereof
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN112758803B (en) Method for hanging prefabricated box girder and changing hooks in air
CN104249979A (en) Guide rail type self-climb slewing crane
CN114572854A (en) Assembled squat silo roof hoisting system and silo roof hoisting method
CN114772490A (en) Construction method of rotary crane of asynchronous cradle belt anchoring system
CN209273680U (en) A kind of box beam rubber tube aid-pulling device
CN112177327A (en) Combined type supporting template for constructional engineering
KR101317384B1 (en) The hoisting and installing method and apparatus of wind turbines by using the self tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant