CN207267791U - Tower crane enclosure device - Google Patents
Tower crane enclosure device Download PDFInfo
- Publication number
- CN207267791U CN207267791U CN201721071778.7U CN201721071778U CN207267791U CN 207267791 U CN207267791 U CN 207267791U CN 201721071778 U CN201721071778 U CN 201721071778U CN 207267791 U CN207267791 U CN 207267791U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- base
- enclosure device
- guardrail
- outline border
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 32
- 239000010959 steel Substances 0.000 claims abstract description 32
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 24
- 229910052742 iron Inorganic materials 0.000 claims description 12
- 238000010276 construction Methods 0.000 abstract description 14
- 238000011161 development Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000007935 neutral effect Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
It the utility model is related to a kind of tower crane enclosure device.The tower crane enclosure device is arranged at tower crane steel platform, and is detachably connected with tower crane steel platform.Wherein, tower crane enclosure device includes base and protection canopy, protection canopy is arranged on base and is detachably connected with base, base includes four first fixed links and two second fixed links, four first fixed link head and the tail are in turn connected to form the outline border of base, and two second fixed links are arranged in parallel in outline border and are connected with outline border.Due to being to be detachably connected between base and tower crane steel platform and between protection canopy and base, tower crane enclosure device can be removed from tower crane steel platform after the completion of construction, and base is separated with protection canopy, in case being subsequently used in turn.Therefore, above-mentioned tower crane enclosure device is convenient to assemble and disassemble, is used in turn rate height, has saved construction cost.
Description
Technical field
The realm of building construction is the utility model is related to, more particularly to tower crane enclosure device.
Background technology
At present, with state during the development of Chinese national economy and the quickening of urbanization process, particularly " 13 "
The total investment to building field will be further increased in family, these all will bring new opportunity for the development of construction.It is and another
On the one hand, China is just carrying forward vigorously the transformation of Economic Development Mode, actively advocates the theories such as " energy-saving and emission-reduction ", " safety and environmental protection ".
Therefore, " energy saving building ", the target of " green installation " must be also reached as construction and installation industry.
For tower crane as most common a kind of lifting equipment on construction site, it will solve falling object from high altitude in use
Problem, it is ensured that the safety of tower crane platform operating personnel.However, current tower crane Terrace prevention device cannot be used in turn, it is not inconsistent
Close " energy saving building " and the target of " green is installed ".
Utility model content
Based on this, it is necessary to provide it is a kind of it is convenient to assemble and disassemble, the tower crane enclosure device that is used in turn can be repeated.
A kind of tower crane enclosure device, is arranged in tower crane steel platform, the tower crane enclosure device and the tower crane steel platform
Be detachably connected, the tower crane enclosure device includes base and protection canopy, the protection canopy be arranged on the base and with institute
State base to be detachably connected, the base includes four first fixed links and two second fixed links, and four described first are fixed
Bar head and the tail are in turn connected to form the outline border of the base, two second fixed links be arranged in parallel in the outline border and with institute
State outline border connection.
In one of the embodiments, the protection canopy includes guardrail and four upright bars, and the guardrail is around described in four
Upright bar is simultaneously connected with the upright bar, and four upright bars are vertically disposed on four vertex of the outline border, the upright bar
It is detachably connected with the outline border.
In one of the embodiments, the guardrail includes the second guardrail of three the first guardrails of face and one side, first shield
It is to be detachably connected between column and between first guardrail and second guardrail.
In one of the embodiments, second guardrail includes an iron gate and two steel wires, the iron gate are located at
Between two steel wires, the steel wire side is connected with the column, and opposite side is connected with the iron gate.
In one of the embodiments, the guardrail is less than the upright bar close to the base, the height of the guardrail
Highly.
In one of the embodiments, the protection canopy further includes ceiling, and the ceiling is connected with the top of the upright bar.
In one of the embodiments, the base further includes more bracing pieces, and the bracing piece is solid positioned at described first
It is connected between fixed pole and the fixed link and with first fixed link and second fixed link.
In one of the embodiments, two second fixed links are located at the both sides of the center line of the outline border respectively.
Base is formed using four first fixed links and two second fixed links, and base and tower crane platform are detachably connected
Connect, then protection canopy is set on base, protection canopy, using being detachably connected, forms tower crane enclosure device with base.The bottom of due to
It is to be detachably connected between seat and tower crane platform and between protection canopy and base, tower crane can be gone along with sb. to guard him to dress after the completion of construction
Put from tower crane platform removal, and base is separated with protection canopy, in case being subsequently used in turn.Therefore, above-mentioned tower crane goes along with sb. to guard him dress
Put it is convenient to assemble and disassemble, be used in turn rate height, saved construction cost.
Brief description of the drawings
Fig. 1 is the front view of the tower crane enclosure device of an embodiment;
Fig. 2 is the side view of the tower crane enclosure device shown in Fig. 1;
Fig. 3 is the A-A ' sectional views of the tower crane enclosure device shown in Fig. 1;
Fig. 4 is the top view of the tower crane enclosure device shown in Fig. 1.
Embodiment
As shown in Figs 1-4, an embodiment tower crane enclosure device 1 is arranged at tower crane steel platform 2, and can with tower crane steel platform 2
Dismantling connection.Wherein, tower crane enclosure device 1 includes base 10 and protection canopy 20, protection canopy 20 be arranged on base 10 and with bottom
Seat 10 is detachably connected, and base 10 includes four first fixed links 12 and two second fixed links 14, four first fixed links 12
Head and the tail are in turn connected to form the outline border 100 of base 10, and two second fixed links 14 are arranged in parallel in outline border 100 and and outline border
100 connections.
Base 10 is formed using four first fixed links 12 and two second fixed links 14, and base 10 and tower crane steel are put down
Platform 2 is detachably connected, and protection canopy 20 is then set on base 10, and protection canopy 20, using being detachably connected, is formed with base 10
Tower crane enclosure device 1.Due to being detachably to connect between base 10 and tower crane steel platform 2 and between protection canopy 20 and base 10
Connect, tower crane enclosure device 1 can be removed from tower crane steel platform 2 after the completion of construction, and base 10 is separated with protection canopy 20,
In case subsequently it is used in turn.Therefore, above-mentioned tower crane enclosure device 1 is convenient to assemble and disassemble, is used in turn rate height, has saved construction cost.
As shown in figure 3, in the present embodiment, base 10 is formed outside rectangle by four head and the tail of first fixed link 12 successively welding
Frame 100, then welds two second fixed links 14 to reinforce outline border 100 in outline border 100 again.Wherein, the first fixed link 12 with
The shape of second fixed link 14 is identical with size, is the square steel tube that length, width and height are respectively 4000mm, 100mm, 100mm.First
12 and second fixed link 14 of fixed link is identical so that the first fixed link 12 and the second fixed link 14 have versatility and interchangeability,
The first fixed link 12 and the second fixed link 14 need not be distinguished during welding, is conducive to improve construction efficiency.In the present embodiment, two
Second fixed link 14 is located at the both sides of 100 center line of outline border respectively.Two second fixed links 14 are symmetrically set along 100 center line of outline border
Put, for example, two second fixed links 14 can be respectively at the 1/5 of outline border 100 and at 4/5.
Please continue to refer to Fig. 3, further, in the present embodiment, base 10 further includes more bracing pieces 16, bracing piece
16 are connected between the first fixed link 12 and the second fixed link 14 and with the first fixed link 12 and the second fixed link 14.Bracing piece
16 be at the neutral gear in outline border 100, to be reinforced to base 10.Wherein, bracing piece 16 can also one end and first solid
Fixed pole 12 connects, and the other end is erected in tower crane steel platform 2.In the present embodiment, employ 8 bracing pieces 16 to base 10 into
Row processing.16 and first fixed link 12 of bracing piece and the second fixed link between the first fixed link 12 and the second fixed link 14
14 is vertical.Wherein, bracing piece 16 is square steel.
As depicted in figs. 1 and 2, in the present embodiment, protection canopy 20 includes guardrail 22 and four upright bars 24, and guardrail 22 is surround
Four upright bars 24 are simultaneously connected with upright bar 24, and four upright bars 24 are vertically disposed on four vertex of outline border 100, upright bar 24 with
Outline border 100 is detachably connected.Protection canopy 20 is used primarily to ensure the safety of tower crane operating platform operating personnel, and guardrail 22 is around four
Root upright bar 24 avoids safety problem caused by falling object from high altitude so that the space of one relative closure of formation of tower crane steel platform 2.
In the present embodiment, guardrail 22 includes the second guardrail 210 of three the first guardrails of face 200 and one side, the first guardrail 200 it
Between and the first guardrail 200 and the second guardrail 210 between be to be detachably connected.Three the first guardrails of face 200 and one side second are protected
Column 210 is bolted is spliced to form protection canopy 20 successively from beginning to end, wherein, the second guardrail 210 includes an iron gate 212 and two
Steel wire 214, iron gate 212 is between two steel wires 214, and 214 side of steel wire is connected with upright bar 24, opposite side and iron gate
212 connections.Iron gate 212 is used for the discrepancy of operating personnel, improves the convenience that tower crane enclosure device 1 uses.In the present embodiment,
First guardrail 200 is the tool-type steel wire of 4000mm*2000mm, and the steel wire 214 in the second guardrail 210 is 1500mm*
The tool-type steel wire of 2000mm, the size of iron gate 212 is 1000mm*2000mm.Above-mentioned first guardrail, 200 and second guardrail
210 be standardized components, can use standardized production technique by factory, is criticized under whole, strict quality control system
Amount production, product quality is stablized, and has versatility and interchangeability, is conducive to improve construction efficiency and ensures construction quality
Stability.
In addition, as shown in Fig. 2, in the present embodiment, guardrail 22 is less than upright bar 24 close to base 10, the height of guardrail 22
Highly.The height of guardrail 22 is probably the half of 24 height of upright bar, i.e. guardrail 22 is ensureing to apply without entirely surrounding upright bar 24
Mounting material is also saved while work is safe.
Further, please refer to Fig. 1 and Fig. 4, in the present embodiment, protection canopy 20 further includes ceiling 26, ceiling
26 are connected with the top of upright bar 24.24 one end of upright bar is detachably connected with base 10, and the other end is equipped with ceiling 26, four upright bars
24 provide support and connection for ceiling 26.Ceiling 26 can prevent falling object from high altitude, while can also be provided for tower crane operating personnel
Cover or block, improve the comfort of operating space.The material of ceiling 26 can make choice according to actual needs, for example, can
To be made of waterproof cloth, can also be made of the higher material of SPF.
Above-mentioned tower crane enclosure device 1 is in practical application, first use four first fixed links 12 and two second fixed links
14 welding form outline border 100, and weld bracing piece 16 at neutral gear and reinforced, and form the base 10 of tower crane enclosure device 1, so
Afterwards whole base 10 is made to be fixed by bolts in tower crane steel platform 2;By the second guardrail 210 of three the first guardrails of face 200 and one side
It is fixed by bolts and is spliced to form protection canopy 20, wherein, the second guardrail 210 is spliced by two pieces of steel wires 214 and an iron gate 212
Form, then the upright bar 24 of protection canopy 20 is bolted to four vertex of base 10, so that whole protection canopy 20
Just it is fixed on base 10, ceiling 26 is then installed on the top of upright bar 24, and then form tower crane enclosure device 1.
It is between base 10 and tower crane steel platform 2 and anti-between the base 10 and protection canopy 20 of above-mentioned tower crane enclosure device 1
It is to be detachably connected between each face guardrail 22 of shield canopy 20 so that tower crane enclosure device 1 is convenient to assemble and disassemble, and can realize weight
It is used in turn again, meets construction industry " energy saving building ", the theory of " green installation ".In addition, above-mentioned tower crane enclosure device 1 is by one
The standardized components composition of series, easy to standard production and quality monitoring, and has versatility and interchangeability, is conducive to raising and applies
Work efficiency rate.Meanwhile above-mentioned tower crane enclosure device 1 two people of general only needs can be installed, easy to operate and efficient, drop
The low labor intensity of construction personnel.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the utility model, its description is more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that the common skill for this area
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (8)
1. a kind of tower crane enclosure device, is arranged in tower crane steel platform, it is characterised in that the tower crane enclosure device and the tower
Hang steel platform to be detachably connected, the tower crane enclosure device includes base and protection canopy, and the protection canopy is arranged at the base
Above and with the base it is detachably connected, the base includes four first fixed links and two second fixed links, described in four
First fixed link head and the tail are in turn connected to form the outline border of the base, and two second fixed links are arranged in parallel in the outline border
In and be connected with the outline border.
2. tower crane enclosure device according to claim 1, it is characterised in that the protection canopy includes guardrail and four vertical
Bar, the guardrail are connected around four upright bars and with the upright bar, and four upright bars are vertically disposed on described outer
Four vertex of frame, the upright bar are detachably connected with the outline border.
3. tower crane enclosure device according to claim 2, it is characterised in that the guardrail includes three the first guardrails of face and one
The second guardrail of face, is to be detachably connected between first guardrail and between first guardrail and second guardrail.
4. tower crane enclosure device according to claim 3, second guardrail includes an iron gate and two steel wires, institute
Iron gate is stated between two steel wires, the steel wire side is connected with the upright bar, and opposite side connects with the iron gate
Connect.
5. tower crane enclosure device according to claim 2, it is characterised in that the guardrail is close to the base, the shield
The height on column is less than the height of the upright bar.
6. tower crane enclosure device according to claim 2, it is characterised in that the protection canopy further includes ceiling, the top
Canopy is connected with the top of the upright bar.
7. tower crane enclosure device according to claim 1, it is characterised in that the base further includes more bracing pieces, institute
Bracing piece is stated between first fixed link and the fixed link and with first fixed link and second fixed link
Connection.
8. tower crane enclosure device according to claim 1, it is characterised in that two second fixed links are located at institute respectively
State the both sides of the center line of outline border.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721071778.7U CN207267791U (en) | 2017-08-25 | 2017-08-25 | Tower crane enclosure device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721071778.7U CN207267791U (en) | 2017-08-25 | 2017-08-25 | Tower crane enclosure device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207267791U true CN207267791U (en) | 2018-04-24 |
Family
ID=61961495
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721071778.7U Expired - Fee Related CN207267791U (en) | 2017-08-25 | 2017-08-25 | Tower crane enclosure device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207267791U (en) |
-
2017
- 2017-08-25 CN CN201721071778.7U patent/CN207267791U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383588A (en) | Lifting platform for protecting safety of high-level construction | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN105226560B (en) | A kind of crossing frame and its construction method | |
CN206513004U (en) | A kind of movable hanger for being easy to roof inner slab to install | |
CN209011528U (en) | A kind of all steel attachment type raise scaffold | |
CN104577876A (en) | Plug-in hanging basket for live working of helicopter | |
CN204391605U (en) | A kind of helicopter live line working plug-in type hanging basket | |
CN207267791U (en) | Tower crane enclosure device | |
CN207700708U (en) | A kind of shellring shape ceiling mounted tracks of unit glass curtain wall | |
CN207363321U (en) | Water supply first-aid repair weather proof enclosure device | |
CN204475973U (en) | Electric power standardization warning isolation rail | |
CN207553565U (en) | A kind of crosshead of truss | |
CN207047702U (en) | A kind of bridge construction scaoffold | |
CN202248823U (en) | Attached-type lifting scaffold with net suspended at bottom | |
CN206029069U (en) | Suspension type welding jobs canopy | |
CN107081550B (en) | Draw and insert-type overhead welding platform and its installation method | |
CN205402211U (en) | Transformer safety protection area | |
CN107740601A (en) | Water supply first-aid repair weather proof enclosure device | |
CN204001887U (en) | Dismantled and assembled dedicated platform for underground workshop vault lighting installation and repairing | |
CN210086058U (en) | Matching type operating platform | |
CN208023608U (en) | A kind of post-cast strip can have enough to meet the need steel channel formwork system | |
CN209413405U (en) | Wear straight line narrow base tower in double loop | |
CN205743272U (en) | A kind of firm protection network | |
CN207314895U (en) | Building outer wall opening full-closed system | |
CN206928748U (en) | A kind of construction site isolation guardrail of installation easy to disassemble |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180424 |