CN207184540U - A kind of building operation management system based on BIM - Google Patents

A kind of building operation management system based on BIM Download PDF

Info

Publication number
CN207184540U
CN207184540U CN201721102429.7U CN201721102429U CN207184540U CN 207184540 U CN207184540 U CN 207184540U CN 201721102429 U CN201721102429 U CN 201721102429U CN 207184540 U CN207184540 U CN 207184540U
Authority
CN
China
Prior art keywords
bim
server
data wire
hand member
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721102429.7U
Other languages
Chinese (zh)
Inventor
来侃
李军
王之洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Architectural Design and Research Institute Co Ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN201721102429.7U priority Critical patent/CN207184540U/en
Application granted granted Critical
Publication of CN207184540U publication Critical patent/CN207184540U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of building operation management system based on BIM, and it includes terminal device, BIM operation platforms, smart machine, subscriber device;The right-hand member of smart machine is bi-directionally connected by data wire and opc server, and monitoring device is provided with below smart machine;The right-hand member of monitoring device is connected by data wire with opc server;The right-hand member of opc server is bi-directionally connected by data wire and OPC client;Cloud Server is provided with below OPC client, OPC client is bi-directionally connected by data wire and Cloud Server;The right-hand member of Cloud Server is bi-directionally connected by data wire and BIM operation platforms, and vpn gateway is provided with below Cloud Server;Vpn gateway is by data wire Opposite direction connection on Cloud Server.The utility model runs building operation management system using BIM, can not only improve the efficiency and quality of building operation maintenance, and reduces the expense of building operation maintenance.

Description

A kind of building operation management system based on BIM
Technical field
It the utility model is related to a kind of management system, more particularly to a kind of building operation management system based on BIM.
Background technology
In the life cycle of Architectural Equipment, the time shared by the operation and maintenance stage of building is most long, spends also highest, though So the building O&M stage is so important, but institute's applicable data and resource are relatively fewer.Traditional building operation management System is to show various information in the form of textual list mostly, can not intuitively, clearly, effectively show the building of whole building thing Space resources, just can not reasonably, in an orderly manner if the overall partitioning scenario in whole building space in time, can not be grasped comprehensively The space resource of whole building group is effectively managed, the cost of building operation management has both been added, has reduced again The efficiency effectively managed space resource.In addition, in traditional building operation flow, design, the number in construction stage The building operation management stage often can not be completely remained into according to data, so as to cause to build the difficulty in operation management stage.
Utility model content
In order to solve the weak point present in above-mentioned technology, the utility model provides a kind of building fortune based on BIM Tie up management system.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of building O&M based on BIM Management system, including terminal device, BIM operation platforms, smart machine, subscriber device;The right-hand member of smart machine passes through data Line is bi-directionally connected with opc server, and monitoring device is provided with below smart machine;Monitoring device is sensor device, monitoring The right-hand member of equipment is connected by data wire with opc server;The right-hand member of opc server is double by data wire and OPC client To connection;Cloud Server is provided with below OPC client, OPC client is bi-directionally connected by data wire and Cloud Server;Cloud The right-hand member of server is bi-directionally connected by data wire and BIM operation platforms, and vpn gateway is provided with below Cloud Server;VPN nets Close by data wire Opposite direction connection on Cloud Server;Terminal device is provided with below BIM operation platforms;
Subscriber device includes video monitoring equipment, Garage Management System and gate control system equipment;Video monitoring equipment, car Base management system, the right-hand member of gate control system equipment pass through video monitoring server, garage system server, gate inhibition's server respectively It is connected with the left end of vpn gateway.
Terminal device includes computer terminal and mobile terminal.
Video monitoring equipment, Garage Management System and gate control system equipment are arranged in parallel from top to bottom.
The right-hand member of computer terminal is connected by data wire with client-server;The right-hand member of mobile terminal passes through data wire It is connected with mobile APP modules.
The utility model runs building operation management system using BIM, can not only improve the effect of building operation maintenance Rate and quality, and the expense of building operation maintenance can be reduced.The design by BIM come carry out space management, asset management, Positioning exclusion, energy management and safety management of facility failure etc., realize visualizing, be intelligent, counting for building O&M stage According to accuracy and the function of uniformity.In addition, using BIM in building design stage, have altered if built in process of construction Design can be reflected in archives in time, so as to build operation and maintenance stage with regard to that can obtain most complete, most detailed building item Mesh information.
Brief description of the drawings
Fig. 1 is composition frame chart of the present utility model.
Fig. 2 is the export flow chart of BIM O&M models.
Fig. 3 is the flow chart of equipment alarm disposal.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
As Figure 1-3, the utility model includes terminal device, and it also includes BIM operation platforms, smart machine, subsystem System equipment;The right-hand member of smart machine is bi-directionally connected by data wire and opc server, and monitoring is provided with below smart machine and is set It is standby;Monitoring device is sensor device, and the right-hand member of monitoring device is connected by data wire with opc server;Monitoring device is Refer to the various sensor devices being laid in building, such as temperature sensor, humidity sensor, air detecting sensors.This A little monitoring devices are the hardware foundations that BIM operation platforms obtain various data and information out of building.In the building O&M of reality , it is necessary to select to support that the sensor device of OPC standards is conveniently integrated in management system.
Smart machine includes the equipment such as intelligent water ammeter, intelligent lighting lamp, intelligent curtain, intelligent projection screen.These intelligence Energy equipment is the important component that BIM operation platforms realize building intellectualization.The difference of smart machine and monitoring device is Smart machine not only has the ability of sensor readings, can also be to equipment propelling data, so as to realize that control intelligence is set Standby function.As monitoring device, to realize that the OPC of equipment is integrated, need selection OPC can be supported to mark in actual items Accurate smart machine.
The right-hand member of opc server is bi-directionally connected by data wire and OPC client;Cloud is provided with below OPC client Server, OPC client are bi-directionally connected by data wire and Cloud Server;The right-hand member of Cloud Server is transported by data wire and BIM Dimension platform is bi-directionally connected, and vpn gateway is provided with below Cloud Server;Vpn gateway is by data wire Opposite direction connection in cloud service On device;Terminal device is provided with below BIM operation platforms;
All building elements are covered in BIM (Building Information Modeling, i.e. BIM) Comprising information, i.e., in addition to geometric data, at the same also comprising building or project data.These data provide for programming system Sufficient calculation basis, make data of these programs according to component, the accurate information required for inquiry can be calculated automatically, wrap Include the plan such as built, elevation, profile, detailed figure, 3 D stereo view, perspective view, material table or calculate every The information such as the air-conditioning power consumption that the illuminating effect of individual room natural lighting, required air conditioner ventilation amount, winter or summer need.
OPC is the quite varied industrial standard of an application, can be by different vendor and the sensing data of different model It is published to by opc server with unified data format in internet.OPC client be docked with opc server it is special Server-side application, support the two-way read-write with opc server.On the one hand, OPC client can parse takes from OPC Be engaged in the data of device, and uploaded in Cloud Server, on the other hand, can by the control signal from BIM operation platforms with The form of OPC data is pushed in opc server.
Cloud Server is used in the wide area network share the operation/maintenance data in LAN, while is also used for multiple O&M items Mesh coordinated management.By using Cloud Server can be greatly enhanced development efficiency and reduce database operation management into This.Further, since LAN server belongs to enterprises server, to ensure security during data exchange, it is therefore desirable to Lan device and Cloud Server realize encryption communication by vpn gateway.
Subscriber device includes video monitoring equipment, Garage Management System and gate control system equipment;Video monitoring equipment, car Base management system, the right-hand member of gate control system equipment pass through video monitoring server, garage system server, gate inhibition's server respectively It is connected with the left end of vpn gateway.Video monitoring equipment, Garage Management System and gate control system equipment parallel from top to bottom Row.
The common feature of subscriber device is in equipment purchase, is to be disposed in units of whole system to install.Respectively The manufacturer of individual subsystem and data standard are all different, and therefore, this equipment component needs completely to dispose in an installation whole Individual subsystem (including hardware device, LAN server, relevant data acquisition software etc.), the number provided again by manufacturer afterwards Data are obtained according to interface.
Terminal device includes computer terminal and mobile terminal.The right-hand member of computer terminal passes through data wire and client-server It is connected;The right-hand member of mobile terminal is connected by data wire with mobile APP modules.It is remote that terminal device is used for operation management personnel Journey checks operation/maintenance data and operation BIM operation management systems.
In addition, this building operation management system also includes LAN server exchange, each subsystem being laid in building The other equipments such as the server of system, main frame, work station, display device, stereo set.Wherein, it is provided with the server various The program of the data acquisition and control of equipment, BIM operation management programs are installed in work station, display device and stereo set are used Visualized in the real-time three-dimensional of O&M information.
Operation management system is built as embodiment to be deployed in the BIM of certain office building below, to BIM of the present utility model The deployment of operational system and project O&M are implemented to be described further.
The deployment of BIM operational systems:In the building O&M stage, it is necessary to BIM be designed a model or BIM construction models pass through The plug-in unit of independent development exports as BIM O&M models.The major function of the plug-in unit is by the geometric parameter in BIM models and other Data separating, it is on the one hand the form that other three dimentional graph displays can be supported by BIM model conversations, on the other hand by O&M mould Mega structure and engineering import the database formulated in type, and this partial data is managed by database.
Project O&M is implemented:In the actual implementation process of the project, operation management personnel passes through the O&M based on PC ends Platform client server and mobile APP modules based on mobile terminal realize the acquisition of operation/maintenance data and the management of equipment.With Some equipment briefly introduces the application flow of BIM operational systems exemplified by alarming:When some monitoring of tools to abnormal conditions, meeting The information such as alarm signal and corresponding alert locations, reason is sent in BIM operation management platforms, subsequent BIM O&Ms pipe Platform in above alarm information pushing to the client-server of corresponding director and cell phone application, will can be waited after disposing again Cancelled by platform and alarmed, complete the disposal of whole alarm flow.
The utility model compared with conventional art advantageously:
(1) bandwagon effect is good:The system employs the threedimensional model exhibition method based on BIM, compared to traditional O&M pipe The way to manage of platform planarization, space structure that can be inside more visual in image ground exhibition building and each O&M equipment Position.Connected in addition, BIM O&Ms model can be designed directly by BIM with construction model by plug-in unit, reduce system deployment Cycle;
(2) equipment compatibility is good:The data acquisition modes integrated due to employing OPC in the present system, reduce directly For the adaptation work of various hardware devices, development difficulty and the cycle of BIM operation platforms are reduced;
(3) security of system is good:Realized by way of configuring vpn gateway logical between LAN and internet in building News, it can effectively improve the security of various equipment and data in building;
(4) system deployment facilitates:The system disposes facility in actual items, as long as paying attention to being adapted in hardware purchase Property, system can quickly be transplanted to other similar in O&M project.
It is to be also not limited to the example above to limitation of the present utility model, the utility model that above-mentioned embodiment, which is not, The variations, modifications, additions or substitutions that those skilled in the art are made in the range of the technical solution of the utility model, Also the scope of protection of the utility model is belonged to.

Claims (4)

1. a kind of building operation management system based on BIM, including terminal device, it is characterised in that:It also puts down including BIM O&Ms Platform, smart machine, subscriber device;The right-hand member of the smart machine is bi-directionally connected by data wire and opc server, is intelligently set Standby lower section is provided with monitoring device;The monitoring device is sensor device, and the right-hand member of monitoring device passes through data wire and OPC Server is connected;The right-hand member of the opc server is bi-directionally connected by data wire and OPC client;The OPC client Lower section is provided with Cloud Server, and OPC client is bi-directionally connected by data wire and Cloud Server;The right-hand member of the Cloud Server leads to Cross data wire to be bi-directionally connected with BIM operation platforms, vpn gateway is provided with below Cloud Server;The vpn gateway passes through data Line Opposite direction connection is on Cloud Server;Terminal device is provided with below the BIM operation platforms;
The subscriber device includes video monitoring equipment, Garage Management System and gate control system equipment;The video monitoring is set Standby, Garage Management System, the right-hand member of gate control system equipment pass through video monitoring server, garage system server, gate inhibition respectively Server is connected with the left end of vpn gateway.
2. the building operation management system according to claim 1 based on BIM, it is characterised in that:The terminal device bag Include computer terminal and mobile terminal.
3. the building operation management system according to claim 1 based on BIM, it is characterised in that:The video monitoring is set Standby, Garage Management System and gate control system equipment are arranged in parallel from top to bottom.
4. the building operation management system according to claim 2 based on BIM, it is characterised in that:The computer terminal Right-hand member is connected by data wire with client-server;The right-hand member of the mobile terminal passes through data wire and mobile APP modules It is connected.
CN201721102429.7U 2017-08-30 2017-08-30 A kind of building operation management system based on BIM Expired - Fee Related CN207184540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721102429.7U CN207184540U (en) 2017-08-30 2017-08-30 A kind of building operation management system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721102429.7U CN207184540U (en) 2017-08-30 2017-08-30 A kind of building operation management system based on BIM

Publications (1)

Publication Number Publication Date
CN207184540U true CN207184540U (en) 2018-04-03

Family

ID=61738621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721102429.7U Expired - Fee Related CN207184540U (en) 2017-08-30 2017-08-30 A kind of building operation management system based on BIM

Country Status (1)

Country Link
CN (1) CN207184540U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110532322A (en) * 2019-08-20 2019-12-03 腾讯云计算(北京)有限责任公司 O&M exchange method, system, computer readable storage medium and equipment
CN112202861A (en) * 2020-09-22 2021-01-08 北京华科软科技有限公司 Hydropower engineering method management application system based on BIM
CN110532322B (en) * 2019-08-20 2024-04-30 腾讯云计算(北京)有限责任公司 Operation and maintenance interaction method, system, computer readable storage medium and equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110532322A (en) * 2019-08-20 2019-12-03 腾讯云计算(北京)有限责任公司 O&M exchange method, system, computer readable storage medium and equipment
CN110532322B (en) * 2019-08-20 2024-04-30 腾讯云计算(北京)有限责任公司 Operation and maintenance interaction method, system, computer readable storage medium and equipment
CN112202861A (en) * 2020-09-22 2021-01-08 北京华科软科技有限公司 Hydropower engineering method management application system based on BIM
CN112202861B (en) * 2020-09-22 2023-09-19 北京华科软科技有限公司 BIM-based hydropower engineering method management application system

Similar Documents

Publication Publication Date Title
CN204925783U (en) Indoor long -range fortune dimension information system that patrols and examines of control protection of transformer substation
Bhatt et al. Design and development of wired building automation systems
CN102436610B (en) A kind of data center intelligent management system based on radio-frequency (RF) identification and method
CN108615143A (en) Device and method based on BIM models Yu O&M information exchange in intelligent building management
CN101329564B (en) Computer room management system
CN202026140U (en) Distribution type distribution room environment and power distribution comprehensive monitor system
CN107483253A (en) A kind of data center machine room operation management system based on three-dimensional VR
CN110428135A (en) A kind of pipe gallery equipment condition monitoring management system
CN103745633B (en) Intelligent research laboratory comprehensive platform
CN110740546B (en) Night illumination sensing system based on intelligent Internet of things
CN104899922A (en) Three-dimensional holographic generation method for intelligent power grid visualization application
CN111784140A (en) Wisdom water affairs management and control scheduling platform based on internet of things
CN104571062A (en) Town comprehensive pipe rack monitoring control and alarm system
CN202486829U (en) Data center intelligent management system based on radio frequency identification
CN104460609A (en) Remote monitoring method and system for oil and gas production
CN110689957A (en) Intelligent operation and maintenance management platform for hospital environment facilities
CN206021323U (en) Digital building system
CN103092169B (en) Digital camp apparatus management/control device
CN109460834A (en) Build operation management system and its management method
CN106961483A (en) Distributed real-time data server
CN107544383A (en) A kind of residential property apparatus monitoring method and system
CN107464284A (en) Three-dimensional visualization property information management system based on mobile terminal
CN104637265A (en) Dispatch-automated multilevel integration intelligent watching alarming system
CN110673673A (en) BIM operation and maintenance platform-based monitoring management system for high-rise ultralow-energy-consumption residence
CN203104119U (en) Internet of Things intelligent grid operation and maintenance system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403

Termination date: 20200830