CN207161121U - A kind of assembled tunnel joint form - Google Patents

A kind of assembled tunnel joint form Download PDF

Info

Publication number
CN207161121U
CN207161121U CN201720118741.9U CN201720118741U CN207161121U CN 207161121 U CN207161121 U CN 207161121U CN 201720118741 U CN201720118741 U CN 201720118741U CN 207161121 U CN207161121 U CN 207161121U
Authority
CN
China
Prior art keywords
tunnel
tunnel structure
insertion end
bell end
rubber ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720118741.9U
Other languages
Chinese (zh)
Inventor
范国刚
贺维国
褚凯
江水德
张哲强
邢永辉
郑余朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd, CRTG Survey and Design Institute Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN201720118741.9U priority Critical patent/CN207161121U/en
Application granted granted Critical
Publication of CN207161121U publication Critical patent/CN207161121U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of assembled tunnel joint form, it is related to technical field of traffic transportation;The outer wall of tunnel structure insertion end is provided with interface steel collar;The outer wall of described tunnel structure bell end is provided with the first sealing rubber ring and the second sealing rubber ring, and the end face of tunnel structure insertion end is provided with elastic sealing gasket;The port outer wall of described tunnel structure bell end is provided with steel loop, and Grouting Pipe is provided with tunnel structure bell end;Shearing resistance latch and pin hole are respectively arranged with described tunnel structure insertion end and tunnel structure bell end;Described tunnel structure insertion end passes through shearing resistance latch and pin hole grafting with tunnel structure bell end.A kind of assembled tunnel joint form described in the utility model, joint manufacture difficulty is small, easy for installation, quick, cost is low, good water-proof effect, securely and reliably.Joint design has certain rigidity, in bad ground, can resist influence of the differential settlement to tunnel.

Description

A kind of assembled tunnel joint form
Technical field
It the utility model is related to technical field of traffic transportation, and in particular to a kind of assembled tunnel joint form.
Background technology
At this stage, Chinese Urbanization is in the high-speed developing period, and big city megalopolis is persistently transformed and expanded, in Small city fast development.The scale in city is among big change with structure.The development of Modern Traffic is being brought just While sharp, influence has also been brought negatively:Along with the increase of automobile, congestion is into the common fault in big or middle city.How in city Increase road passage capability in the limited space in city, be many city urgent problems.Because tunnel is laid in existing road It is small on traffic above-ground or waterway influence under road or urban river, more and more in Traffic Capacity of Urban Road dilatation Using.
Tunnel is embedded in underground, and throughout the year in groundwater environment, its waterproof effect quality directly affects the use work(in tunnel The success or failure of energy and whole engineering.As builder is to tunnel construction environment, the raising of efficiency of construction requirement, tunnel more uses machine Tool construction and fabricated construction.
The seam waterproof of assembled tunnel structure, it is the core of whole tunnel structure water-proof system.Assembled tunnel structure, It is longitudinally rigid small along tunnel, the limited in one's ability of differential settlement is resisted in compound stratum, if tunnel produces excessive inequality Even sedimentation, the waterproof of tunnel seam will be directly affected.
Usual assembled tunnel water proofing has together or twice waterproof layer, waterproof effect are limited.If can less increase engineering Amount and difficulty of construction, and can set up waterproof layer number in assembled tunnel joint area, enhancing tunnel resistance differential settlement Ability, the raising to whole tunnel water proofing system reliability will be of great importance.
Utility model content
The defects of the purpose of this utility model is to be directed to prior art and deficiency, there is provided a kind of difficulty of construction is small, technique Simply, speed of application is fast, good water-proof effect, can resist the assembled tunnel joint form of tunnel differential settlement.
To achieve the above object, the technical solution adopted in the utility model is:It includes tunnel structure insertion end, tunnel knot Structure bell end, interface steel collar, steel loop, the first sealing rubber ring, the second sealing rubber ring, elastic sealing gasket, Grouting Pipe, shearing resistance Latch, pin hole;The outer wall of described tunnel structure insertion end is provided with interface steel collar;Described tunnel structure bell end Outer wall is provided with the first sealing rubber ring and the second sealing rubber ring, and the end face of tunnel structure insertion end is provided with elastic packing Pad;The port outer wall of described tunnel structure bell end is provided with steel loop, and Grouting Pipe is provided with tunnel structure bell end;It is described Tunnel structure insertion end and tunnel structure bell end on be respectively arranged with shearing resistance latch and pin hole;Described tunnel structure is inserted Enter end and pass through shearing resistance latch and pin hole grafting with tunnel structure bell end.
Preferably, it is provided with multi-plywood between described tunnel structure insertion end and tunnel structure bell end.
Preferably, described shearing resistance latch is arranged on the side wall or haunch of tunnel structure insertion end.
Preferably, penetrate steel loop at the top of described Grouting Pipe.
Operation principle of the present utility model is:Four waterproof construction measures are set, wherein three be quality of rubber materials, are together Reserved slip casting measure, arranges shearing resistance latch in side wall or haunch region, resists differential settlement.In tunnel interface leakage scenarios Under, can be close by the way that space between interface steel collar and socket joint end structure is filled by reserved Grouting Pipe ejection for water plugging, sealing material Star is to joint water-stagnating effect.
After said structure, had the beneficial effect that caused by the utility model:A kind of assembled described in the utility model Tunnel joint form, joint manufacture difficulty is small, easy for installation, quick, cost is low, good water-proof effect, securely and reliably.Joint design There is certain rigidity, in bad ground, influence of the differential settlement to tunnel can be resisted.
Brief description of the drawings
Fig. 1 is decomposition chart of the present utility model;
Fig. 2 is the new new assembly structure figure of this practicality;
Fig. 3 is Fig. 2 interior joint A schematic diagrames.
Description of reference numerals:
Tunnel structure insertion end 1, tunnel structure bell end 2, interface steel collar 3, steel loop 4, the first sealing rubber ring 5, Two sealing rubber rings 6, elastic sealing gasket 7, Grouting Pipe 8, shearing resistance latch 9, pin hole 10, multi-plywood 11.
Embodiment
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Referring to such as Fig. 1 --- shown in Fig. 3, present embodiment adopts the following technical scheme that:It is inserted comprising tunnel structure Enter end 1, tunnel structure bell end 2, interface steel collar 3, steel loop 4, the first sealing rubber ring 5, the second sealing rubber ring 6, elasticity Sealing gasket 7, Grouting Pipe 8, shearing resistance latch 9, pin hole 10;The outer wall of described tunnel structure insertion end 1 is provided with interface steel bushing Ring 3;The outer wall of described tunnel structure bell end 2 is provided with the first sealing rubber ring 5 and the second sealing rubber ring 6, tunnel knot The end face of structure insertion end 1 is provided with elastic sealing gasket 7;The port outer wall of described tunnel structure bell end 2 is provided with steel loop 4, Grouting Pipe 8 is provided with tunnel structure bell end 2;Set respectively on described tunnel structure insertion end 1 and tunnel structure bell end 2 It is equipped with shearing resistance latch 9 and pin hole 10;Described tunnel structure insertion end 1 and tunnel structure bell end 2 by shearing resistance latch 9 and The grafting of pin hole 10.
Preferably, it is provided with multi-plywood between described tunnel structure insertion end 1 and tunnel structure bell end 2 11。
Preferably, described shearing resistance latch 9 is arranged on the side wall or haunch of tunnel structure insertion end 1.
Preferably, the described top of Grouting Pipe 8 penetrates steel loop 4.
The operation principle of present embodiment is:Four waterproof construction measures are set, wherein three be quality of rubber materials, one Road is reserved slip casting measure, and shearing resistance latch is arranged in side wall or haunch region, resists differential settlement.In tunnel interface seepage In the case of, can be by reserved Grouting Pipe ejection for water plugging, sealing material is by the way that space between interface steel collar and socket joint end structure is filled out Fill and closely knit reach joint water-stagnating effect.
When present embodiment operates:
1st, tunnel joint is prefabricated by insertion end and bell end mode, interface steel collar 3 is used in the outside of tunnel structure insertion end 1 Connection parcel is closely knit, and does water-proofing treatment;
2nd, tunnel structure bell end 2 reserves two grooves and is used to arrange the first waterproof sealing gasket 5 and second in interface range Waterproof sealing gasket 6, groove is reserved in the end face of tunnel structure insertion end 1 and is used to arrange elastic sealing gasket 7;
3rd, built-in slip casting pipe 8 in socket joint end structure, ejection for water plugging measure is reserved as tunnel;
4th, slip casting pore is reserved on the steel loop 4 of bell end structural edge;
5th, shearing resistance latch 9 is installed on side wall or haunch, controls tunnel differential settlement;
6th, first assembled tunnel structure bell end 2, then assembled tunnel structure insertion end 1, the first sealing rubber ring 5, second are close Envelope rubber ring 6 and the compression of elastic sealing gasket 7 form tunnel water proofing system.
After said structure, had the beneficial effect that caused by present embodiment:One described in present embodiment Kind assembled tunnel joint form, joint manufacture difficulty is small, easy for installation, quick, cost is low, good water-proof effect, securely and reliably. Joint design has certain rigidity, in bad ground, can resist influence of the differential settlement to tunnel.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above.This The technical staff of industry is retouched in above-described embodiment and specification it should be appreciated that the utility model is not restricted to the described embodiments That states simply illustrates principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model Various changes and modifications are also had, these changes and improvements are both fallen within claimed the scope of the utility model.This practicality is new Scope is claimed by appended claims and its equivalent thereof in type.

Claims (4)

  1. A kind of 1. assembled tunnel joint form, it is characterised in that:It include tunnel structure insertion end, tunnel structure bell end, Interface steel collar, steel loop, the first sealing rubber ring, the second sealing rubber ring, elastic sealing gasket, Grouting Pipe, shearing resistance latch, latch Hole;The outer wall of described tunnel structure insertion end is provided with interface steel collar;The outer wall of described tunnel structure bell end is set There are the first sealing rubber ring and the second sealing rubber ring, the end face of tunnel structure insertion end is provided with elastic sealing gasket;Described The port outer wall of tunnel structure bell end is provided with steel loop, and Grouting Pipe is provided with tunnel structure bell end;Described tunnel knot Shearing resistance latch and pin hole are respectively arranged with structure insertion end and tunnel structure bell end;Described tunnel structure insertion end and tunnel Road structure bell end passes through shearing resistance latch and pin hole grafting.
  2. A kind of 2. assembled tunnel joint form according to claim 1, it is characterised in that:Described tunnel structure insertion Multi-plywood is provided between end and tunnel structure bell end.
  3. A kind of 3. assembled tunnel joint form according to claim 1, it is characterised in that:Described shearing resistance latch is set On the side wall or haunch of tunnel structure insertion end.
  4. A kind of 4. assembled tunnel joint form according to claim 1, it is characterised in that:Worn at the top of described Grouting Pipe Saturating steel loop.
CN201720118741.9U 2017-02-09 2017-02-09 A kind of assembled tunnel joint form Active CN207161121U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720118741.9U CN207161121U (en) 2017-02-09 2017-02-09 A kind of assembled tunnel joint form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720118741.9U CN207161121U (en) 2017-02-09 2017-02-09 A kind of assembled tunnel joint form

Publications (1)

Publication Number Publication Date
CN207161121U true CN207161121U (en) 2018-03-30

Family

ID=61708465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720118741.9U Active CN207161121U (en) 2017-02-09 2017-02-09 A kind of assembled tunnel joint form

Country Status (1)

Country Link
CN (1) CN207161121U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837390A (en) * 2017-02-09 2017-06-13 中铁隧道勘测设计院有限公司 A kind of assembled tunnel joint form
CN111119186A (en) * 2019-12-04 2020-05-08 向占富 Novel portable grouting machine and grouting process of joint rubber ring of novel portable grouting machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837390A (en) * 2017-02-09 2017-06-13 中铁隧道勘测设计院有限公司 A kind of assembled tunnel joint form
CN111119186A (en) * 2019-12-04 2020-05-08 向占富 Novel portable grouting machine and grouting process of joint rubber ring of novel portable grouting machine

Similar Documents

Publication Publication Date Title
CN103256052B (en) Construction method for integral straight middle wall type double-arch tunnel
CN204023501U (en) A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam
CN202832570U (en) Tunnel secondary lining construction joint waterproof structure
CN103526724B (en) The anchoring leakage preventing structure that a kind of reservoir bottom geomembrane is connected with storehouse week collector drain periphery fissure
CN106149764A (en) A kind of precast assembly pipe gallery bell and spigot waterproof construction
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN212690047U (en) Tunnel fault broken zone excavation outline line edge curtain slip casting body structure
CN207161121U (en) A kind of assembled tunnel joint form
CN203161259U (en) Buried-in type rubber water-stop belt of double-layer waterproof structure and construction-joint water drainage structure formed by buried-in type rubber water-stop belt
CN106759786A (en) A kind of storm sewer structure and its construction method
CN207537993U (en) A kind of diversion tunnel concrete plug
CN204715426U (en) A kind of water burst drainage system for closed deep foundation ditch exploratory hole
CN205894027U (en) Structure is oozed in cutting of power station underground factory building
CN110762287A (en) Curved pipe jacking interface water stop structure suitable for high water pressure condition
CN106592580A (en) Self-pressurization rapid-permeating precast pile device and construction method thereof
CN206220998U (en) A kind of discharge structure on the outside of tunnel inverted arch
CN106837390A (en) A kind of assembled tunnel joint form
CN205990655U (en) A kind of urban drainage pipe network defense sector sinking device
CN210238573U (en) A waterproof construction that is used for open cut station main part and attached junction
CN210194676U (en) Structure is assembled to prefabricated utility tunnel tube coupling of underground
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN204827469U (en) A tunnel for transmission fluid
CN204475379U (en) Shorten the basement post-pouring zone in Dewatering cycle
CN109914450A (en) Replace the diversion channel and construction method of cofferdam construction in high permeability layer of sand
CN114810147A (en) Shield tunnel inner radial split type grouting reinforcement and combined type plugging method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180619

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 21-316 South Road 88.

Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: No. 1 Hebei street, Hongqiao District, Tianjin City, Tianjin

Co-patentee before: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd.