CN106837390A - A kind of assembled tunnel joint form - Google Patents

A kind of assembled tunnel joint form Download PDF

Info

Publication number
CN106837390A
CN106837390A CN201710070501.0A CN201710070501A CN106837390A CN 106837390 A CN106837390 A CN 106837390A CN 201710070501 A CN201710070501 A CN 201710070501A CN 106837390 A CN106837390 A CN 106837390A
Authority
CN
China
Prior art keywords
tunnel structure
tunnel
insertion end
bell end
rubber ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710070501.0A
Other languages
Chinese (zh)
Inventor
范国刚
贺维国
褚凯
江水德
张哲强
邢永辉
郑余朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd, CRTG Survey and Design Institute Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN201710070501.0A priority Critical patent/CN106837390A/en
Publication of CN106837390A publication Critical patent/CN106837390A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Abstract

A kind of assembled tunnel joint form, it is related to technical field of traffic transportation;The outer wall of tunnel structure insertion end is provided with interface steel collar;The outer wall of described tunnel structure bell end is provided with the first sealing rubber ring and the second sealing rubber ring, and the end face of tunnel structure insertion end is provided with elastic sealing gasket;The port outer wall of described tunnel structure bell end is provided with steel loop, and Grouting Pipe is provided with tunnel structure bell end;Shearing resistance latch and pin hole are respectively arranged with described tunnel structure insertion end and tunnel structure bell end;Described tunnel structure insertion end passes through shearing resistance latch and pin hole grafting with tunnel structure bell end.A kind of assembled tunnel joint form of the present invention, joint manufacture difficulty is small, easy for installation, quick, low cost, and good water-proof effect is safe and reliable.Joint design has certain rigidity, in bad ground, can resist influence of the differential settlement to tunnel.

Description

A kind of assembled tunnel joint form
Technical field
The present invention relates to technical field of traffic transportation, and in particular to a kind of assembled tunnel joint form.
Background technology
At this stage, Chinese Urbanization is in the high-speed developing period, and big city megalopolis is persistently transformed and expanded, in Small city fast development.The scale in city is among big change with structure.The development of Modern Traffic is bringing just While sharp, influence has also been brought negatively:Along with the increase of automobile, congestion is into the common fault in big or middle city.How in city Increase road passage capability in the limited space in city, be many city urgent problems.Because tunnel is laid in existing road It is small on traffic above-ground or waterway influence under road or urban river, more and more in Traffic Capacity of Urban Road dilatation Using.
Tunnel is embedded in underground, and throughout the year in groundwater environment, its waterproof effect quality directly affects the use work(in tunnel The success or failure of energy and whole engineering.As builder is to tunnel construction environment, the raising of efficiency of construction requirement, the more use machines in tunnel Tool construction and fabricated construction.
The seam waterproof of assembled tunnel structure, is the core of whole tunnel structure water-proof system.Assembled tunnel structure, It is longitudinally rigid small along tunnel, the limited in one's ability of differential settlement is resisted in compound stratum, if tunnel produces excessive inequality Even sedimentation, will directly affect the waterproof of tunnel seam.
Usual assembled tunnel water proofing has one or twice waterproof layer, and waterproof effect is limited.If can less increase engineering Amount and difficulty of construction, can set up waterproof layer number in assembled tunnel joint area again, enhancing tunnel resistance differential settlement Ability, the raising to whole tunnel water proofing system reliability will be of great importance.
The content of the invention
Defect and deficiency it is an object of the invention to be directed to prior art, there is provided a kind of difficulty of construction is small, process is simple, Speed of application is fast, good water-proof effect, can resist the assembled tunnel joint form of tunnel differential settlement.
To achieve the above object, the technical solution adopted by the present invention is:It holds comprising tunnel structure insertion end, tunnel structure Spigot, interface steel collar, steel loop, the first sealing rubber ring, the second sealing rubber ring, elastic sealing gasket, Grouting Pipe, shearing resistance are inserted Pin, pin hole;The outer wall of described tunnel structure insertion end is provided with interface steel collar;Outside described tunnel structure bell end Wall is provided with the first sealing rubber ring and the second sealing rubber ring, and the end face of tunnel structure insertion end is provided with elastic sealing gasket; The port outer wall of described tunnel structure bell end is provided with steel loop, and Grouting Pipe is provided with tunnel structure bell end;Described Shearing resistance latch and pin hole are respectively arranged with tunnel structure insertion end and tunnel structure bell end;Described tunnel structure insertion End passes through shearing resistance latch and pin hole grafting with tunnel structure bell end.
Preferably, being provided with multi-plywood between described tunnel structure insertion end and tunnel structure bell end.
Preferably, described shearing resistance latch is arranged on the side wall of tunnel structure insertion end or haunch.
Preferably, described Grouting Pipe top penetrates steel loop.
Operation principle of the invention is:Four road waterproof construction measures are set, wherein three roads are quality of rubber materials, it is together reserved Slip casting measure, arranges shearing resistance latch in side wall or haunch region, resists differential settlement.Under tunnel interface leakage scenarios, Closely knit reaching can be filled by by space between interface steel collar and socket joint end structure by reserved Grouting Pipe ejection for water plugging, sealing material To joint water-stagnating effect.
After said structure, what the present invention was produced has the beneficial effect that:A kind of assembled tunnel joint of the present invention Form, joint manufacture difficulty is small, easy for installation, quick, low cost, and good water-proof effect is safe and reliable.Joint design has certain firm Degree, in bad ground, can resist influence of the differential settlement to tunnel.
Brief description of the drawings
Fig. 1 is decomposition chart of the invention;
Fig. 2 is assembly structure figure of the invention;
Fig. 3 is Fig. 2 interior joint A schematic diagrames.
Description of reference numerals:
Tunnel structure insertion end 1, tunnel structure bell end 2, interface steel collar 3, steel loop 4, the first sealing rubber ring 5, second are close Envelope rubber ring 6, elastic sealing gasket 7, Grouting Pipe 8, shearing resistance latch 9, pin hole 10, multi-plywood 11.
Specific embodiment
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also Other accompanying drawings are obtained with according to these accompanying drawings.
Referring to such as Fig. 1 --- shown in Fig. 3, this specific embodiment is adopted the following technical scheme that:It is inserted comprising tunnel structure Enter end 1, tunnel structure bell end 2, interface steel collar 3, steel loop 4, the first sealing rubber ring 5, the second sealing rubber ring 6, elasticity Sealing gasket 7, Grouting Pipe 8, shearing resistance latch 9, pin hole 10;The outer wall of described tunnel structure insertion end 1 is provided with interface steel bushing Ring 3;The outer wall of described tunnel structure bell end 2 is provided with the first sealing rubber ring 5 and the second sealing rubber ring 6, tunnel knot The end face of structure insertion end 1 is provided with elastic sealing gasket 7;The port outer wall of described tunnel structure bell end 2 is provided with steel loop 4, Grouting Pipe 8 is provided with tunnel structure bell end 2;Set respectively on described tunnel structure insertion end 1 and tunnel structure bell end 2 It is equipped with shearing resistance latch 9 and pin hole 10;Described tunnel structure insertion end 1 and tunnel structure bell end 2 by shearing resistance latch 9 and The grafting of pin hole 10.
Preferably, being provided with multi-plywood between described tunnel structure insertion end 1 and tunnel structure bell end 2 11。
Preferably, described shearing resistance latch 9 is arranged on the side wall of tunnel structure insertion end 1 or haunch.
Preferably, the described top of Grouting Pipe 8 penetrates steel loop 4.
The operation principle of this specific embodiment is:Four road waterproof construction measures are set, wherein three roads are quality of rubber materials, one Road is reserved slip casting measure, and shearing resistance latch is arranged in side wall or haunch region, resists differential settlement.In tunnel interface seepage In the case of, can be filled out by by space between interface steel collar and socket joint end structure by reserved Grouting Pipe ejection for water plugging, sealing material Fill and closely knit reach joint water-stagnating effect.
When this specific embodiment is operated:
1st, tunnel joint is prefabricated by insertion end and bell end mode, the outside interface steel collar 3 of tunnel structure insertion end 1 is connected Parcel is closely knit, and does water-proofing treatment;
2nd, in interface range, reserve two grooves is used to arrange the first waterproof sealing gasket 5 and the second waterproof tunnel structure bell end 2 Sealing gasket 6, is used to arrange elastic sealing gasket 7 in the reserved groove of the end face of tunnel structure insertion end 1;
3rd, built-in slip casting pipe 8 in socket joint end structure, as the reserved ejection for water plugging measure in tunnel;
4th, slip casting pore is reserved on the steel loop 4 of bell end structural edge;
5th, shearing resistance latch 9 is installed on side wall or haunch, controls tunnel differential settlement;
6th, first assembly tunnel structure bell end 2, then assembled tunnel structure insertion end 1, the first sealing rubber ring 5, second seal rubber Cushion rubber 6 and the compression of elastic sealing gasket 7 form tunnel water proofing system.
After said structure, what this specific embodiment was produced has the beneficial effect that:Described in this specific embodiment one Assembled tunnel joint form is planted, joint manufacture difficulty is small, easy for installation, quick, low cost, and good water-proof effect is safe and reliable. Joint design has certain rigidity, in bad ground, can resist influence of the differential settlement to tunnel.
General principle of the invention and principal character and advantages of the present invention has been shown and described above.The skill of the industry Art personnel it should be appreciated that the present invention is not limited to the above embodiments, the simply explanation described in above-described embodiment and specification Principle of the invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these Changes and improvements all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appending claims and Its equivalent thereof.

Claims (4)

1. a kind of assembled tunnel joint form, it is characterised in that:It comprising tunnel structure insertion end, tunnel structure bell end, Interface steel collar, steel loop, the first sealing rubber ring, the second sealing rubber ring, elastic sealing gasket, Grouting Pipe, shearing resistance latch, latch Hole;The outer wall of described tunnel structure insertion end is provided with interface steel collar;The outer wall of described tunnel structure bell end is set There are the first sealing rubber ring and the second sealing rubber ring, the end face of tunnel structure insertion end is provided with elastic sealing gasket;Described The port outer wall of tunnel structure bell end is provided with steel loop, and Grouting Pipe is provided with tunnel structure bell end;Described tunnel knot Shearing resistance latch and pin hole are respectively arranged with structure insertion end and tunnel structure bell end;Described tunnel structure insertion end and tunnel Road structure bell end passes through shearing resistance latch and pin hole grafting.
2. a kind of assembled tunnel joint form according to claim 1, it is characterised in that:Described tunnel structure insertion Multi-plywood is provided between end and tunnel structure bell end.
3. a kind of assembled tunnel joint form according to claim 1, it is characterised in that:Described shearing resistance latch is set On the side wall or haunch of tunnel structure insertion end.
4. a kind of assembled tunnel joint form according to claim 1, it is characterised in that:Wear at described Grouting Pipe top Saturating steel loop.
CN201710070501.0A 2017-02-09 2017-02-09 A kind of assembled tunnel joint form Pending CN106837390A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710070501.0A CN106837390A (en) 2017-02-09 2017-02-09 A kind of assembled tunnel joint form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710070501.0A CN106837390A (en) 2017-02-09 2017-02-09 A kind of assembled tunnel joint form

Publications (1)

Publication Number Publication Date
CN106837390A true CN106837390A (en) 2017-06-13

Family

ID=59122528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710070501.0A Pending CN106837390A (en) 2017-02-09 2017-02-09 A kind of assembled tunnel joint form

Country Status (1)

Country Link
CN (1) CN106837390A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130905A (en) * 2019-05-10 2019-08-16 中铁第四勘察设计院集团有限公司 A kind of shield tunnel circumferential weld shear structure of the vertical dislocation of adaptive act tomography

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2684134A1 (en) * 1991-11-26 1993-05-28 Joint Francais Prefabricated concrete element such as a tunnel arch stone (voussoir), sealing gasket of this element and method and mould for manufacturing this element
CN103821537A (en) * 2014-03-12 2014-05-28 上海市机械施工集团有限公司 Splicing machining method of rectangular shield duct piece and anti-shear structure of rectangular shield duct piece
CN104234721A (en) * 2014-07-24 2014-12-24 中铁隧道集团有限公司 Large-section rectangular pipe jacking pipe section and butt jointing construction method thereof
CN207161121U (en) * 2017-02-09 2018-03-30 中铁隧道勘测设计院有限公司 A kind of assembled tunnel joint form

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2684134A1 (en) * 1991-11-26 1993-05-28 Joint Francais Prefabricated concrete element such as a tunnel arch stone (voussoir), sealing gasket of this element and method and mould for manufacturing this element
CN103821537A (en) * 2014-03-12 2014-05-28 上海市机械施工集团有限公司 Splicing machining method of rectangular shield duct piece and anti-shear structure of rectangular shield duct piece
CN104234721A (en) * 2014-07-24 2014-12-24 中铁隧道集团有限公司 Large-section rectangular pipe jacking pipe section and butt jointing construction method thereof
CN207161121U (en) * 2017-02-09 2018-03-30 中铁隧道勘测设计院有限公司 A kind of assembled tunnel joint form

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130905A (en) * 2019-05-10 2019-08-16 中铁第四勘察设计院集团有限公司 A kind of shield tunnel circumferential weld shear structure of the vertical dislocation of adaptive act tomography
CN110130905B (en) * 2019-05-10 2024-04-19 中铁第四勘察设计院集团有限公司 Shield tunnel circumferential seam shearing-resistant structure adapting to vertical fault of movable fault

Similar Documents

Publication Publication Date Title
CN103256052B (en) Construction method for integral straight middle wall type double-arch tunnel
CN106149764B (en) A kind of precast assembly pipe gallery bell and spigot waterproof construction
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN202832570U (en) Tunnel secondary lining construction joint waterproof structure
CN103410175B (en) A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction
CN103526724B (en) The anchoring leakage preventing structure that a kind of reservoir bottom geomembrane is connected with storehouse week collector drain periphery fissure
CN104879164A (en) Tunnel annular drain structure
CN212690047U (en) Tunnel fault broken zone excavation outline line edge curtain slip casting body structure
CN103114609A (en) Connection device of new and old underground diaphragm walls and construction method
CN207161121U (en) A kind of assembled tunnel joint form
CN203161259U (en) Buried-in type rubber water-stop belt of double-layer waterproof structure and construction-joint water drainage structure formed by buried-in type rubber water-stop belt
CN204572061U (en) A kind of tunnel circle draining structure
CN206034502U (en) Prefabricated utility tunnel bell and spigot waterproof construction of assembling
CN110762287A (en) Curved pipe jacking interface water stop structure suitable for high water pressure condition
CN102535518B (en) Plugging method of large seam of underground diaphragm wall
CN106837390A (en) A kind of assembled tunnel joint form
CN106761775A (en) A kind of construction method of water-stop curtain
CN210194676U (en) Structure is assembled to prefabricated utility tunnel tube coupling of underground
CN204475379U (en) Shorten the basement post-pouring zone in Dewatering cycle
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN207513619U (en) Tunnel rich water section partitioning waterproofing system
CN109914450A (en) Replace the diversion channel and construction method of cofferdam construction in high permeability layer of sand
CN210978736U (en) Curved pipe jacking interface water stop structure suitable for high water pressure condition
CN204983098U (en) Positive pressure box culvert
CN209622218U (en) Double spigot mouth RC pipejacking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190214

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Applicant after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: No. 1 Hebei street, Hongqiao District, Tianjin City, Tianjin

Applicant before: Zhongtie Tunnel Survey and Design Inst., Ltd.

Applicant before: CHINA RAILWAY LIUYUAN GROUP CO., LTD.