CN207143639U CN201720868061.9U CN201720868061U CN207143639U CN 207143639 U CN207143639 U CN 207143639U CN 201720868061 U CN201720868061 U CN 201720868061U CN 207143639 U CN207143639 U CN 207143639U
Authority
CN
China
Prior art keywords
plate body
steel plate
pad
support bar
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720868061.9U
Other languages
Chinese (zh)
Inventor
许炎午
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720868061.9U priority Critical patent/CN207143639U/en
Application granted granted Critical
Publication of CN207143639U publication Critical patent/CN207143639U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of interim road structure of Traffic Engineering Construction, including steel plate body, the arranged on left and right sides of the steel plate body is symmetrically arranged with slot, the both sides of the steel plate body are provided with guide pad, the guide pad has the plate for coordinating the slot, and the bottom of the steel plate body is horizontally arranged with support bar, and the support bar is provided with more than two, the bottom of the support bar is provided with more than two pieces of pad bridge, and the bottom of the steel plate body is provided with connection box;The present apparatus is laid on fluting by steel plate body and forms transition support, effectively vehicle is avoided to fall into fluting, by setting pad bridge in the lower section of steel plate body, effectively support can be formed in fluting, steel plate body is avoided to be occured bending and deformation at slotting position, the present apparatus sets guide pad in the both sides of steel plate body simultaneously, facilitates wheel to reduce sense of jolting by being travelled after guide pad to steel plate body.

Description

A kind of interim road structure of Traffic Engineering Construction
Technical field
It the utility model is related to a kind of interim road structure of Traffic Engineering Construction.
Background technology
During Traffic Engineering Construction, it is often necessary to slotted on damaged road, fluting waits refilling later Pitch, after grooving, it is necessary to lay steel plate above groove, interim roadbed is used as by steel plate, there is provided vehicle form, but steel Plate can occur bending and deformation in loading process, and after steel plate bending deformation, the both ends of steel plate tilt, and easily scratch wheel, simultaneously Cause stronger sense of jolting.
Based on above mentioned problem, it is desirable to provide one kind can form gentle support, the interim roadbed for avoiding flexural deformation from occurring Structure.
The content of the invention
The technical problems to be solved in the utility model is to provide a kind of interim road structure of Traffic Engineering Construction, this dress Put to be laid on fluting by steel plate body and form transition support, effectively avoid vehicle from falling into fluting, by steel plate body Lower section set pad bridge, can be formed in fluting effectively support, avoid steel plate body from being occured bending and deformation at slotting position, The present apparatus sets guide pad in the both sides of steel plate body simultaneously, facilitates wheel to subtract by being travelled after guide pad to steel plate body Jolt less sense.
To solve the above problems, the utility model adopts the following technical scheme that:
A kind of interim road structure of Traffic Engineering Construction, including steel plate body, the arranged on left and right sides of the steel plate body Slot is symmetrically arranged with, guide pad is provided with the both sides of the steel plate body, the guide pad, which has, coordinates the slot to use Plate, the front and rear end opening position of the steel plate body is provided with the screw of the fixed plate, the steel plate body Bottom is horizontally arranged with support bar, and the support bar is provided with more than two, and the bottom of the support bar is provided with more than two pieces Pad bridge, it is described pad bridge and the support bar between be combined with the first screw, the bottom of the steel plate body is provided with connection box, The second screw is combined between the connection box and the support bar.
Preferably, the guide pad has an inclined guiding surface, and the guiding surface extends to the steel plate sheet The upper surface of body, the angle of inclination formed between the guiding surface and horizontal plane are less than 30 °, are easy to draw by guiding surface Guide-car travels, there is provided preferable cruising characteristic.
Preferably, anti-skidding knurled portion is provided with the top of the steel plate body, by setting anti-skidding knurled portion can be with Increase the frictional force between wheel and steel plate body, avoid that skidding accident occurs, anti-skidding knurled portion can be cast in steel plate body Cause directly to suppress by mould during type.
Preferably, reflecting strips, the reflecting strips are provided with the close forward and backward lateral location at the top of the steel plate body For PVC plastic material strip, by setting reflecting strips, the vehicle of dealing can be reminded to pay attention to slowing down, avoid speed too fast and caused by top Winnow with a dustpan sense.
Preferably, more than one piece of pad is combined between the pad bridge and the support bar, the thickness of the pad is 1mm-3mm, the pad is steel pad, by setting pad so that the present apparatus can pad bridge according to the depth adjustment of fluting Bearing height, meet pad bridge support needs.
Preferably, the thickness of the steel plate body is 10mm-20mm.
The beneficial effects of the utility model are:The present apparatus is laid on fluting by steel plate body and forms transition support, is had Effect avoids vehicle from falling into fluting, by setting pad bridge in the lower section of steel plate body, effectively support can be formed in fluting, is kept away Exempt from steel plate body to occur bending and deformation at slotting position, while the present apparatus sets guide pad in the both sides of steel plate body, it is convenient Wheel reduces sense of jolting, the structure of the present apparatus is relatively simple, and cost is more low by being travelled after guide pad to steel plate body Honest and clean, installation is more convenient, is adapted to promote the use of.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is internal structure schematic diagram of the present utility model;
Fig. 2 is the top view of steel plate body;
Fig. 3 is the upward view of steel plate body;
Fig. 4 is the upward view of connection box;
Fig. 5 is installment state figure of the present utility model.
Embodiment
Preferred embodiment of the present utility model is described in detail below in conjunction with the accompanying drawings, so that the advantages of the utility model It can be easier to be readily appreciated by one skilled in the art with feature, it is apparent clear and definite so as to be made to the scope of protection of the utility model Define.
It is described refering to a kind of interim road structure of Traffic Engineering Construction shown in Fig. 1 to Fig. 5, including steel plate body 1 The arranged on left and right sides of steel plate body 1 is symmetrically arranged with slot 101, and the both sides of the steel plate body 1 are provided with guide pad 2, described Guide pad 2 has the plate 201 for coordinating the slot 101, and the front and rear end opening position of the steel plate body 1 is provided with admittedly The screw of the fixed plate 201(It is not shown), the bottom of the steel plate body 1 is horizontally arranged with support bar 3, the support bar 3 are provided with 3, and the bottom of the support bar 3 is provided with more than two pieces of pad bridge 4, between the pad bridge 4 and the support bar 3 Be combined with the first screw 401, the bottom of the steel plate body 1 is provided with connection box 5, the connection box 5 and the support bar 3 it Between be combined with the second screw 501.
A preferred embodiment in the utility model, the guide pad 2 have an inclined guiding surface 221, institute The upper surface that guiding surface 221 extends to the steel plate body 1 is stated, is formed between the guiding surface 221 and horizontal plane Angle of inclination is 25 °, is easy to guide vehicle to travel by guiding surface, there is provided preferable cruising characteristic.
A preferred embodiment in the utility model, the top of the steel plate body 1 are provided with anti-skidding knurled portion 111, by setting anti-skidding knurled portion to increase the frictional force between wheel and steel plate body, avoid that skidding accident occurs, Anti-skidding knurled portion can directly be suppressed during steel plate body casting by mould.
A preferred embodiment in the utility model, at the close forward and backward lateral location at the top of the steel plate body 1 Reflecting strips 112 are provided with, the reflecting strips 112 are PVC plastic material strip, by setting reflecting strips, the vehicle of dealing can be reminded to note Meaning is slowed down, avoid speed too fast and caused by jolt sense.
A preferred embodiment in the utility model, more than one piece is combined between the pad bridge 4 and the support bar 3 Pad 441, the thickness of the pad 441 is 2mm, and the pad is steel pad, by setting pad so that the present apparatus can To pad the bearing height of bridge according to the depth adjustment of fluting, meet the support needs of pad bridge.
A preferred embodiment in the utility model, the thickness of the steel plate body 1 is 15mm.
The beneficial effects of the utility model are:The present apparatus is laid on fluting by steel plate body and forms transition support, is had Effect avoids vehicle from falling into fluting, by setting pad bridge in the lower section of steel plate body, effectively support can be formed in fluting, is kept away Exempt from steel plate body to occur bending and deformation at slotting position, while the present apparatus sets guide pad in the both sides of steel plate body, it is convenient Wheel reduces sense of jolting, the structure of the present apparatus is relatively simple, and cost is more low by being travelled after guide pad to steel plate body Honest and clean, installation is more convenient, is adapted to promote the use of.
The advantages of general principle of the present utility model, principal character and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, the utility model can also on the premise of the spirit and scope of the utility model is not departed from There are various changes and modifications, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model will Protection domain is asked to be defined by appended claims and its equivalent.

Claims (6)

  1. A kind of 1. interim road structure of Traffic Engineering Construction, it is characterised in that:Including steel plate body, the steel plate body Arranged on left and right sides is symmetrically arranged with slot, and guide pad is provided with the both sides of the steel plate body, and the guide pad, which has, coordinates institute The plate of slot is stated, the front and rear end opening position of the steel plate body is provided with the screw of the fixed plate, the steel The bottom of plate body is horizontally arranged with support bar, and the support bar is provided with more than two, and the bottom of the support bar is provided with More than two pieces of pad bridge, is combined with the first screw between the pad bridge and the support bar, the bottom of the steel plate body is set There is connection box, the second screw is combined between the connection box and the support bar.
  2. 2. the interim road structure of Traffic Engineering Construction according to claim 1, it is characterised in that:The guide pad tool There is an inclined guiding surface, the guiding surface extends to the upper surface of the steel plate body, the guiding surface and water The angle of inclination formed between plane is less than 30 °.
  3. 3. the interim road structure of Traffic Engineering Construction according to claim 1, it is characterised in that:The steel plate body Top be provided with anti-skidding knurled portion.
  4. 4. the interim road structure of Traffic Engineering Construction according to claim 1, it is characterised in that:The steel plate body Top close forward and backward lateral location at be provided with reflecting strips, the reflecting strips are PVC plastic material strip.
  5. 5. the interim road structure of Traffic Engineering Construction according to claim 1, it is characterised in that:The pad bridge and institute State and more than one piece of pad is combined between support bar, the thickness of the pad is 1mm-3mm, and the pad is steel pad.
  6. 6. the interim road structure of Traffic Engineering Construction according to claim 1, it is characterised in that:The steel plate body Thickness be 10mm-20mm.
CN201720868061.9U 2017-07-18 2017-07-18 A kind of interim road structure of Traffic Engineering Construction Expired - Fee Related CN207143639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720868061.9U CN207143639U (en) 2017-07-18 2017-07-18 A kind of interim road structure of Traffic Engineering Construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720868061.9U CN207143639U (en) 2017-07-18 2017-07-18 A kind of interim road structure of Traffic Engineering Construction

Publications (1)

Publication Number Publication Date
CN207143639U true CN207143639U (en) 2018-03-27

Family

ID=61675787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720868061.9U Expired - Fee Related CN207143639U (en) 2017-07-18 2017-07-18 A kind of interim road structure of Traffic Engineering Construction

Country Status (1)

Country Link
CN (1) CN207143639U (en)

Similar Documents

Publication Publication Date Title
CN206579647U (en) A kind of wheel guide rail and Anti-side-turning device
CN207143639U (en) A kind of interim road structure of Traffic Engineering Construction
CN212513270U (en) Railway scale of molten iron tank car convenient to adjust wheel track
CN206706468U (en) A kind of split type take-off track pad
CN103128438B (en) A kind of trough type steel rail thermite welding sand mould
CN202416210U (en) Road deceleration distribution skid-proof marking applicable to level crossing
CN211006217U (en) Road tooth applied to junction of non-motor vehicle lane and motor vehicle lane
CN208884994U (en) Stair step typified form
CN205218532U (en) Gantry machine tools cross beam guide rail structure
CN206753127U (en) A kind of charging sentry box structure of Entry to motorway
CN207188611U (en) A kind of bending machine die
CN212185660U (en) Novel architectural design writes platform thoroughly
CN103669121B (en) A kind of double-throat fixed type acute frog
CN203189432U (en) Improved rail base plate connecting structure
CN213653309U (en) Movable prefabricated guardrail template
CN207240473U (en) A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool
CN207331532U (en) A kind of car lane one-way traffic slow down spacing device
CN205852720U (en) A kind of blade storage device
CN206000183U (en) A kind of concrete flattening device of construction
CN203372743U (en) Hot galvanizing unit slitter edge rolled ball transport trolley rollover preventing structure
CN216947759U (en) Mould stabilising arrangement that road was pour
CN205741819U (en) A kind of building base board
CN201738230U (en) Transverse arc-shaped sloping bridge pier
CN207240466U (en) A kind of railway plate die rail support groove boss demoulds constriction device
CN206706490U (en) A kind of roadbed steel structure in construction building site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

Termination date: 20180718