CN207240473U - A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool - Google Patents

A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool Download PDF

Info

Publication number
CN207240473U
CN207240473U CN201721344167.5U CN201721344167U CN207240473U CN 207240473 U CN207240473 U CN 207240473U CN 201721344167 U CN201721344167 U CN 201721344167U CN 207240473 U CN207240473 U CN 207240473U
Authority
CN
China
Prior art keywords
steel slab
embedded
plate
embedded steel
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721344167.5U
Other languages
Chinese (zh)
Inventor
张�浩
鲜勇
唐生武
冯思源
张鑫
徐艳
沈茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Sichuan Iron Beam Engineering Co Ltd
Original Assignee
Sichuan Sichuan Iron Beam Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Sichuan Iron Beam Engineering Co Ltd filed Critical Sichuan Sichuan Iron Beam Engineering Co Ltd
Priority to CN201721344167.5U priority Critical patent/CN207240473U/en
Application granted granted Critical
Publication of CN207240473U publication Critical patent/CN207240473U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool, including cross-brace plate and vertical supporting plate, the vertical supporting plate shares two pieces, is respectively welded at the both sides of the cross-brace plate, it is connected as a single entity with the cross-brace plate, forms a U-shaped structure;Mounting hole is both provided with the vertical supporting plate and the cross-brace plate, and the mounting hole is uniformly distributed.Beneficial effect is:By the way that the cross-brace plate and the longitudinal supporting plate are welded as a whole, and it is fixed in using bolt on pre-embedded steel slab, avoids carrying out welding processing to pre-embedded steel slab, so as to avoid welding deformation;Dismountable fixing tool, it is convenient to be used alternatingly between pre-embedded steel slab, material can be not only saved, but also the intensity of pre-embedded steel slab can be improved, avoid pre-embedded steel slab from being deformed in lifting and cutting excessive.

Description

A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool
Technical field
It the utility model is related to track construction field, and in particular to a kind of embedded supporting rail guidance tape pre-embedded steel slab regular worker Dress.
Background technology
Tramcar is the light-duty rail traffic vehicle for using driven by power and travelling in orbit, it is a kind of public friendship Logical instrument, also known as streetcar, belong to a kind of free of contamination environmentally friendly vehicles.To ensure other vehicles of city on road Normal operation, the track of modern tram use embedded tracks, so as to ensure the flatness on urban road surface.
Applicants have discovered that at least there are following technical problem in the prior art:Embedded tracks need to be in track in construction The support rail trench bottom pre-embedded steel slab of plate, is supported track plates.Since pre-buried monolithic steel plate specification is width 0.2m* long 6m Strip narrow boards, therefore larger bending or buckling deformation can occur in cutting and lifting so that steel plate occurs during installation Dislocation, can not realize that same mould track is completely closely connected, so that cause the problems such as spillage and rail support groove become large-sized during construction, and Using crisscross reinforcing rib is welded on the steel plate, not only consuming material is more, and welding more easily leads to steel plate deformed.
Utility model content
The purpose of this utility model is that to provide a kind of embedded supporting rail guidance tape to solve the above-mentioned problems pre-buried Interal fixation frock, with solve in the prior art embedded tracks construct when, used pre-embedded steel slab cutting, lifting and The technical problems such as larger bending or buckling deformation easily occur during welding.It is excellent in many technical solutions provided by the utility model The technical solution of choosing has:Dismountable fixing tool is installed by being interrupted on pre-embedded steel slab, so that the intensity of steel plate is improved, Both can avoid welding, the technique effects such as excessive deformation, elaboration as detailed below occur for prevented also from cutting and lifting when.
To achieve the above object, the utility model provides following technical scheme:
A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool provided by the utility model, including cross-brace plate and Vertical supporting plate, the vertical supporting plate share two pieces, are respectively welded at the both sides of the cross-brace plate, are laterally propped up with described Fagging is connected as a single entity, and forms a U-shaped structure;
Mounting hole is both provided with the vertical supporting plate and the cross-brace plate, and the mounting hole is uniformly distributed.
Using a kind of above-mentioned embedded supporting rail guidance tape pre-embedded steel slab fixing tool, the cross-brace plate and described vertical After the completion of support plate welding, Milling Process need to be carried out to its upper and lower surface, so as to ensure the flatness of fixing tool top and bottom, treated After each mounting hole completion of processing, fixing tool interruption is placed on pre-embedded steel slab, and according to the position of the mounting hole, Match somebody with somebody on pre-embedded steel slab and make threaded hole, and the mounting hole is passed through using bolt, fixing tool is fixed on pre-embedded steel slab, from And the intensity of pre-embedded steel slab is improved, avoid welding crisscross reinforcing rib, while in lifting and cutting, can also avoid pre-buried Steel plate occurs to increase deformation, after pre-embedded steel slab rigging out, can also disassemble fixing tool, easy to follow-up pre-embedded steel slab Use, greatly save the use of material.
Preferably, the cross-brace plate uses width as 8mm, length is that the steel plate of 200mm is process.
Preferably, the vertical supporting plate uses width as 8mm, length is that the steel plate of 160mm-180mm is process.
Preferably, the size of the mounting hole is 6mm.
Preferably, the two sides at the top of the cross-brace plate are both provided with fillet.
Beneficial effect is:1st, the utility model by the cross-brace plate and the longitudinal supporting plate by being welded as one Body, and be fixed in using bolt on pre-embedded steel slab, avoid carrying out welding processing to pre-embedded steel slab, so as to avoid welding from becoming Shape;
2nd, dismountable fixing tool, it is convenient to be used alternatingly between pre-embedded steel slab, material can be not only saved, but also can improve pre- The intensity of steel plate is buried, avoids pre-embedded steel slab from being deformed in lifting and cutting excessive.
Brief description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the front view of the utility model;
Fig. 2 is the scheme of installation of the utility model.
The reference numerals are as follows:
1st, vertical supporting plate;2nd, cross-brace plate;3rd, mounting hole;4th, fillet.
Embodiment
To make the purpose of this utility model, technical solution and advantage clearer, below by the technology of the utility model Scheme is described in detail.Obviously, the described embodiments are only a part of the embodiments of the utility model, rather than all Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made Obtained all other embodiment is put, belongs to the scope that the utility model is protected.
Referring to shown in Fig. 1-Fig. 2, the utility model provides a kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool, Including cross-brace plate 2 and vertical supporting plate 1, vertical supporting plate 1 shares two pieces, is respectively welded at the both sides of cross-brace plate 2, It is connected as a single entity with cross-brace plate 2, forms a U-shaped structure;
Mounting hole 3 is both provided with vertical supporting plate 1 and cross-brace plate 2, and mounting hole 3 is uniformly distributed.
As optional embodiment, cross-brace plate 2 uses width as 8mm, length be 200mm steel plate processing and Into so set, easy to make the width dimensions of the length of cross-brace plate 2 and pre-embedded steel slab match, so as to improve regular worker The cross-brace power of dress.
Vertical supporting plate 1 uses width as 8mm, and length is that the steel plate of 160mm-180mm is process, so set, making The length of vertical supporting plate 1 and the length of cross-brace plate 2 match, and avoid vertical supporting plate 1 long, cause fixing tool certainly Bending phenomenon occurs for body.
The size of mounting hole 3 is 6mm, so set, easy to be installed by the bolt of M5, can both be avoided in pre-buried steel Excessive threaded hole is processed on plate, ensures that being fixedly connected for fixing tool and pre-embedded steel slab.
The two sides at the top of cross-brace plate 2 are both provided with fillet 4, so set, having the outer side edges of cross-brace plate 2 There is round and smooth excessive angle, avoid scratch hand.
Using the above structure, after the completion of cross-brace plate 2 and vertical supporting plate 1 are welded, milling need to be carried out to its upper and lower surface Processing is cut, so as to ensure the flatness of fixing tool top and bottom, after each 3 completion of processing of mounting hole, fixing tool interruption is put Put on pre-embedded steel slab, and according to the position of mounting hole 3, match somebody with somebody on pre-embedded steel slab and make threaded hole, and installation is passed through using bolt Hole 3, fixing tool is fixed on pre-embedded steel slab, so as to improve the intensity of pre-embedded steel slab, avoids welding crisscross reinforcement Muscle, while in lifting and cutting, can also avoid pre-embedded steel slab from occurring to increase deformation, after pre-embedded steel slab rigging out, may be used also Fixing tool is disassembled, easy to the use of follow-up pre-embedded steel slab, greatlys save the use of material.
The above, is only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model discloses Or replace, it should be covered within the scope of the utility model.Therefore, the scope of protection of the utility model should be with the power Subject to the protection domain that profit requires.

Claims (5)

  1. A kind of 1. embedded supporting rail guidance tape pre-embedded steel slab fixing tool, it is characterised in that:Including cross-brace plate (2) and vertically Support plate (1), the vertical supporting plate (1) share two pieces, are respectively welded at the both sides of the cross-brace plate (2), and described Cross-brace plate (2) is connected as a single entity, and forms a U-shaped structure;
    Mounting hole (3) is both provided with the vertical supporting plate (1) and the cross-brace plate (2), and the mounting hole (3) is equal Even distribution.
  2. A kind of 2. embedded supporting rail guidance tape pre-embedded steel slab fixing tool according to claim 1, it is characterised in that:The horizontal stroke Width is used as 8mm to support plate (2), and length is that the steel plate of 200mm is process.
  3. A kind of 3. embedded supporting rail guidance tape pre-embedded steel slab fixing tool according to claim 1, it is characterised in that:It is described perpendicular Width is used as 8mm to support plate (1), and length is that the steel plate of 160mm-180mm is process.
  4. A kind of 4. embedded supporting rail guidance tape pre-embedded steel slab fixing tool according to claim 1, it is characterised in that:The peace The size for filling hole (3) is 6mm.
  5. A kind of 5. embedded supporting rail guidance tape pre-embedded steel slab fixing tool according to claim 1, it is characterised in that:The horizontal stroke Fillet (4) is both provided with to the two sides at the top of support plate (2).
CN201721344167.5U 2017-10-18 2017-10-18 A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool Active CN207240473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721344167.5U CN207240473U (en) 2017-10-18 2017-10-18 A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721344167.5U CN207240473U (en) 2017-10-18 2017-10-18 A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool

Publications (1)

Publication Number Publication Date
CN207240473U true CN207240473U (en) 2018-04-17

Family

ID=61882741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721344167.5U Active CN207240473U (en) 2017-10-18 2017-10-18 A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool

Country Status (1)

Country Link
CN (1) CN207240473U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111152814A (en) * 2020-01-20 2020-05-15 成都铁安科技有限责任公司 Accurate positioning device and auxiliary tool for imaging equipment of walking part
CN112027027A (en) * 2020-08-31 2020-12-04 华电重工股份有限公司 Marine engineering module installation device and marine engineering module installation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111152814A (en) * 2020-01-20 2020-05-15 成都铁安科技有限责任公司 Accurate positioning device and auxiliary tool for imaging equipment of walking part
CN112027027A (en) * 2020-08-31 2020-12-04 华电重工股份有限公司 Marine engineering module installation device and marine engineering module installation system

Similar Documents

Publication Publication Date Title
CN207240473U (en) A kind of embedded supporting rail guidance tape pre-embedded steel slab fixing tool
CN106812036B (en) Assembled overhead monorail traffic track beam and processing technology
CN205100120U (en) Bury mounting structure of formula waterstop in box culvert
CN105401520A (en) Integrated layer whole-width construction device for light truss type bridge and construction method of construction device
CN104527690A (en) Railway truck chassis
CN109914666A (en) Profiled sheet Combined concrete flooring large area pouring construction method
CN102174790B (en) Assembled sleeper for shield construction and construction method thereof
CN204849519U (en) Formula of bearing steel plate member that building site used
CN107761484B (en) The construction method that a kind of pair of Stray Current in Urban Rail Transit is protected
CN208342097U (en) A kind of I-steel welding platform
CN208203298U (en) A kind of big punching block of rail type side wall
CN103938536B (en) The opencut transportation resources of spanning operation face obstruction and bridges and culverts
CN203100878U (en) Framework for truck scale
CN205295940U (en) Light -duty truss -like bridge wholeization layer full width construction equipment
CN204867941U (en) Assembly welding equipment of curved surface apron
CN204488756U (en) A kind of steel carwash platform device
CN207522823U (en) It is a kind of for high-speed railway bridge floor shield without gasket fabricated device
CN207414659U (en) A kind of mold for being used to make cable bearer
CN201850479U (en) Assembly platform for broad sleeper track arrival and departure track panel
CN206127748U (en) Abrasionproof guard rail tie plae of installation on concrete pillow circuit
CN207727436U (en) A kind of jacked frame bridge top pick towed equipment
CN204982562U (en) Shield constructs construction and uses tie device
CN213389732U (en) Supporting and limiting integrated structure for mounting steel box girder
CN214657197U (en) Construction elevator steel platform foundation capable of being circulated
CN209350538U (en) A kind of piping lane prefabricated panel turning-over support tooling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant