CN102174790B - Assembled tie for shield construction and construction method thereof - Google Patents

Assembled tie for shield construction and construction method thereof Download PDF

Info

Publication number
CN102174790B
CN102174790B CN 201110069255 CN201110069255A CN102174790B CN 102174790 B CN102174790 B CN 102174790B CN 201110069255 CN201110069255 CN 201110069255 CN 201110069255 A CN201110069255 A CN 201110069255A CN 102174790 B CN102174790 B CN 102174790B
Authority
CN
China
Prior art keywords
sleeper
chassis
plate
shield
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110069255
Other languages
Chinese (zh)
Other versions
CN102174790A (en
Inventor
邓美龙
油新华
黄常波
郝本峰
尹清锋
张峰
李钟�
薛刚
郑立波
张洪涛
王东猛
刘华
石小军
朱英伟
王太平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction Communications Engineering Group Co Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction Communications Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction Communications Engineering Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN 201110069255 priority Critical patent/CN102174790B/en
Publication of CN102174790A publication Critical patent/CN102174790A/en
Application granted granted Critical
Publication of CN102174790B publication Critical patent/CN102174790B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to an assembled tie for shield construction and a construction method thereof, belonging to the technical field of tie pavement in shield construction. The assembled tie is formed by splicing two trolley ties and a slag car tie; the baseplate of the assembled tie is cambered; and the existing joist steel ties are replaced by a cambered right-angled triangle plate and a trapezoidal plate. The assembled tie has the advantage of light weight and the like, is easy to stack, and can protect shielded duct pieces. In the construction process, the trolley ties at the back of the trolleys, which are not used any more, are continuously disassembled, thus improving the use ratio of construction members and effectively reducing the construction cost. The assembled tie and the construction method thereof can be widely applied to installing mechanical ties in the process of the shield construction.

Description

Shield-tunneling construction is with assembling sleeper and job practices thereof
Technical field
The present invention relates to sleeper and job practices thereof in a kind of shield-tunneling construction.
Background technology
Shield machine is as current state-of-the-art tunnel piercing ultra-large type special equipment, be realize driving, be unearthed, high-tech construction equipment that cavitation is once excavated in supporting etc., be widely used in construction of tunnel such as urban track traffic, railway, highway, municipal administration, water power.
The level transportation is an important step in the shield-tunneling construction process in the tunnel.At present, transport sleeper in the metro shield constructing tunnel in the hole and be mostly H shaped steel, i iron processing and fabricating, spacing is between 1~1.2m, along with the propelling of shield structure is constantly laid, until tunnel holing through.This kind sleeper mode has the steel material of expending big, Heavy Weight, and shortcomings such as difficulty are deposited in carrying inconvenience.
With the immediate prior art of the present invention is to have disclosed the laying method that transports in the tunnel in a kind of shield-tunneling construction with sleeper in the patent of invention " a kind of shield gantry car and electric locomotive are set up the method for sleeper separately " (patent No. 200610024101.8); Be characterized in: the little sleeper that big sleeper that the follow-up chassis of shield structure need be used and flat bed transport vehicle need be used, set up separately respectively and lay; Along with shield-tunneling construction advances, constantly lay the little sleeper that supplies flat bed transport vehicle to use; Remove the left and right paired wheel sleeper of the follow-up chassis of shield structure that supported, place mat is made the follow-up chassis of new shield structure in the shield-tunneling construction direction of advance and is supported.The sleeper of the left and right wheel of supporting chassis is two i iron behind this shield structure, constitutes a unequal-sided right angle triangle, and minor face vertically withstands the tunnel round bottom, and the tunnel side is shelved on long limit.Say that from efficiency of construction this i iron setting is not easy to carrying in the construction; From the finished product protection aspects, this set easily with the shield duct piece damaged surfaces, makes shield duct piece truncation arrisdefect when serious under supporting chassis, level transportation battery truck marshalling weight behind the shield structure; Relatively, the main material of small-sized sleeper is the 8# channel-section steel from the efficiency of construction aspect, owing to be straight, easy deformation under level transportation battery truck marshalling weight causes level transportation battery truck to organize into groups rail, influences construction speed.
Summary of the invention
The purpose of this invention is to provide a kind of shield-tunneling construction with assembling sleeper and job practices thereof, solve existing sleeper inconvenience carrying, damage shield duct piece easily by pressure, the technical problem that efficiency of construction is low.
For realizing above-mentioned purpose, the present invention adopts following technical scheme:
A kind of shield-tunneling construction is used the assembling sleeper; Be spliced by slag car sleeper and chassis sleeper, said slag car sleeper is formed by two trapezoidal plates, a curved plate B, two top board B and two junction plate B Combination Welding, and the hypotenuse of said trapezoidal plate is an arc; Its symmetry is vertically welded in the two ends central authorities of curved plate B; Said top board B is vertically welded in the end face of trapezoidal plate, has the fixedly bolt hole of the pressing plate connection of slag car rail on it, and said junction plate B is vertically welded on the minor face of trapezoidal plate;
Said chassis sleeper is welded by two right angle triangles, two curved plate A, two top board A and two junction plate A; The hypotenuse of said right angle triangle is an arc; It is vertically welded in the central authorities of curved plate A; Said top board A is vertically welded in the end face of right angle triangle, has the fixedly bolt hole of chassis rail pressing plate on it, and said junction plate A is vertically welded on the right angle minor face of right angle triangle;
Said chassis sleeper is two, splices respectively at the two ends of slag car sleeper, and the junction plate A on the chassis sleeper is connected through bolt with junction plate B on the slag car sleeper.
Said curved plate A and the wide uniform thickness of curved plate, its width is 120mm, and its thickness is 8mm.
The bolt number of a said end is at least two.
Described shield-tunneling construction is with the job practices of assembling sleeper, and construction sequence is following:
Step 1, preceding each member of making slag car sleeper and chassis sleeper with steel plate machining of construction;
Step 2 is vertically welded in curved plate B central authorities with two trapezoidal plates, the vertical welding top plate B of its end face, and its minor face vertical welding is fishplate bar B in succession, forms slag car sleeper; Simultaneously right angle triangle is vertically welded in the central authorities of curved plate A, the vertical welding top plate A of its end face, its right angle minor face vertical welding is fishplate bar A in succession, forms the chassis sleeper;
Step 3 pieces together two chassis sleepers at the two ends of slag car sleeper respectively, and junction plate B is connected through bolt with junction plate A;
Step 4 along with shield-tunneling construction advances, is constantly laid good slag car sleeper and the chassis sleeper of assembly unit to the shield machine direction of advance;
Step 5 after the chassis sleeper behind the chassis surpasses 10m, is removed the chassis sleeper of chassis process, and it is layed in chassis the place ahead;
Step 6, repeating step five is until tunnel holing through.
Adjacent two assembly units are good in the said step 4 slag car sleeper and the clear distance between the chassis sleeper are 1~1.2m.
Compared with prior art the present invention has following characteristics and beneficial effect:
The present invention is processed into arc with base plate, is close to shield duct piece bottom, can reduce that the slag car falls the rail phenomenon in the shield-tunneling construction, improves efficiency of construction.
This method adopts the assembling sleeper and replaces H shaped steel, i iron to do the construction sleeper with the circular arc steel work, has reduced the stacking place, can reuse, and has reduced construction cost.Because construction weight is lighter, be convenient to carrying in the construction, thereby improved efficiency of construction, shortened the duration.
Pass through in the work progress of the present invention the chassis sleeper of chassis process is removed, recycle, thus the turnover rate of raising constructional materials reduces construction cost.
The present invention can be widely used in sleeper and the job practices thereof in the shield-tunneling construction.
Description of drawings
Below in conjunction with accompanying drawing the present invention is done further detailed explanation.
Fig. 1 is a structural representation of the present invention.
Fig. 2 is Fig. 1 vertical view.
Fig. 3 is Figure 1A-A sectional view.
Fig. 4 is Figure 1B-B sectional view.
Fig. 5 is a junction plate A detail drawing.
Fig. 6 is the detail drawing of junction plate B.
Fig. 7 is that the slag car and chassis are provided with figure on sleeper of the present invention.
Reference numeral: 1-curved plate A, 2-right angle triangle, 3-top board A, 4-junction plate A, 5-trapezoidal plate, 6-top board B, 7-junction plate B, 8-curved plate B, 9-slag car rail, 10-chassis rail, 11-bolt, 12-connecting hole.
The specific embodiment
Embodiment is referring to Fig. 1~shown in Figure 7; A kind of shield-tunneling construction is used the assembling sleeper; Be spliced by slag car sleeper and chassis sleeper, it is characterized in that: said slag car sleeper is formed by two trapezoidal plates 5, a curved plate B8, two top board B6 and two junction plate B7 Combination Welding, and the hypotenuse of said trapezoidal plate 5 is an arc; Its symmetry is vertically welded in the two ends central authorities of curved plate B8; Said top board B6 is vertically welded in the end face of trapezoidal plate 5, has the fixedly bolt hole 12 of the pressing plate connection of slag car rail 9 on it, and said junction plate B7 is vertically welded on the minor face of trapezoidal plate;
Said chassis sleeper is welded by two right angle triangles 2, two curved plate A1, two top board A3 and two junction plate A4; The hypotenuse of said right angle triangle 2 is an arc; It is vertically welded in the central authorities of curved plate A1; Said top board A3 is vertically welded in the end face of right angle triangle 2, has the fixedly bolt hole 12 of chassis rail 10 pressing plates on it, and said junction plate A4 is vertically welded on the right angle minor face of right angle triangle 2;
Said chassis sleeper is two, splices respectively at the two ends of slag car sleeper, and the junction plate A4 on the chassis sleeper is connected through bolt 11 with junction plate B8 on the slag car sleeper.
Said curved plate A1 and curved plate 8 wide uniform thickness, its width is 120mm, and its thickness is 8mm.
The bolt number of a said end is at least two.
Said shield-tunneling construction is with the job practices of assembling sleeper, and construction sequence is following:
Step 1, preceding each member of making slag car sleeper and chassis sleeper with steel plate machining of construction;
Step 2 is vertically welded in curved plate B8 central authorities with two trapezoidal plates 5, the vertical welding top plate B6 of its end face, and its minor face vertical welding is fishplate bar B7 in succession, forms slag car sleeper; Simultaneously right angle triangle 2 is vertically welded in the central authorities of curved plate A1, the vertical welding top plate A3 of its end face, its right angle minor face vertical welding is fishplate bar A4 in succession, forms the chassis sleeper;
Step 3 pieces together two chassis sleepers at the two ends of slag car sleeper respectively, and junction plate B7 is connected through bolt 11 with junction plate A4;
Step 4 along with shield-tunneling construction advances, is constantly laid good slag car sleeper and the chassis sleeper of assembly unit to the shield machine direction of advance;
Step 5 after the chassis sleeper behind the chassis surpasses 10m, is removed the chassis sleeper of chassis process, and it is layed in chassis the place ahead;
Step 6, repeating step five is until tunnel holing through.
Adjacent two assembly units are good in the said step 4 slag car sleeper and the clear distance between the chassis sleeper are 1~1.2m.

Claims (5)

1. a shield-tunneling construction is used the assembling sleeper; Be spliced by slag car sleeper and chassis sleeper; It is characterized in that: said slag car sleeper is formed by two trapezoidal plates (5), a curved plate B (8), two top board B (6) and two junction plate B (7) Combination Welding; The hypotenuse of said trapezoidal plate (5) is an arc, and its symmetry is vertically welded in the two ends central authorities of curved plate B (8), and said top board B (6) is vertically welded in the end face of trapezoidal plate (5); Have the fixedly bolt hole (12) of the pressing plate connection of slag car rail (9) on it, said junction plate B (7) is vertically welded on the minor face of trapezoidal plate;
Said chassis sleeper is welded by a right angle triangle (2), a curved plate A (1), a top board A (3) and a junction plate A (4); The hypotenuse of said right angle triangle (2) is an arc; It is vertically welded in the central authorities of curved plate A (1); Said top board A (3) is vertically welded in the end face of right angle triangle (2); Have the fixedly bolt hole (12) of chassis rail (10) pressing plate on it, said junction plate A (4) is vertically welded on the right angle minor face of right angle triangle (2);
Said chassis sleeper is two, splices respectively at the two ends of slag car sleeper, and the junction plate A (4) on the chassis sleeper is connected through bolt (11) with junction plate B (8) on the slag car sleeper.
2. shield-tunneling construction according to claim 1 is used the assembling sleeper, it is characterized in that: said curved plate A (1) and the wide uniform thickness of curved plate (8), and its width is 120mm, and its thickness is 8mm.
3. shield-tunneling construction according to claim 1 is used the assembling sleeper, it is characterized in that: the bolt number of each end at said chassis sleeper place is at least two.
4. one kind according to the job practices of any described shield-tunneling construction of claim 1~3 with the assembling sleeper, and it is characterized in that: construction sequence is following:
Step 1, preceding each member of making slag car sleeper and chassis sleeper with steel plate machining of construction;
Step 2 is vertically welded in curved plate B (8) central authorities with two trapezoidal plates (5), the vertical welding top plate B of its end face (6), and its minor face vertical welding is fishplate bar B (7) in succession, forms slag car sleeper; Simultaneously right angle triangle (2) is vertically welded in the central authorities of curved plate A (1), the vertical welding top plate A of its end face (3), its right angle minor face vertical welding is fishplate bar A (4) in succession, forms the chassis sleeper;
Step 3 pieces together two chassis sleepers at the two ends of slag car sleeper respectively, and junction plate B (7) is connected through bolt (11) with junction plate A (4);
Step 4 along with shield-tunneling construction advances, is constantly laid good slag car sleeper and the chassis sleeper of assembly unit to the shield machine direction of advance;
Step 5 after the chassis sleeper behind the chassis surpasses 10m, is removed the chassis sleeper of chassis process, and it is layed in chassis the place ahead;
Step 6, repeating step five is until tunnel holing through.
5. shield-tunneling construction according to claim 4 is characterized in that with the job practices of assembling sleeper adjacent two assembly units are good in the said step 4 slag car sleeper and the clear distance between the chassis sleeper are 1~1.2m.
CN 201110069255 2011-03-22 2011-03-22 Assembled tie for shield construction and construction method thereof Expired - Fee Related CN102174790B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110069255 CN102174790B (en) 2011-03-22 2011-03-22 Assembled tie for shield construction and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110069255 CN102174790B (en) 2011-03-22 2011-03-22 Assembled tie for shield construction and construction method thereof

Publications (2)

Publication Number Publication Date
CN102174790A CN102174790A (en) 2011-09-07
CN102174790B true CN102174790B (en) 2012-11-28

Family

ID=44518011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110069255 Expired - Fee Related CN102174790B (en) 2011-03-22 2011-03-22 Assembled tie for shield construction and construction method thereof

Country Status (1)

Country Link
CN (1) CN102174790B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453922A (en) * 2014-09-29 2015-03-25 武汉船用机械有限责任公司 Shield machine trolley
CN104562870B (en) * 2015-01-29 2016-03-30 中铁十九局集团轨道交通工程有限公司 Portable combined shield machine sleeper
CN104848844B (en) * 2015-05-13 2017-04-05 中冶建工集团有限公司 A kind of constructing tunnel template bow member chassis guiding ruler localization method
CN106245471A (en) * 2016-10-17 2016-12-21 中建交通建设集团有限公司 A kind of light-duty sleeper of rapid-assembling/disassembling and using method thereof
CN106835866A (en) * 2017-01-25 2017-06-13 中铁隧道集团有限公司 A kind of Open TBM walking side rail separates the method that assembling is recycled with central track
CN107401091B (en) * 2017-09-19 2023-08-18 北京市轨道交通建设管理有限公司 Assembled track structure and construction method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4077742B2 (en) * 2003-02-24 2008-04-23 株式會社濱口商會 Sleeper rolling prevention bracket
JP2006342574A (en) * 2005-06-09 2006-12-21 Maeda Corp Sleeper
CN1888392B (en) * 2006-02-23 2010-05-12 上海市第二市政工程有限公司 Method for setting up sleeper separately for truck jumbo and electric locomotive
CN201952686U (en) * 2011-03-22 2011-08-31 中建市政建设有限公司 Assembled sleeper for shield construction

Also Published As

Publication number Publication date
CN102174790A (en) 2011-09-07

Similar Documents

Publication Publication Date Title
CN102174790B (en) Assembled tie for shield construction and construction method thereof
CN204940141U (en) The reinforcement system of existing line in Framed underpass bridge process
CN201952686U (en) Assembled sleeper for shield construction
CN105196889A (en) Explosion composite induction plate device for linear motor rails
CN205417623U (en) Machine is transported to long step material
CN203684060U (en) Temporary steel-frame bridge
CN102561117B (en) Logistical method for conveying ballastless tracks in twin-track tunnel in construction
CN106638170A (en) Safe and steady railway sleeper
CN202989775U (en) A bridge deck structure for a flatwise tensile rope bridge
CN205259063U (en) A closed construction platform for going up stride construction of old bridge anticollision barrier of railway
CN212742024U (en) Steel sleeper for toothed rail track traffic
CN212404663U (en) Movable track bed concrete pouring device
CN110626733A (en) Special device for transporting ultra-large-diameter pipeline in narrow space
CN215856962U (en) Prefabricated part for tunnel sleeper construction
CN211166866U (en) Rail-mounted flat plate transport trolley
CN203583307U (en) Steel-structure heavy railway crossing slab
CN213173158U (en) Rail running area prefabricated part of tramcar
CN205775658U (en) Bracket sleeper is landed for shield-tunneling construction
CN210916822U (en) Shield constructs uses novel sleeper
CN205576656U (en) Rail that bridge floor railway was laid welds rail production line
CN216894403U (en) TBM construction track connecting piece, track bracket component and track structure
CN211998539U (en) End beam of bridge crane
CN210677533U (en) Subway platform door welding stent
CN202989774U (en) Deck protection structure of horizontal drawing cable bridge
CN211520736U (en) Special device for transporting ultra-large-diameter pipeline in narrow space

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100161, China Fengtai District Beijing No. 52 South Fourth Ring Road, the establishment of a bureau building

Applicant after: China Construction Communications Engineering Group Corporation United

Applicant after: CHINA CONSTRUCTION FIRST BUILDING (GROUP) CORPORATION LIMITED

Address before: 100161, China Fengtai District Beijing No. 52 South Fourth Ring Road, the establishment of a bureau building

Applicant before: China Construction Municipal Construction Corporation Limitd

Applicant before: CHINA CONSTRUCTION FIRST BUILDING (GROUP) CORPORATION LIMITED

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHINA CONSTRUCTION MUNICIPAL CONSTRUCTION CO., LTD. TO: CHINA CONSTRUCTION COMMUNICATION ENGINEERING GROUP CORPORATION LIMITED

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20210322

CF01 Termination of patent right due to non-payment of annual fee