CN207113887U CN201720946297.XU CN201720946297U CN207113887U CN 207113887 U CN207113887 U CN 207113887U CN 201720946297 U CN201720946297 U CN 201720946297U CN 207113887 U CN207113887 U CN 207113887U
Authority
CN
China
Prior art keywords
peg
connection
prism
locating sleeve
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720946297.XU
Other languages
Chinese (zh)
Inventor
杨盼
王宁
李响
亢丹波
孙泽达
沈继军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201720946297.XU priority Critical patent/CN207113887U/en
Application granted granted Critical
Publication of CN207113887U publication Critical patent/CN207113887U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

It the utility model is related to dismountable pit displacement monitoring device, including locating sleeve and prism portion, the locating sleeve lower end is embedded in underground, upper end open is exposed from ground, the prism subordinate portion is provided with connection-peg, and connection-peg profile is adapted to the tube chamber of locating sleeve, and connection-peg insertion locating sleeve upper end, grafting head surface is additionally provided with mark or structure for determining insertion depth, and prism portion top is provided with the prism for total station survey.Above-mentioned pit displacement monitoring device, it is to bury locating sleeve in monitoring site, prism portion top is provided with prism, and bottom is provided with connection-peg, during measurement, by in connection-peg plug-in-sleeve, both accurate fits, it is ensured that precision, again take out in prism portion from sleeve pipe after measurement, place will not leave behind barrier, not influence site operation.

Description

Dismountable pit displacement monitoring device
Technical field
It the utility model is related to the device of monitoring Foundation Pit.
Background technology
, it is necessary to monitor the horizontal displacement data of the foundation ditch periphery soil body during foundation ditch operation, it is ensured that soil stabilization.Existing foundation ditch Horizontal displacement monitoring method using total powerstation, it is necessary to carry out distance-measurement computation to multiple monitoring points of laying, and monitoring point Laying mode, mainly there are two kinds.
Can monitor pier in ground casting concrete, in use, prism special is placed on monitoring pier, use total powerstation Prism is observed.But monitoring pier needs cast in situs, and cost is higher, and concrete pier is stood upright on more than ground, and scene is applied Work causes necessarily to hinder.
Can also monitor mark in embedded underground, after being flattened with tripod with the centering of monitoring mark, in tripod Upper setting prism is observed for total powerstation.Although ground will not produce barrier, each Monitoring Data be required for tripod with Label centering flattens, and operation is comparatively laborious, and the data precision is influenceed by accuracy of alignment.
Utility model content
Technical problem to be solved in the utility model is:A kind of dismountable pit displacement monitoring device is provided, can be square Just in ground assembling and disassembling, ground obstacle will not be produced.
Technical scheme is used by the utility model solves its technical problem:
Dismountable pit displacement monitoring device, including locating sleeve and prism portion, the locating sleeve lower end are embedded in Underground, upper end open are exposed from ground, and the prism subordinate portion is provided with the tube chamber of connection-peg, connection-peg profile and locating sleeve Adaptation, and connection-peg insertion locating sleeve upper end, grafting head surface are additionally provided with mark or structure for determining insertion depth, Prism portion top is provided with the prism for total station survey.
Further, the structure of the determination insertion depth is:Positioned at connection-peg upper end, and the position below prism, if One put encloses the back-up ring stretched out to side face periphery.
Further, in addition to piling mat, be driven underground for auxiliary positioning sleeve pipe, the piling mat lower end be with The column type of locating sleeve adaptation, upper end size range exceed the mouth of pipe of locating sleeve.
The beneficial effects of the utility model are:Above-mentioned pit displacement monitoring device, is to bury locating sleeve in monitoring site, Prism portion top is provided with prism, and bottom is provided with connection-peg, during measurement, by connection-peg plug-in-sleeve, and both accurate fits, Ensure precision, again take out in prism portion from sleeve pipe after measurement, place will not leave behind barrier, not influence site operation.
Brief description of the drawings
Fig. 1 is the schematic diagram of pit displacement monitoring device of the present utility model;
Reference is in figure:Locating sleeve 1, prism portion 2, connection-peg 21, back-up ring 22, prism 231.
Embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples:
Dismountable pit displacement monitoring device, including locating sleeve 1 and prism portion 2, the lower end of locating sleeve 1 are buried In underground, upper end open is exposed from ground, and the bottom of prism portion 2 is provided with connection-peg 21, the profile of connection-peg 21 and positioning sleeve The tube chamber adaptation of pipe 1, and connection-peg 21 inserts the upper end of locating sleeve 1, the surface of connection-peg 21 is additionally provided with for determining that insertion is deep The mark or structure of degree, the top of prism portion 2 are provided with the prism 231 for total station survey.
As shown in Figure 1:Monitoring device, including locating sleeve 1 and prism portion 2, measurement prelocalization sleeve pipe 1 need to be embedded in prison The underground of measuring point position, allows upper end open to expose from ground.During each measurement data, by prism portion 2 and the grafting of locating sleeve 1, i.e., It is that connection-peg 21 inserts the upper end of locating sleeve 1, is measured with total powerstation directed prism 231., can be by prism after measurement Portion 2 is extracted from sleeve pipe, and ground will not leave behind barrier, not interfere with construction.
Connection-peg 21 is provided with mark or structure is used to determine insertion depth, such as can be that the side face of connection-peg 21 sets one Bar graduation mark, it is ensured that the depth of insertion locating sleeve 1 is consistent every time.
It is preferable or positioned at the upper end of connection-peg 21, and position of the prism below 231, the one of setting encloses to side face The back-up ring 22 that periphery is stretched out is used to determine insertion depth.Such as each grafting, require that back-up ring 22 pushes against the nose end of locating sleeve 1 Face, it is ensured that insertion depth is consistent.
The profile of connection-peg 21 is adapted to the tube chamber of locating sleeve 1, and connection-peg 21 can be inserted just in locating sleeve 1, no Shake, reduce the error of installation, and then reduce the data error of measurement.
Above-mentioned monitoring device, when its locating sleeve 1 is buried, special piling mat can be coordinated to squeeze into ground by sleeve pipe with iron hammer Under.Piling mat lower end is the column type being adapted to locating sleeve 1, can be stretched into pipe, and piling mat upper end size range exceeds The mouth of pipe of locating sleeve 1, the mouth of pipe can be covered, then be beaten downwards with iron hammer, avoid damage to locating sleeve 1.
This monitoring device, the level land on foundation ditch periphery is can not only be provided at, can also be arranged on the slope of foundation ditch, be used for Displacement of inclined plane monitors.

Claims (3)

1. dismountable pit displacement monitoring device, it is characterised in that including locating sleeve (1) and prism portion (2), the positioning Sleeve pipe (1) lower end is embedded in underground, and upper end open is exposed from ground, and prism portion (2) bottom is provided with connection-peg (21), inserts Joint (21) profile is adapted to the tube chamber of locating sleeve (1), and connection-peg (21) insertion locating sleeve (1) upper end, connection-peg (21) surface is additionally provided with mark or structure for determining insertion depth, and prism portion (2) top is provided with to be surveyed for total powerstation The prism (231) of amount.
2. dismountable pit displacement monitoring device as claimed in claim 1, it is characterised in that the determination insertion depth Structure is:Positioned at connection-peg (21) upper end, and the position of prism (231) below, the one of setting encloses the gear stretched out to side face periphery Enclose (22).
3. dismountable pit displacement monitoring device as claimed in claim 1, it is characterised in that also include piling mat, use It is driven underground in auxiliary positioning sleeve pipe (1), the column type being adapted to locating sleeve (1), upper end size is in the mat lower end of driving piles Scope exceeds the mouth of pipe of locating sleeve (1).
CN201720946297.XU 2017-07-31 2017-07-31 Dismountable pit displacement monitoring device Active CN207113887U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720946297.XU CN207113887U (en) 2017-07-31 2017-07-31 Dismountable pit displacement monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720946297.XU CN207113887U (en) 2017-07-31 2017-07-31 Dismountable pit displacement monitoring device

Publications (1)

Publication Number Publication Date
CN207113887U true CN207113887U (en) 2018-03-16

Family

ID=61579762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720946297.XU Active CN207113887U (en) 2017-07-31 2017-07-31 Dismountable pit displacement monitoring device

Country Status (1)

Country Link
CN (1) CN207113887U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306603A (en) * 2019-05-29 2019-10-08 中交天津港湾工程研究院有限公司 A kind of reflective target fixed frame of pit retaining monitoring laser range finder and application method
CN113551641A (en) * 2021-07-29 2021-10-26 中冀建勘集团有限公司 Horizontal displacement monitoring device, system and method suitable for subway tunnel in operation period
CN115790548A (en) * 2023-02-01 2023-03-14 上海米度测控科技有限公司 Remote control buried prism device, total station measuring system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306603A (en) * 2019-05-29 2019-10-08 中交天津港湾工程研究院有限公司 A kind of reflective target fixed frame of pit retaining monitoring laser range finder and application method
CN113551641A (en) * 2021-07-29 2021-10-26 中冀建勘集团有限公司 Horizontal displacement monitoring device, system and method suitable for subway tunnel in operation period
CN115790548A (en) * 2023-02-01 2023-03-14 上海米度测控科技有限公司 Remote control buried prism device, total station measuring system and method

Similar Documents

Publication Publication Date Title
CN101487249B (en) Embedding apparatus and method for earth pressure box
CN110206493A (en) A kind of full-sleeve full-rotation construction process for bored pile
CN207113887U (en) Dismountable pit displacement monitoring device
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN105806418A (en) Reservoir landslide multi-field information field monitoring system and construction method thereof
CN104563171A (en) Device and method for detecting penetration of hammering piling for steel pipe pile
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
KR20100114738A (en) Model of measuring underground displacement using inclinometer
CN104121895B (en) The stake bar at plane measurement of higher degree control point, soft clay area and method for embedding thereof
CN205748469U (en) Many Information Field monitoring systems of a kind of reservoir landslide
CN109709308A (en) One kind adopting water type ground fissure physical model test device and test method
CN112392049A (en) Excavation construction method for deep foundation pit in weak stratum
CN103994753B (en) Delaminating deposition device and measuring method for Loess Filling high-filled embankment
CN201334678Y (en) Soil pressure cell inbuilt device
CN114016489A (en) Datum point fixing device for settlement monitoring
CN212405086U (en) Disposal and detection structure for karst cave under rock-socketed pile base
CN105547248A (en) Quickly-assembled automatic inclinometer casing and monitoring method thereof
CN106592654A (en) Monitoring method for perpendicularity of steel pipe pile
CN205475205U (en) Dig bored concrete pile soon and meet hole backfill device that collapses
CN112187843A (en) BIM-based system and method for automatically monitoring capital construction risks of deep foundation pit
CN203274729U (en) Soft soil area horizontal elevation measuring control point
CN217298858U (en) Datum point fixing device for settlement monitoring
CN107063178B (en) Concrete leveling markstone with displacement sensor and elevation observation and calculation method thereof
CN105040699A (en) Drilling pile planting method
CN211081834U (en) Verticality detection tool for rotary drilling and pore forming

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant