CN207092620U - A kind of packaged type reinforcing steel processing shed - Google Patents
A kind of packaged type reinforcing steel processing shed Download PDFInfo
- Publication number
- CN207092620U CN207092620U CN201720884198.3U CN201720884198U CN207092620U CN 207092620 U CN207092620 U CN 207092620U CN 201720884198 U CN201720884198 U CN 201720884198U CN 207092620 U CN207092620 U CN 207092620U
- Authority
- CN
- China
- Prior art keywords
- canopy body
- track groups
- reinforcing steel
- packaged type
- steel processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910001294 Reinforcing steel Inorganic materials 0.000 title claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- 239000000463 material Substances 0.000 description 8
- 238000010276 construction Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000009049 secondary transport Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model discloses a kind of packaged type reinforcing steel processing shed, it is desirable to provide a kind of packaged type reinforcing steel processing shed of rapidoprint convenient in carrying.It includes the first canopy body, the second canopy body, the first track groups and the second track groups;It is characterized in that:The height of the first canopy body is more than the height of the second canopy body, and the width of the first canopy body is more than the width of the second canopy body;The lower end of the first canopy body sets the first rail running wheels, and two tracks and the first rail running wheels of first track groups are engaged;The lower end of the second canopy body sets the second rail running wheels, and two tracks and the second rail running wheels of second track groups are engaged;Second track groups are located between two tracks of the first track groups, and the first track groups and the second track groups are parallel to each other.The utility model uses suitable for all kinds of steel bar meter places.
Description
Technical field
Construction Technology facility technology field is the utility model is related to, more particularly, to a kind of packaged type steel bar meter
Canopy.
Background technology
In temporary engineering work progress, steel bar meter region is protected using reinforcing steel processing shed, reinforcing steel processing shed
How not only to facilitate but also can meet that current high standardized construction requirement is particularly important.Reinforcing steel processing shed relatively common at present is generally
It is fixed, because economy, environmental protection, energy-conservation and safety are advocated in construction at present, before reinforcing steel processing shed is considered in reasonably when building
Put floor space, small principle of highly trying one's best, thus in using straddle truck, gantry crane lifting materials process more not
Just, reinforcing steel processing shed surrounding, top can hinder large scale equipment to lift material, and material is both needed to be hung to remaining position, small-sized utilizing
Equipment, the artificial Secondary Transport that carries out need to put into substantial amounts of manpower and materials into machining shed, and hardly possible meets instantly efficient, quick, environmental protection
Construction demand.
Utility model content
The purpose of this utility model is intended to overcome the shortcomings of the prior art, there is provided a kind of simple operation, takes up an area face
The packaged type reinforcing steel processing shed that product is small, is easy to haulage equipment to operate.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:
A kind of packaged type reinforcing steel processing shed, including the first canopy body, the second canopy body, the first track groups and the second track groups;
The height of the first canopy body is more than the height of the second canopy body, and the width of the first canopy body is more than the width of the second canopy body;It is described
The lower end of first canopy body sets the first rail running wheels, and two tracks of first track groups contact with the first rail running wheels matches somebody with somebody
Close;The lower end of the second canopy body sets the second rail running wheels, two tracks and the second track travel of second track groups
Wheel is engaged;Second track groups are located between two tracks of the first track groups, and the first track groups and the second track groups
It is parallel to each other.
Preferably, the minimum interval of the first canopy body and the second canopy body is not less than 20 centimetres.
Preferably, the first canopy body includes the first support body, and is arranged at the first rain-proof cover of the first support body upper end.
Preferably, first support body is made of zinc-plated square tube.
Preferably, first rain-proof cover is made of color steel tile.
Preferably, the second canopy body includes the second support body, and is arranged at the second rain-proof cover of the second support body upper end.
Preferably, second support body is made of zinc-plated square tube.
Preferably, second rain-proof cover is made of color steel tile.
Compared with prior art, the utility model has the following advantages that:
The utility model not only simple operation, and floor space is small, highly low, and large-scale material can be allowed disposably in place,
And construction cost is low, so as to further meet temporary engineering standardized construction.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is paid
The every other embodiment obtained, belong to the scope of the utility model protection.
Packaged type reinforcing steel processing shed shown in Fig. 1, including the first canopy body 10, the second canopy body 20, the first track groups 1 and
Two track groups 2;The height of the first canopy body 10 is more than the height of the second canopy body 20, and the width of the first canopy body 10 is more than second
The width of canopy body 20;The lower end of the first canopy body 10 sets the first rail running wheels 3, two tracks of first track groups 1
It is engaged with the first rail running wheels 3;The lower end of the second canopy body 20 sets the second rail running wheels 4, second rail
Two tracks of road group 2 are engaged with the second rail running wheels 4;Second track groups 2 are located at two tracks of the first track groups 1
Between, and the first track groups 1 and the second track groups 2 are parallel to each other.
The minimum interval of the first canopy body 10 and the second canopy body 20 is not less than 20 centimetres, avoids that friction, collision occurs.
The first canopy body 10 includes the first support body 5, and is arranged at the first rain-proof cover 6 of the upper end of the first support body 5.It is described
First support body 5 is made of zinc-plated square tube.First rain-proof cover 6 is made of color steel tile.
The second canopy body 20 includes the second support body 7, and is arranged at the second rain-proof cover 8 of the upper end of the second support body 7.It is described
Second support body 7 is made of zinc-plated square tube.Second rain-proof cover 8 is made of color steel tile.
In specific material hoisting process, stowed location can be needed according to specific material, reinforcing steel processing shed is moved, kept away
Exempt from reinforcing steel processing shed surrounding and top interference lifting operation, treat again to recover reinforcing steel processing shed to original position after the completion of material lifting
Put, equally during the larger steel bar meter of part model, due to the limitation of manpower, it is sometimes desirable to utilize crane, gate-type
Loop wheel machine coordinates installation, and such scheme can be equally used in installation process, i.e., efficiently can reach easy to operate effect again.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in
Protection domain within.
Claims (9)
1. a kind of packaged type reinforcing steel processing shed, including the first canopy body, the second canopy body, the first track groups and the second track groups;Its
It is characterised by:The height of the first canopy body is more than the height of the second canopy body, and the width of the first canopy body is more than the second canopy body
Width;The lower end of the first canopy body sets the first rail running wheels, two tracks of first track groups and the first track row
Wheel is walked to be engaged;The lower end of the second canopy body sets the second rail running wheels, two tracks of second track groups and the
Two rail running wheels are engaged;Second track groups are located between two tracks of the first track groups, and the first track groups and
Second track groups are parallel to each other.
2. packaged type reinforcing steel processing shed according to claim 1, it is characterised in that:The first canopy body and the second canopy body
Minimum interval is not less than 20 centimetres.
3. packaged type reinforcing steel processing shed according to claim 1 or claim 2, it is characterised in that:The first canopy body includes first
Support body, and it is arranged at the first rain-proof cover of the first support body upper end.
4. packaged type reinforcing steel processing shed according to claim 3, it is characterised in that:First support body uses zinc-plated square tube
It is made.
5. packaged type reinforcing steel processing shed according to claim 3, it is characterised in that:First rain-proof cover uses color steel tile
It is made.
6. packaged type reinforcing steel processing shed according to claim 1 or claim 2, it is characterised in that:The second canopy body includes second
Support body, and it is arranged at the second rain-proof cover of the second support body upper end.
7. packaged type reinforcing steel processing shed according to claim 3, it is characterised in that:The second canopy body includes the second frame
Body, and it is arranged at the second rain-proof cover of the second support body upper end.
8. packaged type reinforcing steel processing shed according to claim 6, it is characterised in that:Second support body uses zinc-plated square tube
It is made.
9. packaged type reinforcing steel processing shed according to claim 6, it is characterised in that:Second rain-proof cover uses color steel tile
It is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720884198.3U CN207092620U (en) | 2017-07-20 | 2017-07-20 | A kind of packaged type reinforcing steel processing shed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720884198.3U CN207092620U (en) | 2017-07-20 | 2017-07-20 | A kind of packaged type reinforcing steel processing shed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207092620U true CN207092620U (en) | 2018-03-13 |
Family
ID=61545527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720884198.3U Expired - Fee Related CN207092620U (en) | 2017-07-20 | 2017-07-20 | A kind of packaged type reinforcing steel processing shed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207092620U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667346A (en) * | 2019-01-22 | 2019-04-23 | 中建三局集团有限公司 | A kind of mobile steel structure closing canopy |
CN110159007A (en) * | 2019-05-31 | 2019-08-23 | 中国二十二冶集团有限公司 | Orbit movable reinforcing steel processing shed |
CN110778153A (en) * | 2019-10-29 | 2020-02-11 | 武汉一冶建筑安装工程有限责任公司 | Construction site material processing shed |
-
2017
- 2017-07-20 CN CN201720884198.3U patent/CN207092620U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109667346A (en) * | 2019-01-22 | 2019-04-23 | 中建三局集团有限公司 | A kind of mobile steel structure closing canopy |
CN110159007A (en) * | 2019-05-31 | 2019-08-23 | 中国二十二冶集团有限公司 | Orbit movable reinforcing steel processing shed |
CN110778153A (en) * | 2019-10-29 | 2020-02-11 | 武汉一冶建筑安装工程有限责任公司 | Construction site material processing shed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207092620U (en) | A kind of packaged type reinforcing steel processing shed | |
CN201825671U (en) | Hoisting trolley for track plate | |
CN206233102U (en) | A kind of packaged type faces side operation work platform | |
CN207876879U (en) | A kind of approach bridge type automated container terminal handling operation system | |
CN108002070A (en) | A kind of approach bridge type automated container terminal handling operation system and operational method | |
CN205419566U (en) | Automatic container terminals handling operation system of basin formula | |
CN207142660U (en) | The device for hoisting of train overhaul platform | |
CN204873574U (en) | Hoist girder construction of stretching out and drawing back | |
Naicker et al. | Analysis of electric-rubber tyred gantries for a more green Durban container terminal | |
CN207375272U (en) | For rail pipeline and the steel rail translation system of the small spacer conditions of terrace | |
CN203959748U (en) | A kind of rail roadway stakcer crane with Combined guide wheels | |
CN202337945U (en) | Outer side in-place beam body lifting device | |
CN209009491U (en) | Rotary system | |
CN204474177U (en) | A kind of electromagnet transfer crane | |
CN204726453U (en) | A kind of inclined shaft lane skip bucket Obstruct apparatus | |
CN204286353U (en) | For the guide rail bracket joint pick-up unit of lifter | |
CN203474376U (en) | Steel wire rope stacking machine | |
CN203229337U (en) | Lorry crane | |
CN205170256U (en) | A there is rail loop wheel machine device for TBM tunnel construction | |
CN201634379U (en) | Two-stage retractable straddle carrier | |
CN205772985U (en) | A kind of straddle truck equipment of civil engineering | |
CN206691869U (en) | A kind of single pile movement system | |
CN206858000U (en) | A kind of reliable and stable high-performance electric block gantry crane | |
CN206319262U (en) | Carry the Diamond-Shape Form Traveler of transport and Lift-on/Lift-off System | |
CN205275132U (en) | Forklift lifting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180313 |