CN207079698U - With split type pipe plugging system in a kind of inspection shaft - Google Patents
With split type pipe plugging system in a kind of inspection shaft Download PDFInfo
- Publication number
- CN207079698U CN207079698U CN201721017604.2U CN201721017604U CN207079698U CN 207079698 U CN207079698 U CN 207079698U CN 201721017604 U CN201721017604 U CN 201721017604U CN 207079698 U CN207079698 U CN 207079698U
- Authority
- CN
- China
- Prior art keywords
- flashboard
- inspection shaft
- split type
- type pipe
- pipe plugging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Barrages (AREA)
Abstract
The utility model is with split type pipe plugging system, including gate member and stifled son in a kind of inspection shaft;The gate member is inserted in the well of the inspection shaft vertically, plays a part of blocking the water route of old pipeline, while the gate member does not influence the normal operation in the water route of new pipeline;Stifled son gets lodged in the opening of the old pipeline, and described stifled son is blind plugging;Described gate member includes flashboard and flashboard slot, and the flashboard slot is fixed in inspection shaft side wall with inspection shaft bottom plate, and the ram seal is fixed in flashboard slot.With split type pipe plugging system in a kind of inspection shaft described in the utility model, construction of not cutting off the water is fully achieved, it is ensured that the normal operation in UNICOM's inspection shaft and new pipeline water route, easy construction is swift to operate, can ensure sealing.
Description
Technical field
Pipeline and auxiliary construction construction work field are the utility model is related to, more particularly to split is used in a kind of inspection shaft
Formula pipe plugging system.
Background technology
Current municipal pipeline from outside factory enters first large-scale pool structure in factory in water factory, typically passes through large-diameter pipe
Road and auxiliary construction (such as inspection shaft, gate valve well) carry out UNICOM.Built by separate periods engineering or reconstruction and extension project, easily occur due to
Former engineering design does not take into full account later reorganization and expansion, causes the inlet channel of preliminary engineering to be located at the construction use of reconstruction and extension project
In ground, and as the obstacle of reconstruction and extension project construction, it need to carry out changing and move water route and carry out former waterway pipe and auxiliary construction
Remove.
After the old pipeline that need to be cut off is cut off, the situation that old pipeline water route is run parallel with new pipeline water route is formed, will be old
Pipeline opening of the pipeline in UNICOM's inspection shaft is blocked to block raw water road, and then will leave water in old pipeline and adjunct
After pump drainage, old pipeline and auxiliary construction are removed.
At present, for the plugging construction operation at such a well indoor pipe road junction, general construction method is that application is cut off the water window, from
Water inlet source cuts off the water, and then robs work in the window phase inner tissue that cuts off the water, the water pump drainage that will be left as early as possible in pipeline and auxiliary construction,
The pipeline opening closure operation of raw water road pipeline, row water flowing again after the completion of closure are carried out after formation water-less environment.The construction method lacks
Fall into as follows:1. having to that application cuts off the water could organizing construction;2. former operation of engineering projects can be caused to stop during cutting off the water, cause huge
Operating loss and indirect loss;3. window phase typical time of cutting off the water is compressed extremely short, to ensureing that construction safety and quality are unfavorable.
Blocked for the well indoor pipe road junction under the conditions of water flowing, special circumstances need to use frogman to carry out underwater operation, the party
Method needs special operation workers and special equipment, and cost is high, and construction operation is dangerous big, and need to ensure underwater visual condition and welding
Condition.For the sewage of muddiness, or when pipe material does not possess welding condition, can not use.
Therefore study a kind of easy, quick, economic, safety pipeline opening closure solved with split type gate member it is above-mentioned
Defect present in construction method.
The content of the invention
The utility model overcomes the defects of prior art and construction method and deficiency, there is provided can keep water route it is unimpeded,
With split type pipe plugging system in a kind of inspection shaft used under conditions of not cutting off the water.
With split type pipe plugging system, including gate member and stifled son in a kind of inspection shaft;The gate member is vertical
It is inserted in the well of the inspection shaft, plays a part of blocking the water route of old pipeline, while the gate member does not influence new pipeline
The normal operation in water route;Stifled son gets lodged in the opening of the old pipeline, and described stifled son is blind plugging, is easy to drain the old pipeline
Interior water.
Described gate member includes flashboard and flashboard slot, and the flashboard slot is fixed in inspection shaft side wall and inspection shaft bottom
On plate, the ram seal is fixed in flashboard slot.
Preferably, the flashboard is steel plate, and the flashboard includes upper flashboard and lower flashboard, and the upper flashboard is fixed on lower flashboard
Top;Formed between the upper flashboard and lower flashboard by the second polyurethane lath with strong structure gluing knot;Upper flashboard can
Pour after completion reaches intensity requirement and dismantle in blocking concrete, realize the purpose of secondary use.
Further, described upper flashboard top is provided with hoisting ring, and the hoisting ring is steel hoop, and is weldingly fixed on institute
State on upper flashboard, the hoisting ring plays a part of lifting.
The described forward and backward two sides of lower flashboard upper middle position is symmetrically welded guide rod, and the guide rod is galvanizing channel-section steel,
And the guide rod tip position reserves hole for hoist, the guide rod was both used as lifting lower flashboard, and and can is under upper flashboard lifting
Leading effect is played during inserting.
Preferably, filled up between the flashboard and flashboard slot with the first polyurethane lath, it is therefore intended that avoid in sewage
The first-class debris of rubble, reinforcing bar is fallen into inspection shaft when causing the lower flashboard to insert, inspection shaft bottom plate can not be inserted into and with inspection shaft bottom
Space be present between plate and cause leak.
In order to further reinforce gate member and ensure quality, the flashboard slot uses galvanizing channel-section steel and galvanizing angle steel
Welding production forms;The flashboard slot is fixed in inspection shaft side wall and inspection shaft bottom plate using expansion bolt, as shown in figure 1,
The expansion bolt welds with flashboard slot;The expansion bolt is often located as two, and arrangement spacing is 500mm.
In order to strengthen anti-corrosion, the side coating anti-corrosion asphalt paint of the contact water of the lower flashboard.
The stifled son is steel plate material, and described to block up sub- edge provided with a circle flanging, the one side with flanging is provided with back cord, carried on the back
It is stupefied between flanging formed accommodate old pipeline annular space, the gap length be equal to old pipeline thickness, the back cord by
Band iron is made.
The beneficial effects of the utility model are:
Using, with split type pipe plugging system, fully achieving and not cutting off the water in a kind of inspection shaft described in the utility model
Construction, it is ensured that the normal operation in UNICOM's inspection shaft and new pipeline water route, easy construction is swift to operate, can ensure sealing,
And upper flashboard can be poured after completion reaches intensity requirement in blocking concrete and dismantled, secondary use is safe, economical, effective, is not required to
Job that requires special skills, and it is applied to various condition of water quality, do not limited by pipe material.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 A direction views;
Fig. 3 is the structural representation of upper flashboard;
Fig. 4 is the structural representation of lower flashboard;
Fig. 5 is the structural representation for blocking up son;
Fig. 6 is Fig. 5 E-E to sectional view;
Fig. 7 is scheme of installation of the present utility model;
Wherein:1- upper flashboards;2- lower flashboards;3- flashboard slots;4- guide rods;5- hoisting rings;6- inspection shaft side walls;7- is checked
Shaft bottom plate;8- expansion bolts;9- the first polyurethane laths;10- gate members;11- old pipelines;The new pipelines of 12-;The stifled sons of 13-;
14- inspection shafts;15- the second polyurethane laths.
Embodiment
It is described in detail referring to the drawings below with reference to embodiment of the present utility model.
The interior split type pipe plugging system of a kind of inspection shaft, as shown in fig. 7, comprises gate member 10 and stifled son 13;Institute
State gate member 10 to be inserted in vertically in the well of the inspection shaft 14, play a part of blocking the water route of old pipeline 11, while the lock
Door component 10 does not influence the normal operation in the water route of new pipeline 12;Stifled son 13 gets lodged in the opening of the old pipeline 11, described
Stifled son 13 is blind plugging, is easy to drain the water in the old pipeline 11.
Described gate member includes flashboard and flashboard slot 3, and as shown in Figure 1 and Figure 2, the flashboard slot 3 is fixed on inspection shaft
In side wall 6 and on inspection shaft bottom plate 7, the ram seal is fixed in flashboard slot 3.
Preferably, as shown in Fig. 2 the flashboard is steel plate, the flashboard includes upper flashboard 1 and lower flashboard 2, the upper flashboard
1 is fixed on the top of lower flashboard 2;The second polyurethane lath 15 of sealing installation, described close between the upper flashboard 1 and lower flashboard 2
Envelope mode is to use strong structure gluing knot;Upper flashboard 1 can be poured after completion reaches intensity requirement in blocking concrete and dismantled, and be realized
The purpose of secondary use.
Further, the described top of upper flashboard 1 is provided with hoisting ring 5, as shown in Fig. 2 the hoisting ring 5 is steel hoop,
And be weldingly fixed on the upper flashboard 1, the hoisting ring 5 plays a part of lifting.
The described forward and backward two sides of the upper middle position of lower flashboard 2 is symmetrically welded guide rod 4, and the guide rod 4 is galvanizing groove
Steel, and the tip position of guide rod 4 reserves hole for hoist (not shown), the guide rod 4 was both used as lifting lower flashboard 2,
And can plays leading effect in upper flashboard 1 lifts down process.
Preferably, the first polyurethane lath 9 of sealing installation between the flashboard and flashboard slot 3, as shown in figure 1, purpose exists
When avoiding the first-class debris of the rubble in sewage, reinforcing bar from falling into inspection shaft 14 causing lower flashboard 2 to insert, inspection shaft can not be inserted into
Bottom plate 7 and space be present between inspection shaft bottom plate 7 and cause leak.
In order to further reinforce gate member and ensure quality, the flashboard slot 3 uses galvanizing channel-section steel and galvanizing angle
Steel welding production forms;The flashboard slot 3 is fixed in inspection shaft side wall 6 and inspection shaft bottom plate 7 using expansion bolt 8, such as Fig. 1
Shown, the expansion bolt 8 welds with flashboard slot 3;The expansion bolt 8 is often located as two in the upper and lower surface of flashboard slot, cloth
It is 500mm to put spacing;Expansion bolt 8 is arranged in pairs in the top and bottom of flashboard slot 3.
Moreover, the flashboard slot 3 is by the flashboard slot 3 for being attached to inspection shaft side wall 6 and the lock being attached on inspection shaft bottom plate 7
The two parts of board slot 3 form, and are vertically fixedly mounted in inspection shaft side wall 6 using expansion bolt 8, laterally solid using expansion bolt 8
On inspection shaft bottom plate 7, flashboard slot 3 and the brake application board slot 3 of inspection shaft bottom plate 7 in inspection shaft side wall 6 form U-shaped, lock for Dingan County
Plate is inserted in U-shaped flashboard slot 3.
In order to strengthen anti-corrosion, the side coating anti-corrosion asphalt paint of the contact water of the lower flashboard 2.
Described stifled sub 13 be steel plate material, and as shown in Figure 5, Figure 6, stifled sub 13 edge is provided with a circle flanging, with folding
The one side on side is provided with back cord, and the annular space D for accommodating old pipeline is formed between back cord and flanging, and the space D width is equal to old
The thickness of pipeline 11, the back cord are made up of band iron.
Implementation:
In inspection shaft side wall 6 and inspection shaft bottom plate 7 install flashboard slot 3, make flashboard, then successively by lower flashboard 2, on
Flashboard 1 is inserted in flashboard slot 3, and now inspection shaft is divided into two spaces by flashboard, as shown in fig. 7, having hydrospace C and anhydrous sky
Between B, the anhydrous space B is used for operation, stifled sub 13 is fixed on the mouth of pipe of old pipeline 11, is easy to block in old pipeline
11, and toward concrete perfusion in old pipeline 11.
It should be noted that the gate member and stifled son 13 can be used individually, use can also be merged, also may be used
To coordinate other devices to use.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art
For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and
Retouching also should be regarded as the scope of protection of the utility model.
Claims (8)
1. with split type pipe plugging system in a kind of inspection shaft, it is characterised in that
Including gate member and stifled son;The gate member is inserted in the well of the inspection shaft vertically, is played and is blocked old pipeline
The effect in water route, while the gate member does not influence the normal operation in the water route of new pipeline;Stifled son gets lodged in opening for the old pipeline
At mouthful, described stifled son is blind plugging;
Described gate member includes flashboard and flashboard slot, and the flashboard slot is fixed in inspection shaft side wall and inspection shaft bottom plate
On, the ram seal is fixed in flashboard slot.
2. with split type pipe plugging system in a kind of inspection shaft according to claim 1, it is characterised in that the flashboard
For steel plate, the flashboard includes upper flashboard and lower flashboard, and the upper flashboard is fixed on the top of lower flashboard;
The second polyurethane lath of sealing installation between the upper flashboard and lower flashboard.
3. with split type pipe plugging system in a kind of inspection shaft according to claim 2, it is characterised in that described is upper
Flashboard top is provided with hoisting ring;
The hoisting ring is steel hoop, and is weldingly fixed on the upper flashboard.
4. with split type pipe plugging system in a kind of inspection shaft according to claim 3, it is characterised in that under described
The forward and backward two sides of flashboard upper middle position is symmetrically welded guide rod, and the guide rod is galvanizing channel-section steel;
The guide rod tip position reserves hole for hoist.
5. with split type pipe plugging system in a kind of inspection shaft according to claim 4, it is characterised in that the flashboard
The first polyurethane lath of sealing installation between flashboard slot.
6. with split type pipe plugging system in a kind of inspection shaft according to claim 5, it is characterised in that the flashboard
Groove is formed using galvanizing channel-section steel and galvanizing angle steel welding production;
The flashboard slot is fixed in inspection shaft side wall and inspection shaft bottom plate using expansion bolt, the expansion bolt and flashboard slot
Welding.
7. with split type pipe plugging system in a kind of inspection shaft according to claim 6, it is characterised in that the lower lock
The side coating anti-corrosion asphalt paint of the contact water of plate.
8. with split type pipe plugging system in a kind of inspection shaft according to claim 7, it is characterised in that the stifled son
For steel plate material;
Described to block up sub- edge provided with a circle flanging, the one side with flanging is provided with back cord, and it is old that receiving is formed between back cord and flanging
The annular space of pipeline;
The back cord is made up of band iron.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721017604.2U CN207079698U (en) | 2017-08-15 | 2017-08-15 | With split type pipe plugging system in a kind of inspection shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721017604.2U CN207079698U (en) | 2017-08-15 | 2017-08-15 | With split type pipe plugging system in a kind of inspection shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207079698U true CN207079698U (en) | 2018-03-09 |
Family
ID=61420132
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721017604.2U Expired - Fee Related CN207079698U (en) | 2017-08-15 | 2017-08-15 | With split type pipe plugging system in a kind of inspection shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207079698U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295869A (en) * | 2018-10-23 | 2019-02-01 | 上海市基础工程集团有限公司 | Large-section box culvert changes row's interface arrangement and method under the operating condition of waters |
CN111733717A (en) * | 2020-05-21 | 2020-10-02 | 中国市政工程中南设计研究总院有限公司 | Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork |
-
2017
- 2017-08-15 CN CN201721017604.2U patent/CN207079698U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295869A (en) * | 2018-10-23 | 2019-02-01 | 上海市基础工程集团有限公司 | Large-section box culvert changes row's interface arrangement and method under the operating condition of waters |
CN109295869B (en) * | 2018-10-23 | 2021-05-28 | 上海市基础工程集团有限公司 | Interface device and method for changing large-section box culvert into row under water area working condition |
CN111733717A (en) * | 2020-05-21 | 2020-10-02 | 中国市政工程中南设计研究总院有限公司 | Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021228189A1 (en) | Reusable post-cast strip support replacement force transfer device and construction method therefor | |
CN206053969U (en) | A kind of shield tunnel and open cut main body portal ring beam hermetic water-proof structure | |
CN101705697B (en) | Diaphragm wall joint flexible water stop installing device and method | |
CN103277108A (en) | Slurry shield tunneling machine underwater arrival construction method | |
CN207079698U (en) | With split type pipe plugging system in a kind of inspection shaft | |
CN206916753U (en) | A kind of water sealing structure of diaphram wall and its seam crossing | |
CN206706791U (en) | Base pit dewatering well plugging structure | |
CN209855849U (en) | Gas drainage drilling hole orifice prevention device | |
AU2020103510A4 (en) | Helical pile with segmented pressure grouting and grouting process thereof | |
CN110644499A (en) | Construction tool and construction method for asynchronous construction conversion support of foundation pit | |
CN207700333U (en) | A kind of inspection shaft having pressure sewage conduct cutover for Large Diameter Pipeline | |
CN207469277U (en) | The quick slip casting plugging device of diaphram wall leakage point in a kind of foundation pit | |
CN103205986A (en) | Concrete raft foundation construction-joint grouting device and construction method | |
CN109854273A (en) | The shield duct piece method for dismounting and its equipment of service channel in tunnel | |
CN204456228U (en) | A kind of diaphragm wall fast plugging device | |
CN208857972U (en) | Built-in fitting | |
CN208618430U (en) | It is a kind of for wearing the structure of shutting off in river under shield tunnel | |
CN102758443B (en) | Novel enclosing structure applicable to connection change between new pipes and old pipes and construction method thereof | |
CN212200511U (en) | Deep foundation pit plugging device | |
CN209637771U (en) | The shield duct piece of service channel removes equipment in a kind of tunnel | |
CN207862959U (en) | It is a kind of for the shut-in well end pipe of plugging dewatering well and building structure | |
JP5898915B2 (en) | Temporary deadline structure of dam body | |
CN101338559B (en) | Underground continuous wall bottom slag removal grouting apparatus and method | |
CN111636490A (en) | Waterproof construction method for penetrating foundation slab through lattice column | |
CN215520875U (en) | Subway deep foundation multiple spot ration reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20180815 |
|
CF01 | Termination of patent right due to non-payment of annual fee |