CN111733717A - Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork - Google Patents

Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork Download PDF

Info

Publication number
CN111733717A
CN111733717A CN202010433796.5A CN202010433796A CN111733717A CN 111733717 A CN111733717 A CN 111733717A CN 202010433796 A CN202010433796 A CN 202010433796A CN 111733717 A CN111733717 A CN 111733717A
Authority
CN
China
Prior art keywords
steel
wallboard
wall plate
box culvert
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010433796.5A
Other languages
Chinese (zh)
Other versions
CN111733717B (en
Inventor
李国洪
杨涛
王雄
徐林
李刚
徐海艳
黄建波
赵清宇
罗俊
刘臣
邓涛
陈波
张永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central and Southern China Municipal Engineering Design and Research Institute Co Ltd filed Critical Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority to CN202010433796.5A priority Critical patent/CN111733717B/en
Publication of CN111733717A publication Critical patent/CN111733717A/en
Application granted granted Critical
Publication of CN111733717B publication Critical patent/CN111733717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
    • E01F5/005Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/021Connection of sewer pipes to manhole shaft
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Mechanical Engineering (AREA)
  • Sewage (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention provides a wallboard perforating method and a steel template structure of a concrete box culvert and an inspection well under the condition of non-stop production, and the method can be used for perforating and pipe burying under the normal operation condition of a sewage treatment facility, particularly, the steel template is arranged on the inner side surface of the wallboard at a position of a planned perforated hole, the steel template is fixed by using cross braces and inclined braces, then concrete is poured in an accommodating cavity formed by the steel template and the wallboard, and the outer side surface of the wallboard can be subjected to perforating, repairing, reinforcing and other work after the concrete reaches the strength.

Description

Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork
Technical Field
The invention relates to the technical field of municipal engineering, in particular to a method for perforating a wall plate under the condition that a concrete box culvert and an inspection well are not stopped (water runs in the well).
Background
In recent years, with the enhancement of awareness of environmental protection, sewage treatment facilities are newly added and expanded in various places, and the original sewage treatment facilities are modified to improve the sewage discharge standard. Due to government regulation and the increased awareness of environmental protection of the masses, sewage treatment facilities need to be kept running continuously. When a sewage treatment facility is reconstructed and expanded, holes are required to be added on an original box culvert and an inspection well for reconnecting pipelines sometimes, the sewage treatment facility is required to be stopped more inconveniently, and concrete repair and reinforcement are required after some holes are formed, so that the operation cannot be completed in a short time.
At present, when a wall plate is provided with a hole in a box culvert and an inspection well in a water running state, the wall plate is generally subjected to short-time operation stop when the sewage amount is small, and then the wall plate is subjected to hole opening. However, the repairing and reinforcing of the holes are difficult to achieve the effect due to the time limit; the waterproof measures for the holes cannot be implemented as required, leaving the potential for water leakage. For structures with large water delivery quantity, the temporary water cut-off can not meet the requirement of opening holes, at the moment, water guide measures need to be adopted, but the limit of the environment and conditions is more, the method is not easy to implement, and for box culverts and inspection wells related to sewage treatment operation, the operation needs to be suspended, so that the operation suspending process is troublesome, the sewage which cannot be normally treated is directly discharged, the water environment is polluted, and the social influence is large; therefore, there is a need for a method of opening the wall panels in the water running condition of the box culvert and the manhole.
Disclosure of Invention
The invention aims to provide a method for perforating a wall plate of a concrete box culvert and an inspection well under the condition of non-stop production, which solves the technical problem that the wall plate can be perforated under the condition that water runs in the box culvert and the inspection well when a sewage treatment facility runs normally.
The invention is realized by the following technical scheme:
a method for perforating a concrete box culvert and a wall plate of an inspection well without stopping production comprises the following steps:
s1, manufacturing a steel template according to the size of the hole to be drilled on the wallboard;
s2, cleaning the inner side surface of the wallboard at the position of the hole to be drilled, hoisting the steel template, putting the steel template into a box culvert or an inspection well, attaching the steel template to the wallboard through a cross brace and an inclined brace, and then fixing the cross brace and the inclined brace, so that the steel template and the inner side surface of the wallboard form an accommodating cavity;
s3, pouring concrete in the accommodating cavity formed in the step S2;
s4, after the concrete reaches the strength, perforating, repairing and reinforcing the outer side surface of the wall plate, connecting a pipeline with the wall plate, and performing water stop construction according to the design requirement;
s5, chiseling concrete in the hole range, detaching the cross brace and the inclined brace, vibrating the steel formwork to loosen the concrete in the accommodating cavity, and then hoisting the steel formwork together with the concrete to finish the hole opening and pipe burying operation.
The steel formwork in the step S1 comprises channel steels arranged on the left side and the right side of the inner side of the wall plate at the hole to be drilled, bottom sealing angle steel fixed at the lower part of the channel steel, steel plates fixed on the outer side of the channel steel and reinforcing angle steel.
In the step S1, the left, right, and bottom edges of the steel form exceed the hole edge 1m of the hole or reach two opposite side walls and the bottom wall perpendicular to the wall plate.
And in the step S1, the top of the steel plate is higher than the inner water level of the box culvert or the inspection well and is 200mm lower than the top of the wall plate.
And a cross brace is fixed on the back surface of the channel steel, and two ends of the cross brace are respectively fixed on the wall plate and the top of the wall plate opposite to the wall plate by expansion bolts.
The lower part of channel-section steel is fixed with the bracing, bolt swing joint is adopted with the junction of channel-section steel to the bracing, the other end of bracing extends the top of wallboard, the bracing is equipped with the bar hole that is used for bolted connection with the department of being connected of stull.
And in the step S1, a polyethylene foam board with the thickness of 10mm is adhered to the contact surface of the channel steel, the bottom sealing angle steel and the wall board.
The steel formwork comprises the steel formwork, a cross brace fixed to the upper portion of the steel formwork and an inclined brace fixed to the lower portion of the steel formwork, the steel formwork is tightly attached to the inner side surface of the wallboard at the position of the hole to be drilled to form an accommodating cavity, the cross brace is fixed to the top of the wallboard and the top of the wallboard opposite to the wallboard through expansion bolts, one end of the inclined brace is movably connected with the channel steel through bolts, the other end of the inclined brace extends to the top of the wallboard and is connected with the cross brace through a strip-shaped hole bolt, and a concrete pouring layer is further arranged in the accommodating cavity.
Compared with the prior art, the invention has the beneficial effects that:
the method for perforating the wallboard without stopping production of the concrete box culvert and the inspection well can perform perforating and pipe burying under the normal operation condition of a sewage treatment facility without stopping production, specifically comprises the steps of arranging a steel template on the inner side surface of the wallboard at a planned perforated hole, fixing the steel template by using a cross brace and an inclined brace, pouring concrete in an accommodating cavity formed by the steel template and the wallboard, and performing perforating, repairing, reinforcing and the like on the outer side surface of the wallboard after the concrete reaches the strength.
Drawings
Fig. 1 is a flow chart illustrating the steps of the method for forming holes in a panel according to the present invention.
Figure 2 is a plan layout view of the steel formworks of the present invention arranged on a box culvert or inspection well wall plate.
Fig. 3 is a longitudinal sectional view of fig. 1.
Fig. 4 is a transverse cross-sectional view of fig. 1.
Shown in the figure:
1-steel formwork, 11-channel steel, 12-bottom sealing angle steel, 13-steel plate, 14-reinforcing angle steel, 2-cross brace, 3-diagonal brace, 4-holding cavity, 5-expansion bolt, 6-bolt, 7-strip hole, 8-concrete pouring layer, 9-polyethylene foam board, a-wallboard, b-wallboard opposite to wallboard a, and c-planned open hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1, the present embodiment provides a method for perforating a concrete box culvert and a wall panel of an inspection well without stopping production, which comprises the following steps:
s1, manufacturing a steel template 1 according to the size of the hole c to be drilled on the wallboard a;
s2, cleaning the inner side surface of the wall plate a at the hole c to be perforated, and hoisting the manufactured steel template 1 to an interior for installation;
s3, pouring C30 underwater concrete in an accommodating cavity 4 formed by the steel template 1 and the inner side face of the wall plate a;
s4, after the concrete reaches the strength, perforating, repairing and reinforcing the outer side of the wallboard a, connecting a pipeline with the wallboard a, and performing water stop construction according to the design requirement;
and S5, chiseling concrete in the hole c range, disassembling the steel template 1, vibrating the steel template 1, hoisting the steel template 1 together with the concrete layer 8, and finishing the hole-opening pipe-burying operation.
Specifically, as shown in fig. 2 to 4, the steel form 1 in step S1 includes channel steels 11 disposed on the left and right sides of the inner side surface of the wall plate a at the hole c to be bored, back cover angles 12 fixed to the lower portion of the channel steels 11, steel plates 13 fixed to the outer side surfaces of the channel steels 11, and reinforcement angles 14, and more preferably, the channel steels 11 are 20# channel steels, the long sides of the back cover angles 12 are 200mm, the thicknesses of the steel plates 13 are determined according to actual engineering requirements, the numbers and the intervals of the reinforcement angles 14 are determined according to actual engineering requirements, and the numbers of the reinforcement angles 14 in this embodiment are 4. At the joint of the back cover angle 12 and the 20# channel steel 11, the part of the back cover angle 12 which can not extend into the 20# channel steel 11 (the short side and part of the long side of the back cover angle 12) should be cut off to ensure that no gap exists between the back cover angle 12 and the 20# channel steel 11 after the connection.
Preferably, in step S1, the channel steel 11 on the left and right sides should be disposed at a position greater than 1m from the edge of the c-shaped hole, and the bottom edge of each channel steel 11 should also exceed 1m from the edge of the c-shaped hole, when the box culvert or the inspection well is relatively small, the channel steel 11 on the two sides may be directly disposed on two vertical opposite sidewalls perpendicular to the wall plate a, and the bottom edge of the channel steel 11 may be directly disposed on the bottom wall of the box culvert or the inspection well. The top of the steel plate 13 needs to exceed the inner water surface of the box culvert or the inspection well and is not higher than 200mm below the top of the wallboard a, and the arrangement can ensure that the hole c to be perforated is water-tight and water-proof.
Preferably, in step S1, the steel form 1 further includes a cross brace 2 fixed to the back of the channel steel 11 and an inclined brace 3 movably connected to the lower portion of the channel steel 11, the cross brace 2 is a channel steel or an angle steel, and can be selected according to actual requirements, and two ends of the cross brace 2 are respectively fixed to the top of the wall plate a and the top of the wall plate b opposite to the wall plate a by using expansion bolts 5; the junction of 3 and the 11 lower parts of channel-section steel of bracing should cut off the floor of bracing 3 to with the web bend to suitable angle after with 11 channel-section steels adopt 6 swing joint of bolt, the other end of bracing 3 extends the top of wallboard b, bracing 3 and stull 2 treat that the junction is equipped with bar hole 7 that is used for bolted connection, treat when whole steel form 1 hoists to box culvert or well, through the position of bar hole 7 adjustment steel form 1, use bolt 6 to screw up bracing 2 and bracing 3 fixedly through bar hole 7 after having adjusted to use expansion bolts 5 to fix the both ends of bracing 2 on two relative wallboards. The connection part of the inclined strut 3 and the lower part of the channel steel 11 is connected but not fixed by bolts 6, so that the position of the steel form 1 is conveniently adjusted.
It should be noted that, except that the connections between the cross brace 2 and the inclined brace 3 and between the inclined brace 3 and the channel steel 11 are bolt connections, the connections of the other section steels are all welded. And a polyethylene foam plate 9 with the thickness of 10mm is adhered to the contact surface between the channel steel 11 and the bottom sealing angle steel 12 and the wall plate a.
Specifically, in step S2, use lifting device to hang steel form 1 wholly to box culvert or in the well, utilize stull 2 and 3 adjusting position of bracing to make channel-section steel 11 press close to wallboard an ' S medial surface, then beat expansion bolts 5 fixed with stull 2 ' S both ends respectively at wallboard an and wallboard b ' S top surface, at stull 2 and 3 strip hole 7 departments of reserving of bracing, adopt bolt 6 to connect and fix, then steel form 1 and wallboard a medial surface form holding chamber 4.
Specifically, in the step S3, C30 underwater concrete is poured into the accommodating cavity 4 to form the concrete layer 8, and the top of the concrete layer 8 is flush with the steel plate 13.
Specifically, in step S5, the concrete in the hole c is chiseled, the expansion bolts 5 and 6 are loosened, the steel form 1 is vibrated, and the steel form 1 is lifted together with the concrete, thereby completing the hole-opening pipe-burying operation.
Simultaneously, the embodiment still provides a steel form that is used for concrete box culvert and inspection shaft wallboard trompil under not stopping production, and its structure is shown in fig. 2 ~ 4, including steel form 1 and fix at the stull 2 on steel form 1 upper portion and fix bracing 3 in steel form 1 lower part, steel form 1 hugs closely in the inboard surface of planned trompil hole c department wallboard a, forms holding chamber 4, the stull 2 passes through expansion bolts 5 to be fixed at wallboard a and the top of wallboard b relative with wallboard a, the one end and the channel-section steel 11 of bracing 3 adopt bolt 6 swing joint, the other end of bracing 3 extends wallboard b's top to pass through bar hole 7 bolted connection with stull 2, still be equipped with concrete placement layer 8 in the holding chamber 4.
The concrete structure of the steel form for the concrete box culvert and the inspection well for the opening of the wall plate without stopping production in the embodiment is described in detail in the corresponding wall plate opening method, and is not described again here.
In summary, the method for perforating the wallboard of the concrete box culvert and the inspection well under the condition of non-stop production can perform perforating and pipe burying under the normal operation condition of a sewage treatment facility, specifically, a steel template is arranged on the inner side surface of the wallboard at the position of a planned perforated hole, the steel template is fixed by using a cross brace and an inclined brace, then concrete is poured in an accommodating cavity formed by the steel template and the wallboard, the outer side surface of the wallboard can perform perforating, repairing, reinforcing and other operations after the concrete reaches the strength, the whole process does not need to stop the operation of the facility, compared with the existing perforating method, the continuous operation of the sewage treatment facility can greatly reduce pollution and adverse effects on the environment, the construction process of the method is simple, and the waste concrete can be removed together after the construction is completed without causing future troubles.
The parts not described in the specification are prior art or common general knowledge. The present embodiments are illustrative only and not intended to limit the scope of the present invention, and modifications and equivalents thereof by those skilled in the art are considered to fall within the scope of the present invention as set forth in the claims.

Claims (10)

1. A method for perforating a concrete box culvert and a wallboard of an inspection well without stopping production is characterized by comprising the following steps of: the method comprises the following steps:
s1, manufacturing a steel template (1) according to the size of the hole (c) to be drilled on the wall plate (a);
s2, cleaning the inner side surface of the wallboard (a) at the position of the hole (c) to be drilled, hoisting the steel template (1) and placing the steel template into a box culvert or an inspection well, tightly attaching the steel template (1) to the wallboard (a) through the cross braces (2) and the inclined braces (3), and then fixing the cross braces (2) and the inclined braces (3), so that the steel template (1) and the inner side surface of the wallboard (a) form an accommodating cavity (4);
s3, pouring concrete in the accommodating cavity (4) formed in the step S2;
s4, after the concrete reaches the strength, perforating, repairing and reinforcing the outer side surface of the wall plate (a), connecting a pipeline with the wall plate (a), and performing water stop construction according to design requirements;
s5, chiseling concrete in the range of the hole (c), detaching the cross brace (2) and the inclined brace (3), vibrating the steel formwork (1) to loosen the concrete in the accommodating cavity (4), and then hoisting the steel formwork (1) together with the concrete to complete the operation of opening the hole and burying the pipe.
2. The method for perforating a wall plate of a concrete box culvert and an inspection well under the condition of no production stop as claimed in claim 1, wherein the method comprises the following steps: the steel formwork (1) in the step S1 comprises channel steels (11) arranged on the left side and the right side of the inner side of a wall plate (a) at the position of the hole (c) to be drilled, bottom sealing angle steel (12) fixed at the lower part of the channel steels (11), steel plates (13) fixed on the outer side of the channel steels (11) and reinforcing angle steel (14).
3. The method for perforating a wall plate of a concrete box culvert and an inspection well under the condition of no production stop as claimed in claim 2, wherein the method comprises the following steps: in the step S1, the left, right and bottom edges of the steel form (1) exceed the hole edge 1m of the hole (c) or reach two opposite side walls and the bottom wall perpendicular to the wall plate (a).
4. The method for perforating a wall plate of a concrete box culvert and an inspection well under the condition of no production stop as claimed in claim 2, wherein the method comprises the following steps: and in the step S1, the top of the steel plate (13) is higher than the inner water surface of the box culvert or the inspection well and is lower than 200mm below the top of the wall plate (a).
5. The method for perforating a wall plate of a concrete box culvert and an inspection well under the condition of no production stop as claimed in claim 2, wherein the method comprises the following steps: the back of channel-section steel (11) is fixed with stull (2), the both ends of stull (2) adopt expansion bolts (5) to fix the top at wallboard (a) and wallboard (b) relative with wallboard (a) respectively.
6. The method for perforating a wall plate of a concrete box culvert and an inspection well under the condition of no production stop as claimed in claim 5, wherein the method comprises the following steps: the lower part of channel-section steel (11) is fixed with bracing (3), bolt (6) swing joint is adopted with the junction of channel-section steel (11) in bracing (3), the other end of bracing (3) extends the top of wallboard (b), bracing (3) and stull (2) treat the junction and be equipped with bar hole (7) that are used for bolted connection.
7. The method for perforating a wall plate of a concrete box culvert and an inspection well under the condition of no production stop as claimed in claim 2, wherein the method comprises the following steps: and in the step S1, a polyethylene foam board (9) with the thickness of 10mm is adhered to the contact surface of the channel steel (11) and the bottom sealing angle steel (12) and the wall board (a).
8. The utility model provides a steel form that is used for concrete box culvert and inspection shaft wallboard trompil under not stopping production which characterized in that: including steel form (1) and fix stull (2) on steel form (1) upper portion and fix bracing (3) in steel form (1) lower part, steel form (1) hugs closely in the interior side surface of planning trompil hole (c) department wallboard (a), forms holding chamber (4), the top at wallboard (a) and relative wallboard (b) with wallboard (a) is fixed through expansion bolts (5) in stull (2), the one end and channel-section steel (11) of bracing (3) adopt bolt (6) swing joint, the other end of bracing (3) extends the top of wallboard (b) to pass through bar hole (7) bolted connection with stull (2), still be equipped with concrete placement layer (8) in holding chamber (4).
9. The steel form for the opening of the wall plate of the concrete box culvert and the inspection well without stopping production according to claim 8, wherein: the steel template (1) comprises channel steels (11) arranged at the left side and the right side of the inner side surface of a wallboard (a) at the position of a hole (c) to be drilled, bottom sealing angle steel (12) arranged at the lower part of each channel steel (11), steel plates (13) fixed at the outer side surfaces of the channel steels (11) at the left side and the right side, and a plurality of reinforcing angle steel (14) arranged at the outer side surfaces of the steel plates (13), wherein,
the bottom edges of the two channel steels (11) and the bottom edges of the channel steels (11) are arranged at positions larger than 1m of the hole edge of the hole (c) to be drilled or to two opposite side walls and a bottom wall which are vertical to the wall plate (a);
the top of the steel plate (13) is higher than the inner water surface of the box culvert or the inspection well and is 200mm lower than the top of the wall plate (a).
10. The steel form for the opening of the wall plate of the concrete box culvert and the inspection shaft without stopping production according to claim 9, wherein: and a polyethylene foam plate (9) with the thickness of 10mm is adhered to the contact surface of the channel steel (11) and the bottom sealing angle steel (12) and the wall plate (a).
CN202010433796.5A 2020-05-21 2020-05-21 Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork Active CN111733717B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010433796.5A CN111733717B (en) 2020-05-21 2020-05-21 Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010433796.5A CN111733717B (en) 2020-05-21 2020-05-21 Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork

Publications (2)

Publication Number Publication Date
CN111733717A true CN111733717A (en) 2020-10-02
CN111733717B CN111733717B (en) 2021-09-10

Family

ID=72647621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010433796.5A Active CN111733717B (en) 2020-05-21 2020-05-21 Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork

Country Status (1)

Country Link
CN (1) CN111733717B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT243709B (en) * 1962-10-19 1965-11-25 Hermann Muecher Attachment used to temporarily block a street gully
US3898778A (en) * 1974-01-10 1975-08-12 Lennart G Erickson Slotted drainage conduit and integral concrete floor
DE19540068A1 (en) * 1995-10-27 1997-04-30 Finbau Finnentroper Bauelement Mesh grating, especially for laying in openings in concrete of constructed roads
JP2001050461A (en) * 1999-08-05 2001-02-23 Sekisui Chem Co Ltd Non-water-suspending branch joint
US20070154266A1 (en) * 2005-12-29 2007-07-05 Wassman Matthew A Culvert inlet protection device
CN102691851A (en) * 2012-06-15 2012-09-26 上海久坚加固工程有限公司 Method for reinforcing pipeline by adopting fibrous composite fabric
WO2012163266A1 (en) * 2011-05-30 2012-12-06 中国葛洲坝集团股份有限公司 Method for discharging water from dam concrete placing area via concealed pipe
CN103452165A (en) * 2013-07-04 2013-12-18 洛阳富兴管业有限公司 Connecting structure and connecting method for water delivery pipe and steel pipe
CN104499504A (en) * 2014-11-25 2015-04-08 中铁四局集团第三建设有限公司 Road inspection well and construction method thereof
CN105715064A (en) * 2016-01-31 2016-06-29 太原钢铁(集团)有限公司 Repairing and reinforcing method for reinforced concrete stock bin
CN106545032A (en) * 2016-11-04 2017-03-29 常州信息职业技术学院 Large-scale power inspection shaft well body and preparation method thereof
CN207079698U (en) * 2017-08-15 2018-03-09 中铁四局集团第三建设有限公司 With split type pipe plugging system in a kind of inspection shaft
CN107816117A (en) * 2017-11-15 2018-03-20 上海市城市排水有限公司竹园第污水输送分公司 A kind of large-scale pressure current box culvert is not cut off the water outer restorative procedure
CN110306449A (en) * 2019-05-31 2019-10-08 武汉市武昌市政建设(集团)有限公司 A kind of connection method of new box culvert and existing road box culvert

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT243709B (en) * 1962-10-19 1965-11-25 Hermann Muecher Attachment used to temporarily block a street gully
US3898778A (en) * 1974-01-10 1975-08-12 Lennart G Erickson Slotted drainage conduit and integral concrete floor
DE19540068A1 (en) * 1995-10-27 1997-04-30 Finbau Finnentroper Bauelement Mesh grating, especially for laying in openings in concrete of constructed roads
JP2001050461A (en) * 1999-08-05 2001-02-23 Sekisui Chem Co Ltd Non-water-suspending branch joint
US20070154266A1 (en) * 2005-12-29 2007-07-05 Wassman Matthew A Culvert inlet protection device
WO2012163266A1 (en) * 2011-05-30 2012-12-06 中国葛洲坝集团股份有限公司 Method for discharging water from dam concrete placing area via concealed pipe
CN102691851A (en) * 2012-06-15 2012-09-26 上海久坚加固工程有限公司 Method for reinforcing pipeline by adopting fibrous composite fabric
CN103452165A (en) * 2013-07-04 2013-12-18 洛阳富兴管业有限公司 Connecting structure and connecting method for water delivery pipe and steel pipe
CN104499504A (en) * 2014-11-25 2015-04-08 中铁四局集团第三建设有限公司 Road inspection well and construction method thereof
CN105715064A (en) * 2016-01-31 2016-06-29 太原钢铁(集团)有限公司 Repairing and reinforcing method for reinforced concrete stock bin
CN106545032A (en) * 2016-11-04 2017-03-29 常州信息职业技术学院 Large-scale power inspection shaft well body and preparation method thereof
CN207079698U (en) * 2017-08-15 2018-03-09 中铁四局集团第三建设有限公司 With split type pipe plugging system in a kind of inspection shaft
CN107816117A (en) * 2017-11-15 2018-03-20 上海市城市排水有限公司竹园第污水输送分公司 A kind of large-scale pressure current box culvert is not cut off the water outer restorative procedure
CN110306449A (en) * 2019-05-31 2019-10-08 武汉市武昌市政建设(集团)有限公司 A kind of connection method of new box culvert and existing road box culvert

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
熊艾玲: "上海浦东新区杜鹃路φ1600mm污水管修复工程", 《中国市政工程》 *
王杨: "一种钢筋混凝土管不停水开叉接驳施工技术", 《甘肃水利水电技术》 *

Also Published As

Publication number Publication date
CN111733717B (en) 2021-09-10

Similar Documents

Publication Publication Date Title
WO2021228189A1 (en) Reusable post-cast strip support replacement force transfer device and construction method therefor
CN108914965A (en) The continuous construction method of aluminum alloy mould plate for pipe gallery
CN204435673U (en) Integrated frame column template structure
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN104400898A (en) Vertical integral forming mould of novel prefabricated concrete segment and forming method thereof
CN206625428U (en) Floor closed system is poured after a kind of pipe well
CN206748695U (en) The prefabricated edges of boards mould of zigzag
CN111733717B (en) Method for perforating concrete box culvert and inspection well on wall plate without stopping production and steel formwork
CN209145275U (en) A kind of T-type shear wall aluminum alloy template component
CN107060173B (en) Early demoulding construction method in clear-water concrete wafer board structure hole
CN106930391B (en) Cast-in-place drainage channel structure of top plate for formwork-free construction and construction method
CN214942375U (en) Aluminum alloy template anti-floating device for indoor partition water stop table
CN111236681A (en) Hanging die for adding laminated slab at bottom of concrete slab and construction method thereof
CN114808555A (en) Prefabricated frame plate and application method thereof
CN205711786U (en) Big cross section porous overlength cast-in-place box culvert formwork system
CN210127630U (en) Bathroom stagnant water plastic formwork
CN210770662U (en) Regularization utility tunnel water supply pipe buttress steel form
CN207567731U (en) Gate pier and fan-shaped sealing built-in fitting primary concreting structure
CN210738077U (en) Waterproof reverse-edge aluminum alloy hanging die
CN112593749A (en) Construction method of anti-seepage concrete of MBBR water treatment process structure
KR20020065661A (en) A Repair ethod and Repair tructure of Bridge Pier Mould Construction
CN110700297A (en) Sump setting combined steel formwork and installation method thereof
CN220166712U (en) Integral box culvert red copper water stop reinforcing and installing device
CN213297137U (en) Formwork reinforcing device for improving concrete construction quality of falling plate type toilet
CN204414349U (en) The vertical integrally forming mould of Novel precast concrete pipe sheet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant