CN207048377U - A kind of construction site distribution box protection canopy for being easily installed dismounting - Google Patents

A kind of construction site distribution box protection canopy for being easily installed dismounting Download PDF

Info

Publication number
CN207048377U
CN207048377U CN201720634750.3U CN201720634750U CN207048377U CN 207048377 U CN207048377 U CN 207048377U CN 201720634750 U CN201720634750 U CN 201720634750U CN 207048377 U CN207048377 U CN 207048377U
Authority
CN
China
Prior art keywords
fixedly connected
support column
canopy
distribution box
easily installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720634750.3U
Other languages
Chinese (zh)
Inventor
屠秋华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Keqiao Junda Textile Co Ltd
Original Assignee
Shaoxing Keqiao Junda Textile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Keqiao Junda Textile Co Ltd filed Critical Shaoxing Keqiao Junda Textile Co Ltd
Priority to CN201720634750.3U priority Critical patent/CN207048377U/en
Application granted granted Critical
Publication of CN207048377U publication Critical patent/CN207048377U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Construction engineering technical field is the utility model is related to, and discloses a kind of construction site distribution box protection canopy for being easily installed dismounting, including ceiling, the bottom four corners of the ceiling have been fixedly connected with sleeve pipe, support column are socketed with described sleeve pipe.The utility model passes through ceiling, sleeve pipe, support column, jack, first hook, first support bar, first link, second hook, spring, second link, head rod, second connecting rod and protection network, the installation process for changing the distribution box protection canopy in traditional construction site is more loaded down with trivial details, need a large amount of weld jobs, a large amount of cutting operations are needed during dismounting, waste substantial amounts of human resources and be substantially disposable, the shortcomings that recycling rate of waterused is relatively low and waste of material is big, only need support column and ceiling grafting, by first support bar grafting on the support columns, again by protection network and first support bar and support column grafting, it may be such that and be easily installed and dismantle, save manpower and material, and repeatable utilization.

Description

A kind of construction site distribution box protection canopy for being easily installed dismounting
Technical field
Construction engineering technical field is the utility model is related to, specially a kind of construction site distribution box for being easily installed dismounting Protection canopy.
Background technology
With economic development, the raising of living standards of the people, urban development is more and more rapider, and urban construction is more and more fast Suddenly, construction site is more and more, in building construction process, it will usually uses interim fitting case, distribution box, which is generally located on, to be built Build near thing.For safe construction, at present, construction site must set up distribution box protection canopy, and existing distribution box protection canopy is mostly Job site is voluntarily set up, and mainly sets up steel pipe frame or main member, then by these steel pipes or master by way of welding Component is wanted to be fixed.Current distribution box protection canopy is primarily present following two problems:First, installation process is more loaded down with trivial details, and Need a large amount of weld jobs, need a large amount of cutting operations during dismounting, waste substantial amounts of human resources;2nd, it is substantially disposable Use, recycling rate of waterused is relatively low and waste of material is big.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of construction site distribution box for being easily installed dismounting and prevented Canopy is protected, possesses the advantages that being easily installed dismounting and recycling, solves the problems, such as to be not easy to installing/dismounting and waste of materials.
(2) technical scheme
To achieve the above object, the utility model provides following technical scheme:A kind of construction site for being easily installed dismounting Distribution box protection canopy, including ceiling, the bottom four corners of the ceiling have been fixedly connected with sleeve pipe, support are socketed with described sleeve pipe Post, the side of the top and bottom of the support column has been fixedly connected with jack, the first hook is provided with the jack, described First one end of hook away from jack is fixedly connected with first support bar, and the side of the first support bar and support column is fixed The first link is connected with, the second hook is provided with first link, the side of second hook away from the first link is consolidated Surely spring is connected with, the one end of the spring away from the second hook is fixedly connected with the second link, and second link is away from bullet One end of spring has been respectively fixedly connected with head rod and the second connecting rod, solid between the head rod and the second connecting rod Surely protection network is connected with, the side of one of support column is fixedly connected with fixture block, lock is connected with the fixture block Button, the side of the lock away from fixture block are fixedly connected with the first roller bearing, and the side of first roller bearing is fixedly connected with canopy door, The side of the canopy door away from the first roller bearing is fixedly connected with two the second roller bearings, and the side of second roller bearing is fixedly connected with Second support bar.
Preferably, the bottom of described sleeve pipe is opened up fluted, and support column is provided with groove.
Preferably, through hole, through hole of the fixture block through lock are offered on the fixture block and lock.
Preferably, described Men Yousi connecting rod connection wire netting composition of canopy, the first roller bearing and the second roller bearing are arranged on canopy In the connecting rod of the left and right sides of door.
Preferably, the bottom of the connecting rod in the left side of the canopy door and the bottom of support column are on a horizontal line.
Preferably, it is arranged to slope at the top of the ceiling.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of construction site distribution box protection for being easily installed dismounting Canopy, possesses following beneficial effect:
1st, the utility model passes through ceiling, sleeve pipe, support column, jack, the first hook, first support bar, the first link, Two hooks, spring, the second link, head rod, the second connecting rod and protection network, change the distribution box in traditional construction site The installation process of protection canopy is more loaded down with trivial details, it is necessary to a large amount of weld jobs, needs a large amount of cutting operations during dismounting, wastes substantial amounts of people Power resource and be substantially disposable, the shortcomings that recycling rate of waterused is relatively low and waste of material is big, it is only necessary to by support column with Ceiling grafting, by first support bar grafting on the support columns, then by protection network and first support bar and support column grafting, you can make It must be easy to mount and dismount, save manpower and material, and repeatable utilization.
2nd, the utility model passes through first support bar, lock, fixture block, the first roller bearing, the second roller bearing, the first link, second Link and spring so that dismounting is easily installed between canopy door and protection network, it is only necessary to by first support bar and the connecting rod of canopy door Grafting, and spring is plugged in the connecting rod of canopy door.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is enlarged drawing at A in Fig. 1;
Fig. 3 is the utility model side view;
Fig. 4 is enlarged drawing at B in Fig. 3;
Fig. 5 is enlarged drawing at C in Fig. 3.
In figure:1 ceiling, 2 sleeve pipes, 3 support columns, 4 jacks, 5 first hooks, 6 first support bars, 7 first links, 8 second Hook, 9 springs, 10 second links, 11 head rods, 12 second connecting rods, 13 protection networks, 14 fixture blocks, 15 locks, 16 first Roller bearing, 17 canopy doors, 18 second roller bearings, 19 second support bars.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5 are referred to, the utility model provides a kind of technical scheme:A kind of construction site distribution for being easily installed dismounting Case protection canopy, including ceiling 1, the top of ceiling 1 are arranged to slope, and slope is advantageous to draining, and the bottom four corners of ceiling 1 are fixed It is connected with sleeve pipe 2, the bottom of sleeve pipe 2 opens up fluted, and support column 3 is provided with groove, support column 3 is socketed with sleeve pipe 2, is propped up The side of the top and bottom of dagger 3 has been fixedly connected with jack 4, and the first hook 5 is provided with jack 4, and the first hook 5 is remote One end of jack 4 is fixedly connected with first support bar 6, and the side of first support bar 6 and support column 3 has been fixedly connected with the first extension Ring 7, the second hook 8 is provided with the first link 7, and the second 8 sides away from the first link 7 of hook are fixedly connected with spring 9, bullet The one end of spring 9 away from the second hook 8 is fixedly connected with the second link 10, and second one end of link 10 away from spring 9 is fixed respectively The connecting rod 12 of head rod 11 and second is connected with, protection is fixedly connected between the connecting rod 12 of head rod 11 and second Net 13, the side of one of support column 3 are fixedly connected with fixture block 14, and lock 15, the He of fixture block 14 are connected with fixture block 14 Through hole is offered on lock 15, lock can be pinned canopy door 17 through both through holes, locked by fixture block 14 through the through hole of lock 15 15 sides away from fixture block 14 of button are fixedly connected with the first roller bearing 16, and the side of the first roller bearing 16 is fixedly connected with canopy door 17, canopy 17 sides away from the first roller bearing 16 of door are fixedly connected with two the second roller bearings 18, and canopy door 17 connects wire netting by four connecting rods Composition, the bottom of the connecting rod in the left side of canopy door 17 and the bottom of support column 3 are on a horizontal line, the first roller bearing 16 and the In the connecting rod for the left and right sides that two roller bearings 18 are arranged on canopy door 17, the side of the second roller bearing 18 is fixedly connected with second support bar 19。
The electric elements occurred in this article electrically connect with the main controller and 220V civil powers in the external world, and main controller can be meter Calculation machine etc. plays the conventionally known equipment of control.
When in use, support column 3 is plugged in sleeve pipe 2, the first hook 5 is plugged in jack 4,8 are linked up with by second It is plugged on the first link 7, similarly, installation canopy door 17, fixture block 14 can be pinned canopy door 17 through lock 15;Conversely, then Detachably.
In summary, this be easily installed the construction site distribution box protection canopy of dismounting by ceiling 1, sleeve pipe 2, support column 3, The hook of jack 4, first 5, first support bar 6, the first link 7, second hook 8, spring 9, the second link 10, head rod 11st, the second connecting rod 12 and protection network 13, it is more loaded down with trivial details to change the installation process of the distribution box protection canopy in traditional construction site, Need a large amount of weld jobs, need a large amount of cutting operations during dismounting, wasting substantial amounts of human resources and being substantially disposably makes It is relatively low and the shortcomings that waste of material is big with, recycling rate of waterused, it is only necessary to by support column 3 and the grafting of ceiling 1, by first support bar 6 It is plugged on support column 3, then by protection network 13 and first support bar 6 and the grafting of support column 3, you can so that being easily installed and tearing open Unload, save manpower and material, and repeatable utilization;Pass through first support bar 6, lock 15, fixture block 14, the first roller bearing 16, second Roller bearing 18, the first link 7, the second link 10 and spring 9 so that dismounting is easily installed between canopy door 17 and protection network 13, is only needed It is plugged on by the connecting rod grafting of first support bar 6 and canopy door 17, and by spring 9 in the connecting rod of canopy door 17.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of construction site distribution box protection canopy for being easily installed dismounting, including ceiling (1), it is characterised in that:The ceiling (1) bottom four corners have been fixedly connected with sleeve pipe (2), and support column (3) is socketed with described sleeve pipe (2), the support column (3) The side of top and bottom has been fixedly connected with jack (4), and the first hook (5) is provided with the jack (4), and described first hangs The one end of hook (5) away from jack (4) is fixedly connected with first support bar (6), the first support bar (6) and support column (3) Side has been fixedly connected with the first link (7), and the second hook (8), second hook are provided with first link (7) (8) side away from the first link (7) is fixedly connected with spring (9), and the one end of the spring (9) away from the second hook (8) is consolidated Surely the second link (10) is connected with, the one end of second link (10) away from spring (9) has been respectively fixedly connected with the first connection Bar (11) and the second connecting rod (12), protection network is fixedly connected between the head rod (11) and the second connecting rod (12) (13), the side of one of support column (3) is fixedly connected with fixture block (14), and lock is connected with the fixture block (14) Detain (15), the side of the lock (15) away from fixture block (14) is fixedly connected with the first roller bearing (16), first roller bearing (16) Side be fixedly connected with canopy door (17), side of the canopy door (17) away from the first roller bearing (16) is fixedly connected with two second Roller bearing (18), the side of second roller bearing (18) are fixedly connected with second support bar (19).
A kind of 2. construction site distribution box protection canopy for being easily installed dismounting according to claim 1, it is characterised in that:Institute The bottom for stating sleeve pipe (2) opens up fluted, and support column (3) is provided with groove.
A kind of 3. construction site distribution box protection canopy for being easily installed dismounting according to claim 1, it is characterised in that:Institute State and through hole is offered on fixture block (14) and lock (15), through hole of the fixture block (14) through lock (15).
A kind of 4. construction site distribution box protection canopy for being easily installed dismounting according to claim 1, it is characterised in that:Institute State canopy door (17) to be made up of four connecting rods connection wire nettings, the first roller bearing (16) and the second roller bearing (18) are arranged on canopy door (17) The left and right sides connecting rod on.
A kind of 5. construction site distribution box protection canopy for being easily installed dismounting according to claim 1, it is characterised in that:Institute The bottom of the connecting rod in the left side of canopy door (17) is stated with the bottom of support column (3) to be located on a horizontal line.
A kind of 6. construction site distribution box protection canopy for being easily installed dismounting according to claim 1, it is characterised in that:Institute State and be arranged to slope at the top of ceiling (1).
CN201720634750.3U 2017-06-02 2017-06-02 A kind of construction site distribution box protection canopy for being easily installed dismounting Expired - Fee Related CN207048377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720634750.3U CN207048377U (en) 2017-06-02 2017-06-02 A kind of construction site distribution box protection canopy for being easily installed dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720634750.3U CN207048377U (en) 2017-06-02 2017-06-02 A kind of construction site distribution box protection canopy for being easily installed dismounting

Publications (1)

Publication Number Publication Date
CN207048377U true CN207048377U (en) 2018-02-27

Family

ID=61492047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720634750.3U Expired - Fee Related CN207048377U (en) 2017-06-02 2017-06-02 A kind of construction site distribution box protection canopy for being easily installed dismounting

Country Status (1)

Country Link
CN (1) CN207048377U (en)

Similar Documents

Publication Publication Date Title
CN104790675B (en) Reinforced concrete block masonry structure assemblage construction method
CN204126230U (en) Assembly scaffold unit
CN205934747U (en) A hang basket that is used for cantilever to pour bridge construction operation with pre -compaction structure
CN103967210A (en) Square steel pipe waste concrete core spiral hoop stiffening composite column with T-shaped ribbed stiffeners
CN103352537A (en) Integral load-bearing heat-insulating wall plate and production and construction technology thereof
CN206289945U (en) A kind of assembled Portable safety crosshead
CN205976733U (en) Can have enough to meet need encloses fender temporarily
CN102979297B (en) Hanging type stairwell operating platform mechanism and construction method thereof
CN207048377U (en) A kind of construction site distribution box protection canopy for being easily installed dismounting
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN207959875U (en) A kind of construction scaffold
CN205000640U (en) Outer wall mold sheet composition reinforcerment system
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN206806134U (en) A kind of fixing device for the transformer being easily installed
CN207092595U (en) A kind of construction building site stair
CN211499897U (en) Net rack sliding rod piece reinforcing device
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN207144975U (en) A kind of constructing tunnel hangs equipment
CN206971143U (en) A kind of easy-to-mount municipal administration decoration guardrail
CN207110421U (en) One kind is used to protect frame system outside the working regularization of assembled architecture
CN109235709B (en) Full cast-in-place outer wall structure of building
CN203393721U (en) Inner support main purlin component
CN207892016U (en) A kind of H profile steel combination pedestal in house
CN203403683U (en) Double-layer rib penetrating device
CN206769153U (en) Assemble cast-in-place combined type superposed box mesh-beam floor system attachment structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

Termination date: 20180602