CN207892016U - A kind of H profile steel combination pedestal in house - Google Patents

A kind of H profile steel combination pedestal in house Download PDF

Info

Publication number
CN207892016U
CN207892016U CN201820151657.1U CN201820151657U CN207892016U CN 207892016 U CN207892016 U CN 207892016U CN 201820151657 U CN201820151657 U CN 201820151657U CN 207892016 U CN207892016 U CN 207892016U
Authority
CN
China
Prior art keywords
steel
longitudinal
plate
connecting hole
profile steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820151657.1U
Other languages
Chinese (zh)
Inventor
周小凯
朱勇
刘立久
胡刚
杨华
张绍雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Yukuang Construction Engineering Co ltd
Original Assignee
Jiangsu Ten Thousand Reach Hang Xiao Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Ten Thousand Reach Hang Xiao Steel Structure Co Ltd filed Critical Jiangsu Ten Thousand Reach Hang Xiao Steel Structure Co Ltd
Priority to CN201820151657.1U priority Critical patent/CN207892016U/en
Application granted granted Critical
Publication of CN207892016U publication Critical patent/CN207892016U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本实用新型公开了一种房屋的H型钢组合基座,包括多个钢筋混凝土基础、通过第一安装法兰与该钢筋混凝土基础固定连接的钢管柱以及通过第二安装法兰与该钢管柱远离所述第一安装法兰一端固定连接的H型钢组合结构,其中,所述钢管柱与水平面垂直,所述H型钢组合结构包括多个横向H型钢以及多个纵向H型钢,所述横向H型钢通过直角连接板与所述纵向H型钢连接并通过螺钉固定,所述横向H型钢和所述纵向H型钢均包括纵向钢板以及位于该纵向钢板两端的横向钢板,所述纵向钢板的两端均设有第一安装连接孔。有益效果:本实用新型实现了房屋基座的低成本建设的同时,具备高稳定性且方便房屋的拆卸和再次搭建。

The utility model discloses an H-shaped steel combined base of a house, which comprises a plurality of reinforced concrete foundations, a steel pipe column fixedly connected with the reinforced concrete foundation through a first installation flange, and a steel pipe column separated from the steel pipe column through a second installation flange. An H-shaped steel composite structure fixedly connected to one end of the first mounting flange, wherein the steel pipe column is perpendicular to the horizontal plane, and the H-shaped steel composite structure includes a plurality of horizontal H-shaped steels and a plurality of longitudinal H-shaped steels, and the horizontal H-shaped steels Connected to the longitudinal H-shaped steel through a right-angled connecting plate and fixed by screws, the horizontal H-shaped steel and the longitudinal H-shaped steel both include a longitudinal steel plate and a transverse steel plate located at both ends of the longitudinal steel plate, and both ends of the longitudinal steel plate are provided with There is a first mounting connection hole. Beneficial effects: the utility model realizes the low-cost construction of the house base, and at the same time has high stability and is convenient for dismantling and rebuilding of the house.

Description

一种房屋的H型钢组合基座An H-shaped steel composite base for a house

技术领域technical field

本实用新型涉及建筑基座建设技术领域,具体为一种房屋的H型钢组合基座。The utility model relates to the technical field of building base construction, in particular to an H-shaped steel combined base of a house.

背景技术Background technique

在日常生活中,许多房屋经常需要搭建在河边狭地等地理位置上,其大多数房屋或其他建筑物基座多是采用砖、水泥、豁土、沙石等建造,或者是采用钢筋混凝土结构,采用这种建筑结构建造的房屋无法进行重新拆卸后再次搭建,施工成本高。In daily life, many houses often need to be built in geographical locations such as narrow land by the river. Most of the houses or other building bases are mostly built with bricks, cement, open soil, sand, etc., or reinforced concrete Structure, the houses built with this kind of building structure cannot be rebuilt after dismantling again, and the construction cost is high.

实用新型内容Utility model content

(一)解决的技术问题(1) Solved technical problems

针对现有技术的不足,本实用新型提供了一种房屋的H型钢组合基座,解决了在河边狭地房屋拆卸,不能重新搭建,施工成本高的问题。Aiming at the deficiencies of the prior art, the utility model provides an H-shaped steel combined base of a house, which solves the problems of dismantling, inability to rebuild, and high construction costs in the narrow land by the river.

(二)技术方案(2) Technical solution

为实现上述目的,本实用新型提供如下技术方案:一种房屋的H型钢组合基座,包括多个钢筋混凝土基础、通过第一安装法兰与该钢筋混凝土基础固定连接的钢管柱以及通过第二安装法兰与该钢管柱远离所述第一安装法兰一端固定连接的H型钢组合结构,其中,所述钢管柱与水平面垂直,所述H型钢组合结构包括多个横向H型钢以及多个纵向H型钢,所述横向H型钢通过直角连接板与所述纵向H型钢连接并通过螺钉固定,所述横向H型钢和所述纵向H型钢均包括纵向钢板以及位于该纵向钢板两端的横向钢板,所述纵向钢板的两端均设有第一安装连接孔,所述纵向钢板上且位于两个第一安装连接孔之间设有第二安装连接孔,相邻的两个纵向钢板沿该纵向钢板的轴向通过第一夹板连接且通过螺钉固定,所述横向钢板的两端均设有第三安装连接孔,所述横向钢板的两端表面设有与所述第三安装连接孔相对应的第三安装法兰,相邻的两个第三安装法兰之间通过第二夹板连接并通过螺钉固定。In order to achieve the above purpose, the utility model provides the following technical solutions: an H-shaped steel composite base of a house, including a plurality of reinforced concrete foundations, a steel pipe column fixedly connected to the reinforced concrete foundation through the first installation flange, and a second An H-shaped steel composite structure in which the installation flange is fixedly connected to the end of the steel pipe column away from the first installation flange, wherein the steel pipe column is perpendicular to the horizontal plane, and the H-shaped steel composite structure includes a plurality of horizontal H-shaped steels and a plurality of longitudinal H-shaped steel, the horizontal H-shaped steel is connected with the longitudinal H-shaped steel through a right-angled connecting plate and fixed by screws, the horizontal H-shaped steel and the longitudinal H-shaped steel both include a longitudinal steel plate and a transverse steel plate located at both ends of the longitudinal steel plate, so Both ends of the longitudinal steel plates are provided with a first installation connection hole, and a second installation connection hole is provided on the longitudinal steel plate and between the two first installation connection holes. The axial direction is connected by the first splint and fixed by screws, the two ends of the transverse steel plate are provided with the third installation connection hole, the surface of the two ends of the transverse steel plate is provided with the third installation connection hole corresponding For the third mounting flange, two adjacent third mounting flanges are connected by a second splint and fixed by screws.

优选的,所述钢筋混凝土基础包括若干钢筋以及浇灌于该钢筋周围的成型混凝土柱,所述钢筋远离所述混凝土柱的一端通过所述第一安装法兰与所述钢管柱连接并通过螺钉固定。Preferably, the reinforced concrete foundation includes several steel bars and formed concrete columns poured around the steel bars, and the end of the steel bars away from the concrete column is connected to the steel pipe column through the first installation flange and fixed by screws .

优选的,所述直角连接板包括横板与竖板,所述横板上设有与所述第二安装连接孔相对应的第四安装连接孔,所述竖板上设有与所述第一安装连接孔相对应的第五安装连接孔。Preferably, the right-angle connecting plate includes a horizontal plate and a vertical plate, the horizontal plate is provided with a fourth installation connection hole corresponding to the second installation connection hole, and the vertical plate is provided with a fourth installation connection hole corresponding to the first installation connection hole. A fifth installation connection hole corresponding to the first installation connection hole.

优选的,所述横向H型钢的一端设有凸棱,所述横向H型钢远离所述凸棱的一端设有与其相匹配的榫槽,所述凸棱上设有与所述第二安装连接孔对应设置的通孔。Preferably, one end of the horizontal H-shaped steel is provided with a convex rib, and the end of the horizontal H-shaped steel away from the convex rib is provided with a matching tongue and groove, and the convex rib is provided with a The holes correspond to the provided through-holes.

(三)有益效果(3) Beneficial effects

本实用新型提供了一种房屋的H型钢组合基座,通过钢筋混凝土作为基础,配合第一安装法兰、钢管柱、第二安装法兰以及H型钢组合结构构成基座机体,在H型钢组合结构的横向H型钢和纵向H型钢中,采用第一夹板连接相邻的两个纵向钢板,通过第三安装法兰和第二夹板的稳定配合,有利于相邻的两个横向钢板之间的稳定连接,本实用新型实现了房屋基座的低成本建设的同时,具备高稳定性且方便房屋的拆卸和再次搭建。The utility model provides an H-shaped steel combined base of a house. The reinforced concrete is used as the foundation, and the first installation flange, the steel pipe column, the second installation flange and the H-shaped steel combined structure constitute the base body. In the horizontal H-shaped steel and vertical H-shaped steel of the structure, the first splint is used to connect the two adjacent longitudinal steel plates, and the stable cooperation between the third mounting flange and the second splint is beneficial to the connection between the two adjacent horizontal steel plates. Stable connection, the utility model realizes the low-cost construction of the house base, and at the same time has high stability and is convenient for the disassembly and rebuilding of the house.

附图说明Description of drawings

图1为本实用新型的部分结构示意图;Fig. 1 is a partial structural representation of the utility model;

图2为本实用新型中直角连接板的剖视图;Fig. 2 is the cross-sectional view of the right-angle connecting plate in the utility model;

图3为本实用新型中相邻的横向钢板的部分结构示意图。Fig. 3 is a partial structural schematic diagram of adjacent transverse steel plates in the utility model.

图中:1、钢筋混凝土基础;2、第一安装法兰;3、钢管柱;4、第二安装法兰;5、H型钢组合结构;6、横向H型钢;7、纵向H型钢;8、直角连接板;9、纵向钢板;10、横向钢板;11、第一安装连接孔;12、第二安装连接孔;13、第一夹板;14、第三安装连接孔;15、第三安装法兰;16、第二夹板;17、第四安装连接孔;18、第五安装连接孔;19、凸棱;20、榫槽。In the figure: 1. Reinforced concrete foundation; 2. First installation flange; 3. Steel pipe column; 4. Second installation flange; 5. H-shaped steel composite structure; 6. Horizontal H-shaped steel; 7. Longitudinal H-shaped steel; 8 , right-angle connecting plate; 9, longitudinal steel plate; 10, transverse steel plate; 11, the first installation connection hole; 12, the second installation connection hole; 13, the first splint; 14, the third installation connection hole; 15, the third installation Flange; 16, the second splint; 17, the fourth installation connection hole; 18, the fifth installation connection hole; 19, convex edge; 20, tongue and groove.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

如图1-3所示,本实用新型提供一种技术方案:一种房屋的H型钢组合基座,包括多个钢筋混凝土基础1、通过第一安装法兰2与该钢筋混凝土基础1固定连接的钢管柱3以及通过第二安装法兰4与该钢管柱3远离所述第一安装法兰2一端固定连接的H型钢组合结构5,其中,所述钢管柱3与水平面垂直,所述H型钢组合结构5包括多个横向H型钢6以及多个纵向H型钢7,所述横向H型钢6通过直角连接板8与所述纵向H型钢7连接并通过螺钉固定,所述横向H型钢6和所述纵向H型钢7均包括纵向钢板9以及位于该纵向钢板9两端的横向钢板10,所述纵向钢板9的两端均设有第一安装连接孔11,所述纵向钢板9上且位于两个第一安装连接孔11之间设有第二安装连接孔12,相邻的两个纵向钢板9沿该纵向钢板9的轴向通过第一夹板13连接且通过螺钉固定,所述横向钢板10的两端均设有第三安装连接孔14,所述横向钢板10的两端表面设有与所述第三安装连接孔14相对应的第三安装法兰15,相邻的两个第三安装法兰15之间通过第二夹板16连接并通过螺钉固定。As shown in Figures 1-3, the utility model provides a technical solution: an H-shaped steel composite base for a house, including a plurality of reinforced concrete foundations 1, which are fixedly connected to the reinforced concrete foundation 1 through the first installation flange 2 The steel pipe column 3 and the H-shaped steel composite structure 5 fixedly connected to the end of the steel pipe column 3 away from the first installation flange 2 through the second installation flange 4, wherein the steel pipe column 3 is perpendicular to the horizontal plane, and the H The section steel composite structure 5 includes a plurality of transverse H-section steels 6 and a plurality of longitudinal H-section steels 7, the transverse H-section steels 6 are connected with the longitudinal H-section steels 7 through right-angle connecting plates 8 and fixed by screws, and the transverse H-section steels 6 and The longitudinal H-shaped steel 7 includes a longitudinal steel plate 9 and a transverse steel plate 10 positioned at both ends of the longitudinal steel plate 9, the two ends of the longitudinal steel plate 9 are provided with first installation connection holes 11, and the longitudinal steel plate 9 is located on the two ends of the longitudinal steel plate 9. A second installation connection hole 12 is provided between the first installation connection holes 11, and two adjacent longitudinal steel plates 9 are connected by the first splint 13 along the axial direction of the longitudinal steel plates 9 and fixed by screws, and the transverse steel plates 10 Both ends of the horizontal steel plate 10 are provided with a third installation connection hole 14, the surface of both ends of the transverse steel plate 10 is provided with a third installation flange 15 corresponding to the third installation connection hole 14, and the two adjacent third The mounting flanges 15 are connected by a second splint 16 and fixed by screws.

具体来说,所述钢筋混凝土基础1包括若干钢筋以及浇灌于该钢筋周围的成型混凝土柱,所述钢筋远离所述混凝土柱的一端通过所述第一安装法兰2与所述钢管柱3连接并通过螺钉固定;所述直角连接板8包括横板与竖板,所述横板上设有与所述第二安装连接孔12相对应的第四安装连接孔17,所述竖板上设有与所述第一安装连接孔11相对应的第五安装连接孔18。所述横向H型钢6的一端设有凸棱19,所述横向H型钢6远离所述凸棱19的一端设有与其相匹配的榫槽20,所述凸棱19上设有与所述第二安装连接孔12对应设置的通孔。Specifically, the reinforced concrete foundation 1 includes several steel bars and formed concrete columns poured around the steel bars, and the end of the steel bars away from the concrete column is connected to the steel pipe column 3 through the first installation flange 2 And fixed by screws; the right-angle connecting plate 8 includes a horizontal plate and a vertical plate, the horizontal plate is provided with a fourth installation connection hole 17 corresponding to the second installation connection hole 12, and the vertical plate is provided with There is a fifth installation connection hole 18 corresponding to the first installation connection hole 11 . One end of the horizontal H-shaped steel 6 is provided with a convex rib 19, and the end of the horizontal H-shaped steel 6 away from the convex rib 19 is provided with a matching tongue and groove 20, and the convex rib 19 is provided with The two installation connection holes 12 are correspondingly arranged through holes.

如图1-3所示,在实际应用时,搭建好多个钢筋混凝土基础1后,通过第一安装法兰2固定安装钢管柱3,通过第二安装法兰4安装好水平方向的横向H型钢6,通过直角连接板8连接纵向H型钢7,实现测量好所需长度,再根据实际横向H型钢6和纵向H型钢7的长度进行衔接固定安装,其中,相邻的两个横向H型钢6中纵向钢板通过第一夹板13连接,通过螺钉将第一夹板13固定安装在相邻的两个横向H型钢6之间,需要说明的是,相邻的两个纵向H型同样通过第一夹板13及螺钉固定连接,横向钢板10与纵向钢板9之间通过直角连接板8及螺钉分别穿插第二安装连接孔12和第一安装连接孔11进行固定连接,其中,相邻的两个横向钢板10通过螺钉穿擦第二夹板16及第三安装法兰固定连接。As shown in Figure 1-3, in actual application, after building multiple reinforced concrete foundations 1, the steel pipe column 3 is fixedly installed through the first installation flange 2, and the horizontal horizontal H-shaped steel is installed through the second installation flange 4 6. Connect the vertical H-shaped steel 7 through the right-angled connecting plate 8 to measure the required length, and then perform connection and fixed installation according to the actual length of the horizontal H-shaped steel 6 and the longitudinal H-shaped steel 7, wherein the two adjacent horizontal H-shaped steels 6 The middle longitudinal steel plates are connected by the first splint 13, and the first splint 13 is fixedly installed between two adjacent horizontal H-shaped steels 6 by screws. 13 and screw fixed connection, the transverse steel plate 10 and the longitudinal steel plate 9 are fixedly connected through the right-angled connecting plate 8 and the screw through the second installation connection hole 12 and the first installation connection hole 11, wherein the two adjacent transverse steel plates 10 is fixedly connected to the second splint 16 and the third mounting flange through screw penetration.

综上可得,本实用新型提供了一种房屋的H型钢组合基座,通过钢筋混凝土1作为基础,配合第一安装法兰2、钢管柱3、第二安装法兰4以及H型钢组合结构5构成基座机体,在H型钢组合结构5的横向H型钢6和纵向H型钢7中,采用第一夹板13连接相邻的两个纵向钢板9,通过第三安装法兰15和第二夹板16的稳定配合,有利于相邻的两个横向钢板10之间的稳定连接,本实用新型实现了房屋基座的低成本建设的同时,具备高稳定性且方便房屋的拆卸和再次搭建。To sum up, the utility model provides an H-shaped steel composite base for a house, which uses reinforced concrete 1 as the foundation, cooperates with the first installation flange 2, the steel pipe column 3, the second installation flange 4 and the H-shaped steel composite structure 5 constitute the base body, in the horizontal H-shaped steel 6 and the longitudinal H-shaped steel 7 of the H-shaped steel composite structure 5, the first splint 13 is used to connect two adjacent longitudinal steel plates 9, and the third mounting flange 15 and the second splint The stable cooperation of 16 is conducive to the stable connection between two adjacent horizontal steel plates 10. The utility model realizes the low-cost construction of the house base, and at the same time has high stability and is convenient for dismantling and rebuilding of the house.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定,需要说明的是,该文中出现的电器元件均与外界的主控器及220V市电电连接,并且主控器可为计算机等起到控制的常规已知设备。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacement and modification, the scope of the present utility model is limited by the appended claims and their equivalents. It should be noted that the electrical components appearing in this article are all connected to the external main controller and 220V mains electricity, and the main controller A conventionally known device that functions as a computer or the like can be used.

Claims (4)

1. a kind of H profile steel in house combines pedestal, it is characterised in that:Including multiple reinforced concrete foundations (1), pass through the first peace The steel pipe column (3) and pass through the second mounting flange (4) and this that dress flange (2) is fixedly connected with the reinforced concrete foundation (1) The H profile steel composite structure (5) that steel pipe column (3) is fixedly connected far from described first mounting flange (2) one end, wherein the steel pipe Column (3) and horizontal plane, the H profile steel composite structure (5) include multiple lateral H profile steels (6) and multiple longitudinal H profile steels (7), the lateral H profile steel (6) is connect and is fixed by screw, institute with longitudinal H profile steel (7) by right-angle connecting plate (8) Lateral H profile steel (6) and longitudinal H profile steel (7) are stated including longitudinal steel plate (9) and positioned at longitudinal direction steel plate (9) both ends The both ends of lateral steel plate (10), the longitudinal direction steel plate (9) are equipped with the first installation connecting hole (11), on the longitudinal direction steel plate (9) And the second installation connecting hole (12) is equipped between two first installation connecting holes (11), adjacent two longitudinal steel plates (9) It connects axially through first clamping plate (13) along the longitudinal direction steel plate (9) and is fixed by screw, the two of the transverse direction steel plate (10) End is equipped with third installation connecting hole (14), and two end surfaces of the transverse direction steel plate (10) are equipped with installs connecting hole with the third (14) corresponding third mounting flange (15) passes through second clamping plate (16) between adjacent two third mounting flanges (15) even It connects and is fixed by screw.
2. a kind of H profile steel in house according to claim 1 combines pedestal, it is characterised in that:The reinforced concrete Plinth (1) includes the formation of concrete column of several reinforcing bars and pouring around the reinforcing bar, and the reinforcing bar is far from the concrete column One end connect with the steel pipe column (3) by first mounting flange (2) and fixed by screw.
3. a kind of H profile steel in house according to claim 1 combines pedestal, it is characterised in that:The right-angle connecting plate (8) Including transverse slat and riser, the transverse slat is equipped with the 4th installation connecting hole corresponding with second installation connecting hole (12) (17), the riser is equipped with the 5th installation connecting hole (18) corresponding with first installation connecting hole (11).
4. a kind of H profile steel in house according to claim 1 combines pedestal, it is characterised in that:The transverse direction H profile steel (6) One end be equipped with fin (19), it is described transverse direction H profile steel (6) far from the fin (19) one end be equipped with matched tongue-and-groove (20), the fin (19) is equipped with the through-hole being correspondingly arranged with the second installation connecting hole (12).
CN201820151657.1U 2018-01-30 2018-01-30 A kind of H profile steel combination pedestal in house Active CN207892016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820151657.1U CN207892016U (en) 2018-01-30 2018-01-30 A kind of H profile steel combination pedestal in house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820151657.1U CN207892016U (en) 2018-01-30 2018-01-30 A kind of H profile steel combination pedestal in house

Publications (1)

Publication Number Publication Date
CN207892016U true CN207892016U (en) 2018-09-21

Family

ID=63545596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820151657.1U Active CN207892016U (en) 2018-01-30 2018-01-30 A kind of H profile steel combination pedestal in house

Country Status (1)

Country Link
CN (1) CN207892016U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523354A (en) * 2020-12-29 2021-03-19 安徽金和鑫钢结构有限公司 Steel house assembling connecting part

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523354A (en) * 2020-12-29 2021-03-19 安徽金和鑫钢结构有限公司 Steel house assembling connecting part

Similar Documents

Publication Publication Date Title
CN203236589U (en) Sectional type quick release prefabricated bridge deck slab side mould device
CN209509508U (en) Building templates for assembled engineering
CN110295754A (en) A kind of detachable prefabricated stand column bar reinforcement positioning device and its installation method
CN205591355U (en) Assembled residential building
CN205591361U (en) High strength wallboard and floor connection structure
CN205475677U (en) Steel house room unit
CN204402039U (en) A kind of aluminum alloy mould plate system exterior wall straightening board member
CN110424370A (en) The linear type connecting node and L shape connecting node of prefabricated post and prefabricated panel
CN207003735U (en) Connection cast-in-situ steel reinforced concrete assembled wall in a kind of double-template assembled
CN205224593U (en) A supporting construction for reinforced concrete stand
CN206352340U (en) Connecting node between precast concrete column and pedestal
CN108979138A (en) Support system, assembled laminated frame trestle and column bed die block erection method
CN204001409U (en) Precast composite slab
CN219011307U (en) A prefabricated structure of four-way cable well
CN206174453U (en) Novel instrument formula bathroom falls board and hangs mould device
CN217353856U (en) Assembled precast concrete encloses fender
CN104908150A (en) Piping shaft manufacturing formwork and industrialized piping shaft production method
CN205314161U (en) Shaft runner template
CN204571006U (en) A kind of prefabricated sleeper overlaid plate type shear wall component of strap end portion shrouding
CN113482239B (en) High-performance concrete permanent formwork square steel pipe combination beam and manufacturing method thereof
CN207944436U (en) A kind of novel full assembled field culverts and water gates
CN218786911U (en) Square steel tube combined special-shaped column base joint
CN207017634U (en) A kind of shaped steel frame wooden model
CN221920415U (en) Assembly type building reinforcing assembly
CN208167766U (en) A kind of simple and fast connection precast concrete plate fetal membrane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250301

Address after: No. 135, North Street Village, North Street Administrative Village, Juancheng Town, Juancheng County, Heze City, Shandong Province 274600

Patentee after: Huang Yan

Country or region after: China

Address before: 222506 Economic Development Zone, Guannan County, Lianyungang City, Jiangsu Province (Jing'er Road)

Patentee before: JIANGSU WANNIANDA HANGXIAO STEEL STRUCTURE CO.,LTD.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250331

Address after: Facade 1-A-17, Botai Shifu Territory, Dujuan Avenue, Mayuan Street, Qixingguan District, Bijie City, Guizhou Province, China 551700

Patentee after: Guizhou Yukuang Construction Engineering Co.,Ltd.

Country or region after: China

Address before: No. 135, North Street Village, North Street Administrative Village, Juancheng Town, Juancheng County, Heze City, Shandong Province 274600

Patentee before: Huang Yan

Country or region before: China