CN207046635U - A kind of elevator hoistways structure - Google Patents

A kind of elevator hoistways structure Download PDF

Info

Publication number
CN207046635U
CN207046635U CN201720949937.2U CN201720949937U CN207046635U CN 207046635 U CN207046635 U CN 207046635U CN 201720949937 U CN201720949937 U CN 201720949937U CN 207046635 U CN207046635 U CN 207046635U
Authority
CN
China
Prior art keywords
hoistway
unit
pedestal
slide rail
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720949937.2U
Other languages
Chinese (zh)
Inventor
周晓锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shangrao fengke Elevator Co., Ltd
Original Assignee
周晓锋
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周晓锋 filed Critical 周晓锋
Priority to CN201720949937.2U priority Critical patent/CN207046635U/en
Application granted granted Critical
Publication of CN207046635U publication Critical patent/CN207046635U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses the hoistway structure of a kind of elevator hoistways structure, including N section hoistway units to be arranged on pedestal, and pedestal is provided with vertically and horizontally slide rail;First paragraph hoistway unit N1On pedestal, its side is additionally provided with from hoisting mechanism;It is arranged on first paragraph hoistway unit N1Side N section hoistway units NnIt is lifted up with matching to merge along vertical slide rail from hoisting mechanism;N section hoistway units NnWhen being promoted to preset height and the translation mechanism with being arranged on horizontal slide rail is engaged, and is translated to 1 section of hoistway unit N of Nn‑1Top.Compared with prior art, the utility model, which has, can be achieved outdoor installation elevator, and safe and efficient, construct the advantages that factor is few, and the engineering time is short that disturb residents.

Description

A kind of elevator hoistways structure
Technical field
The utility model belongs to elevator technology field, and in particular to a kind of elevator hoistways structure.
Background technology
Aging blocks install elevator major part additional and construct the hoistway needed for elevator using steel construction at present, such as publication number CN 105329751 A Chinese invention patent discloses elevator hoistways structure, and it includes four parallel columns set up and multiple horizontal strokes Beam, connects four columns by crossbeam between two neighboring column and encloses and connect the passage to form rectangle.Electricity is installed in hoistway Ladder, in-site installation hoistway with steel structure, which generally requires, builds that scaffold, the job content that disturbs residents are a lot, and the duration is very long, has made steel construction Elevator is marched into the arena installation again after hoistway, and the whole duration needs one month or so.
In addition, also having some producers by the elevator components scene crane hanging component in the hoistway in advance, have integral hoisting or Segmental hoisting, but in whole hoisting process, many safety precautions because being influenceed to realize by specific environment, have compared with Big potential safety hazard, the live goliath for running into narrow space cannot be introduced into, constructional difficulties.
Utility model content
The shortcomings that for above-mentioned prior art or deficiency, the technical problems to be solved in the utility model is to provide one kind can be real Existing outdoor installation elevator, safe and efficient, the construction factor that disturbs residents is few, engineering time short elevator hoistways structure.
In order to solve the above technical problems, the utility model has following form:
A kind of elevator hoistways structure, the hoistway structure include N section hoistway units, and it is arranged on pedestal, the pedestal Provided with vertical slide rail and horizontal slide rail, first paragraph hoistway unit N1On the pedestal, the first paragraph hoistway unit N1's Side is also configured with from hoisting mechanism, N section hoistway units NnIt is arranged on the first paragraph hoistway unit N1Side, the N Duan Jingdao units NnWith it is described match from hoisting mechanism merge along the vertical slide rail and be lifted up;The N sections hoistway unit Nn When being promoted to preset height, the N sections hoistway unit NnIt is engaged with the translation mechanism being arranged on horizontal slide rail, and it is described N section hoistway units NnIt is translated to N-1 section hoistway units Nn-1Top.
Also include the lifting assembly installed in Chuck top, one end of the lifting assembly and the N sections hoistway unit NnIt is flexibly connected, the other end is arranged on the horizontal slide rail.
The lifting assembly is hoist engine, and the lifting end of the hoist engine is linked up with the N sections hoistway unit NnOn, The other end is arranged on the horizontal slide rail.
The lifting assembly is pulley assembly, and the pulley end of the pulley assembly is arranged on the horizontal slide rail, surrounded The lifting end that pulley in the pulley assembly is set is linked up with the N sections hoistway unit NnOn.
Described from hoisting mechanism is hydraulic mandril, and the hydraulic mandril is arranged on the first paragraph hoistway by push rod support Unit N side.
Described from hoisting mechanism is rack and pinion assembly, and the gear in the rack and pinion assembly is respectively and fixedly installed to institute First paragraph hoistway unit N side and the Chuck top are stated, the outside of the gear is around setting rack.
The translation mechanism is rack and pinion assembly or timing belt or back-shaped steel wire rope.
The frame structure that the pedestal is assembled by H profile steel is formed, and being additionally provided with sliding block in the H profile steel leads boots.
The also horizontally disposed limited location bar of the pedestal, the gag lever post are provided with for being arranged on the N sections hoistway unit NnThe mobile pulley N that top is set01The chute of slip.
Also include connecting plate, the connecting plate is by N-1 section hoistway units N setting up and downn-1With the N section hoistways Unit NnPositioning and locking.
Compared with prior art, the utility model has the following technical effect that:
1) the utility model is gone forward side by side pedestrian in place using electronic lifting assembly and translation mechanism to realize elevator hoistways structure Work positions, and safe operation process is controllable;
2) the utility model can realize outdoor installation elevator, reduce construction and disturb residents factor, shorten the engineering time, can bigger model Exclosure realizes target;
3) the utility model can realize that elevator components prefabrication, in-site installation elevator speed are fast;Semi-automatic segmentation peace The steel structure lift shaft scheme of dress can not need crane hanging component, whole installation process simple operation, safely controllable.
Brief description of the drawings
By reading the detailed description made to non-limiting example made with reference to the following drawings, the application's is other Feature, objects and advantages will become more apparent upon:
Fig. 1:The utility model elevator hoistways structural base structural representation;
Fig. 2:The utility model elevator hoistways structure installs structural representation during the second hoistway unit;
Fig. 3:The utility model elevator hoistways structure lifts structural representation during the second hoistway unit;
Fig. 4:The utility model elevator hoistways structure translates structural representation during the second hoistway unit;
Fig. 5:The utility model elevator hoistways structure installs structural representation during the 3rd hoistway unit.
Embodiment
Design, concrete structure and caused technique effect of the present utility model are made furtherly below with reference to accompanying drawing It is bright, to be fully understood from the purpose of this utility model, feature and effect.
As shown in Figures 1 to 5, the utility model elevator hoistways structure, the hoistway structure is arranged on pedestal 10, described Pedestal 10 is provided with vertical slide rail and horizontal slide rail, and the hoistway structure includes multistage hoistway unit, and the present embodiment is preferably provided with Three sections of hoistway units.The utility model can realize the outdoor installation elevator of simplicity, reduce construction and disturb residents factor, when shortening construction Between, it can more broadly realize target.A is residential building in Fig. 1, and B is balcony or residential quarter.
The frame structure that the pedestal 10 is assembled by H profile steel is formed, and sliding block is additionally provided with the H profile steel and leads boots 11.It is described Pedestal 10 is not limited to be made up of H profile steel, and there is slide rail can also be used with the other structures for leading boots.
The hoistway structure also includes the lifting assembly 40 installed in the top of pedestal 10, and the lifting assembly 40 is used to be lifted N section hoistway units Nn, one end of the lifting assembly 40 and the N sections hoistway unit NnIt is flexibly connected, the other end is arranged on On the horizontal slide rail.
Preferably, the lifting assembly 40 is hoist engine, and the hook 42 at the end of lifting rope 41 of the hoist engine hooks up described N section hoistway units Nn, the other end is on the horizontal slide rail.
Preferably, the lifting assembly 40 is pulley assembly, and the pulley end of the pulley assembly is arranged on the level and slided On rail, the hook 42 at the end of lifting rope 41 that the pulley in the pulley assembly is set hooks up the N sections hoistway unit Nn
Be additionally provided with the portal frame 20 from hoisting mechanism, it is described from hoisting mechanism be hydraulic mandril 21, the hydraulic top Bar 21 is arranged on the first paragraph hoistway unit N by push rod support 221Side.The portal frame 20 is provided with from elevator Structure, set up, dismounting leans on the operating mechanism of setting itself can complete independently.
Preferably, described from hoisting mechanism is rack and pinion assembly, and the gear in the rack and pinion assembly is fixed respectively Installed in the first paragraph hoistway unit N1Side and the top of the pedestal 10, the outside of the gear is around setting tooth Bar.
The translation mechanism 30 is rack and pinion assembly or timing belt or back-shaped steel wire rope.Translation mechanism 30 can be a variety of Structure, can suitably it be selected as needed in actual application, flexibility is stronger.
The also horizontally disposed limited location bar 50 of the pedestal 10, the gag lever post 50 is provided with for being arranged on the N section wells Road unit NnThe mobile pulley N that top is set01The chute of slip.The gag lever post 50 is used for the N sections hoistway unit Nn Raised position be defined.
As shown in Figures 2 to 4, first paragraph hoistway unit N1On the pedestal 10, the first paragraph hoistway unit N1 Side be also equipped with being configured with the portal frame 20 from hoisting mechanism, second segment hoistway unit N2It is arranged on the first paragraph hoistway Unit N1Side, be lifted up in the vertical slide rail described in the driving effect lower edge from hoisting mechanism on pedestal 10;Institute State second segment hoistway unit N2When being promoted to preset height, translation mechanism 30 on horizontal slide rail is arranged on by the second segment well Road unit N2Move to first paragraph hoistway unit N1Top.The utility model is utilized from hoisting mechanism, described below electronic carried Component and translation mechanism are risen to realize that elevator hoistways structure is in place and is positioned manually, safe operation process is controllable.
As above-mentioned second segment hoistway unit N2Lifted and move to the first paragraph hoistway unit N1Top when, using even Fishplate bar is by second segment hoistway unit N setting up and down2With the first paragraph hoistway unit N1Positioning and locking;Then the 3rd section is carried out Hoistway unit N3Operation.
As shown in figure 3, the 3rd section of hoistway unit N3It is arranged on the first paragraph hoistway unit N1Side, in the self-carry The vertical slide rail described in the driving effect lower edge of mechanism on pedestal 10 is risen to be lifted up;The 3rd section of hoistway unit N3It is promoted to During preset height, translation mechanism 30 on horizontal slide rail is arranged on by the 3rd section of hoistway unit N3Move to second segment hoistway Unit N2Top;As above-mentioned 3rd section of hoistway unit N3Lifted and move to the second segment hoistway unit N2Top when, adopt With connecting plate by second segment hoistway unit N setting up and down2With the 3rd section of hoistway unit N3Positioning and locking;The like it is straight To completion N section hoistway units Nn, specific method for improving is:
N section hoistway units NnIt is arranged on the first paragraph hoistway unit N1Side, in the driving from hoisting mechanism Vertical slide rail described in effect lower edge on pedestal 10 is lifted up;The N sections hoistway unit NnWhen being promoted to preset height, if Translation mechanism 30 on horizontal slide rail is put by the N sections hoistway unit NnMove to N-1 section hoistway units Nn-1It is upper Side, as above-mentioned N sections hoistway unit NnLifted and move to the N-1 sections hoistway unit Nn-1Top when, using connecting plate By N section hoistway units N setting up and downnWith N-1 section hoistway units Nn-1Positioning and locking.After above-mentioned installation terminates, institute is unloaded State lifting assembly 40.
The utility model realizes that elevator hoistways structure is in place and it is artificial to carry out using electronic lifting assembly and translation mechanism Positioning, safe operation process are controllable;The utility model can realize the outdoor installation elevator of simplicity, reduce construction and disturb residents factor, contracting The short engineering time, it can more broadly realize target;The utility model can realize elevator components prefabrication, in-site installation electricity Terraced speed is fast;The steel structure lift shaft scheme of semi-automatic segmentation installation can not need crane hanging component, whole installation process It is simple operation, safely controllable.Therefore, the utility model has good market application foreground.
Above example is only to illustrate the technical solution of the utility model and non-limiting, reference only to preferred embodiment pair The utility model is described in detail.It will be understood by those within the art that can be to technology of the present utility model Scheme is modified or equivalent substitution, without departing from the spirit and scope of technical solutions of the utility model, all should cover in this reality With in new right.

Claims (10)

1. a kind of elevator hoistways structure, the hoistway structure includes N section hoistway units, and it is arranged on pedestal (10), its feature It is,
The pedestal (10) is provided with vertical slide rail and horizontal slide rail,
First paragraph hoistway unit N1On the pedestal (10), the first paragraph hoistway unit N1Side be also configured with from Hoisting mechanism,
N section hoistway units NnIt is arranged on the first paragraph hoistway unit N1Side, the N sections hoistway unit NnWith it is described Match to merge along the vertical slide rail from hoisting mechanism and be lifted up;
The N sections hoistway unit NnWhen being promoted to preset height, the N sections hoistway unit NnWith being arranged on horizontal slide rail Translation mechanism (30) be engaged, and the N sections hoistway unit NnIt is translated to N-1 section hoistway units Nn-1Top.
2. elevator hoistways structure according to claim 1, it is characterised in that also include carrying installed in pedestal (10) top Rise component (40), one end of the lifting assembly (40) and the N sections hoistway unit NnIt is flexibly connected, the other end is arranged on institute State on horizontal slide rail.
3. elevator hoistways structure according to claim 2, it is characterised in that the lifting assembly (40) is hoist engine, institute Lifting rope (41) the end hook of hoist engine is stated in the N sections hoistway unit NnOn, the other end is arranged on the horizontal slide rail.
4. elevator hoistways structure according to claim 2, it is characterised in that the lifting assembly (40) is pulley assembly, The pulley end of the pulley assembly is arranged on the horizontal slide rail, the lifting rope that the pulley in the pulley assembly is set (41) end hook is in the N sections hoistway unit NnOn.
5. elevator hoistways structure according to claim 1, it is characterised in that it is described from hoisting mechanism be hydraulic mandril (21), the hydraulic mandril (21) is arranged on the first paragraph hoistway unit N by push rod support (22)1Side.
6. elevator hoistways structure according to claim 1 or 5, it is characterised in that it is described from hoisting mechanism be rack-and-pinion Component, the gear in the rack and pinion assembly are respectively and fixedly installed to the first paragraph hoistway unit N1Side and described Pedestal (10) top, the outside of the gear is around setting rack.
7. elevator hoistways structure according to claim 1, it is characterised in that the translation mechanism (30) is rack-and-pinion group Part or timing belt or back-shaped steel wire rope.
8. elevator hoistways structure according to claim 1, it is characterised in that the frame that the pedestal (10) is assembled by H profile steel Frame structure is formed, and being additionally provided with sliding block in the H profile steel leads boots (11).
9. the elevator hoistways structure according to claim 1 or 8, it is characterised in that the pedestal (10) is also horizontally disposed to be had Gag lever post (50), the gag lever post (50) are provided with for being arranged on the N sections hoistway unit NnThe mobile pulley that top is set N01The chute of slip.
10. elevator hoistways structure according to claim 1, it is characterised in that will also be upper including connecting plate, the connecting plate The N-1 section hoistway units N of lower settingn-1With the N sections hoistway unit NnPositioning and locking.
CN201720949937.2U 2017-08-01 2017-08-01 A kind of elevator hoistways structure Active CN207046635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720949937.2U CN207046635U (en) 2017-08-01 2017-08-01 A kind of elevator hoistways structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720949937.2U CN207046635U (en) 2017-08-01 2017-08-01 A kind of elevator hoistways structure

Publications (1)

Publication Number Publication Date
CN207046635U true CN207046635U (en) 2018-02-27

Family

ID=61498712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720949937.2U Active CN207046635U (en) 2017-08-01 2017-08-01 A kind of elevator hoistways structure

Country Status (1)

Country Link
CN (1) CN207046635U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107215749A (en) * 2017-08-01 2017-09-29 周晓锋 A kind of elevator hoistways structure and method for improving
CN112744664A (en) * 2021-01-08 2021-05-04 华城(天津)建筑科技有限公司 Self-lifting hoisting equipment, construction method and sliding locking assembly

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107215749A (en) * 2017-08-01 2017-09-29 周晓锋 A kind of elevator hoistways structure and method for improving
CN112744664A (en) * 2021-01-08 2021-05-04 华城(天津)建筑科技有限公司 Self-lifting hoisting equipment, construction method and sliding locking assembly
CN112744664B (en) * 2021-01-08 2024-04-26 华城(天津)建筑科技有限公司 Self-lifting hoisting equipment, construction method and sliding locking assembly

Similar Documents

Publication Publication Date Title
CN109399432B (en) A kind of hoistway job platform that climbs certainly
CN206408952U (en) A kind of construction adhesion type lifts discharging platform
CN207046635U (en) A kind of elevator hoistways structure
CN102448866A (en) Method for installing the hoisting roping of an elevator
WO2000007923A1 (en) A device and method for installing elevator equipment
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN107215749A (en) A kind of elevator hoistways structure and method for improving
CN105715028A (en) Successive lifting device and lifting scaffold with same
US4205826A (en) Lifting and supporting apparatus for a tower crane
CN109516409A (en) Flooring construction tower crane turns device for hoisting
CN203229334U (en) Lifting framework for lifting and translating single steel member
CN209179426U (en) A kind of elevator shaft steel construction section construction device
CN206328067U (en) Movable draining platform
CN109372242B (en) Elevator shaft construction safety lifting platform device and using method
CN208648493U (en) A kind of no scaffold installation elevator operation platform device
CN207226943U (en) A kind of double crossbeam synchronous hoisting devices
CN201826523U (en) Integral shaft lifting steel form
CN206384699U (en) A kind of tower bright shaft hoisting system of non-stop production reformation
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN105671245B (en) A kind of method of utilization hoist engine flip-over type installing converter
CN218912242U (en) Tripod extension jacking formwork platform for elevator shaft construction
JPH08218620A (en) Scaffold device for constructing towerlike structure
CN211341822U (en) Building curtain wall mounting bracket
CN203008347U (en) Steel platform for elevator shaft construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200305

Address after: 334000 No.11, Chaoyang 5th Road, Chaoyang Industrial Park, Xinzhou District, Shangrao City, Jiangxi Province

Patentee after: Shangrao fengke Elevator Co., Ltd

Address before: 201600, room 25, No. 30, Lane 602, Rong Yue Middle Road, Shanghai, Songjiang District

Patentee before: Zhou Xiaofeng

TR01 Transfer of patent right