CN209179426U - A kind of elevator shaft steel construction section construction device - Google Patents
A kind of elevator shaft steel construction section construction device Download PDFInfo
- Publication number
- CN209179426U CN209179426U CN201821937470.0U CN201821937470U CN209179426U CN 209179426 U CN209179426 U CN 209179426U CN 201821937470 U CN201821937470 U CN 201821937470U CN 209179426 U CN209179426 U CN 209179426U
- Authority
- CN
- China
- Prior art keywords
- platform
- construction
- hoistway
- material loading
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a kind of elevator shaft steel construction section construction devices, its main feature is that being respectively equipped with isolation platform and material loading platform at the top and bottom of construction segmentation, isolation platform has single track hanging beam, material loading platform is equipped with hoistable platform, the fence shelf is made of steel plate and fashioned iron ribbing, and is held in the pre-buried support of hoistway;The single track hanging beam is equipped with electric block;The hoistable platform is the elevating mechanism of wire-rope/pulley component and hoist engine driving.The utility model has the cross-operation that different height section is carried out in same hoistway compared with prior art, effectively avoid influence of the Construction of Steel Structure to lower part hoistway, security risk is reduced, provides Construction of Steel Structure method in a set of safe, orderly, efficient elevator for super high-rise building.
Description
Technical field
The utility model relates to elevator shaft installation technology of steel structure field, specifically a kind of to be used for super high-rise building
Elevator shaft steel construction section construction device.
Background technique
Usually there is multiple elevator shafts in super high-rise building in Core Walls Structure, the steel construction in elevator shaft is generally light
The girder steel of type, such steel construction need to can be installed after the completion of Core Walls Structure civil engineering structure, and be at this time closing in Core Walls Structure
The interior space, be not available steel construction in the conventional cranes tool such as tower crane lifting hoistway, the hoistway of skyscraper is high, floor
More, operating environment is complicated, inside hoistway is not easy that firm job platform is arranged, and the different height section in same hoistway is deposited
The cross-operation the case where, security risk is big.
Utility model content
A kind of elevator shaft steel construction segmentation that the purpose of this utility model is in view of the deficiencies of the prior art and designs is applied
Tooling is set, and elevator shaft is divided into the construction segmentation of several hoistways, each hoistway construction section setting lifting using isolation platform
Platform realizes the cross-operation for carrying out different height section in same hoistway, effectively avoids Construction of Steel Structure to lower part hoistway
Influence, reduce security risk, provide Construction of Steel Structure in a set of safe, orderly, efficient elevator for super high-rise building
Method,
Technical scheme of realizing the purpose of the utility model is that a kind of elevator shaft steel construction section construction device,
Feature is that the top and bottom of hoistway construction segmentation are respectively equipped with isolation platform and material loading platform, and monorail crane is arranged under isolation platform
Hoistable platform is arranged on material loading platform in beam, and the isolation platform and material loading platform are made of steel plate and fashioned iron ribbing, and are held on
In the pre-buried support of hoistway, and it is bolted connection;The single track hanging beam is equipped with electric block;The hoistable platform is steel
The elevating mechanism of cord pulley assembly and hoist engine driving, and elevating safety lock is set and enters and leaves the safety rope of platform;The steel
On cord pulley assembly one end and the pre-buried support of hoistway, the other end is connect with the hoist engine being arranged on hoistable platform.
The utility model has the cross-operation that different height section is carried out in same hoistway compared with prior art, effectively
Avoid influence of the Construction of Steel Structure to lower part hoistway, reduce security risk, for super high-rise building provide a set of safety, it is orderly,
Construction of Steel Structure method in efficient elevator.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is implementation example figure.
Specific embodiment
Refering to attached drawing 1, the utility model by be arranged in hoistway construction segmentation at the top of isolation platform 1, bottom feeding put down
Hoistable platform 5 on platform 11, and its single track hanging beam 2 and material loading platform 11 that are arranged under isolation platform 1 forms, and the isolation is flat
Platform 1 and material loading platform 11 are made of steel plate and fashioned iron ribbing, and are held in the pre-buried support 8 of hoistway 6, and the company of being bolted
It connects;The single track hanging beam 2 is equipped with electric block 3;The hoistable platform 5 is that wire-rope/pulley component 10 and hoist engine 12 drive
Elevating mechanism, and be arranged elevating safety lock and enter and leave platform safety rope 4;10 one end of wire-rope/pulley component setting exists
On the pre-buried support 13 of hoistway 6, the other end is connect with the hoist engine 12 being arranged on hoistable platform 5.
Refering to attached drawing 2, it is newly a construction segmentation by 7 ~ 10 floors that this is practical, and elevator shaft 6 is divided into from the bottom to top
Several construction segmentations, then carry out the installation exercise of steel construction in elevator in the steps below:
(1) installation of lifting facility
Single track hanging beam 2 uses i shaped steel, and specification and electric block 3 are mating, and 2 both ends of single track hanging beam pass through bolt and well
The built-in fitting 9 in road 6 is fixedly connected, and electric block 3 is debugged qualification after being installed on single track hanging beam 2 and can come into operation, electronic
3 lifting capacity of cucurbit is greater than required installation steel member piece weight, and lifting stroke is greater than the height of hoistway construction segmentation.
(2) isolation of construction segmentation
Isolation platform 1 is made of steel plate and fashioned iron ribbing, 3 are made generally according to the size of 6 planar dimension of elevator shaft ~
4 pieces of platform cover boards, platform side edge thereof directly rest in the pre-buried support 8 of hoistway 6, and are fixedly connected by bolt with support 8,
Two movable hoisting rings 7 are provided with to be easily installed every piece of platform cover board.After the isolation platform 1 at top is installed, lower part steel knot
Structure construction area is isolated with hoistway overhead, can effectively stop top high-altitude junk, reduces construction safety hidden danger.
(3), the installation of lifting operation platform
The elevating mechanism that hoistable platform 5 is driven using wire-rope/pulley component 10 and hoist engine 12, and by professional production factory
Family's customization, and elevating safety lock and construction illumination lamp are configured, a set of firm safety rope is separately separately configured at every layer of lift port
4, safety belt need to be hung on this safety rope 4 by construction personnel, after be allowed for access hoistable platform 5 carry out installation exercise operation.
(4) installation of material loading platform
The material loading platform 11 of lower part is the placement that hoistway steel construction is temporarily fed, structure and its production and installation and top
Isolation platform 1 it is similar, while also the Construction of Steel Structure region on top being kept apart with lower part hoistway, effectively steel construction is avoided to apply
Influence of the work to lower part hoistway reduces security risk.
Above to be only described further to the utility model, not to limit the utility model patent, all is this reality
With novel equivalence enforcement, it is intended to be limited solely by within the scope of the claims of the utility model patent.
Claims (1)
1. a kind of elevator shaft steel construction section construction device, it is characterised in that the top and bottom of hoistway construction segmentation are set respectively
There are isolation platform (1) and material loading platform (11), monorail crane beam (2) are set under isolation platform (1), is arranged on material loading platform (11) and rises
It drops platform (5), the isolation platform (1) and material loading platform (11) are made of steel plate and fashioned iron ribbing, and it is pre- to be held on hoistway (6)
In the support (8) buried, and it is bolted connection;The single track hanging beam (2) is equipped with electric block (3);The hoistable platform
(5) it is the elevating mechanism of wire-rope/pulley component (10) and hoist engine (12) driving, and elevating safety lock is set and enters and leaves platform
Safety rope (4);On described wire-rope/pulley component (10) one end and hoistway (6) pre-buried support (13), the other end and setting
Hoist engine (12) connection on hoistable platform (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821937470.0U CN209179426U (en) | 2018-11-23 | 2018-11-23 | A kind of elevator shaft steel construction section construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821937470.0U CN209179426U (en) | 2018-11-23 | 2018-11-23 | A kind of elevator shaft steel construction section construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209179426U true CN209179426U (en) | 2019-07-30 |
Family
ID=67373873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821937470.0U Active CN209179426U (en) | 2018-11-23 | 2018-11-23 | A kind of elevator shaft steel construction section construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209179426U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112010241A (en) * | 2020-08-15 | 2020-12-01 | 亚洲富士电梯股份有限公司 | Steel construction well elevator installation machineshop car |
-
2018
- 2018-11-23 CN CN201821937470.0U patent/CN209179426U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112010241A (en) * | 2020-08-15 | 2020-12-01 | 亚洲富士电梯股份有限公司 | Steel construction well elevator installation machineshop car |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110228743B (en) | Overhead two-to-one suspension ratio construction elevator for elevator shaft traction and operation method thereof | |
CN103266192B (en) | Hoisting method for replacing cooling wall in overhauling of blast furnace | |
CN103790390B (en) | The glass plate Lift-on/Lift-off System of large-span domes Glass Curtain Wall Construction and construction method thereof | |
CN203173684U (en) | Component for hoisting reinforcement cage | |
CN205387439U (en) | Mast hoisting accessory | |
CN102635225A (en) | Equipment hoisting platform and method for super high-rise buildings | |
CN206767425U (en) | A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage | |
CN209179426U (en) | A kind of elevator shaft steel construction section construction device | |
CN203794533U (en) | Light portable mobile lifting equipment | |
CN109339399A (en) | A kind of section construction method of steel construction in elevator shaft | |
CN210480530U (en) | Elevator shaft traction overhead two-to-one suspension ratio construction elevator | |
CN202390116U (en) | High-intensity small-tonnage hoist | |
CN110029807A (en) | For installing the device of steel construction traverse colored steel | |
CN215248971U (en) | Hoisting construction device for large-scale overweight electromechanical equipment of high-rise and super high-rise building | |
CN109516409A (en) | Flooring construction tower crane turns device for hoisting | |
CN207792431U (en) | A kind of multi-functional construction elevator | |
CN204162320U (en) | Facilitate the crane-car of operation at night | |
CN113175203A (en) | Method for setting lifting power equipment in attached lifting scaffold | |
CN208980118U (en) | A kind of machine-roomless lift rope head fixing device | |
CN110803174A (en) | Double-cableway slope transportation device and using method thereof | |
CN201169512Y (en) | Clamp sling special for mounting electric hoist | |
CN201567778U (en) | One-drive multi- hoisting point hoister | |
CN109694004A (en) | A kind of headframe bridge crane installation sheave wheel platform and crane installation method | |
CN214570016U (en) | Suspension balance lifting appliance for vertical lifting transportation system | |
CN214456360U (en) | High-altitude hoisting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |