CN211341822U - Building curtain wall mounting bracket - Google Patents
Building curtain wall mounting bracket Download PDFInfo
- Publication number
- CN211341822U CN211341822U CN201922102298.8U CN201922102298U CN211341822U CN 211341822 U CN211341822 U CN 211341822U CN 201922102298 U CN201922102298 U CN 201922102298U CN 211341822 U CN211341822 U CN 211341822U
- Authority
- CN
- China
- Prior art keywords
- plate
- plates
- transverse
- column
- curtain wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000875 corresponding Effects 0.000 claims abstract description 4
- 230000003014 reinforcing Effects 0.000 claims description 10
- 238000000034 method Methods 0.000 abstract description 5
- 238000010276 construction Methods 0.000 abstract description 4
- 239000011435 rock Substances 0.000 abstract description 3
- 229910000838 Al alloy Inorganic materials 0.000 description 3
- 239000011521 glass Substances 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002965 rope Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001360 synchronised Effects 0.000 description 1
Images
Abstract
The utility model discloses a building curtain wall mounting bracket, which comprises a chassis, a vertical column, an inclined column, a transverse plate and a bottom groove plate; the upright column and the inclined upright column are both arranged on the chassis, and the inclined upright column is obliquely arranged; the number of the transverse plates is multiple, the transverse plates are different in length, all the transverse plates are horizontal, two ends of each transverse plate are respectively connected with the inclined upright posts and the upright posts, the transverse plates are arranged from top to bottom, and the lengths of the transverse plates from top to bottom are reduced in sequence; and a bottom groove plate is arranged on the horizontal plane corresponding to each layer of transverse plate, the bottom groove plates are hinged on the inclined upright posts, and grooves capable of accommodating the bottoms of the unit plates are formed in the bottom groove plates. The utility model discloses a building curtain installing support sets up the kerve plate on oblique stand, utilizes the relative fixed unit plate of kerve plate for the unit plate is in the kerve plate all the time lifting by crane in-process bottom, need not that the workman is hand to also avoid the unit plate to produce uncontrolled slope and rock, is showing the security that improves the construction.
Description
Technical Field
The utility model relates to a building engineering equipment field especially relates to a building curtain wall installing support.
Background
The form of the building curtain wall is generally divided into a frame type curtain wall and a unit type curtain wall, wherein unit blocks of the unit type curtain wall are assembled in a processing plant and then directly hung on a main structure by workers at a construction site. The installation method of the unit plate comprises the following steps: workers use hoisting equipment (such as electric hoists) to connect the tops of the unit plates, then the unit plates are hoisted step by step to a specified floor, and then the unit plates are hung on embedded parts at the edge of the floor slab through the auxiliary operation of the workers. The unit plate blocks are horizontally placed on the support before being hoisted, the support used in the prior art is only a common iron frame, the top of the unit plate blocks is pulled up by a lifting rope when being hoisted, the bottom of the unit plate blocks is still dropped on the support, and the unit plate blocks are in a semi-suspended state at the moment and are inclined and quite unstable; in this stage, workers are generally required to control the unit plates nearby in an auxiliary mode until the unit plates are stably lifted, and the operation is high in danger and easy to collide with the workers.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a novel building curtain installing support for the unit plate need not the workman and directly holds at the in-process of lifting by crane, improves the security of construction.
In order to solve the technical problem, the utility model discloses a technical scheme does: a building curtain wall mounting bracket comprises a chassis, upright posts, inclined upright posts, transverse plates and bottom groove plates;
the upright column and the inclined upright column are both arranged on the chassis, and the inclined upright column is obliquely arranged; the number of the transverse plates is multiple, the transverse plates are different in length, all the transverse plates are horizontal, two ends of each transverse plate are respectively connected with the inclined upright posts and the upright posts, the transverse plates are arranged from top to bottom, and the lengths of the transverse plates from top to bottom are reduced in sequence;
and a bottom groove plate is arranged on the horizontal plane corresponding to each layer of transverse plate, the bottom groove plates are hinged on the inclined upright posts, and grooves capable of accommodating the bottoms of the unit plates are formed in the bottom groove plates.
The utility model discloses a building curtain wall installing support places a unit plate on each layer diaphragm when using, and in the recess of kerve plate was inserted to the bottom of unit plate, the kerve plate was along with unit plate synchronous revolution in the in-process that the unit plate lifted by crane, and the bottom of unit plate was in the kerve plate all the time until the unit plate is completely vertical and leave the kerve plate, avoided the unit plate to produce uncontrolled slope and rock.
Furthermore, a round shaft is arranged on the inclined upright post, a bearing flat plate is arranged on the upright post, a round hole is formed in the first end of the transverse plate, the round hole in the first end of the transverse plate is sleeved on the round shaft, and the second end of the transverse plate falls on the bearing flat plate; after the unit plate on the uppermost layer is lifted, a worker can transversely move the transverse plate on the uppermost layer to take the unit plate off, so that the unit plate on the next layer can be lifted conveniently.
Furthermore, the bottom of the chassis is provided with the rollers, so that a worker can conveniently move the whole support.
Furthermore, a reinforcing column is arranged on the chassis, the top of the reinforcing column is connected with the inclined upright column, and the reinforcing column is used for improving the strength of the inclined upright column.
Further, a handrail is arranged on the reinforcing column.
Furthermore, a first rubber layer is arranged on the surface of the groove of the bottom groove plate, and a second rubber layer is arranged on the surface of the transverse plate. The unit plate generally comprises an aluminum alloy frame and glass embedded in the aluminum alloy frame, and the first rubber layer and the second rubber layer can protect the aluminum alloy frame and the glass from generating surface scratches.
Has the advantages that: (1) the utility model discloses a building curtain installing support sets up the kerve plate on oblique stand, utilizes the relative fixed unit plate of kerve plate for the unit plate is in the kerve plate all the time lifting by crane in-process bottom, need not that the workman is hand to also avoid the unit plate to produce uncontrolled slope and rock, is showing the security that improves the construction. (2) The utility model discloses a building curtain installing support sets up the oblique stand as bearing structure for a plurality of kerfs that articulate on the oblique stand can misplace each other in the horizontal direction, and the kerfs of avoiding the upper strata lifts by crane the unit plate of lower floor and produces the interference. (3) The utility model discloses a building curtain wall installing support uses the bearing flat board on the round axle on the oblique stand and the upright post to install the diaphragm, makes things convenient for the workman to dismantle the diaphragm, avoids upper diaphragm to produce the interference to lifting by crane of lower floor's unit plate. (4) The utility model discloses a building curtain installing support lifts by crane the initial stage in the bottom on chassis at the unit plate, and the workman can adjust the gesture of unit plate through removing the support, and this kind of adjustment need not the unit plate that workman direct contact is in half unsettled state, reduces the danger of operation.
Drawings
FIG. 1 is a top view of the architectural curtain wall mounting bracket of example 1.
Fig. 2 is a sectional view a-a of fig. 1.
Fig. 3 is an enlarged view a of fig. 2.
FIG. 4 is (a) a view showing a state of use of the mounting bracket for a curtain wall according to embodiment 1.
Fig. 5 is a view (second view) showing a state of use of the mounting bracket for a curtain wall according to the embodiment 1.
Wherein: 1. a chassis; 2. a vertical column; 201. a load-bearing plate; 3. an inclined upright post; 301. a circular shaft; 4. a transverse plate; 401. a circular hole; 402. a second rubber layer; 5. a bottom slot plate; 501. a first rubber layer; 6. a reinforcement column; 7. a roller; 8. a handrail; 9. unit plates.
Detailed Description
The present invention will be described in further detail with reference to the following embodiments.
Example 1
As shown in fig. 1 and 2, the mounting bracket for the building curtain wall of the embodiment comprises a chassis 1, an upright post 2, an inclined upright post 3, a transverse plate 4, a bottom groove plate 5, a reinforcing post 6, a roller 7 and a handrail 8;
the upright column 2 and the inclined upright column 3 are both arranged on the chassis 1, and the inclined upright column 3 is obliquely arranged; as shown in fig. 3, a round shaft 301 is arranged on the inclined upright post 3, a bearing flat plate 201 is arranged on the upright post 2, a round hole 401 is arranged at a first end of the transverse plate 4, the round hole 401 at the first end of the transverse plate 4 is sleeved on the round shaft 301, and a second end of the transverse plate 4 falls on the bearing flat plate 201; the transverse plates 4 are arranged from top to bottom, five layers are formed, and the lengths of the transverse plates 4 from top to bottom are reduced in sequence;
a bottom groove plate 5 is arranged on a horizontal plane corresponding to each layer of transverse plate 4, the bottom groove plates 5 are hinged on the inclined upright posts 3, and grooves capable of accommodating the bottoms of the unit plates 9 are formed in the bottom groove plates 5;
the bottom of the chassis 1 is provided with a roller 7, the chassis 1 is provided with a reinforcing column 6, the top of the reinforcing column 6 is connected with an inclined upright post 3, and the reinforcing column 6 is provided with a handrail 8;
the surface of the groove of the bottom groove plate 5 is provided with a first rubber layer 501, and the surface of the transverse plate 4 is provided with a second rubber layer 402.
When the building curtain wall mounting bracket of the embodiment is used, a unit plate 9 is placed on each layer of transverse plate 4, and the bottom of the unit plate 9 is inserted into the groove of the bottom groove plate 5; the unit plates 9 are lifted sequentially from top to bottom, fig. 4 shows a schematic diagram of lifting the uppermost unit plate 9, the bottom trough plate 5 rotates synchronously with the unit plates 9 in the lifting process of the unit plates 9, the bottoms of the unit plates 9 are always positioned in the bottom trough plate 5 until the unit plates 9 are completely vertical and leave the bottom trough plate 5, and uncontrolled inclination and shaking of the unit plates 9 are avoided;
after the hoisting of the unit plate 9 at the uppermost layer is completed, the worker can take the unit plate 9 at the uppermost layer down by moving the transverse plate 4 at the uppermost layer transversely, and then continue to hoist the unit plate 9 at the next layer, as shown in fig. 5.
Although the embodiments of the present invention have been described in the specification, these embodiments are only for the purpose of presentation and should not be construed as limiting the scope of the present invention. Various omissions, substitutions, and changes may be made without departing from the spirit and scope of the invention.
Claims (7)
1. The utility model provides a building curtain wall installing support which characterized in that: comprises a chassis, a vertical column, an inclined column, a transverse plate and a bottom groove plate;
the upright column and the inclined upright column are both arranged on the chassis, and the inclined upright column is obliquely arranged; the number of the transverse plates is multiple, the transverse plates are different in length, all the transverse plates are horizontal, two ends of each transverse plate are respectively connected with the inclined upright posts and the upright posts, the transverse plates are arranged from top to bottom, and the lengths of the transverse plates from top to bottom are reduced in sequence;
and a bottom groove plate is arranged on the horizontal plane corresponding to each layer of transverse plate, the bottom groove plates are hinged on the inclined upright posts, and grooves capable of accommodating the bottoms of the unit plates are formed in the bottom groove plates.
2. The building curtain wall mounting bracket of claim 1, wherein: the inclined upright post is provided with a round shaft, the upright post is provided with a bearing flat plate, a first end of the transverse plate is provided with a round hole, the round hole of the first end of the transverse plate is sleeved on the round shaft, and a second end of the transverse plate falls on the bearing flat plate.
3. The building curtain wall mounting bracket of claim 1, wherein: and the bottom of the chassis is provided with rollers.
4. The building curtain wall mounting bracket of claim 3, wherein: the chassis is provided with a reinforcing column, and the top of the reinforcing column is connected with an inclined upright column.
5. The building curtain wall mounting bracket of claim 4, wherein: the reinforced column is provided with a handrail.
6. The building curtain wall mounting bracket of claim 1, wherein: and a first rubber layer is arranged on the surface of the groove of the bottom groove plate.
7. The building curtain wall mounting bracket of claim 1, wherein: and a second rubber layer is arranged on the surface of the transverse plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922102298.8U CN211341822U (en) | 2019-11-29 | 2019-11-29 | Building curtain wall mounting bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922102298.8U CN211341822U (en) | 2019-11-29 | 2019-11-29 | Building curtain wall mounting bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211341822U true CN211341822U (en) | 2020-08-25 |
Family
ID=72092350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922102298.8U Expired - Fee Related CN211341822U (en) | 2019-11-29 | 2019-11-29 | Building curtain wall mounting bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211341822U (en) |
-
2019
- 2019-11-29 CN CN201922102298.8U patent/CN211341822U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107435438B (en) | Chimney rollover construction device | |
CN109081247A (en) | A kind of hanging method of vestibule large-span steel girder | |
WO2022252633A1 (en) | Method for arranging upside-down hoisting power device in attached lifting scaffold | |
CN211341822U (en) | Building curtain wall mounting bracket | |
KR102117142B1 (en) | Method for carrying elevator counterweight | |
CN110984611A (en) | Narrow space steel column installation method | |
CN105019664A (en) | High-altitude slipping installation method for compartment-type electric room | |
CN113175203A (en) | Method for setting lifting power equipment in attached lifting scaffold | |
CN109653502A (en) | Staged moves back the big Glass Curtain Wall Construction method of platform | |
CN203320922U (en) | Supporting device for forming of elevator shaft template | |
CN206530037U (en) | A kind of elevating platform assembly for Construction of Silo | |
CN102777026A (en) | Method for constructing ultra-long rear casting plate supporting system by using Bailey frames | |
CN202689494U (en) | Elevator shaft template support | |
CN201826523U (en) | Integral shaft lifting steel form | |
CN108331326A (en) | Monoblock type mould bases and its construction method for Super High fission conjoined composite structure | |
CN213771174U (en) | Steel truss lifting platform | |
CN217500989U (en) | Adjustable construction operation platform of elevartor shaft | |
CN210825131U (en) | Bridge construction is with device of demolising of support | |
JP3074765U (en) | Pillar building construction system equipment | |
CN113027146B (en) | Method for lifting and hoisting outer wall stone | |
CN215671202U (en) | BIM on-spot assembled outer wall construction adjusting device | |
CN215519855U (en) | Prefabricated shaped steel scaffold that construction can promote in high-rise building well | |
CN212743356U (en) | Reverse construction method hangs mould system | |
CN206359154U (en) | A kind of steel construction secondary member hoisting device | |
CN216787879U (en) | Interlayer complex special-shaped aluminum veneer curtain wall construction structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200825 Termination date: 20211129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |