CN206384699U - A kind of tower bright shaft hoisting system of non-stop production reformation - Google Patents

A kind of tower bright shaft hoisting system of non-stop production reformation Download PDF

Info

Publication number
CN206384699U
CN206384699U CN201620858809.2U CN201620858809U CN206384699U CN 206384699 U CN206384699 U CN 206384699U CN 201620858809 U CN201620858809 U CN 201620858809U CN 206384699 U CN206384699 U CN 206384699U
Authority
CN
China
Prior art keywords
new
elevator
headframe
building
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620858809.2U
Other languages
Chinese (zh)
Inventor
陈兴
侯大德
杨家冕
肖益盖
汪亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority to CN201620858809.2U priority Critical patent/CN206384699U/en
Application granted granted Critical
Publication of CN206384699U publication Critical patent/CN206384699U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tower bright shaft hoisting system of non-stop production reformation, in former headframe building(1)Periphery, be additionally provided with a new headframe building framework(9), new headframe building framework(9)Top for closing new headframe upstairs portion's Framework Building(1′), and new directive wheel support platform is had from bottom to top(19), new elevator support platform(20);Install, debugging is newly driven a vehicle(8′), new elevator(2′)And new electric-control system(4′), new directive wheel(3′);Using maintenance or holiday time, by former elevator(2)With former directive wheel(3)Displacement is removed, by new elevator(2′)Steel wire rope(15)And hoisting container(5)Connection, the completion in this way, lifting system renovates, former elevator(2)Stop using.The utility model can be changed in the case where bright vertical shaft does not stop production to the bright vertical shaft multi-rope friction hoist normally produced, so as to carry out upgrading to lifting system, economic effect is obvious.

Description

A kind of tower bright shaft hoisting system of non-stop production reformation
Technical field
The utility model is related to a kind of bright shaft hoisting system, can be in the sub-terrain mines such as steel, coloured, gold, chemical industry, coal Applied in the tower bright shaft hoisting system non-stop production reformation in mountain.
Background technology
Bright shaft hoisting is widely used in the underground mine of the industry such as steel, coloured, gold, chemical industry, coal, wherein restrict more Friction pulley is lifted, and can be divided into tower and console mode and be lifted two kinds.
In China, there is the mine of many use frictional geared liftings, because the elevator selected originally is less than normal, in pit shaft After extension, original elevator can not meet safety requirements;Some mines, because original design hoisting power is less than normal, with life The development of production, need to increase hoisting power, then need to change bigger skip bucket or single decker cage is replaced with into two-deck(er) cage.More than Situation, all refers to that increasing elevator, the problem of promoting system need to be changed.But existing technical method is utilized, if will Elevator is changed, then needs pit shaft stopping using a very long time, first removes existing equipment, then placing installation base again Plinth beam, installation elevator, 1 year at least, at most more than 1 year off-time.But reality is, most mine, its Lifting system is the project of primary importance in mine, it is impossible to which stop production transformation for a long time, therefore, and the bright few renewals of vertical shaft multi rope winding change Situation about making, most of is all that new cylinder of digging well is updated transformation, causes investment to roll up.
Chinese patent CN103967503A discloses a kind of tower interior shaft lifting system non-stop production reformation method, is carried in original The L distances of the surface of machine chamber are risen, newly one new lifting system elevator chamber of driving, new lifting system is excavated in its underpart Directive wheel chamber, on new lifting system directive wheel chamber bottom plate rock pillar, utilizes rock drill down some new lifting systems of Drilling Steel wire rope cord hole, and and former elevator chamber top plate insertion, finally using overhauling or stop the not time, by former elevator and former be oriented to Wheel removes displacement, and the steel wire rope of new lifting system elevator is connected by new lifting system steel wire rope cord hole and hoisting container, The completion in this way, lifting system renovates, former elevator is stopped using.The patent can be right in the case where interior shaft does not stop production The interior shaft multi-rope friction hoist normally produced is changed, so as to carry out upgrading to lifting system.But this method is uncomfortable Should be in the tower bright original lifting means of shaft hoisting system less than normal and do not stop to increase hoisting power and need to change elevator Production transformation.
The content of the invention
The purpose of this utility model causes original aiming at current tower bright shaft hoisting system in order to solve shaft stretch There is lifting means less than normal and need to change elevator, but one kind that can not for a long time stop production and propose to increase hoisting power The tower bright shaft hoisting system of non-stop production reformation.
To realize above-mentioned purpose of the present utility model, a kind of tower bright shaft hoisting system of non-stop production reformation of the utility model System uses following technical scheme:
In former headframe building, former elevator, former directive wheel, former electric-control system and hoisting container, people's row stair, electricity are installed On ladder, former driving, the framework platform in former headframe building provided with large equipment hole for hoist, elevator mounting hole, people row stair hole and Boom hoist cable passes through hole.
Periphery in former headframe building, is additionally provided with a new headframe building framework, the top of described new headframe building framework is envelope The new headframe closed upstairs portion's Framework Building, has new directive wheel support platform, new from bottom to top in new headframe upstairs portion's Framework Building Elevator support platform.
In new directive wheel support platform, new elevator support platform and large equipment hole for hoist, elevator mounting hole, Ren Hanglou Terraced hole and boom hoist cable pass through the correspondence position up and down in hole, be respectively equipped with top equipment hoisting hole, upper elevator mounting hole, on People from portion row stair hole, the current hole of top boom hoist cable.
It is current in former headframe building roof and large equipment hole for hoist, elevator mounting hole, people row stair hole and boom hoist cable The correspondence position up and down in hole is designed for opening, and people's row stair are connected with above prolonging people's row stair, it is described on prolong people's row stair inclination Between new directive wheel support platform, new elevator support platform;Described elevator movement is installed to new elevator support It is changed into moving up elevator on platform.
Top of the new driving in new headframe upstairs portion's Framework Building, new directive wheel is arranged on new directive wheel support platform On, new hoist installation is in new elevator support platform, and new electric-control system is arranged in new directive wheel support platform,
The steel wire rope of new elevator and hoisting container connection.
To make structure stress more reasonable, described new headframe building framework is combined by frame column, Vierendeel girder and tie-beam Constitute, frame column is vertically mounted on ground, Vierendeel girder is horizontally arranged on frame column, tie-beam be horizontally arranged at frame column with Between former headframe building.If construction does not influence existing production, tie-beam can be crossed to the framework of former headframe building and opposite side Beam connects.
A kind of tower bright shaft hoisting system of non-stop production reformation of the utility model use above technical scheme after, with Lower beneficial effect:The bright vertical shaft multi-rope friction hoist normally produced can be changed in the case where bright vertical shaft does not stop production, from And upgrading is carried out to lifting system.
Major advantage of the present utility model:Avoiding mine can not stop production replacing lifting means because lifting bright vertical shaft, without Separately new pick lifting pit shaft, or lifting system renovates the situation of influence mine economic profit of must stopping production for a long time, Economic effect is obvious.
Brief description of the drawings
Fig. 1 be a kind of tower bright shaft hoisting system of non-stop production reformation of the utility model lifting system transformation before and after cut open Face schematic diagram;
Fig. 2 is that a kind of lifting system transformation of the tower bright shaft hoisting system of non-stop production reformation of the utility model is front and rear flat Face schematic diagram.
Reference is:
1- original headframes building;1 '-new headframe upstairs portion's Framework Building;2- original elevators;2 '-new elevator;3- originals are oriented to Wheel;3 '-new directive wheel;4- original electric-control systems;4 '-new electric-control system;5- hoisting containers;6- protoplast's row stair;6 '-on Prolong people's row stair;7- elevators;7 '-move up elevator;8- original drivings;8 '-newly driving;The new headframe building frameworks of 9-;10- original wells High building roof;11- equipment hoistings hole;11 '-top equipment hoisting hole;12- elevator mounting holes;12 '-upper elevator is installed Hole;13- people's row stair hole;13 '-people from top row stair hole;14- boom hoist cables pass through hole;14 '-top lifts steel wire The current hole of rope;15- steel wire ropes;16- frame columns;17- Vierendeel girders;18- tie-beams;The new directive wheel support platforms of 19-;20- New elevator support platform.
Embodiment
To further describe the utility model, with reference to the accompanying drawings and examples to a kind of non-stop production reformation of the utility model Tower bright shaft hoisting system be described in further details.
Section shows before and after a kind of tower bright shaft hoisting system reform of non-stop production reformation of the utility model as shown in Figure 1 It is intended to and combines Fig. 2 to find out, a kind of tower bright shaft hoisting system of non-stop production reformation of the utility model, in former headframe building 1, Former elevator 2, former directive wheel 3, former electric-control system 4 and hoisting container 5, people's row stair 6, elevator 7, former driving 8 are installed, in original Framework platform in headframe building 1 is provided with large equipment hole for hoist 11, elevator mounting hole 12, people's row stair hole 13 and lifting steel wire The current hole 14 of rope.Non-stop production reformation is carried out using following steps:
1)Between the tower bright shaft hoisting system normal production period for needing to transform, the periphery in former headframe building 1, new construction One new headframe building framework 9, the described height of new headframe building framework 9 is after the former roof of headframe building 1, and closing is made on top into New headframe upstairs portion's Framework Building 1 ', new headframe upstairs portion's Framework Building 1 ' it is interior have from bottom to top new directive wheel support platform 19, New elevator support platform 20.
Described new headframe building framework 9 is made up of the combination of frame column 16, Vierendeel girder 17 and tie-beam 18, and frame column 16 hangs down Directly it is arranged on ground, Vierendeel girder 17 is horizontally arranged on frame column 16, and tie-beam 18 is horizontally arranged at frame column 16 and Yuan Jing Between high building 1.If construction does not influence existing production, tie-beam 18 also can highly cross former headframe building 1 and right at some Marginal frame beam 17 connects.
In new directive wheel support platform 19, new elevator support platform 20 and large equipment hole for hoist 11, elevator mounting hole 12nd, people's row stair hole 13 and boom hoist cable pass through the correspondence position up and down in hole 14, be respectively equipped with top equipment hoisting hole 11 ', Upper elevator mounting hole 12 ', people from top row stair hole 13 ', the current hole 14 ' of top boom hoist cable.
2)By former headframe building roof 10 and large equipment hole for hoist 11, elevator mounting hole 12, people's row stair hole 13 and lifting The correspondence position up and down in the current hole 14 of steel wire rope is cut, and people's row stair 6 are continued up extension and are installed to and prolong people's row stair 6 ' Position, it is described on prolong people's row stair 6 ' and be tiltedly mounted between new directive wheel support platform 19, new elevator support platform 20; Elevator 7 is moved up by elevator mounting hole 12, upper elevator mounting hole 12 ' respectively and is installed in new elevator support platform It is changed into moving up elevator 7 '.
3)After the completion of above-mentioned work, start new driving 8 ', new elevator 2 ' and new electric-control system 4 ', the peace of new directive wheel 3 ' Dress, debugging;New driving 8 ' is arranged on the new headframe interior top of portion's Framework Building 1 ' upstairs, and new directive wheel 3 ' is arranged on new directive wheel branch Support on platform 19, new elevator 2 ' is arranged in new elevator support platform 20, new electric-control system 4 ' is arranged on new directive wheel branch Support on platform 19;
4)Finally using maintenance or holiday time, former elevator 2 and former directive wheel 3 are removed into displacement, by new elevator 2 ' steel wire rope 15 and hoisting container 5 is connected, and the completion in this way, lifting system renovates, former elevator 2 is stopped using.

Claims (3)

1. a kind of tower bright shaft hoisting system of non-stop production reformation, in former headframe building (1), is provided with former elevator (2), original Directive wheel (3), former electric-control system (4) and hoisting container (5), people's row stair (6), elevator (7), former driving (8), in former headframe building (1) framework platform in is provided with large equipment hole for hoist (11), elevator mounting hole (12), people's row stair hole (13) and lifting steel Cord is passed through hole (14), it is characterised in that:
1) in the periphery of former headframe building (1), be additionally provided with a new headframe building framework (9), described new headframe building framework (9) it is upper Portion is the new headframe closed portion's Framework Building (1 ') upstairs, and new guiding is had from bottom to top in new headframe upstairs portion's Framework Building (1 ') Take turns support platform (19), new elevator support platform (20);
Installed in new directive wheel support platform (19), new elevator support platform (20) and large equipment hole for hoist (11), elevator The correspondence position up and down of hole (12), people's row stair hole (13) and boom hoist cable current hole (14), is respectively equipped with top equipment and hangs Dress hole (11 '), upper elevator mounting hole (12 '), people from top row stair hole (13 '), top boom hoist cable pass through hole (14 ');
2) former headframe building roof (10) and large equipment hole for hoist (11), elevator mounting hole (12), people's row stair hole (13) and The pass through correspondence position up and down in hole (14) of boom hoist cable designs for opening, people's row stair (6) and above prolongs people's row stair (6 ') even Connect, it is described on prolong people's row stair (6 ') and be tiltedly mounted on new directive wheel support platform (19), new elevator support platform (20) Between;Mobile be installed in new elevator support platform of described elevator (7) is changed into moving up elevator (7 ');
3) top of the new driving (8 ') in new headframe upstairs portion's Framework Building (1 '), new directive wheel (3 ') is arranged on new guiding Take turns in support platform (19), new elevator (2 ') is arranged on new elevator support platform (20), new electric-control system (4 ') is installed On new directive wheel support platform (19);
4) steel wire rope (15) of new elevator (2 ') and hoisting container (5) connection.
2. a kind of tower bright shaft hoisting system of non-stop production reformation as claimed in claim 1, it is characterised in that:Described New headframe building framework (9) is made up of the combination of frame column (16), Vierendeel girder (17) and tie-beam (18), and frame column (16) is vertically pacified On ground, Vierendeel girder (17) is horizontally arranged on frame column (16), tie-beam (18) be horizontally arranged at frame column (16) with Between former headframe building (1).
3. a kind of tower bright shaft hoisting system of non-stop production reformation as claimed in claim 1, it is characterised in that:Described is new Headframe building framework (9) is made up of the combination of frame column (16), Vierendeel girder (17) and tie-beam (18), frame column (16) right angle setting On ground, Vierendeel girder (17) is horizontally arranged on frame column (16), and tie-beam (18) crosses the frame of former headframe building (1) and opposite side Set a roof beam in place (17) connect.
CN201620858809.2U 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system of non-stop production reformation Active CN206384699U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620858809.2U CN206384699U (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system of non-stop production reformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620858809.2U CN206384699U (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system of non-stop production reformation

Publications (1)

Publication Number Publication Date
CN206384699U true CN206384699U (en) 2017-08-08

Family

ID=59485599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620858809.2U Active CN206384699U (en) 2016-08-10 2016-08-10 A kind of tower bright shaft hoisting system of non-stop production reformation

Country Status (1)

Country Link
CN (1) CN206384699U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350639A (en) * 2018-12-21 2020-06-30 西门子歌美飒可再生能源公司 Platform positioning system, method of operating a platform positioning system and wind turbine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350639A (en) * 2018-12-21 2020-06-30 西门子歌美飒可再生能源公司 Platform positioning system, method of operating a platform positioning system and wind turbine

Similar Documents

Publication Publication Date Title
CN106241579B (en) A kind of tower bright shaft hoisting changes the non-stop production reformation method of console mode lifting
CN106545172A (en) A kind of installation method of high-altitude long-span steel truss
CN109110616B (en) Overhead telescopic construction elevator roof beam for elevator shaft traction and installation and use method thereof
CN103696774A (en) Development method of blind shaft frame for surface and underground parallel construction
CN104632088A (en) Petroleum drilling machine tower-shaped derrick sleeving mounting method
CN106050260B (en) A kind of tower bright shaft hoisting system non-stop production reformation method
CN103964285B (en) A kind of many rope floor types change tower interior shaft elevator system non-stop production reformation method
CN105971654A (en) Process for rapidly assembling shield-type hydraulic support underground
CN205222535U (en) Dismounting device of tower machine balancing weight piece
CN206384699U (en) A kind of tower bright shaft hoisting system of non-stop production reformation
CN200964317Y (en) Elevator hoistway lifter
CN103967503B (en) A kind of tower interior shaft Hoisting System non-stop production reformation method
CN107288640B (en) A kind of nothing is surely restricted self-supporting modularization vertical shaft driving and masonry construction device
CN104500117A (en) Repeated-support-free continuous support forepoling hydraulic support frame
CN103964284A (en) Non-production-stopping modifying method for hoisting system with multi-rope friction pulley for hoisting internal shaft
CN103277104A (en) Sinking platform in-well hanging equipment and method
CN105298500B (en) The method of headframe is changed to by steel headframe suitable for underground mining lifting system
CN103670449B (en) Coal bunker partial sealing support technology
CN201714388U (en) Rock drill bracket special for digging a tunnel
CN102887415B (en) Elevator
CN209337920U (en) It is a kind of for drop shaft, the interim lift headframe of ore storage bin
CN209179426U (en) A kind of elevator shaft steel construction section construction device
CN114476907B (en) Non-stop production reconstruction method for open shaft lifting system
CN217172894U (en) Temporary twisting-changing structure for coal mine shaft
CN216638711U (en) Hoisting assembly device and system of TBM in deep well coal mine low-clearance chamber

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.