CN206408952U - A kind of construction adhesion type lifts discharging platform - Google Patents

A kind of construction adhesion type lifts discharging platform Download PDF

Info

Publication number
CN206408952U
CN206408952U CN201720054587.3U CN201720054587U CN206408952U CN 206408952 U CN206408952 U CN 206408952U CN 201720054587 U CN201720054587 U CN 201720054587U CN 206408952 U CN206408952 U CN 206408952U
Authority
CN
China
Prior art keywords
screw rod
unloading platform
guide rail
wall
guide rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720054587.3U
Other languages
Chinese (zh)
Inventor
吕政建
蔡占国
亓培爱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Lianhai Construction Technology Co ltd
Original Assignee
Shandong Union New Type Building Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Union New Type Building Material Co Ltd filed Critical Shandong Union New Type Building Material Co Ltd
Priority to CN201720054587.3U priority Critical patent/CN206408952U/en
Application granted granted Critical
Publication of CN206408952U publication Critical patent/CN206408952U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种建筑施工附着式升降卸料平台,包括墙体和导轨架,所述导轨架通过穿墙螺栓固定设置在所述墙体上,所述导轨架上固定设置有导轨和升降机构,所述导轨竖直平行设置,所述升降机构包括卸料平台、电机和丝杆,所述卸料平台在靠近墙体的一侧设有滑套,所述卸料平台通过滑套与所述导轨滑动连接,所述丝杆位于所述导轨之间,且丝杆与所述导轨平行设置,所述丝杆的两端通过轴承活动设置在所述导轨架上,所述电机位于所述丝杆的顶端,且所述丝杆与所述电机传动连接,本实用新型操作简单,提升设备一次安装到位后即可,不需多次重复安装,为现场施工人员降低操作难度加快施工速,结构简单、安装与操作方便、能减少安全隐患。

The utility model discloses an attached lifting and unloading platform for building construction, which comprises a wall and a guide rail frame. The guide rail frame is fixedly arranged on the wall body through wall-through bolts. Lifting mechanism, the guide rails are vertically arranged in parallel, the lifting mechanism includes a discharge platform, a motor and a screw rod, the discharge platform is provided with a sliding sleeve on the side close to the wall, and the discharge platform passes through the sliding sleeve Slidingly connected with the guide rails, the screw rod is located between the guide rails, and the screw rod is arranged parallel to the guide rails, the two ends of the screw rod are movably arranged on the guide rail frame through bearings, and the motor is located on the The top of the screw rod, and the screw rod is connected with the motor transmission. The utility model is easy to operate, and the lifting device can be installed once in place without repeated installation. It reduces the difficulty of operation for the on-site construction personnel and speeds up the construction. High speed, simple structure, convenient installation and operation, and can reduce potential safety hazards.

Description

一种建筑施工附着式升降卸料平台A building construction attached lifting unloading platform

技术领域technical field

本实用新型涉及建筑器材技术领域,具体为一种建筑施工附着式升降卸料平台。The utility model relates to the technical field of building equipment, in particular to an attached lifting and unloading platform for building construction.

背景技术Background technique

卸料平台是施工现场常搭设各种临时性的操作台和操作架,能进行各种砌筑装修和粉刷等作业,一般来说,可在一定工期内用于承载物料,并在其中进行各种操作的构架式平台,称之为操作平台。操作平台分为移动式操作平台、落地式和悬挑式操作平台多种,也可称之为转料平台。在高层建筑的施工过程中,所使用的传统卸料平台为悬挑式结构,每上一层都需要拆除和重新搭设,无法配合爬架(工具式脚手架)的升降操作。不仅劳动强度大、施工效率低,而且还存在严重的安全隐患,十分不利于高层建筑施工。The unloading platform is a variety of temporary operating platforms and operating frames that are often set up on the construction site. It can perform various masonry decoration and painting operations. A structured platform for such operations is called an operating platform. The operation platform is divided into mobile operation platform, floor type and cantilever type operation platform, which can also be called transfer platform. In the construction process of high-rise buildings, the traditional unloading platform used is a cantilevered structure, and each upper floor needs to be dismantled and re-erected, which cannot cooperate with the lifting operation of the climbing frame (tool-type scaffolding). Not only the labor intensity is high, the construction efficiency is low, but also there are serious safety hazards, which is very unfavorable for the construction of high-rise buildings.

发明内容Contents of the invention

本实用新型的目的在于提供一种建筑施工附着式升降卸料平台,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide an attached lifting and unloading platform for building construction, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种建筑施工附着式升降卸料平台,包括墙体和导轨架,所述导轨架通过穿墙螺栓固定设置在所述墙体上,所述导轨架上固定设置有导轨和升降机构,所述导轨竖直平行设置,所述升降机构包括卸料平台、电机和丝杆,所述卸料平台在靠近墙体的一侧设有滑套,所述卸料平台通过滑套与所述导轨滑动连接,所述丝杆位于所述导轨之间,且丝杆与所述导轨平行设置,所述丝杆的两端通过轴承活动设置在所述导轨架上,所述电机位于所述丝杆的顶端,且所述丝杆与所述电机传动连接。In order to achieve the above purpose, the utility model provides the following technical solutions: a building construction attached lifting and unloading platform, including a wall and a guide rail frame, the guide rail frame is fixed on the wall through wall bolts, the A guide rail and a lifting mechanism are fixedly arranged on the guide rail frame. The guide rails are vertically arranged in parallel. The lifting mechanism includes a discharge platform, a motor and a screw mandrel. The discharge platform is provided with a sliding sleeve on the side close to the wall. The unloading platform is slidingly connected with the guide rails through a sliding sleeve, the screw rod is located between the guide rails, and the screw rod is arranged parallel to the guide rails, and the two ends of the screw rod are movably arranged on the guide rails through bearings. On the guide rail frame, the motor is located at the top of the screw rod, and the screw rod is connected to the motor in transmission.

优选的,所述丝杆穿过所述卸料平台,且所述卸料平台在与丝杆连接的位置设有螺纹孔,卸料平台与所述丝杆通过螺纹连接。Preferably, the screw rod passes through the unloading platform, and the unloading platform is provided with a threaded hole at a position connected to the screw rod, and the unloading platform is connected to the screw rod through threads.

优选的,所述卸料平台的底部焊接有支撑杆,所述支撑杆与所述导轨及卸料平台构成三角形结构。Preferably, a support rod is welded to the bottom of the unloading platform, and the support rod forms a triangular structure with the guide rail and the unloading platform.

优选的,所述导轨采用光滑的不锈钢,管径为50-80mm,所述滑套上设有紧固螺栓。Preferably, the guide rail is made of smooth stainless steel with a pipe diameter of 50-80mm, and fastening bolts are arranged on the sliding sleeve.

优选的,所述卸料平台上焊接有护栏。Preferably, guardrails are welded on the unloading platform.

与现有技术相比,本实用新型的有益效果是:本实用新型通过电机驱动丝杆转动,在丝杆转动的过程中带动卸料平台上下运动,卸料平台通过滑套与导轨向下滑动,防止卸料平台左右晃动,支撑杆与导轨及卸料平台构成三角形结构提高了强度,具有防倾覆、防坠落的优点,且优于以往市场的普通附着式升降脚手架,其安全可靠性更高,降低成本、减少管理费用,操作简单,提升设备一次安装到位后即可,不需多次重复安装,为现场施工人员降低操作难度加快施工速,结构简单、安装与操作方便、能减少安全隐患。Compared with the prior art, the beneficial effect of the utility model is: the utility model drives the screw to rotate through the motor, and drives the unloading platform to move up and down during the rotation of the screw, and the unloading platform slides downward through the sliding sleeve and the guide rail , to prevent the unloading platform from shaking left and right, the triangular structure formed by the support rod, the guide rail and the unloading platform improves the strength, has the advantages of anti-overturning and anti-falling, and is superior to ordinary attached lifting scaffolds in the past market, and its safety and reliability are higher , reduce costs, reduce management costs, simple operation, the lifting equipment can be installed once in place, no need to repeat the installation many times, reduce the difficulty of operation for the on-site construction personnel and speed up the construction speed, simple structure, convenient installation and operation, and can reduce potential safety hazards .

附图说明Description of drawings

图1为本实用新型的侧视结构示意图;Fig. 1 is the side view structural representation of the utility model;

图2为本实用新型正面结构示意图。Fig. 2 is a schematic diagram of the front structure of the utility model.

图中:1-滑套;2-墙体;3-穿墙螺栓;4-电机;5-导轨架;6-导轨;7-护栏;8-卸料平台;9-支撑杆;10-升降机构;11-丝杆;12-紧固螺栓。In the figure: 1- sliding sleeve; 2- wall; 3- wall bolt; 4- motor; 5- rail frame; 6- guide rail; 7- guardrail; 8- unloading platform; Mechanism; 11-screw mandrel; 12-fastening bolt.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-2,本实用新型提供一种技术方案:一种建筑施工附着式升降卸料平台,包括墙体2和导轨架5,所述导轨架5通过穿墙螺栓3固定设置在所述墙体2上,所述导轨架5上固定设置有导轨6和升降机构10,所述导轨6竖直平行设置,所述升降机构10包括卸料平台8、电机4和丝杆11,所述卸料平台8在靠近墙体2的一侧设有滑套1,所述卸料平台8通过滑套1与所述导轨6滑动连接,所述丝杆11位于所述导轨6之间,且丝杆11与所述导轨6平行设置,所述丝杆11的两端通过轴承活动设置在所述导轨架5上,所述电机4位于所述丝杆11的顶端,且所述丝杆11与所述电机4传动连接。Please refer to Figure 1-2, the utility model provides a technical solution: a building construction attached lifting and unloading platform, including a wall 2 and a guide rail frame 5, and the rail frame 5 is fixed on the wall through the wall bolt 3 On the wall 2, a guide rail 6 and a lift mechanism 10 are fixedly arranged on the guide rail frame 5, the guide rail 6 is vertically arranged in parallel, and the lift mechanism 10 includes a discharge platform 8, a motor 4 and a screw mandrel 11. The unloading platform 8 is provided with a sliding sleeve 1 on the side close to the wall 2, the unloading platform 8 is slidably connected with the guide rails 6 through the sliding sleeve 1, and the screw rod 11 is located between the guide rails 6, And screw mandrel 11 is arranged in parallel with described guide rail 6, and the two ends of described screw mandrel 11 are movably arranged on described guide rail frame 5 by bearing, and described motor 4 is positioned at the top of described screw mandrel 11, and described screw mandrel 11 11 is in drive connection with the motor 4 .

所述丝杆11穿过所述卸料平台8,且所述卸料平台8在与丝杆11连接的位置设有螺纹孔,卸料平台8与所述丝杆11通过螺纹连接;所述卸料平台8的底部焊接有支撑杆9,所述支撑杆9与所述导轨6及卸料平台8构成三角形结构;所述导轨6采用光滑的不锈钢,管径为50-80mm,所述滑套1上设有紧固螺栓12;所述卸料平台8上焊接有护栏7。The screw mandrel 11 passes through the unloading platform 8, and the unloading platform 8 is provided with a threaded hole at a position connected to the screw mandrel 11, and the unloading platform 8 is threadedly connected with the screw mandrel 11; The bottom of the discharge platform 8 is welded with a support rod 9, which forms a triangular structure with the guide rail 6 and the discharge platform 8; the guide rail 6 is made of smooth stainless steel with a pipe diameter of 50-80mm, and the slide The cover 1 is provided with fastening bolts 12; the unloading platform 8 is welded with a guardrail 7.

工作原理:该实用新型通过电机4驱动丝杆11转动,在丝杆11转动的过程中带动卸料平台8上下运动,卸料平台8通过滑套1与导轨6向下滑动,防止卸料平台8左右晃动,支撑杆9与导轨6及卸料平台8构成三角形结构提高了强度,具有防倾覆、防坠落的优点,且优于以往市场的普通附着式升降脚手架,其安全可靠性更高,降低成本、减少管理费用,操作简单,提升设备一次安装到位后即可,不需多次重复安装,为现场施工人员降低操作难度加快施工速,结构简单、安装与操作方便、能减少安全隐患。Working principle: The utility model drives the screw rod 11 to rotate through the motor 4, and drives the unloading platform 8 to move up and down during the rotation of the screw rod 11. The unloading platform 8 slides downward through the sliding sleeve 1 and the guide rail 6 to prevent the unloading platform 8 shakes left and right, and the triangular structure formed by the support rod 9, the guide rail 6 and the unloading platform 8 improves the strength, has the advantages of anti-overturning and anti-falling, and is superior to ordinary attached lifting scaffolds in the past market, and its safety and reliability are higher. Reduce costs, reduce management costs, simple operation, the lifting equipment can be installed once in place, no need to repeat the installation many times, reduce the difficulty of operation for the on-site construction personnel and speed up the construction speed, simple structure, convenient installation and operation, and can reduce potential safety hazards.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (5)

1.一种建筑施工附着式升降卸料平台,包括墙体(2)和导轨架(5),其特征在于:所述导轨架(5)通过穿墙螺栓(3)固定设置在所述墙体(2)上,所述导轨架(5)上固定设置有导轨(6)和升降机构(10),所述导轨(6)竖直平行设置,所述升降机构(10)包括卸料平台(8)、电机(4)和丝杆(11),所述卸料平台(8)在靠近墙体(2)的一侧设有滑套(1),所述卸料平台(8)通过滑套(1)与所述导轨(6)滑动连接,所述丝杆(11)位于所述导轨(6)之间,且丝杆(11)与所述导轨(6)平行设置,所述丝杆(11)的两端通过轴承活动设置在所述导轨架(5)上,所述电机(4)位于所述丝杆(11)的顶端,且所述丝杆(11)与所述电机(4)传动连接。1. An attached lifting and unloading platform for building construction, including a wall (2) and a rail frame (5), characterized in that: the rail frame (5) is fixed on the wall through the wall bolt (3) On the body (2), the guide rail frame (5) is fixed with a guide rail (6) and a lifting mechanism (10), the guide rail (6) is vertically arranged in parallel, and the lifting mechanism (10) includes a discharge platform (8), motor (4) and screw rod (11), the unloading platform (8) is provided with a sliding sleeve (1) on the side close to the wall (2), and the unloading platform (8) passes through The sliding sleeve (1) is slidingly connected with the guide rails (6), the screw rod (11) is located between the guide rails (6), and the screw rod (11) is arranged parallel to the guide rails (6), the Both ends of the screw rod (11) are movably arranged on the rail frame (5) through bearings, the motor (4) is located at the top of the screw rod (11), and the screw rod (11) and the Motor (4) transmission connection. 2.根据权利要求1所述的一种建筑施工附着式升降卸料平台,其特征在于:所述丝杆(11)穿过所述卸料平台(8),且所述卸料平台(8)在与丝杆(11)连接的位置设有螺纹孔,卸料平台(8)与所述丝杆(11)通过螺纹连接。2. A building construction attached lifting unloading platform according to claim 1, characterized in that: the screw rod (11) passes through the unloading platform (8), and the unloading platform (8 ) is provided with a threaded hole at the position connected with the screw rod (11), and the unloading platform (8) is connected with the screw rod (11) through threads. 3.根据权利要求1所述的一种建筑施工附着式升降卸料平台,其特征在于:所述卸料平台(8)的底部焊接有支撑杆(9),所述支撑杆(9)与所述导轨(6)及卸料平台(8)构成三角形结构。3. A building construction attached lifting unloading platform according to claim 1, characterized in that: the bottom of the unloading platform (8) is welded with a support rod (9), and the support rod (9) and The guide rail (6) and the unloading platform (8) form a triangular structure. 4.根据权利要求1所述的一种建筑施工附着式升降卸料平台,其特征在于:所述导轨(6)采用光滑的不锈钢,管径为50-80mm,所述滑套(1)上设有紧固螺栓(12)。4. The building construction attached lifting and unloading platform according to claim 1, characterized in that: the guide rail (6) is made of smooth stainless steel with a pipe diameter of 50-80 mm, and the sliding sleeve (1) is A fastening bolt (12) is provided. 5.根据权利要求1所述的一种建筑施工附着式升降卸料平台,其特征在于:所述卸料平台(8)上焊接有护栏(7)。5. The building construction attached lifting unloading platform according to claim 1, characterized in that a guardrail (7) is welded on the unloading platform (8).
CN201720054587.3U 2017-01-18 2017-01-18 A kind of construction adhesion type lifts discharging platform Expired - Fee Related CN206408952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720054587.3U CN206408952U (en) 2017-01-18 2017-01-18 A kind of construction adhesion type lifts discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720054587.3U CN206408952U (en) 2017-01-18 2017-01-18 A kind of construction adhesion type lifts discharging platform

Publications (1)

Publication Number Publication Date
CN206408952U true CN206408952U (en) 2017-08-15

Family

ID=59556209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720054587.3U Expired - Fee Related CN206408952U (en) 2017-01-18 2017-01-18 A kind of construction adhesion type lifts discharging platform

Country Status (1)

Country Link
CN (1) CN206408952U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107522136A (en) * 2017-09-03 2017-12-29 李保龙 A kind of railroad bridge construction lowering or hoisting gear
CN108147311A (en) * 2017-12-27 2018-06-12 宁波联创同宇环保科技有限公司 A kind of material lifting platform and its method for improving
CN108217162A (en) * 2017-12-26 2018-06-29 周远桂 A kind of construction material transfer equipment
CN108910760A (en) * 2018-08-08 2018-11-30 北京鼎翰科技有限公司 A kind of high-building construction elevator material-receiving device
CN110130628A (en) * 2019-04-28 2019-08-16 四川航天建筑工程有限公司 Attaching scaffold and its erection method
CN110499916A (en) * 2019-08-31 2019-11-26 杭州昂创科技有限公司 Exempt from the construction method through walls for increasing anchorage support pull folding discharging platform
CN113123614A (en) * 2021-06-16 2021-07-16 韦氏(苏州)医疗科技有限公司 Purified glass wallboard installation auxiliary device and installation method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107522136A (en) * 2017-09-03 2017-12-29 李保龙 A kind of railroad bridge construction lowering or hoisting gear
CN108217162A (en) * 2017-12-26 2018-06-29 周远桂 A kind of construction material transfer equipment
CN108147311A (en) * 2017-12-27 2018-06-12 宁波联创同宇环保科技有限公司 A kind of material lifting platform and its method for improving
CN108910760A (en) * 2018-08-08 2018-11-30 北京鼎翰科技有限公司 A kind of high-building construction elevator material-receiving device
CN110130628A (en) * 2019-04-28 2019-08-16 四川航天建筑工程有限公司 Attaching scaffold and its erection method
CN110499916A (en) * 2019-08-31 2019-11-26 杭州昂创科技有限公司 Exempt from the construction method through walls for increasing anchorage support pull folding discharging platform
CN110499916B (en) * 2019-08-31 2021-08-13 杭州昂创科技有限公司 Construction method of wall-penetration-free heightening, anchoring, supporting, pulling and folding type unloading platform
CN113123614A (en) * 2021-06-16 2021-07-16 韦氏(苏州)医疗科技有限公司 Purified glass wallboard installation auxiliary device and installation method thereof

Similar Documents

Publication Publication Date Title
CN206408952U (en) A kind of construction adhesion type lifts discharging platform
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN113789948A (en) A large-span roofed atrium side wall slide rail hanging basket and its construction method
CN203173644U (en) Multifunctional lifting shaft working platform system
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN203947752U (en) The servicing unit of building by laying bricks or stones for coke oven flue vault
CN207468059U (en) A kind of telescopic tower crane people row escape way
CN212249184U (en) Electric creeping formwork device for building construction
CN207609153U (en) A kind of elevator liftable construction operation platform
CN206467991U (en) The operation platform that a kind of building main body construction protection and exterior wall finishing are integrated
CN206172883U (en) Large pipe support promotes device of taking one's place
CN205777580U (en) Automatic lifting type discharging platform
CN114165040B (en) Safety device for construction site of steel structure building engineering
CN201099575Y (en) Hanging basket rotatable material lifting equipment
CN109763639A (en) A kind of super high-rise ceiling special construction work platform and construction method thereof
CN211173071U (en) Light climbing formwork steel frame system
CN218292712U (en) But height-adjusting's scaffold frame for house construction
CN104806002A (en) High-rise construction lifting safe protective screen
CN103359625A (en) Automatic construction equipment for building hoisting and platform elevating of new rural construction
CN111677261A (en) A sliding guide rail type operating platform for ceiling construction
CN201915614U (en) Integral electric climbing frame suitable for shear wall structure
CN110219452A (en) Protective frame and its lift structure
CN205857729U (en) A kind of deflection is encorbelmented interior pull-type sliding and lifting device
CN110185249A (en) Protective frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 271100 No. 2, middle Park Road, Niuquan Town, Laiwu District, Jinan City, Shandong Province

Patentee after: SHANDONG LIANHAI CONSTRUCTION TECHNOLOGY Co.,Ltd.

Address before: No. 2, Yuanyuan Middle Road, Niuquan Town, Laicheng District, Laiwu City, Shandong Province, 271124

Patentee before: SHANDONG LIANHAI NOVEL BUILDING MATERIAL CO.,LTD.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170815

CF01 Termination of patent right due to non-payment of annual fee