CN207020522U - One kind is based on BIM sewage disposal remote monitoring systems - Google Patents
One kind is based on BIM sewage disposal remote monitoring systems Download PDFInfo
- Publication number
- CN207020522U CN207020522U CN201720922879.4U CN201720922879U CN207020522U CN 207020522 U CN207020522 U CN 207020522U CN 201720922879 U CN201720922879 U CN 201720922879U CN 207020522 U CN207020522 U CN 207020522U
- Authority
- CN
- China
- Prior art keywords
- bim
- electrically connected
- monitoring systems
- sewage disposal
- database server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Sewage (AREA)
Abstract
The utility model discloses one kind to be based on BIM sewage disposal remote monitoring systems, including multiple front end pumping station monitoring systems, collection host computer, database server, BIM servers and at least one BIM terminating machines;Multiple front end pumping station monitoring systems carry out data monitoring and information monitoring to multiple pumping plants respectively;The collection host computer is acquired, filters and handled to the data message of multiple front end pumping station monitoring systems;The collection host computer is electrically connected with the database server, and the database server is electrically connected with the BIM servers, and at least one BIM terminating machines receive the data message of database server and the BIM servers, and carry out real-time display;The disposition of sewage can be monitored in real time, and form model and be monitored, sewage situation is made and timely and effectively tackled, and sewage situation data can be managed collectively, for the follow-up validity and accuracy for providing reference data, improving processing.
Description
Technical field
Sewage management system is the utility model is related to, more particularly to one kind is based on BIM sewage disposal remote monitoring systems.
Background technology
Often there is the problem of urban waterlogging in existing environment, the upgrading, flood control to urban drainage pipe network are met an urgent need
Speedily carry out rescue work, routine servicing maintenance management proposes more urgent information-based requirement;Existing urban pipe network system does not have information
Change management, be all much manually operated, scene is not equipped with robot control system(RCS), is unfavorable for Sewage Disposal to equipment of pumping station state and instrument
The real-time detections of table data, can not system sewage network is controlled, effectively solve problem, also data do not entered
The effective unified management of row, causes many contingency questions not to be resolved.
Utility model content
The utility model purpose is to provide one kind and is based on BIM sewage disposal remote monitoring systems, solves in the prior art not
The problem of sewage situation can be monitored in real time, solution fully rely on manually-operated present situation in the prior art, solve in the prior art
Data can not be accomplished with effectively automatic record, cause many contingency questions can not reflect the problem of being conveniently resolved in time.
The utility model solves technical problem and adopted the following technical scheme that:One kind is based on BIM sewage disposal remote monitorings system
System, including multiple front end pumping station monitoring systems, collection host computer, database server, BIM servers and at least one BIM are whole
Terminal;Multiple front end pumping station monitoring systems carry out data monitoring and information monitoring to multiple pumping plants respectively;It is multiple it is described before
End pumping station monitoring system is electrically connected by VPN and the collection host computer, and the collection host computer is to multiple front end pumps
The data message for monitoring system of standing is acquired, filters and handled;The collection host computer is electrically connected with the database server,
The database server is electrically connected with the BIM servers, at least one BIM terminating machines respectively with the database service
Device and BIM servers are electrically connected;At least one BIM terminating machines receive the data of database server and the BIM servers
Information, and carry out real-time display.
Preferably, the front end pumping station monitoring system includes PLC, digital video recorder, at least one shooting
Machine, vpn routers, at least one immersible pump, at least one electrically operated valve, at least one grid, at least one flowmeter and extremely
A few tank gage;The water inlet of the immersible pump is provided with grid, and the electrically operated valve enters to the Inlet and outlet water of the immersible pump
Row control, uniformly the PLC is electrically connected for the immersible pump, electrically operated valve, flowmeter and tank gage;It is described at least one to take the photograph
Camera is electrically connected with the digital video recorder, and at least one video camera carries out IMAQ, the VPN routes to pumping plant
Device is electrically connected with the PLC and multiple video cameras;The vpn routers are electrically connected with the collection host computer.
Preferably, in addition to pipe network monitor system and sewage disposal monitoring system, the pipe network monitor system is to multiple pumps
Pipeline between standing is monitored, and the sewage disposal monitoring system is monitored to sewage disposal;The pipe network monitor system,
Multiple front end pumping station monitoring systems and sewage disposal monitoring system pass through VPN and the upper electromechanics of collection
Even.
Preferably, the front end pumping station monitoring system also includes flowmeter well and steel sheet pile, and the steel sheet pile is in inside
Empty structure, the flowmeter well are arranged in the steel sheet pile, flowmeter are provided with the pipeline of pumping plant, and the pipeline is worn
The steel sheet pile and the flowmeter well are crossed, the flowmeter is located in the flowmeter well.
Preferably, in addition to WEB server, the WEB server connect with database server communication.
The utility model has the advantages that:The disposition of sewage can be monitored in real time, and form model and supervised
Control, is made to sewage situation and timely and effectively tackling, and sewage situation data can be managed collectively, and reference is provided to be follow-up
Data, improve the validity and accuracy of processing.
Brief description of the drawings
Fig. 1 is the line assumption diagram based on BIM sewage disposal remote monitoring systems;
Fig. 2 is the line assumption diagram of front end pumping station monitoring system;
Fig. 3 is flowmeter well and steel sheet pile setting structure schematic diagram.
Mark is illustrated as in figure:1- front ends pumping station monitoring system;2- gathers host computer;3- database servers;4-BIM takes
Business device;5-BIM terminating machines;6-PLC controllers;7- digital video recorders;8- video cameras;9-VPN routers;10- immersible pumps;
11- electrically operated valves;12- grids;13- flowmeters;14- tank gages;15- pipe network monitor systems;16- sewage disposal monitoring systems;
17- flowmeter wells;18- steel sheet piles.
Embodiment
The technical solution of the utility model is further elaborated with reference to embodiment and accompanying drawing.
Embodiment 1
As shown in figure 1, the present embodiment, which provides one kind, is based on BIM sewage disposal remote monitoring systems, including multiple front end pumps
Monitoring system of standing 1, collection host computer 2, database server 3, BIM servers 4 and at least one BIM terminating machines 5;It is multiple described
Front end pumping station monitoring system 1 carries out data monitoring and information monitoring to multiple pumping plants respectively;Multiple front end pumps station systems
System 1 is electrically connected by VPN and the collection host computer 2, and the collection host computer 2 is to multiple front end pumps station systems
The data message of system 1 is acquired, filters and handled;The collection host computer 2 is electrically connected with the database server 3, described
Database server 3 is electrically connected with the BIM servers 4, at least one BIM terminating machines 5 respectively with the database service
Device 3 and BIM servers 4 are electrically connected;At least one BIM terminating machines 5 receive database server 3 and the BIM servers 4
Data message, and carry out real-time display.
The flow, water level and real-time image information of multiple pumping plants are acquired using front end pumping station monitoring system 1, passed through
Collection host computer 2 is integrated, filtered and handled to resulting information, and database server 3 is combined with BIM servers 4,
Display model and real data and the switching monitoring of image on BIM terminating machines 5.Database server 3 can be constantly to history number
According to record processing is carried out, make operation management system every time no longer since initial data, but accumulated in a process data
On platform, monitoring processing to sewage etc. is analyzed, checked and simulated comprehensively;And sewage situation data can be carried out with unified pipe
Reason, for the follow-up validity and accuracy for providing reference data, improving processing.
As shown in Fig. 2 the front end pumping station monitoring system 1 includes PLC 6, digital video recorder 7, at least one
Individual video camera 8, vpn routers 9, at least one immersible pump 10, at least one electrically operated valve 11, at least one grid 12, at least
One flowmeter 13 and at least one tank gage 14;The water inlet of the immersible pump 10 is provided with grid 12, the electrically operated valve
The Inlet and outlet water of 11 pairs of immersible pumps 10 is controlled, and the immersible pump 10, electrically operated valve 11, flowmeter 13 and tank gage 14 are equal
The even PLC 6 is electrically connected;At least one video camera 8 is electrically connected with the digital video recorder 7, at least one institute
State video camera 8 and IMAQ is carried out to pumping plant, the vpn routers 9 carry out electricity with the PLC 6 and multiple video cameras 8
Even;The vpn routers 9 are electrically connected with the collection host computer 2.The switch of immersible pump 10 is controlled by PLC 6,
And by flowmeter 13 and the monitoring record water-carrying capacity of tank gage 14 and water level, transfer data to vpn routers 9;Digitally recorded video
The image information imprinting that camera 7 gathers at least one video camera 8 sends vpn routers 9 to, by vpn routers 9 by information
It is driven and gives collection host computer 2.
As shown in figure 1, pipe network monitor system 15 and dirt further may include based on BIM sewage disposal remote monitoring systems
Water process monitoring system 16, the pipe network monitor system 15 are monitored to the pipeline between multiple pumping plants, the sewage disposal
Monitoring system 16 is monitored to sewage disposal;The pipe network monitor system 15, multiple front end pumping station monitoring systems 1 and dirt
Water process monitoring system 16 is electrically connected by VPN and the collection host computer 2.
As shown in figure 3, preferably front end pumping station monitoring system 1 described further also includes the He of flowmeter well 17 to the present embodiment
Steel sheet pile 18, the steel sheet pile 18 are the structure of inner hollow, and the flowmeter well 17 is arranged in the steel sheet pile 18, pumping plant
Pipeline on be provided with flowmeter 13, and the pipeline is through the steel sheet pile 18 and the flowmeter well 17, the flowmeter
13 in the flowmeter well 17.
In transformation process is carried out for original pipe network, there are very much pipe network or pumping plant to be fitted without flowmeter 13 in itself, for
Pumping plant in online operation, the installation of flowmeter 13 need to cut off the water just implement, so, the construction time pair that flowmeter 13 is installed
The operation of sewage our station has considerable influence, if the time is oversize, sewage can not be discharged normally, can cause shadow to the enterprise of service and resident
Ring, flowmeter well 17 and steel sheet pile 18 are set, when mounted, can directly dig pit, steel sheet pile 18 and flowmeter well 17 are assembled in
On pipeline, when cutting off the water supply the short time between replace need to set the former duct section of flowmeter 13, can water flowing immediately, road surface can be recovered.
The preferable further embodiment of the present embodiment, WEB service is also included based on BIM sewage disposals remote monitoring system
Device, the WEB server connect with database server communication.B/S system architectures can be used, using WEB server, if
The UNICOM for putting the smart machines such as mobile phone, palm PC uses, and sets related APP cell phone softwares information transmission platform.
The sequencing of above example only for ease of describing, does not represent the quality of embodiment.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations;
Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:
It can still modify to the technical scheme described in foregoing embodiments, or which part technical characteristic is carried out etc.
With replacement;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the utility model technology
The spirit and scope of scheme.
Claims (5)
1. one kind is based on BIM sewage disposal remote monitoring systems, it is characterised in that including multiple front end pumping station monitoring systems, adopts
Collect host computer, database server, BIM servers and at least one BIM terminating machines;
Multiple front end pumping station monitoring systems carry out data monitoring and information monitoring to multiple pumping plants respectively;Multiple front ends
Pumping station monitoring system is electrically connected by VPN and the collection host computer, and the collection host computer is to multiple front end pumping plants
The data message of monitoring system is acquired, filters and handled;
The collection host computer is electrically connected with the database server, and the database server is electrically connected with the BIM servers,
At least one BIM terminating machines are electrically connected with the database server and BIM servers respectively;At least one BIM is whole
Terminal receives the data message of database server and the BIM servers, and carries out real-time display.
2. according to claim 1 be based on BIM sewage disposal remote monitoring systems, it is characterised in that the front end pumping plant
Monitoring system include PLC, digital video recorder, at least one video camera, vpn routers, at least one immersible pump,
At least one electrically operated valve, at least one grid, at least one flowmeter and at least one tank gage;
The water inlet of the immersible pump is provided with grid, and the electrically operated valve is controlled to the Inlet and outlet water of the immersible pump, institute
Stating immersible pump, electrically operated valve, flowmeter and tank gage, uniformly the PLC is electrically connected;At least one video camera and institute
Digital video recorder is stated to be electrically connected, at least one video camera to pumping plant carry out IMAQ, the vpn routers with it is described
PLC and multiple video cameras are electrically connected;
The vpn routers are electrically connected with the collection host computer.
3. according to claim 2 be based on BIM sewage disposal remote monitoring systems, it is characterised in that is also supervised including pipe network
Control system and sewage disposal monitoring system, the pipe network monitor system are monitored to the pipeline between multiple pumping plants, the dirt
Water process monitoring system is monitored to sewage disposal;
The pipe network monitor system, multiple front end pumping station monitoring systems and sewage disposal monitoring system pass through Virtual Private Network
Network is electrically connected with the collection host computer.
4. according to claim 3 be based on BIM sewage disposal remote monitoring systems, it is characterised in that the front end pumping plant
Monitoring system also includes flowmeter well and steel sheet pile, and the steel sheet pile is the structure of inner hollow, and the flowmeter well is arranged on
In the steel sheet pile, flowmeter is provided with the pipeline of pumping plant, and the pipeline passes through the steel sheet pile and the flowmeter well,
The flowmeter is located in the flowmeter well.
5. according to claim 1-4 any one based on BIM sewage disposal remote monitoring systems, it is characterised in that also
Including WEB server, the WEB server connects with database server communication.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720922879.4U CN207020522U (en) | 2017-07-27 | 2017-07-27 | One kind is based on BIM sewage disposal remote monitoring systems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720922879.4U CN207020522U (en) | 2017-07-27 | 2017-07-27 | One kind is based on BIM sewage disposal remote monitoring systems |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207020522U true CN207020522U (en) | 2018-02-16 |
Family
ID=61482388
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720922879.4U Expired - Fee Related CN207020522U (en) | 2017-07-27 | 2017-07-27 | One kind is based on BIM sewage disposal remote monitoring systems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207020522U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109267612A (en) * | 2018-11-13 | 2019-01-25 | 株洲珠华智慧水务科技有限公司 | One kind being based on BIM water transfer pipe network Stress management systems |
CN111115727A (en) * | 2020-01-02 | 2020-05-08 | 中建一局华江建设有限公司 | Rural sewage treatment system and method |
CN111709656A (en) * | 2020-06-22 | 2020-09-25 | 苏州柝创智慧建筑科技有限公司 | Shield tunnel construction management system based on BIM |
CN113608470A (en) * | 2021-08-04 | 2021-11-05 | 苏州思萃融合基建技术研究所有限公司 | Rainwater flood control pump station state monitoring method and device based on BIM information platform |
-
2017
- 2017-07-27 CN CN201720922879.4U patent/CN207020522U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109267612A (en) * | 2018-11-13 | 2019-01-25 | 株洲珠华智慧水务科技有限公司 | One kind being based on BIM water transfer pipe network Stress management systems |
CN109267612B (en) * | 2018-11-13 | 2024-03-26 | 株洲珠华智慧水务科技有限公司 | BIM-based water delivery pipe network pressure management system |
CN111115727A (en) * | 2020-01-02 | 2020-05-08 | 中建一局华江建设有限公司 | Rural sewage treatment system and method |
CN111709656A (en) * | 2020-06-22 | 2020-09-25 | 苏州柝创智慧建筑科技有限公司 | Shield tunnel construction management system based on BIM |
CN113608470A (en) * | 2021-08-04 | 2021-11-05 | 苏州思萃融合基建技术研究所有限公司 | Rainwater flood control pump station state monitoring method and device based on BIM information platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207020522U (en) | One kind is based on BIM sewage disposal remote monitoring systems | |
CN104950855A (en) | Town sewage plant and pump station operation monitoring management system and town sewage plant and pump station operation monitoring management method | |
CN110322027A (en) | A kind of domestic sewage in rural areas Internet of Things management platform | |
CN110535845A (en) | A kind of GROUP OF HYDROPOWER STATIONS remote date transmission method, system, terminal and storage medium based on Internet of Things | |
CN101622952A (en) | Water management informatization structure system of irrigation district | |
CN104766173A (en) | Digital water supply management system and method | |
CN112437116A (en) | Sewage treatment wisdom operation system based on thing networking and cloud platform | |
CN206021060U (en) | Urban Drainage Pumping Stations intelligent linkage control system | |
CN109905406A (en) | A kind of drainage pipeline networks monitoring system based on big data | |
CN111665766A (en) | Water affair intelligent monitoring system based on thing networking | |
CN106292596A (en) | A kind of sewage treatment plant intelligent management expert diagnostic system | |
CN110223411A (en) | A kind of public water dispenser cruising inspection system and method | |
CN205102881U (en) | Distributing type water level measurement device | |
CN117072883A (en) | Urban drainage pipe network remote monitoring maintenance system based on Internet of things technology | |
CN112330491A (en) | Water supply and drainage system based on wisdom water utilities | |
CN206114005U (en) | Irrigated area hydrological information remote supervising system | |
CN114640828A (en) | Factory network river and lake integrated operation monitoring and early warning system based on pipe network GIS | |
CN204490681U (en) | A kind of wireless monitor Sewage treatment systems | |
CN106647579B (en) | A kind of sewage collecting pipe network information networked control systems and method | |
CN107606490A (en) | A kind of drainage pipeline networks monitoring system based on big data | |
CN208314510U (en) | A kind of dust-proof automatic monitoring processing system based on BIM technology | |
CN203746223U (en) | Internet of things technology-based mechanical equipment expert system | |
CN207380516U (en) | A kind of sewage disposal remote centralized monitoring system | |
CN205899337U (en) | Remote monitoring and management system of sewage factory based on network and control technique combine together | |
CN107703894A (en) | A kind of drainage pipeline networks remotely monitors SCADA system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180216 Termination date: 20180727 |