CN111709656A - Shield tunnel construction management system based on BIM - Google Patents

Shield tunnel construction management system based on BIM Download PDF

Info

Publication number
CN111709656A
CN111709656A CN202010571585.8A CN202010571585A CN111709656A CN 111709656 A CN111709656 A CN 111709656A CN 202010571585 A CN202010571585 A CN 202010571585A CN 111709656 A CN111709656 A CN 111709656A
Authority
CN
China
Prior art keywords
bim
data
construction
management system
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010571585.8A
Other languages
Chinese (zh)
Inventor
桑林华
黄旭艳
李燕燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Guanchuang Intelligent Building Technology Co ltd
Original Assignee
Suzhou Guanchuang Intelligent Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Guanchuang Intelligent Building Technology Co ltd filed Critical Suzhou Guanchuang Intelligent Building Technology Co ltd
Priority to CN202010571585.8A priority Critical patent/CN111709656A/en
Publication of CN111709656A publication Critical patent/CN111709656A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention belongs to the technical field of tunnel construction management, and particularly relates to a shield method tunnel construction management system based on BIM, which comprises the following steps: the system comprises a plurality of data acquisition ends, a plurality of data acquisition ends and a data processing module, wherein the data acquisition ends are respectively arranged on each acquisition station of a construction end and used for acquiring station construction conditions; the output end of the data acquisition end is connected with the data transmission server, and the data acquired by the data acquisition end is transmitted through the data transmission server; BIM handles the end, the data acquisition end passes through data transmission server and handles the end with the data transmission who gathers BIM, BIM handles the end and includes the computer of integrated BIM system and the construction management system of integration in the computer, can carry out real-time supervision to the different construction position in tunnel that the shield constructs the method construction to the condition monitoring inside the tunnel, can discover the condition fast and solve the problem when the emergence condition, raise the efficiency.

Description

Shield tunnel construction management system based on BIM
Technical Field
The invention relates to the technical field of tunnel construction management, in particular to a shield method tunnel construction management system based on BIM.
Background
A tunnel is a building constructed underground or underwater or in a mountain, with railways or roads for motor vehicles to pass through. The tunnel can be divided into three categories of mountain tunnels, underwater tunnels and urban tunnels according to the positions of the tunnels. A tunnel traversing from a mountain or under a hill to shorten the distance and avoid a large slope is called a mountain tunnel; underwater tunnels passing under a river or sea floor to cross a river or channel; urban tunnels are used to cross underground cities to meet the needs of railways to pass through large cities.
In the field of tunnel construction nowadays, in order to ensure construction progress and quality, most of the existing methods are to monitor the construction process by filling a series of paper forms and inputting by a computer in a later period through special personnel, but because the forms are numerous, the form presentation mode is not intuitive enough and other factors, so that the tracing of the construction problem in the later period is complicated and the efficiency is low, and the monitoring strength of people on tunnel construction is greatly weakened.
Disclosure of Invention
The invention aims to provide a shield tunnel construction management system based on BIM (building information modeling), which aims to solve the problems that the construction process is monitored by personnel who fill a series of paper forms and input by a computer at the later stage in the background technology, but the construction problem is complicated to trace and low in efficiency at the later stage due to the factors of numerous forms, insufficient visual form presentation modes and the like, and the monitoring strength of people on tunnel construction is greatly weakened.
In order to achieve the purpose, the invention provides the following technical scheme: a shield method tunnel construction management system based on BIM includes:
the system comprises a plurality of data acquisition ends, a plurality of data acquisition ends and a data processing module, wherein the data acquisition ends are respectively arranged on each acquisition station of a construction end and used for acquiring station construction conditions;
the output end of the data acquisition end is connected with the data transmission server, and the data acquired by the data acquisition end is transmitted through the data transmission server;
BIM handles the end, the data acquisition end passes through data transmission server and handles the end with the data transmission who gathers BIM, BIM handles the end including the computer of integrated BIM system and the construction management system of integration in the computer, and the station data transmission that the data acquisition end gathered handles the end to BIM, and BIM system detects the distribution and transmits to the construction management system to the station data of gathering, and the construction management system receives the station data of gathering and judges the station data of gathering:
when the collected station data does not meet the construction requirement of the station, the construction management system makes an unqualified indication;
when the collected station data meets the construction requirements of the station, the construction management system makes a qualified instruction;
the collected work position data is judged by the BIM processing terminal and then stored in the database, the information in the database can be updated, and after the same work position data is submitted to the database, the new work position data covers the old work position data;
the output end of the BIM processing end is connected with the warning reminding end, and when the construction management system does a disqualification indication, the warning reminding end receives the BIM processing end and performs a warning function;
when the construction management system makes an unqualified indication, the BIM processing end reminds the staff to carry out secondary construction on the construction position which does not meet the station construction requirement until the detected station construction data meets the station construction requirement.
Preferably, the data acquisition end comprises an RFID acquisition end, a manual filling end and an image acquisition end.
Preferably, the manual filling end is used for manually filling and uploading the collected information.
Preferably, the image acquisition end is a high-definition camera, the high-definition camera is a high-definition camera with an infrared night vision assembly, and the high-definition camera is driven to rotate through a rotating mechanism.
Preferably, the rotating mechanism is a speed reduction driving motor, a mounting plate is connected to the output end of the speed reduction driving motor, and the high-definition camera is mounted on the mounting plate.
Preferably, the warning reminding end comprises a warning alarm lamp and a warning loudspeaker.
Preferably, an RFID identification end matched with the RFID acquisition end is integrated in the data transmission server, and the RFID identification end identifies the acquired data of the RFID acquisition end.
Compared with the prior art, the invention has the beneficial effects that:
1) the method can monitor different construction positions of the tunnel constructed by the shield method in real time, thereby monitoring the condition inside the tunnel, quickly finding the condition and solving the problem when the condition occurs, improving the efficiency and avoiding the problem expansion;
2) through electronic informatization data acquisition, the use of manpower can be reduced, and the accuracy and the effectiveness of information acquisition are improved, so that the problems can be quickly solved;
3) different position information can be acquired simultaneously, and therefore information acquisition efficiency is improved.
Drawings
FIG. 1 is a logic block diagram of the system of the present invention;
FIG. 2 is a logic block diagram of the data acquisition end system of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Example (b):
referring to fig. 1-2, the present invention provides a technical solution: a shield method tunnel construction management system based on BIM includes:
the system comprises a plurality of data acquisition ends, a plurality of data acquisition ends and a data processing module, wherein the data acquisition ends are respectively arranged on each acquisition station of a construction end and used for acquiring station construction conditions;
the output end of the data acquisition end is connected with the data transmission server, and the data acquired by the data acquisition end is transmitted through the data transmission server;
BIM handles the end, the data acquisition end passes through data transmission server and handles the end with the data transmission who gathers BIM, BIM handles the end including the computer of integrated BIM system and the construction management system of integration in the computer, and the station data transmission that the data acquisition end gathered handles the end to BIM, and BIM system detects the distribution and transmits to the construction management system to the station data of gathering, and the construction management system receives the station data of gathering and judges the station data of gathering:
when the collected station data does not meet the construction requirement of the station, the construction management system makes an unqualified indication;
when the collected station data meets the construction requirements of the station, the construction management system makes a qualified instruction;
the collected work position data is judged by the BIM processing terminal and then stored in the database, the information in the database can be updated, and after the same work position data is submitted to the database, the new work position data covers the old work position data;
the output end of the BIM processing end is connected with the warning reminding end, and when the construction management system does a disqualification indication, the warning reminding end receives the BIM processing end and performs a warning function;
when the construction management system makes an unqualified indication, the BIM processing end reminds the staff to carry out secondary construction on the construction position which does not meet the station construction requirement until the detected station construction data meets the station construction requirement.
Further, the data acquisition end comprises an RFID acquisition end, a manual filling end and an image acquisition end.
Further, the manual filling end is used for manually filling and uploading the collected information.
Further, the image acquisition end is high definition digtal camera, high definition digtal camera is the high definition digtal camera that has infrared night vision subassembly, high definition digtal camera passes through rotary mechanism drive and rotates.
Further, rotary mechanism is speed reduction driving motor, be connected with the mounting panel on speed reduction driving motor's the output, high definition digtal camera installs on the mounting panel.
Further, the warning reminding end comprises a warning alarm lamp and a warning loudspeaker.
Furthermore, an RFID identification end matched with the RFID acquisition end is integrated in the data transmission server, and the RFID identification end identifies the acquired data of the RFID acquisition end.
The working principle is as follows: the shield tunnel construction method is a method for constructing a tunnel by using a shield machine, controlling an excavation surface and surrounding rocks not to collapse and destabilize, tunneling the tunnel, discharging slag, assembling duct pieces in the machine to form a lining, implementing grouting after the wall, and not disturbing the surrounding rocks.
The tunnel underground excavation construction method adopts a shield tunneling machine for excavation and takes reinforced concrete segments as lining supports. The shield of the shield machine is a cutter head and a pressure chamber which keep the stability of the excavation surface, and a shield steel shell which supports the surrounding rock. The term "construction" refers to a duct piece and a post-grouting body that constitute a tunnel lining.
Installing the data acquisition end at each acquisition point according to the requirement;
the data acquisition end acquires data on the working condition of the acquisition point, wherein the acquired data comprises tunnel size, angle and the like;
the method comprises the steps that collected data are transmitted to a BIM processing end through a data transmission server (the core of the BIM is that a virtual three-dimensional model of the building engineering is built, and a complete building engineering information base consistent with the actual situation is provided for the model by utilizing a digital technology, wherein the information base not only comprises geometric information, professional attributes and state information for describing building components, but also comprises state information of non-component objects (such as space and motion behaviors);
when the difference exists, the collected station data is considered to not meet the construction requirement of the station, and the BIM processing end gives an alarm through the warning reminding end;
and when no difference exists, the collected station data is considered to meet the construction requirement of the station.
While there have been shown and described the fundamental principles and essential features of the invention and advantages thereof, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof; the present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a shield constructs method tunnel construction management system based on BIM which characterized in that includes:
the system comprises a plurality of data acquisition ends, a plurality of data acquisition ends and a data processing module, wherein the data acquisition ends are respectively arranged on each acquisition station of a construction end and used for acquiring station construction conditions;
the output end of the data acquisition end is connected with the data transmission server, and the data acquired by the data acquisition end is transmitted through the data transmission server;
BIM handles the end, the data acquisition end passes through data transmission server and handles the end with the data transmission who gathers BIM, BIM handles the end including the computer of integrated BIM system and the construction management system of integration in the computer, and the station data transmission that the data acquisition end gathered handles the end to BIM, and BIM system detects the distribution and transmits to the construction management system to the station data of gathering, and the construction management system receives the station data of gathering and judges the station data of gathering:
when the collected station data does not meet the construction requirement of the station, the construction management system makes an unqualified indication;
when the collected station data meets the construction requirements of the station, the construction management system makes a qualified instruction;
the collected work position data is judged by the BIM processing terminal and then stored in the database, the information in the database can be updated, and after the same work position data is submitted to the database, the new work position data covers the old work position data;
the output end of the BIM processing end is connected with the warning reminding end, and when the construction management system does a disqualification indication, the warning reminding end receives the BIM processing end and performs a warning function;
when the construction management system makes an unqualified indication, the BIM processing end reminds the staff to carry out secondary construction on the construction position which does not meet the station construction requirement until the detected station construction data meets the station construction requirement.
2. The BIM-based shield tunneling management system according to claim 1, wherein: the data acquisition end comprises an RFID acquisition end, a manual filling end and an image acquisition end.
3. The BIM-based shield tunneling management system according to claim 2, wherein: and the manual filling end is used for manually filling and uploading the acquired information.
4. The BIM-based shield tunneling management system according to claim 2, wherein: the image acquisition end is high definition digtal camera, high definition digtal camera is the high definition digtal camera that has infrared night vision subassembly, high definition digtal camera passes through rotary mechanism drive and rotates.
5. The BIM-based shield tunneling management system according to claim 4, wherein: the rotating mechanism is a speed reduction driving motor, a mounting plate is connected to the output end of the speed reduction driving motor, and the high-definition camera is mounted on the mounting plate.
6. The BIM-based shield tunneling management system according to claim 1, wherein: the warning reminding end comprises a warning alarm lamp and a warning loudspeaker.
7. The BIM-based shield tunneling management system according to claim 2, wherein: and an RFID identification end matched with the RFID acquisition end is integrated in the data transmission server, and the RFID identification end identifies the acquired data of the RFID acquisition end.
CN202010571585.8A 2020-06-22 2020-06-22 Shield tunnel construction management system based on BIM Pending CN111709656A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010571585.8A CN111709656A (en) 2020-06-22 2020-06-22 Shield tunnel construction management system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010571585.8A CN111709656A (en) 2020-06-22 2020-06-22 Shield tunnel construction management system based on BIM

Publications (1)

Publication Number Publication Date
CN111709656A true CN111709656A (en) 2020-09-25

Family

ID=72541576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010571585.8A Pending CN111709656A (en) 2020-06-22 2020-06-22 Shield tunnel construction management system based on BIM

Country Status (1)

Country Link
CN (1) CN111709656A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473720A (en) * 2013-09-06 2013-12-25 上海大学 Shield tunnel construction management system based on BIM
CN103530826A (en) * 2013-09-06 2014-01-22 上海大学 BIM (Building Information Modeling)-based shield method tunnel construction management method
JP2017120517A (en) * 2015-12-28 2017-07-06 東芝エレベータ株式会社 BIM system and method
CN207020522U (en) * 2017-07-27 2018-02-16 上海嘉定城市发展集团有限公司 One kind is based on BIM sewage disposal remote monitoring systems
CN109472091A (en) * 2018-11-13 2019-03-15 四川华芯项目管理有限公司 A kind of assembled architecture construction and stage monitoring system and method for being on active service
CN110634176A (en) * 2019-09-30 2019-12-31 中铁二局集团勘测设计院有限责任公司 Shield tunnel construction display system and method integrating real-time tunneling data

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103473720A (en) * 2013-09-06 2013-12-25 上海大学 Shield tunnel construction management system based on BIM
CN103530826A (en) * 2013-09-06 2014-01-22 上海大学 BIM (Building Information Modeling)-based shield method tunnel construction management method
JP2017120517A (en) * 2015-12-28 2017-07-06 東芝エレベータ株式会社 BIM system and method
CN207020522U (en) * 2017-07-27 2018-02-16 上海嘉定城市发展集团有限公司 One kind is based on BIM sewage disposal remote monitoring systems
CN109472091A (en) * 2018-11-13 2019-03-15 四川华芯项目管理有限公司 A kind of assembled architecture construction and stage monitoring system and method for being on active service
CN110634176A (en) * 2019-09-30 2019-12-31 中铁二局集团勘测设计院有限责任公司 Shield tunnel construction display system and method integrating real-time tunneling data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
程子洪;: "BIM辅助铁路隧道施工方案可视化设计应用" *

Similar Documents

Publication Publication Date Title
CN115454057B (en) Digital twin intelligent management and control modeling system and method for coal mine machine crowd
CN112525093A (en) System for building tunnel three-dimensional model
CN108090610A (en) Orbit construction system based on BIM technology
CN113360583A (en) Construction progress visualization method based on BIM model and monitoring image comparison
CN112945096B (en) Tunnel disease monitoring system and method for high-speed train
Ye et al. A digital twin approach for tunnel construction safety early warning and management
CN110927821A (en) BIM + GIS-based advanced geological forecast information system for tunnel construction
CN104914008A (en) Quasi-rectangular shield soil chamber residue soil flow characteristic visualization observation test system and method
CN114113118B (en) Rapid detection device and detection method for subway tunnel lining crack leakage water disease
CN108868837B (en) A kind of underground space building system
CN102568293A (en) Rectangular tunnel boring machine teaching system
CN105841626A (en) Underworkings deformation monitoring device and method
CN111310329B (en) Monitoring management system of earthwork residue soil vehicle on construction site of constructional engineering
CN116009024A (en) Attached lifting scaffold monitoring simulation application system based on BIM technology
CN113505911B (en) Cutter life prediction system based on automatic cruise and prediction method thereof
CN111709656A (en) Shield tunnel construction management system based on BIM
CN108876082A (en) A kind of construction site emergency management and rescue management system and method based on BIM
CN202832661U (en) Underground personnel location system based on four-dimensional (4D) display
CN211123324U (en) BIM + GIS-based advanced geological forecast information system for tunnel construction
CN111101949B (en) Dynamic monitoring management system and method related to risk source crossing process
CN114320273B (en) Rotary excavating pile construction process monitoring system based on Internet of things technology
CN115964547A (en) Engineering data analysis system based on BIM
CN115631680A (en) Mixed reality digital twin platform and construction method and application method thereof
CN114993300A (en) Transparent mine full-space tracking monitoring and intelligent early warning system
CN112682051A (en) Three-dimensional visual risk early warning method based on shield real-time monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200925