CN207003723U - High-rise assembled single row of holes precast shear wall and its assembling structure - Google Patents
High-rise assembled single row of holes precast shear wall and its assembling structure Download PDFInfo
- Publication number
- CN207003723U CN207003723U CN201720863223.XU CN201720863223U CN207003723U CN 207003723 U CN207003723 U CN 207003723U CN 201720863223 U CN201720863223 U CN 201720863223U CN 207003723 U CN207003723 U CN 207003723U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- shear wall
- prefabricated shear
- floor
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims description 30
- 239000010959 steel Substances 0.000 claims description 30
- 230000002787 reinforcement Effects 0.000 claims description 14
- 238000009826 distribution Methods 0.000 claims description 10
- 238000010276 construction Methods 0.000 abstract description 35
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 10
- 238000009434 installation Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 7
- 238000009415 formwork Methods 0.000 description 4
- 239000011376 self-consolidating concrete Substances 0.000 description 4
- 239000011440 grout Substances 0.000 description 3
- 238000000707 layer-by-layer assembly Methods 0.000 description 2
- 238000003032 molecular docking Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
本实用新型提出一种高层装配式单排孔预制剪力墙,其包括有预制墙体,预制墙体的顶端中央和底端中央对称具有装配孔,底端的装配孔贯通连接有灌浆孔,该预制剪力墙具有结构简单、易于制造、便于运输和吊装的特点;又提出上述预制剪力墙的装配结构,多块预制剪力墙下上依次对齐、间隔设置,装配孔内放有连接筋,连接筋的底端插于下块预制剪力墙装配孔内至少400mm、顶端插于上块预制剪力墙装配孔内至少500mm;预制剪力墙一侧或两侧设有叠合楼板;装配孔及灌浆孔内、叠合楼板浇筑有混凝土,使上、下预制剪力墙和叠合楼板联接。本实用新型的预制剪力墙的装配结构具有现场施工方便快速、施工工期短、工程造价低的特点。
The utility model proposes a high-rise prefabricated single-row hole prefabricated shear wall, which includes a prefabricated wall body, and the top center and bottom center of the prefabricated wall body have assembly holes symmetrically, and the assembly holes at the bottom end are connected with grouting holes. The prefabricated shear wall has the characteristics of simple structure, easy manufacture, convenient transportation and hoisting; the assembly structure of the above-mentioned prefabricated shear wall is also proposed, and the lower and upper parts of the prefabricated shear wall are aligned and arranged at intervals, and the connecting ribs are placed in the assembly holes , the bottom end of the connecting rib is inserted into the assembly hole of the lower prefabricated shear wall for at least 400mm, and the top end is inserted into the assembly hole of the upper prefabricated shear wall for at least 500mm; one or both sides of the prefabricated shear wall are provided with laminated floors; Concrete is poured in the assembly hole and the grouting hole, and the laminated floor slab, so that the upper and lower prefabricated shear walls and the laminated floor slab are connected. The assembly structure of the prefabricated shear wall of the utility model has the characteristics of convenient and fast on-site construction, short construction period and low engineering cost.
Description
技术领域technical field
本实用新型涉及建筑技术领域,具体涉及一种预制剪力墙板及其装配结构。The utility model relates to the technical field of buildings, in particular to a prefabricated shear wall panel and an assembly structure thereof.
背景技术Background technique
装配式建筑是指用预制剪力墙/柱、叠合板、预制梁等预制的构件在建筑工地上现场装配而成的建筑,这种建筑具有施工速度快、工期短,受气候条件制约小的特点。预制构件中预制剪力墙在竖向上装配连接方式主要采用:1、套筒灌浆连接,具体是将上、下两块预制剪力墙上预埋的钢筋通过套筒对接,套筒内灌浆实现高强度连接,这种连接方式的不知之处在于:(1)套筒、钢筋的对接、灌浆操作工序繁琐,不便于现场施工;(2)套筒属于装配式建筑构件对接的专用配件,结构较复杂,制造成本较高,容易增加工程造价;2、约束浆锚搭接连接,具体是在预制剪力墙的排孔内安装钢筋,将上、下两块预制剪力墙的钢筋通过排孔对插,再向排孔内灌浆实现高强度连接,这种连接方式的不知之处在于:目前为配合现场装配工艺,排孔内的钢筋安装结构较复杂,现场装配施工时安装钢筋容易拖延工期,如果预制剪力墙的排孔内钢筋预先安装好,外露的钢筋又非常不利于运输和吊装。因此有必要对现有的预制剪力墙的竖向装配连接方式进行改进。Prefabricated buildings refer to buildings assembled on-site with prefabricated shear walls/columns, laminated panels, prefabricated beams and other prefabricated components on the construction site. features. Among the prefabricated components, the vertical assembly and connection methods of the prefabricated shear walls are mainly adopted: 1. Sleeve grouting connection, specifically, the steel bars pre-embedded in the upper and lower prefabricated shear walls are connected through the sleeves, and the grouting in the sleeves is realized. High-strength connection, the unknown point of this connection method is: (1) the sleeve, steel bar docking, and grouting operation procedures are cumbersome, which is not convenient for on-site construction; (2) the sleeve is a special accessory for the docking of prefabricated building components. It is more complicated, the manufacturing cost is higher, and it is easy to increase the project cost; 2. Constrained grout anchor lap connection, specifically installing steel bars in the row holes of the prefabricated shear wall, and passing the steel bars of the upper and lower prefabricated shear walls through the row The holes are inserted in pairs, and then grouted into the row holes to achieve high-strength connection. The unknown point of this connection method is that at present, in order to cooperate with the on-site assembly process, the installation structure of the steel bars in the row holes is relatively complicated, and it is easy to delay the installation of steel bars during on-site assembly construction. During the construction period, if the steel bars in the row holes of the prefabricated shear wall are pre-installed, the exposed steel bars are very unfavorable for transportation and hoisting. Therefore, it is necessary to improve the existing vertical assembly and connection methods of prefabricated shear walls.
发明内容Contents of the invention
本实用新型的目的是提出一种高层装配式单排孔预制剪力墙,其具有结构简单、易于制造、便于运输和吊装的特点;又提出该预制剪力墙的装配结构,具有现场施工方便快速、施工工期短、工程造价低的特点。The purpose of this utility model is to propose a high-rise assembled single-row hole prefabricated shear wall, which has the characteristics of simple structure, easy manufacture, convenient transportation and hoisting; Fast, short construction period and low project cost.
本实用新型的目的可通过以下技术方案实现:The purpose of this utility model can be realized through the following technical solutions:
高层装配式单排孔预制剪力墙,其包括有预制墙体,所述预制墙体内预埋有水平分布筋、竖向分布筋和拉结筋,若干根水平分布筋和若干根竖向分布筋交错排列构成钢筋骨架,2个钢筋骨架间隔藏于预制墙体内,拉结筋端分别连接于2个钢筋骨架上,所述预制墙体的顶端中央和底端中央对称具有若干竖向分布的直柱形装配孔,所述预制墙体底端附近的侧面上具有若干灌浆孔,灌浆孔为弧形弯孔或直柱形斜孔,灌浆孔与预制墙体底端的装配孔对应贯通连接,所述装配孔和灌浆孔错开钢筋骨架及拉结筋。其中装配孔可以采用以下尺寸:直径为80~100mm、长度为500~1000mm。The high-rise prefabricated single-row hole prefabricated shear wall includes a prefabricated wall body, and the prefabricated wall is pre-embedded with horizontal distribution bars, vertical distribution bars and tie bars, several horizontal distribution bars and several vertical bars. The distribution bars are arranged in a staggered manner to form a steel skeleton, and the two steel skeletons are hidden in the prefabricated wall at intervals, and the ends of the tie bars are respectively connected to the two steel skeletons. Distributed straight cylindrical assembly holes, there are several grouting holes on the side near the bottom of the prefabricated wall, the grouting holes are arc-shaped curved holes or straight cylindrical oblique holes, and the grouting holes correspond to the assembly holes at the bottom of the prefabricated wall connection, the assembly holes and grouting holes are staggered from the steel skeleton and tie bars. The assembly hole can adopt the following dimensions: a diameter of 80-100mm and a length of 500-1000mm.
一种预制剪力墙的装配结构,包括有上下对齐、间隔设置的2块预制剪力墙,所述预制剪力墙为上述高层装配式单排孔预制剪力墙,上、下预制剪力墙的装配孔对齐,下块预制剪力墙的顶端与上块预制剪力墙的底端之间具有叠合楼板间隔并构成联接位,至少1根连接筋插于上、下预制剪力墙的装配孔内,连接筋的底端插于下块预制剪力墙的装配孔内至少400mm,连接筋的顶端穿过联接位插于上块预制剪力墙的装配孔内至少500mm。An assembly structure of prefabricated shear walls, including two prefabricated shear walls aligned up and down and arranged at intervals, the prefabricated shear walls are the above-mentioned high-rise prefabricated shear walls with single row of holes, and the upper and lower prefabricated shear walls The assembly holes of the walls are aligned, the top of the lower prefabricated shear wall and the bottom of the upper prefabricated shear wall have a superimposed floor interval and form a joint position, and at least one connecting bar is inserted into the upper and lower prefabricated shear walls The bottom end of the connecting rib is inserted into the assembly hole of the lower prefabricated shear wall for at least 400mm, and the top end of the connecting rib is inserted through the joint position into the assembly hole of the upper precast shear wall for at least 500mm.
预制剪力墙的一侧或两侧位于联接位处设有叠合楼板,叠合楼板包括预制楼板和位于预制楼板上的现浇楼板,所述预制楼板内预埋有楼板钢筋,楼板钢筋的外露部分位于联接位处,联接位的上部及预制楼板的上方铺设有连续的楼板钢筋骨架。One or both sides of the prefabricated shear wall are provided with a laminated floor at the joint position. The laminated floor includes a prefabricated floor and a cast-in-place floor on the prefabricated floor. The prefabricated floor is pre-embedded with floor reinforcement. The exposed part is located at the connection position, and a continuous floor steel skeleton is laid on the upper part of the connection position and above the prefabricated floor slab.
预制剪力墙的装配孔和灌浆孔内、联接位内以及楼板钢筋骨架浇筑有混凝土,下块预制剪力墙与叠合楼板通过混凝土联接,上、下预制剪力墙通过连接筋和混凝土联接。Concrete is poured in the assembly hole and grouting hole of the prefabricated shear wall, in the connection position and the steel skeleton of the floor slab, the lower prefabricated shear wall and the laminated floor are connected by concrete, and the upper and lower prefabricated shear walls are connected by connecting bars and concrete .
上述预制剪力墙的装配结构的施工方法,其包括以下步骤:The construction method of the assembly structure of above-mentioned prefabricated shear wall, it comprises the following steps:
步骤1、在地基或楼面上确定预制剪力墙的安装位,在安装位附近搭建临时固定架,将预制剪力墙吊装于安装位、并由临时固定架固定,预制剪力墙的底端与地基或楼面之间采用座浆填平;在地基上装配预制剪力墙时,地基上预埋连接筋,使连接筋的顶端插于预制剪力墙的装配孔内至少500mm。Step 1. Determine the installation position of the prefabricated shear wall on the foundation or floor, build a temporary fixing frame near the installation position, hoist the prefabricated shear wall at the installation position, and fix it by the temporary fixing frame, and the bottom of the prefabricated shear wall Fill the gap between the end and the foundation or the floor with seat grout; when assembling the prefabricated shear wall on the foundation, pre-embed the connecting ribs on the foundation, so that the top of the connecting ribs is inserted into the assembly hole of the prefabricated shear wall for at least 500mm.
步骤2、搭建临时支撑架,在预制剪力墙的上方一侧或两侧分别安装预制楼板,预制楼板由临时支撑架支撑,于预制楼板的上方铺设连续的楼板钢筋骨架。Step 2. Build a temporary support frame, install prefabricated floor slabs on one or both sides above the prefabricated shear wall, the prefabricated floor slab is supported by the temporary support frame, and lay a continuous floor steel skeleton above the prefabricated floor slab.
步骤3、在预制剪力墙的装配孔内放入连接筋,将连接筋的顶部与预制楼板的楼板钢筋的外露部分和/或楼板钢筋骨架固定连接。Step 3. Put connecting bars in the assembly holes of the prefabricated shear walls, and fix the top of the connecting bars with the exposed part of the floor reinforcement of the prefabricated floor slab and/or the floor reinforcement skeleton.
步骤4、在预制剪力墙侧面与预制楼板底面的衔接部位安装模板,分别由预制剪力墙的灌浆孔和预制剪力墙顶端的装配孔灌注自密实混凝土,使灌浆孔和预制剪力墙两端的装配孔填充满混凝土;向楼板钢筋骨架上浇筑混凝土;待混凝土凝结至强度达到要求后,预制楼板与楼板钢筋骨架联接成叠合楼板。Step 4. Install the formwork at the joint between the side of the prefabricated shear wall and the bottom of the prefabricated floor, and pour self-compacting concrete through the grouting hole of the prefabricated shear wall and the assembly hole at the top of the prefabricated shear wall respectively, so that the grouting hole and the prefabricated shear wall The assembly holes at both ends are filled with concrete; concrete is poured on the steel skeleton of the floor; after the concrete is condensed until the strength meets the requirements, the prefabricated floor and the steel skeleton of the floor are connected to form a laminated floor.
步骤5、在步骤4建造的叠合楼板形成的楼面上,重复步骤1至步骤4依次向上装配预制剪力墙,完成各层预制剪力墙的装配,施工到最顶层时,在步骤3中,连接筋上部不高出联接位或者省去步骤3。Step 5. On the floor formed by the laminated floor slabs built in step 4, repeat steps 1 to 4 to assemble the prefabricated shear walls upward in order to complete the assembly of prefabricated shear walls on each floor. When the construction reaches the top floor, in step 3 , the upper part of the connecting rib is not higher than the connecting position or step 3 is omitted.
本实用新型具有以下实质性特点和进步。The utility model has the following substantive features and progress.
1、本实用新型的高层装配式单排孔预制剪力墙结构非常简单,具有易于制造、便于运输和吊装的特点。1. The prefabricated high-rise prefabricated shear wall with single row of holes of the utility model is very simple in structure, and has the characteristics of easy manufacture, transportation and hoisting.
2、本实用新型的预制剪力墙的装配结构在施工时,将连接筋现场安装于预制剪力墙的装配孔内,连接于叠合楼板的楼板钢筋骨架上实现定位,具有现场施工方便、操作简单、快速的特点。2. During the construction of the assembly structure of the prefabricated shear wall of the present utility model, the connecting bars are installed in the assembly holes of the prefabricated shear wall on site, and connected to the floor reinforcement skeleton of the laminated floor to realize positioning, which has the advantages of convenient on-site construction, Simple and fast operation.
3、本实用新型的预制剪力墙的装配结构在施工时,先装配下一层剪力墙及该楼层顶板后再装配上一层的剪力墙及其楼顶板,这种逐层装配方式能有效确保施工质量;同时,装配上层剪力墙时,可拆除下层施工时中使用的临时固定架、临时支撑架及模板,重新用于上层剪力墙的施工,具有配件重复使用率高、施工投入小的特点。3. When the assembly structure of the prefabricated shear wall of the present invention is being constructed, the shear wall of the next layer and the roof of the floor are assembled first, and then the shear wall of the upper layer and the roof of the floor are assembled. This layer-by-layer assembly The method can effectively ensure the construction quality; at the same time, when assembling the upper shear wall, the temporary fixing frame, temporary support frame and formwork used in the construction of the lower layer can be removed and reused for the construction of the upper layer shear wall, which has a high reuse rate of accessories , The characteristics of small construction investment.
附图说明Description of drawings
图1为本实用新型的高层装配式单排孔预制剪力墙的结构示意图(俯视状态)。Fig. 1 is a structural schematic diagram (overlooking state) of the high-rise assembled single-row hole prefabricated shear wall of the present invention.
图2为图1所示的预制剪力墙的剖视图(主视状态)。Fig. 2 is a sectional view (front view state) of the prefabricated shear wall shown in Fig. 1 .
图3为图1所示的预制剪力墙的装配结构的示意图。Fig. 3 is a schematic diagram of the assembly structure of the prefabricated shear wall shown in Fig. 1 .
图4为图1所示的预制剪力墙的装配施工方法中步骤1的施工示意图。Fig. 4 is a construction schematic diagram of step 1 in the assembly construction method of the prefabricated shear wall shown in Fig. 1 .
图5为图1所示的预制剪力墙的装配施工方法中步骤2和步骤3的施工示意图。Fig. 5 is a construction schematic diagram of steps 2 and 3 in the assembly construction method of the prefabricated shear wall shown in Fig. 1 .
图6为图1所示的预制剪力墙的装配施工方法中步骤4的施工示意图。Fig. 6 is a construction schematic diagram of step 4 in the assembly construction method of the prefabricated shear wall shown in Fig. 1 .
图7为图1所示的预制剪力墙的装配施工方法中步骤5施工建筑物中间层的示意图。Fig. 7 is a schematic diagram of constructing the middle layer of the building in step 5 in the assembly construction method of the prefabricated shear wall shown in Fig. 1 .
图8为图1所示的预制剪力墙的装配施工方法中步骤5施工建筑物顶层的示意图。Fig. 8 is a schematic diagram of the construction of the top floor of the building in step 5 in the assembly construction method of the prefabricated shear wall shown in Fig. 1 .
具体实施方式detailed description
下面结合附图对本实用新型作进一步说明。Below in conjunction with accompanying drawing, the utility model is further described.
实施例1Example 1
参考图1和图2,高层装配式单排孔预制剪力墙,其包括有预制墙体1。所述预制墙体1内预埋有水平分布筋11、竖向分布筋12和拉结筋13,若干根水平分布筋11和若干根竖向分布筋12交错排列构成钢筋骨架,2个钢筋骨架间隔藏于预制墙体1内,拉结筋13端分别连接于2个钢筋骨架上。Referring to Fig. 1 and Fig. 2, the high-rise prefabricated shear wall with single row of holes includes a prefabricated wall body 1 . The prefabricated wall 1 is pre-embedded with horizontal distribution bars 11, vertical distribution bars 12 and tie bars 13, several horizontal distribution bars 11 and several vertical distribution bars 12 are staggered to form a reinforcement skeleton, and two reinforcement skeletons The intervals are hidden in the prefabricated wall body 1, and the 13 ends of the tie bars are respectively connected to the two steel bar skeletons.
所述预制墙体1的顶端中央和底端中央对称具有若干竖向分布的直柱形装配孔10,所述预制墙体1底端附近的侧面上具有若干灌浆孔101,灌浆孔101为弧形弯孔(也可以是斜向设置的直柱形斜孔),灌浆孔101与预制墙体1底端的装配孔10对应贯通连接,所述装配孔10和灌浆孔101错开钢筋骨架及拉结筋13。The top center of the prefabricated wall 1 and the center of the bottom end are symmetrically provided with several vertically distributed straight column-shaped assembly holes 10, and there are several grouting holes 101 on the side near the bottom of the prefabricated wall 1, and the grouting holes 101 are arcs. curved hole (or a straight cylindrical oblique hole arranged obliquely), the grouting hole 101 is correspondingly connected with the assembly hole 10 at the bottom of the prefabricated wall 1, and the assembly hole 10 and the grouting hole 101 are staggered from the steel skeleton and tie Tendon13.
本实施例中预制墙体1顶端的装配孔10的直径为90mm、长度为900mm,灌浆孔101的直径为90mm,预制墙体1底端的装配孔10的直径为90mm、长度为650mm。In this embodiment, the diameter of the assembly hole 10 at the top of the prefabricated wall 1 is 90mm and the length is 900mm, the diameter of the grouting hole 101 is 90mm, and the diameter of the assembly hole 10 at the bottom of the prefabricated wall 1 is 90mm and the length is 650mm.
本实施例的预制剪力墙结构简单、易于制造,预制墙体1的表面外露钢筋少,使运输和吊装的操作简单、安全,减少了运输占用空间,还利于施工人员吊装操作的安全性。The prefabricated shear wall of this embodiment has a simple structure and is easy to manufacture. The surface of the prefabricated wall body 1 has few exposed steel bars, which makes the transportation and hoisting operations simple and safe, reduces the space occupied by transportation, and is also conducive to the safety of construction personnel's hoisting operations.
实施例2Example 2
参考图3,一种预制剪力墙的装配结构,包括有上下对齐、间隔设置的2块预制剪力墙,所述预制剪力墙采用实施例1的高层装配式单排孔预制剪力墙,上、下预制剪力墙的装配孔10对齐,下块预制剪力墙的顶端与上块预制剪力墙的底端之间具有叠合楼板间隔并构成联接位15,1根连接筋16插于上、下预制剪力墙的装配孔10内,连接筋16的底端插于下块预制剪力墙的装配孔10内600mm,连接筋16的顶端穿过联接位15、插于上块预制剪力墙的装配孔10内900mm。为便于现场施工,连接筋16顶端插入装配孔10内长度满足不少于500mm、底端插入装配孔10内长度满足不少于400mm,分别满足锚固要求即可。Referring to Fig. 3, an assembly structure of prefabricated shear walls includes two prefabricated shear walls aligned up and down and arranged at intervals, and the prefabricated shear walls adopt the high-rise prefabricated single-row hole prefabricated shear wall , the assembly holes 10 of the upper and lower prefabricated shear walls are aligned, and there is a superimposed floor interval between the top of the lower prefabricated shear wall and the bottom of the upper prefabricated shear wall to form a joint position 15, and a connecting rib 16 Insert it into the assembly hole 10 of the upper and lower prefabricated shear walls, insert the bottom end of the connecting rib 16 into the assembling hole 10 of the lower prefabricated shear wall for 600 mm, and the top end of the connecting rib 16 passes through the joint position 15 and inserts it into the upper The inside of the assembly hole 10 of the block prefabricated shear wall is 900mm. In order to facilitate on-site construction, the length of the top end of the connecting rib 16 inserted into the assembly hole 10 is not less than 500mm, and the length of the bottom end inserted into the assembly hole 10 is not less than 400mm, which can meet the anchoring requirements respectively.
预制剪力墙的两侧位于联接位15处分别设有叠合楼板,(对于靠近建筑物最外侧的墙体,预制剪力墙的一侧位于联接位15处设有叠合楼板,图中未示),叠合楼板包括预制楼板2和位于预制楼板2上的现浇楼板3,所述预制楼板2内预埋有楼板钢筋21,楼板钢筋21的外露部分联接位15处,联接位15的上部及预制楼板2的上方铺设有连续的楼板钢筋骨架31。The two sides of the prefabricated shear wall are respectively provided with laminated floor slabs at the joint position 15, (for the wall near the outermost side of the building, one side of the prefabricated shear wall is provided with a laminated floor plate at the joint position 15, as shown in the figure not shown), the laminated floor includes a prefabricated floor 2 and a cast-in-place floor 3 located on the prefabricated floor 2, the prefabricated floor 2 is pre-embedded with floor steel bars 21, and the exposed part of the floor steel bar 21 has 15 connecting positions, and the connecting positions 15 The upper part of the slab and the top of the prefabricated slab 2 are laid with a continuous slab reinforcement skeleton 31.
预制剪力墙的装配孔10和灌浆孔101内、联接位15内以及楼板钢筋骨架31浇筑有混凝土,下块预制剪力墙与叠合楼板通过混凝土联接,上、下预制剪力墙通过连接筋16和混凝土联接。Concrete is poured in the assembly hole 10 and the grouting hole 101 of the prefabricated shear wall, the connection position 15 and the steel skeleton 31 of the floor slab. The lower prefabricated shear wall and the laminated floor are connected by concrete, and the upper and lower prefabricated shear walls are connected by Rib 16 is connected with concrete.
本实施例的预制剪力墙的装配结构的施工方法,其包括以下步骤。The construction method of the prefabricated shear wall assembly structure of this embodiment includes the following steps.
步骤1、在地基或楼面上确定预制剪力墙的安装位,在安装位附近搭建临时固定架,参考图4,将预制剪力墙吊装于安装位、并由临时固定架固定(图中未示),预制剪力墙的底端与地基之间采用座浆14填平;在地基上装配预制剪力墙时,地基上预埋1根连接筋16,使连接筋16的顶端插于预制剪力墙的底端的装配孔10内900mm。Step 1. Determine the installation position of the prefabricated shear wall on the foundation or floor, and build a temporary fixing frame near the installation position. Referring to Figure 4, hoist the prefabricated shear wall at the installation position and fix it with the temporary fixing frame (in the figure not shown), the bottom of the prefabricated shear wall and the foundation are filled with seat grout 14; when the prefabricated shear wall is assembled on the foundation, a connecting bar 16 is pre-embedded on the foundation, so that the top of the connecting bar 16 is inserted into the 900mm inside the assembly hole 10 at the bottom of the prefabricated shear wall.
步骤2、搭建临时支撑架(图中未示),参考图5,在预制剪力墙的上方两侧分别安装预制楼板2,预制楼板2由临时支撑架支撑,采用机械连接或焊接方式、固定连接预制楼板2之间的楼板钢筋外露部分,于预制楼板2的上方铺设连续的楼板钢筋骨架31。Step 2. Build a temporary support frame (not shown in the figure). Referring to Figure 5, install prefabricated floor slabs 2 on both sides above the prefabricated shear wall. The prefabricated floor slab 2 is supported by a temporary support frame and fixed by mechanical connection or welding. The exposed part of the floor reinforcement between the prefabricated floor slabs 2 is connected, and a continuous floor reinforcement skeleton 31 is laid on the top of the prefabricated floor slab 2 .
步骤3、参考图5,在预制剪力墙的装配孔10内放入1根连接筋16,将连接筋16的顶部与预制楼板2的楼板钢筋外露部分和楼板钢筋骨架31、采用机械连接或焊接方式固定连接。Step 3, with reference to Figure 5, put a connecting bar 16 in the assembly hole 10 of the prefabricated shear wall, and connect the top of the connecting bar 16 to the exposed part of the floor steel bar of the prefabricated floor 2 and the floor steel bar skeleton 31, using mechanical connection or Fixed connection by welding.
步骤4、参考图6,在预制剪力墙侧面与预制楼板2底面的衔接部位安装模板4,先向预制剪力墙顶端的装配孔10内灌注自密实混凝土,以及由预制剪力墙的灌浆孔101灌注自密实混凝土,使灌浆孔101和预制剪力墙两端的装配孔10填充满自密实混凝土,待自密实混凝土初凝后,再在楼板钢筋骨架31上浇筑现浇楼板混凝土,待现浇楼板混凝土凝结至强度达到要求后,预制楼板2与楼板钢筋骨架31联接成叠合楼板。Step 4, referring to Fig. 6, install formwork 4 at the joint between the side of the prefabricated shear wall and the bottom surface of the prefabricated floor 2, first pour self-compacting concrete into the assembly hole 10 at the top of the prefabricated shear wall, and the grouting of the prefabricated shear wall Hole 101 is poured with self-compacting concrete, so that the grouting hole 101 and the assembly holes 10 at both ends of the prefabricated shear wall are filled with self-compacting concrete. After pouring the concrete of the floor slab until the strength reaches the requirement, the prefabricated floor 2 and the steel skeleton 31 of the floor are connected to form a laminated floor.
步骤5、参考图7,在步骤4建造的叠合楼板形成的楼面上,重复步骤1至步骤4依次向上装配预制剪力墙,完成各层预制剪力墙的装配;参考图8,施工到最顶层时,在步骤3中,连接筋16上部不高出联接位15,且连接筋16弯锚锚入最顶层楼板的楼板钢筋骨架31内并连接。Step 5, refer to Figure 7, on the floor formed by the laminated floor slabs built in Step 4, repeat Step 1 to Step 4 to assemble the prefabricated shear walls upwards in sequence, and complete the assembly of prefabricated shear walls on each floor; refer to Figure 8, construction When reaching the top floor, in step 3, the upper part of the connecting rib 16 is not higher than the connecting position 15, and the connecting rib 16 is bent and anchored into the floor reinforcement skeleton 31 of the top floor slab and connected.
本实施例的预制剪力墙的装配结构通过预制楼板2构造的叠合楼板实现上、下层预制剪力墙的联接,具有装配牢固,施工质量高的特点;在施工过程中,先装配下一层剪力墙及该楼层顶板后再装配上一层的剪力墙及其楼顶板,这种逐层装配方式有效确保了施工质量;同时,装配上层剪力墙时,可拆除下层施工时中使用的临时固定架、临时支撑架及模板,重新用于上层剪力墙的施工,具有配件重复使用率高、施工投入小的特点。The assembly structure of the prefabricated shear wall in this embodiment realizes the connection of the upper and lower prefabricated shear walls through the superimposed floor slab constructed by the prefabricated floor 2, which has the characteristics of firm assembly and high construction quality; in the construction process, the next The shear wall and the roof slab of the upper floor are assembled after the shear wall of the first floor and the roof of the floor. This layer-by-layer assembly method effectively ensures the construction quality; at the same time, when assembling the upper shear wall, the lower floor can be removed during construction. The temporary fixing frame, temporary support frame and formwork used in the construction are reused in the construction of the upper shear wall, which has the characteristics of high reuse rate of accessories and small construction investment.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720863223.XU CN207003723U (en) | 2017-07-17 | 2017-07-17 | High-rise assembled single row of holes precast shear wall and its assembling structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720863223.XU CN207003723U (en) | 2017-07-17 | 2017-07-17 | High-rise assembled single row of holes precast shear wall and its assembling structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207003723U true CN207003723U (en) | 2018-02-13 |
Family
ID=61454315
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720863223.XU Active CN207003723U (en) | 2017-07-17 | 2017-07-17 | High-rise assembled single row of holes precast shear wall and its assembling structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207003723U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107201792A (en) * | 2017-07-17 | 2017-09-26 | 广东省建科建筑设计院有限公司 | High-rise assembled single row of holes precast shear wall and its assembling structure and construction method |
| CN109137983A (en) * | 2018-10-24 | 2019-01-04 | 中建科技有限公司 | Assembled integral solid exposed wall plate pipe gallery and its construction method |
| CN110792164A (en) * | 2019-11-12 | 2020-02-14 | 燕山大学 | Transverse assembling device and method for assembled shear wall |
| CN115030326A (en) * | 2022-08-15 | 2022-09-09 | 山东惠晟建筑科技有限公司 | Fully-prefabricated assembled house structure |
-
2017
- 2017-07-17 CN CN201720863223.XU patent/CN207003723U/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107201792A (en) * | 2017-07-17 | 2017-09-26 | 广东省建科建筑设计院有限公司 | High-rise assembled single row of holes precast shear wall and its assembling structure and construction method |
| CN109137983A (en) * | 2018-10-24 | 2019-01-04 | 中建科技有限公司 | Assembled integral solid exposed wall plate pipe gallery and its construction method |
| CN110792164A (en) * | 2019-11-12 | 2020-02-14 | 燕山大学 | Transverse assembling device and method for assembled shear wall |
| CN110792164B (en) * | 2019-11-12 | 2021-03-12 | 燕山大学 | A kind of horizontal assembly device and assembly method of prefabricated shear wall |
| CN115030326A (en) * | 2022-08-15 | 2022-09-09 | 山东惠晟建筑科技有限公司 | Fully-prefabricated assembled house structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107201792A (en) | High-rise assembled single row of holes precast shear wall and its assembling structure and construction method | |
| CN107254933A (en) | The high-rise single through hole precast shear wall of assembled and its assembling structure and construction method | |
| CN111576619B (en) | Production method of high-strength concrete post-cast assembled frame system | |
| CN109083275B (en) | Prefabricated column and one-piece prefabricated beam-slab assembly node and its construction method | |
| CN105804241A (en) | Single-layer prefabricated assembly type reinforced concrete beam-column joint | |
| CN107882328B (en) | Construction method of large-span steel truss suspension structure | |
| CN107476470A (en) | Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method | |
| CN109184030B (en) | A kind of prefabricated concrete shear wall superimposed structure system and installation method | |
| CN107558603A (en) | A kind of assembled arthitecutral structure system and its construction method | |
| HK1232269A1 (en) | Prefabricated frame and construction method using the same | |
| CN102418387A (en) | Post-tensioning external prestressed steel beam and pre-tensioning prestressed superposed beam combined building structure system and construction technology thereof | |
| CN103046746A (en) | Construction method of conversion beam reinforcing bars for tall building structure | |
| RU2318099C1 (en) | Composite form of multistory building and method of erection thereof | |
| CN110005053A (en) | A sub-structure assembled frame structure and its construction method | |
| CN110761443A (en) | Prefabricated concrete structure wall-column concrete-filled steel tubular key connection structure and its assembling method | |
| CN102418425A (en) | Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system | |
| CN108086488B (en) | Prefabricated frame-shear structural wall split-level connection structure and assembly method | |
| CN210067020U (en) | A sub-structure assembled frame structure | |
| CN108222291A (en) | A kind of tension anchoring method connecting-type assembled wall-harden structure and installation method | |
| CN212656384U (en) | High-strength concrete connecting piece, high-strength concrete post-cast assembled frame system and support frame | |
| CN207003803U (en) | The single through hole precast shear wall of high-rise assembled and its assembling structure | |
| CN120990260A (en) | A precast shear wall, building module, modular building system and assembly method | |
| CN110984367A (en) | Assembly type building frame structure member and construction method thereof | |
| CN114753299A (en) | Pile-cap-free fully-assembled wharf structure and construction method thereof | |
| CN212453065U (en) | Assembled building frame structure member |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20200114 Address after: 510500 No. 121 martyrs East Road, Guangzhou, Guangdong, Tianhe District Patentee after: Guangdong Architectural Design Institute of the Department of Construction Co., Ltd. Address before: Liwan District Guangzhou City, Guangdong province 510000 Liuhua Road No. 85 Guangdong Construction Comprehensive Building 7 floor Co-patentee before: Guangdong Construction Academy Group Plc Patentee before: Guangdong Architectural Design Institute of the Department of Construction Co., Ltd. |