CN206987070U - Steel construction assembled architecture wallboard node - Google Patents

Steel construction assembled architecture wallboard node Download PDF

Info

Publication number
CN206987070U
CN206987070U CN201720597425.4U CN201720597425U CN206987070U CN 206987070 U CN206987070 U CN 206987070U CN 201720597425 U CN201720597425 U CN 201720597425U CN 206987070 U CN206987070 U CN 206987070U
Authority
CN
China
Prior art keywords
precast concrete
rubber support
interior wall
limited block
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720597425.4U
Other languages
Chinese (zh)
Inventor
鲁正
宰秋锐
常佳奇
林威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201720597425.4U priority Critical patent/CN206987070U/en
Application granted granted Critical
Publication of CN206987070U publication Critical patent/CN206987070U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of steel construction assembled architecture wallboard node, including steel structure girder, precast concrete floor, precast concrete interior wall, rubber support, limited block, rubber support is arranged at a certain distance between described precast concrete floor and precast concrete interior wall, being vertically connected with steel plate for rubber support is provided with bolt hole, it is corresponding with the internally threaded sleeve arranged on precast concrete interior wall, precast concrete floor, it is attached thereto by bolt.Limited block is arranged on superstructure simultaneously, limited block is bolted with reserving internally threaded sleeve on superstructure.The utility model can be consumed energy by rubber support detrusion under geological process, have the function that antidetonation.There is construction is simple simultaneously, material is cheap and easily-available, and construction speed is fast, and artificial demand is few, the advantages that no situ wet operation.

Description

Steel construction assembled architecture wallboard node
Technical field
A kind of new steel construction assembled wallboard node is the utility model is related to, is a kind of Flexible Node, is made in earthquake With lower by lead core rubber support detrusion dissipation energy, belong to the supporting work of civil engineering steel construction assembled architecture interior wall Journey, civil engineering assembled architecture earthquake resistant construction field.
Background technology
Assembled architecture pollutes the advantages that small due to its construction speed block, scene and quickly grown in recent years, but its antidetonation Poor-performing is always the target of public criticism.Traditional rigid joint deforms in geological process underframe easily occurs wall damage, and soft Property node adapts to larger deformation.Meanwhile traditional wallboard rigid connection node construction is complicated, with using the soft of partially restrained Property node it is high compared to cost, construction speed is slow, and artificial demand is big, and situ wet operation is more, there is certain pollution to job site.
Notice the larger vertical bearing capacity of rubber support, and can be in seismic process by elastic plastics characteristic come Dissipation energy has reached the purpose of antidetonation, while rubber support has preferable Hysteresis Behavior, easy for installation, cheap, extensively It is general to be used for bridge, the antidetonation of building, shock insulation.Current rubber support is mainly used in the Seismic Isolation of Isolation Layer of bridge and building, also It is not used for precast concrete interior wall and the case of precast concrete cover connecting node.
Utility model content
The purpose of this utility model is to make up the deficiency of existing assembled architecture wallboard Flexible Node development, there is provided one Kind steel construction assembled wallboard node, is especially a kind of Flexible Node based on rubber support, there is certain antihunt action.
The utility model is achieved through the following technical solutions:
A kind of steel construction assembled wallboard node, including steel structure girder 1, precast concrete floor 2, precast concrete interior wall 5th, rubber support 3 and limited block 7, it is characterised in that:By certain between the precast concrete floor 2 and precast concrete interior wall 5 Spacing is disposed with rubber support 3, and the both ends of rubber support 3 are provided with junction steel plate 4, some spiral shells are provided with the junction steel plate 4 Keyhole, the bolt hole is corresponding with the internally threaded sleeve arranged on precast concrete interior wall 5 and precast concrete floor 2, and one Bolt hole on block junction steel plate 4 is connected by the first bolt 6 with the internally threaded sleeve on precast concrete interior wall 5, another The bolt hole of block junction steel plate 4 is connected by the first bolt with the inner bolt sleeve pipe on precast concrete floor 2;Concrete Limited block 7 is arranged on Tulou lid 2, the limited block 7 is located at the both sides of precast concrete interior wall 5, and not with precast concrete interior wall 5 Contact, limited block 7 are connected with precast concrete floor 2 by the second bolt 8.
In the utility model, rubber support 3 is high-damp rubber support or lead core rubber support.
In the utility model, limited block 7 leaves hole with precast concrete interior wall 5, so as to allow precast concrete interior wall 5 Have certain displacement under geological process, but displacement it is excessive then play position-limiting action, prevent wall from collapsing.
The beneficial effects of the utility model are:
Novel joint disclosed in the utility model can be consumed energy under geological process by lead core rubber support detrusion, Have the function that antidetonation.Novel joint disclosed in the utility model has construction is simple simultaneously, and material is cheap and easily-available, construction speed It hurry up, artificial demand is few, the advantages that no situ wet operation.
Brief description of the drawings
Fig. 1 is profile of the utility model perpendicular to structural beams.
Profile of Fig. 2 positions the utility model perpendicular to metope.
Label in figure:1 is steel structure girder, and 2 be precast concrete floor, and 3 be rubber support, and 4 be junction steel plate, and 5 be pre- Concrete inner wall processed, 6 be the first bolt, and 7 be limited block, and 8 be the second bolt.
Embodiment
The utility model is further illustrated below by embodiment combination accompanying drawing.
Embodiment 1:A kind of steel construction assembled wallboard node, including it is steel structure girder 1, precast concrete floor 2, prefabricated mixed Native interior wall 5, rubber support 3, limited block 7 are coagulated, described rubber support 3 uses high-damp rubber support or lead core rubber support. Arrange rubber support 3 between described precast concrete floor 2 and precast concrete interior wall 5 at a certain distance, rubber support 3 it is upper Bolt hole is provided with lower junction steel plate 4, with the internally threaded sleeve arranged on precast concrete interior wall 5, precast concrete floor 2 It is corresponding, it is attached thereto by the first bolt 6.Limited block is arranged on superstructure 2 simultaneously, limited block 7 is with reserving interior spiral shell on superstructure 2 Line sleeve pipe is connected by the second bolt 8, and limited block 7 does not contact with precast concrete interior wall, and hole is left with wall, so as to allow Wall has certain displacement under geological process, but displacement it is excessive then play position-limiting action, prevent wall from collapsing.

Claims (3)

1. a kind of steel construction assembled architecture wallboard node, including steel structure girder (1), precast concrete floor (2), concrete Native interior wall (5), rubber support (3) and limited block (7), it is characterised in that:The precast concrete floor (2) and precast concrete Rubber support (3) is disposed between interior wall (5) at a certain distance, the both ends of rubber support (3) are provided with junction steel plate (4), the company Connect and some bolts hole are provided with steel plate (4), the bolt hole and precast concrete interior wall (5) and precast concrete floor (2) The internally threaded sleeve of upper arrangement is corresponding, and the bolt hole on one piece of junction steel plate (4) passes through the first bolt (6) and precast concrete Internally threaded sleeve on interior wall (5) is connected, and the bolt hole of another piece of junction steel plate (4) passes through the first bolt and precast concrete Inner bolt sleeve pipe on superstructure (2) is connected;Limited block (7), limited block (7) position are arranged on precast concrete floor (2) In precast concrete interior wall (5) both sides, and do not contacted with precast concrete interior wall (5), limited block (7) and precast concrete floor (2) connected by the second bolt (8).
2. steel construction assembled architecture wallboard node according to claim 1, it is characterised in that:Rubber support (3) is height Damping rubber support or lead core rubber support.
3. steel construction assembled architecture wallboard node according to claim 1, it is characterised in that:Limited block (7) with it is prefabricated Concrete inner wall (5) leaves hole.
CN201720597425.4U 2017-05-26 2017-05-26 Steel construction assembled architecture wallboard node Expired - Fee Related CN206987070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720597425.4U CN206987070U (en) 2017-05-26 2017-05-26 Steel construction assembled architecture wallboard node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720597425.4U CN206987070U (en) 2017-05-26 2017-05-26 Steel construction assembled architecture wallboard node

Publications (1)

Publication Number Publication Date
CN206987070U true CN206987070U (en) 2018-02-09

Family

ID=61389936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720597425.4U Expired - Fee Related CN206987070U (en) 2017-05-26 2017-05-26 Steel construction assembled architecture wallboard node

Country Status (1)

Country Link
CN (1) CN206987070U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622370A (en) * 2020-06-10 2020-09-04 刘超 Assembled building floor and energy dissipation shock-absorbing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111622370A (en) * 2020-06-10 2020-09-04 刘超 Assembled building floor and energy dissipation shock-absorbing structure

Similar Documents

Publication Publication Date Title
WO2018072366A1 (en) Self-resetting and assembly-type flexible anti-seismic structure for subway station
CN202831402U (en) Concrete filled steel tubular column with inner-connected circular pipe and outer-sleeved concrete filled steel tube
CN205530344U (en) Utility tunnel is pour to split type no mould
CN206512590U (en) A kind of assembled hollow steel pipe constrains reinforced column squat pier
CN105421477A (en) Construction method for tower crane foundation
CN104213717A (en) Integrated reconstruction method for multi-storey residential
CN103243638B (en) Bridge space radioactive concrete-filled steel tube bridge pier and construction method thereof
CN206328893U (en) A kind of new vertical piece dry type connection shear wall
CN206987070U (en) Steel construction assembled architecture wallboard node
CN204475529U (en) The syndeton of a kind of assembling type outer wall and beam
CN103469902A (en) Full-rigidity steel pipe concrete column connecting node
CN203270856U (en) Building wall
CN104652608A (en) Assembly type exterior wall and beam connecting structure
CN107938499A (en) A kind of prefabricated assembled bridge pier
CN202347534U (en) Force transferring structure between foundation ditch support pile and basement outer wall
CN201850539U (en) Large-well variable-cross-section restricted-orifice surge chamber for water supply system of hydropower station
CN107152034A (en) A kind of pipe gallery and its construction method
CN207597914U (en) Add the construction stress structure for building multi-layer underground space under a kind of existing building group
CN201133089Y (en) Loading transferring device for roof beam changing to floor joist
CN205776312U (en) Circular combined super-large diameter offshore wind farm single-pile foundation
CN201187051Y (en) Deep water bridge foundation construction multifunctional drill platform top board
CN203684267U (en) Novel offshore wind power basic structure
CN203640154U (en) Engineered wood-pressed steel plate-lightweight aggregate concrete composite beam
CN208267067U (en) A kind of building basement bottom plate catch pit
CN206570828U (en) Assembled steel sheet pile waling support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180209

Termination date: 20200526

CF01 Termination of patent right due to non-payment of annual fee