CN206570828U - Assembled steel sheet pile waling support system - Google Patents
Assembled steel sheet pile waling support system Download PDFInfo
- Publication number
- CN206570828U CN206570828U CN201720155778.9U CN201720155778U CN206570828U CN 206570828 U CN206570828 U CN 206570828U CN 201720155778 U CN201720155778 U CN 201720155778U CN 206570828 U CN206570828 U CN 206570828U
- Authority
- CN
- China
- Prior art keywords
- waling
- steel sheet
- sheet pile
- support
- inner support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model provides a kind of reasonable in design, strong operability, simply and easily assembled steel sheet pile waling support system structural system of constructing.A kind of assembled steel sheet pile waling support system, including steel sheet pile, waling and inner support, waling is arranged on the inside of steel sheet pile, inner support is used to support waling, and waling and inner support, which are constituted, sets bracket below frame structure system, waling, for supporting waling, bracket is welded with steel sheet pile, and inner support should be avoided conflicting with pile foundation casing, and system transform is installed in favor of integrally-built.
Description
Technical field
The utility model is related to a kind of waling support system, and in particular to a kind of assembled steel sheet pile waling support system,
Belong to traffic engineering New technical use field.
Background technology
The support of steel sheet pile waling is mainly used in supporting steel plate pile cofferdam, it is ensured that steel sheet pile is held in excavation of foundation pit and later stage
Platform, the safety of pier stud construction period, are removed after substructure construction is finished, and waling typically uses shaped steel, and support can use type
Steel or steel pipe.And at present between steel sheet pile waling and support using being welded to connect, method is cut using vapour during dismounting and removed, each component exists
Install with having substantial amounts of loss in demolishing process, turnover utilization rate is relatively low, while need to consume substantial amounts of welding material, it is economical
Property it is poor, field operation labor intensity is higher, and field operation danger coefficient is big, and efficiency of construction is relatively low.
Utility model content
The utility model purpose is to provide a kind of reasonable in design, strong operability, simply and easily assembling steel plate of constructing
Stake waling support system.
To achieve these goals, the utility model uses following technical scheme:
A kind of assembled steel sheet pile waling support system, including steel sheet pile, waling and inner support, waling are arranged on steel sheet pile
Inner side, inner support is used to support waling, and waling and inner support constitute and bracket set below frame structure system, waling, bracket with
Steel sheet pile is connected.
Above-mentioned assembled steel sheet pile waling support system preferred scheme, waling and inner support junction set on waling and cut
Power plate.
Above-mentioned assembled steel sheet pile waling support system preferred scheme, inner support is more than one layer.
Above-mentioned assembled steel sheet pile waling support system preferred scheme, is connected between waling and waling and inner support by flange
Connect.
Above-mentioned assembled steel sheet pile waling support system preferred scheme, waling and inner support be formed steel construction or shaped steel with
Steel pipe combination structure.
The beneficial effects of the utility model:
1st, steel sheet pile waling inner support uses assembled combining structure, simple in construction, workable;
2nd, each component is manufactured in factory, and precision is high;
3rd, it is connected by screw bolts between each component, installation rate is fast, efficiency of construction is high;
4th, total easy installation and removal, field operation labor intensity is low, good economy performance.
Brief description of the drawings
Fig. 1 is the floor map that the utility model selectes embodiment;
Fig. 2 is the elevational schematic view that the utility model selectes embodiment;
Fig. 3 is the side schematic view that the utility model selectes embodiment;
Fig. 4 is inner supporting structure schematic diagram;
Fig. 5 is waling structural representation.
In figure:1st, steel sheet pile, 2, waling, 3, inner support, 4, flange, 5, bracket, 6, shear plate, 7, intend construction bearing platform;8、
Pile foundation casing.
Embodiment
For the purpose of this utility model, technical scheme and advantage is more clearly understood, develop simultaneously implementation referring to the drawings
Example, the utility model is further described.
A kind of assembled steel sheet pile waling support system, including steel sheet pile 1, waling 2 and inner support 3, waling 2 are arranged on steel
The inner side of sheet pile 1, inner support is used to support waling 2, and waling 2 and inner support 3 constitute frame structure system, and the lower section of waling 2 sets support
Frame 5, for supporting waling 2, bracket 5 is welded with steel sheet pile 1, and inner support 3 should avoid conflicting with pile foundation 8, in favor of overall structure
Be installed on system transform.
In the present embodiment, by flange 4 and bolt connection between waling 2 and waling 2 and inner support 3, waling 2 and inner support
3 junctions set shear plate 6 on waling 2, and the horizontal thrust of the generation of inner support 3 is born with flange and bolt engineering.
In the present embodiment, waling 2 is vertically positioned provided with bracket 5 between steel sheet pile 1 and waling 2.
In the present embodiment, waling 2 and inner support 3 are formed steel construction or shaped steel and steel pipe combination structure, process and assemble side
Just.
The utility model installation method is as follows:
1st, waling 2 and inner support 3 are fabricated according to design drawing in factory, and is transported to job site successively;
2nd, after pile foundation construction is finished, interim platform for lining is set in working water level above casing 9;
3rd, surveying and locating, successively successively assembled waling 2 and inner support 3;For multilayer waling inner supporting structure, layer and layer it
Between using temporary structure connect it is integral;
4th, after waling 2 and inner support 3 are installed, temporary platform, overall decentralization to design attitude are removed;
5th, with waling 2 to be oriented to inserting piling steel sheet pile 1 successively, until completing whole steel sheet pile cofferdam construction.
6th, draw water back cover in cofferdam, sets bracket 5, cuts off casing 1 and follow-up bearing platform construction etc..
Above-mentioned embodiment is only specific case of the present utility model, is not to make other forms to the utility model
Limitation, any those skilled in the art are changed or are modified as possibly also with the technology contents of the disclosure above equivalent
The equivalent implementations of change.But on the premise of every technical principle without departing from the utility model, according to of the present utility model
Any simple modification, equivalent variations and remodeling that technical spirit is made to embodiment of above, should all fall into of the present utility model
Scope of patent protection.
Claims (5)
1. a kind of assembled steel sheet pile waling support system, it is characterised in that:Including steel sheet pile(1), waling(2)And inner support
(3), waling(2)It is arranged on steel sheet pile(1)Inner side, inner support is used to support waling(2), waling(2)And inner support(3)Constitute frame
Frame structural body system, waling(2)Lower section sets bracket(5), bracket(5)With steel sheet pile(1)Connection.
2. assembled steel sheet pile waling support system as claimed in claim 1, it is characterised in that:Waling(2)And inner support(3)Even
Connect and be in waling(2)Upper setting shear plate(6).
3. assembled steel sheet pile waling support system as claimed in claim 1 or 2, it is characterised in that:Inner support(3)For one layer with
On.
4. assembled steel sheet pile waling support system as claimed in claim 1 or 2, it is characterised in that:Waling(2)And waling(2)
And inner support(3)Between pass through flange(4)Connection.
5. assembled steel sheet pile waling support system as claimed in claim 1 or 2, it is characterised in that:Waling(2)And inner support
(3)It is formed steel construction or shaped steel and steel pipe combination structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720155778.9U CN206570828U (en) | 2017-02-21 | 2017-02-21 | Assembled steel sheet pile waling support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720155778.9U CN206570828U (en) | 2017-02-21 | 2017-02-21 | Assembled steel sheet pile waling support system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206570828U true CN206570828U (en) | 2017-10-20 |
Family
ID=60058651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720155778.9U Active CN206570828U (en) | 2017-02-21 | 2017-02-21 | Assembled steel sheet pile waling support system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206570828U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924411A (en) * | 2019-11-15 | 2020-03-27 | 中交武汉港湾工程设计研究院有限公司 | Steel sheet pile cofferdam prefabricated supporting structure convenient to system conversion |
-
2017
- 2017-02-21 CN CN201720155778.9U patent/CN206570828U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924411A (en) * | 2019-11-15 | 2020-03-27 | 中交武汉港湾工程设计研究院有限公司 | Steel sheet pile cofferdam prefabricated supporting structure convenient to system conversion |
CN110924411B (en) * | 2019-11-15 | 2024-06-14 | 中交武汉港湾工程设计研究院有限公司 | Steel sheet pile cofferdam assembled supporting structure convenient for system conversion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
LU102092B1 (en) | Newly-built or expanded wind power foundation structure on soft ground and construction method thereof | |
CN103397660A (en) | Underground construction constructed in assembled mode and construction method of underground construction | |
CN201546227U (en) | Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall | |
CN103882869A (en) | Inclined supporting pile structure for foundation pit support and construction method thereof | |
CN202925555U (en) | Supporting and protecting structure for inclined struts of foundation pit | |
CN110080418B (en) | Bolt-spliced detachable assembly type shear wall structure | |
CN205024712U (en) | Combined tower crane foundation | |
CN201679147U (en) | Underpinning structure for superstructure shear wall during underground top-down construction of high-rise building | |
CN105780802A (en) | Jacket offshore wind turbine foundation with brackets and construction method thereof | |
CN201250408Y (en) | Recovery type steel structure foundation pit exterior-protected device | |
CN110820765A (en) | Prefabricated enclosure structure for narrow deep foundation pit and construction method | |
CN104060617A (en) | Prefabricated internal support system and construction method for foundation pit support system | |
CN203547753U (en) | Profile steel concrete shaft wall base | |
CN101824825B (en) | Deep foundation pit open cutting construction method | |
CN203429648U (en) | Large steel cylinder cofferdam structure | |
CN216041201U (en) | Earlier prop and dig double-deck diagonal bracing foundation ditch enclosure system afterwards | |
CN104895079A (en) | Reverse construction method for piling steel sheet piles | |
CN206570828U (en) | Assembled steel sheet pile waling support system | |
CN103215965A (en) | Laminate type high-rise platform pile tower crane foundation and construction method | |
CN202416324U (en) | Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project | |
CN210887282U (en) | Steel grating ring type wind power tower foundation ring facility | |
CN211646415U (en) | Prefabricated enclosure structure for narrow deep foundation pit | |
CN205577187U (en) | Prefabricated steel pipe concrete constructional column rammed earth wall | |
CN205188982U (en) | Removable system of strutting of rectangle work well | |
CN212983870U (en) | Circular working pit supporting member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |