CN206986840U - Geomembrane system in bank base position - Google Patents

Geomembrane system in bank base position Download PDF

Info

Publication number
CN206986840U
CN206986840U CN201720262109.1U CN201720262109U CN206986840U CN 206986840 U CN206986840 U CN 206986840U CN 201720262109 U CN201720262109 U CN 201720262109U CN 206986840 U CN206986840 U CN 206986840U
Authority
CN
China
Prior art keywords
geomembrane
base position
dam body
bank base
geotechnological
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720262109.1U
Other languages
Chinese (zh)
Inventor
袁俊陶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201720262109.1U priority Critical patent/CN206986840U/en
Application granted granted Critical
Publication of CN206986840U publication Critical patent/CN206986840U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a bank-based geomembrane system, which comprises anchoring grooves (4) arranged on mountains at two sides, wherein a dam body (3) is arranged between the anchoring grooves (4) at the two sides, a geomembrane (2) is arranged at the joint of the downstream side of the dam body (3) and the anchoring grooves (4), and a geomembrane protective layer (1) is arranged at the outer side of the geomembrane (2); and two ends of the geomembrane (2) are anchored in the anchoring grooves (4) after being wound on the dam body (3). The utility model discloses can adapt to the dam body and warp, can avoid stress concentration, prevent that the geomembrane from tearing, avoid the prevention of seepage body inefficacy.

Description

A kind of geotechnological membranous system of bank base position
Technical field
A kind of geotechnological membranous system is the utility model is related to, particularly a kind of geotechnological membranous system of bank base position.
Background technology
In Hydraulic and Hydro-Power Engineering, geomembrane is had been widely used in engineering practice as impervious body.Dam body with The bank base position that massif connects, geomembrane deformation is maximum, and the stress born is maximum.Existing anchorage style by being rigidly connected, The deformation of dam body can not be well adapted to, geomembrane is also easy to produce tear at the position, causes impervious body tear failure.
The content of the invention
The purpose of this utility model is, there is provided a kind of geotechnological membranous system of bank base position.The utility model can adapt to Dam deformation, stress concentration can be avoided, prevents geomembrane from tearing, avoids impervious body from failing.
The technical solution of the utility model:A kind of geotechnological membranous system of bank base position, includes on the massif of both sides Anchor slot, dam body is provided between the anchor slot of both sides, dam body downstream and the junction of the anchor slot are provided with geomembrane, geotechnological The outside of film is provided with geomembrane protective layer;The both ends of the geomembrane are anchored in anchor slot after being unrolled on dam body.
The geotechnological membranous system of foregoing bank base position, the thickness of the geomembrane protective layer are more than 30cm.
The geotechnological membranous system of foregoing bank base position, the geomembrane are anchored in anchor slot, are tamped using flexible clay.
The geotechnological membranous system of foregoing bank base position, the geomembrane protective layer are stone-laying or concrete slab.
The geotechnological membranous system of foregoing bank base position, the geomembrane are anchored at part >=1.5m in anchor slot.
The beneficial effects of the utility model:
1st, the utility model by being anchored in anchor slot again after geomembrane is unrolled on dam body, after dam body water storage When downstream deforming, geomembrane can follow dam body to swim deformation downwardly together, will not produce stress in bank base link position Concentrate, can prevent geomembrane from tearing, the situation for avoiding impervious body from failing occurs.
, the utility model by the way that the thickness of geomembrane protective layer is set greater than into 30cm, geomembrane can be played compared with Good protective effect, ensure that geomembrane does not cause aging by ultraviolet radiation.
, the utility model anchor slot is tamped by using flexible clay, be backfilling and compacted and compare compared to conventional concrete, this The anchorage style of utility model can preferably play the effect for preventing that geomembrane from tearing.
Brief description of the drawings
Accompanying drawing 1 is structural representation of the present utility model;
Description of reference numerals:1- geomembrane protective layers, 2- geomembranes, 3- dam bodys, 4- anchor slots.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples, but is not intended as to the utility model The foundation of limitation.
Embodiment of the present utility model:
A kind of geotechnological membranous system of bank base position, as shown in Figure 1, include the anchor slot 4 on the massif of both sides, two Dam body 3 is provided between the anchor slot 4 of side, the downstream of dam body 3 and the junction of the anchor slot 4 are provided with geomembrane 2, geomembrane 2 Outside be provided with geomembrane protective layer 1;The both ends of the geomembrane 2 are anchored in anchor slot 4 after being unrolled on dam body 3.
The thickness of the geomembrane protective layer 1 is more than 30cm, and specific thickness is depending on practice of construction environment needs.
The geomembrane 2 is anchored in anchor slot 4, is tamped using flexible clay.
The geomembrane protective layer 1 is stone-laying or concrete slab.
The geomembrane 2 is anchored at part >=1.5m in anchor slot 4.
Operation principle:Dam foundation when geomembrane 2 anchors first along dam body 3 is wrapped up, along dam body 3 and basic contact surface Laying of unrolling is carried out, length of unrolling is more than 1.0m, is then anchored at the anchor slot 4 of lower section again, geotechnological when dam deforms Film 2 follows the dam foundation together, avoids geomembrane 2 from tearing or be drawn out.Substituted simultaneously by the way of being unrolled in clay anchor slot 4 The anchorage style of original bolt anchor slot.

Claims (5)

  1. A kind of 1. geotechnological membranous system of bank base position, it is characterised in that:Include the anchor slot on the massif of both sides(4), two The anchor slot of side(4)Between be provided with dam body(3), dam body(3)Downstream and the anchor slot(4)Junction be provided with geomembrane (2), geomembrane(2)Outside be provided with geomembrane protective layer(1);The geomembrane(2)Both ends in dam body(3)On unroll after anchor Gu in anchor slot(4)It is interior.
  2. 2. the geotechnological membranous system of bank base position according to claim 1, it is characterised in that:The geomembrane protective layer(1) Thickness be more than 30cm.
  3. 3. the geotechnological membranous system of bank base position according to claim 1, it is characterised in that:The geomembrane(2)It is anchored at Anchor slot(4)In, tamped using flexible clay.
  4. 4. the geotechnological membranous system of bank base position according to claim 1, it is characterised in that:The geomembrane protective layer(1) For stone-laying or concrete slab.
  5. 5. the geotechnological membranous system of bank base position according to claim 1, it is characterised in that:The geomembrane(2)It is anchored at Anchor slot(4)Interior part >=1.5m.
CN201720262109.1U 2017-03-17 2017-03-17 Geomembrane system in bank base position Active CN206986840U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720262109.1U CN206986840U (en) 2017-03-17 2017-03-17 Geomembrane system in bank base position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720262109.1U CN206986840U (en) 2017-03-17 2017-03-17 Geomembrane system in bank base position

Publications (1)

Publication Number Publication Date
CN206986840U true CN206986840U (en) 2018-02-09

Family

ID=61421473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720262109.1U Active CN206986840U (en) 2017-03-17 2017-03-17 Geomembrane system in bank base position

Country Status (1)

Country Link
CN (1) CN206986840U (en)

Similar Documents

Publication Publication Date Title
CN204780994U (en) Underground continuous wall lining wall construction structure
CN105464048A (en) Composite geomembrane anti-seepage structure capable of automatically adapting to weir body deformation and construction method
CN105672205B (en) A kind of rock leakage preventing structure
CN208280185U (en) A kind of post-cast strip advanced water-stopping construction
CN105298516A (en) Combined supporting structure of steel pipe pile steel-bar-embedded tunnel composite lining used for soft foundation
CN105926617B (en) A kind of structure and its construction method that protection can be provided anti-float anchor rod
CN105697021A (en) Prefabricated tunnel allowing tunnel shield to penetrate shallow covering riverbed and construction method
CN204703179U (en) A kind of composite geo-membrane sloping core cofferdam
CN101694100A (en) Waterproof construction of basement soleplate and construction method thereof
CN206204880U (en) A kind of side slope comprehensive regulation structure of prevention river channel erosion
CN110863502B (en) Construction method for dynamically adjusting foundation pit precipitation and plugging precipitation well and plugging structure
CN208981282U (en) A kind of high earthquake territory concrete face rockfill dam dam crest structure
CN206986840U (en) Geomembrane system in bank base position
CN110158542A (en) The Lossless connection structure and construction method of cut-pff wall and nut cap concrete
CN104314089A (en) Method for composite geo-membrane sloping core cofferdam
CN207228173U (en) A kind of underground project waterproof structure
CN205475098U (en) Panel rock -fill dam seepage prevention structure
CN205444109U (en) Can automatic adapt to composite geomembrane seepage prevention structure that weir body warp
CN210264737U (en) Waterproof water pressure resistant composite lining structure of full package
CN209923937U (en) Deep foundation pit supporting device
CN107587476B (en) Wave-blocking wall with prefabricated reverse arc olecranon structure and design and construction method thereof
CN206784320U (en) A kind of geomembrane air exit
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
CN206015619U (en) A kind of rock for reducing panel stress strain level