CN110863502B - Construction method and plugging structure for dynamic adjustment of foundation pit dewatering and plugging of dewatering wells - Google Patents
Construction method and plugging structure for dynamic adjustment of foundation pit dewatering and plugging of dewatering wells Download PDFInfo
- Publication number
- CN110863502B CN110863502B CN201910963424.0A CN201910963424A CN110863502B CN 110863502 B CN110863502 B CN 110863502B CN 201910963424 A CN201910963424 A CN 201910963424A CN 110863502 B CN110863502 B CN 110863502B
- Authority
- CN
- China
- Prior art keywords
- dewatering well
- well
- layer
- precipitation
- plugging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 68
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 161
- 238000001556 precipitation Methods 0.000 claims abstract description 147
- 238000007789 sealing Methods 0.000 claims abstract description 42
- 239000003673 groundwater Substances 0.000 claims abstract description 40
- 239000010410 layer Substances 0.000 claims description 83
- 238000000576 coating method Methods 0.000 claims description 49
- 239000011248 coating agent Substances 0.000 claims description 48
- 238000007667 floating Methods 0.000 claims description 40
- 239000000463 material Substances 0.000 claims description 38
- 239000004568 cement Substances 0.000 claims description 22
- 239000011247 coating layer Substances 0.000 claims description 18
- 239000004567 concrete Substances 0.000 claims description 17
- 238000000034 method Methods 0.000 claims description 16
- 239000010426 asphalt Substances 0.000 claims description 13
- 230000000149 penetrating effect Effects 0.000 claims description 12
- 238000004364 calculation method Methods 0.000 claims description 11
- 239000004575 stone Substances 0.000 claims description 8
- 238000004804 winding Methods 0.000 claims description 4
- 239000003973 paint Substances 0.000 claims 4
- 230000005484 gravity Effects 0.000 claims 2
- 238000005056 compaction Methods 0.000 claims 1
- 239000000758 substrate Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 4
- 238000013461 design Methods 0.000 description 10
- 230000000903 blocking effect Effects 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000012528 membrane Substances 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000002349 well water Substances 0.000 description 4
- 235000020681 well water Nutrition 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 3
- 239000011241 protective layer Substances 0.000 description 3
- 238000005728 strengthening Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 1
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000003566 sealing material Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 230000008961 swelling Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
技术领域Technical Field
本发明涉及一种建筑物深基坑施工的方法,具体涉及基坑降水动态调整及降水井封堵的施工方法与封堵结构。The invention relates to a method for constructing a deep foundation pit of a building, and in particular to a construction method and a blocking structure for dynamically adjusting foundation pit dewatering and blocking a dewatering well.
背景技术Background Art
长期以来,我国多数深基坑工程在进行土方开挖的过程中,均会遇到地下水位过高和地表水量过大的情况,而为了有效的改善施工条件和保证施工安全,通常在基坑外合理布置降水井,通过此种方法有效地减少了基坑范围内的潜水和承压水,成功地降低了地下水位,较好地解决了深基坑开挖和施工中的困难,同时也减少了基坑的施工对外围建筑物、管线及地面沉降等的影响。For a long time, most deep foundation pit projects in my country have encountered the situation of too high groundwater level and too much surface water during earth excavation. In order to effectively improve construction conditions and ensure construction safety, precipitation wells are usually reasonably arranged outside the foundation pit. This method effectively reduces groundwater and pressurized water within the foundation pit, successfully lowers the groundwater level, and better solves the difficulties in deep foundation pit excavation and construction. At the same time, it also reduces the impact of foundation pit construction on peripheral buildings, pipelines and ground subsidence.
当地下结构施工完成及土方回填完成后,地下水位标高满足设计要求的抗浮水位标高时,即可停止降水。降水井停止降水后,基坑内筏板位置的降水井由于建筑功能要求需要进行封堵。为了便于降水井的封堵,降水井井管一般采用铁管,井管外围焊接止水板,井管内注入水泥砂浆,井管口焊接止水板封口。When the underground structure construction is completed and the earthwork backfill is completed, the groundwater level meets the anti-floating water level required by the design, and the precipitation can be stopped. After the precipitation well stops precipitation, the precipitation well at the raft position in the foundation pit needs to be blocked due to the building function requirements. In order to facilitate the blocking of the precipitation well, the precipitation well pipe is generally made of iron pipe, the outer periphery of the well pipe is welded with a water stop plate, cement mortar is injected into the well pipe, and the well pipe mouth is welded with a water stop plate to seal it.
上述的现有技术方案存在以下缺陷:在设置降水井时,井管需要穿透基础筏板,因此破坏了筏板的防水层。而降水井在进行封堵时,仅在井管外围焊接一道止水板,未作特殊的防水处理,达不到止水效果,地下水会透过破坏的防水层沿井管外壁渗透到地下室地面。The above-mentioned prior art solutions have the following defects: when setting up the precipitation well, the well pipe needs to penetrate the foundation raft, thus destroying the waterproof layer of the raft. When the precipitation well is blocked, only a water stop plate is welded on the outer periphery of the well pipe without any special waterproof treatment, which fails to achieve the water stop effect. Groundwater will penetrate through the damaged waterproof layer along the outer wall of the well pipe to the basement floor.
发明内容Summary of the invention
本发明的目的是提供降水井封堵结构及其施工方法,以解决现有技术中深基坑封堵后渗水的问题。The purpose of the present invention is to provide a drainage well plugging structure and a construction method thereof, so as to solve the problem of water seepage after deep foundation pit plugging in the prior art.
为实现上述目的,本发明采用的技术方案是:提供一种基坑降水动态调整及降水井封堵的施工方法,其特征在于,施工步骤如下:To achieve the above object, the technical solution adopted by the present invention is: to provide a construction method for dynamic adjustment of foundation pit dewatering and plugging of dewatering wells, characterized in that the construction steps are as follows:
降低地下水位,并对所述地下水位进行动态调整,在所述降水井的外缘缠绕膨胀条;Lowering the groundwater level and dynamically adjusting the groundwater level by winding expansion strips around the outer edge of the precipitation well;
施工成型垫层,在所述垫层上铺设防水涂料层组并铺设防水卷材,在所述防水卷材与所述降水井的接触位置缠绕止水套环;Constructing a formed cushion layer, laying a waterproof coating layer group and a waterproof coiled material on the cushion layer, and winding a water stop ring at the contact position between the waterproof coiled material and the precipitation well;
施工筏板基础层,在所述防水卷材上施工成型筏板基础层,并在所述降水井和所述筏板基础层的接触位置设置第一止水板,所述第一止水板套设于所述降水井的外缘;Constructing a raft foundation layer, constructing a formed raft foundation layer on the waterproof membrane, and arranging a first water stop plate at a contact position between the precipitation well and the raft foundation layer, wherein the first water stop plate is sleeved on the outer edge of the precipitation well;
设置封闭板,在所述降水井的内部设置封闭板,所述封闭板的外缘和所述降水井的内侧壁固定连接。A closing plate is arranged inside the precipitation well, and the outer edge of the closing plate is fixedly connected to the inner wall of the precipitation well.
施工封闭墩盖,在设置所述封闭板后,在所述降水井的井口上浇筑封闭墩盖,所述封闭墩盖位于所述降水井的井口上并对所述降水井的井口进行封闭。Constructing a closed pier cover, after setting the closed plate, pouring a closed pier cover on the wellhead of the precipitation well, the closed pier cover is located on the wellhead of the precipitation well and closes the wellhead of the precipitation well.
进一步地,还包括如下施工步骤:Furthermore, the method further comprises the following construction steps:
施工筏板基础层后,在所述筏板基础层靠近顶部的位置涂抹防水封闭涂料,且所述防水封闭涂料环绕所述降水井涂抹。After the raft foundation layer is constructed, a waterproof sealing coating is applied near the top of the raft foundation layer, and the waterproof sealing coating is applied around the precipitation well.
进一步地,还包括如下施工步骤:Furthermore, the method further comprises the following construction steps:
在涂抹所述防水封闭涂料后,在所述降水井的外缘位置设置有第二止水板,所述第二止水板套设于所述降水井的外缘,所述第二止水板位于所述防水封闭涂料的上方。After applying the waterproof sealing coating, a second water stop plate is arranged at the outer edge of the precipitation well, the second water stop plate is sleeved on the outer edge of the precipitation well, and the second water stop plate is located above the waterproof sealing coating.
进一步地,还包括如下施工步骤:Furthermore, the method further comprises the following construction steps:
在设置所述封闭板前,向所述降水井内填充封堵材料直至所述封堵材料的高度距所述降水井井口的距离为100mm至300mm。Before setting the closing plate, the drainage well is filled with a plugging material until the height of the plugging material is 100 mm to 300 mm from the wellhead of the drainage well.
进一步地,所述封堵材料包括水泥和抗渗自密实微膨胀细石砼。。Furthermore, the plugging material includes cement and anti-seepage self-compacting micro-expanding fine stone concrete.
进一步地,在向所述降水井内填充所述封堵材料时,先向所述降水井内填充水泥再填充抗渗自密实微膨胀细石砼。Furthermore, when filling the plugging material into the precipitation well, cement is firstly filled into the precipitation well and then the anti-seepage self-compacting micro-expanding fine stone concrete is filled into the precipitation well.
进一步地,所述封闭墩盖为浇筑的混凝土墩,且所述封闭墩盖的半径为500mm至750mm,厚度为300mm至500mm厚的圆柱形墩盖。Furthermore, the closed pier cover is a cast concrete pier, and the closed pier cover has a radius of 500 mm to 750 mm and a thickness of 300 mm to 500 mm.
进一步地,所述地下水位动态调整的方法包括如下步骤:Furthermore, the method for dynamically adjusting the groundwater level comprises the following steps:
在外部主体结构施工前,计算最初抗浮物体的抗浮能力,确定最初控制水位标高,并将所述地下水位降低至不高于所述最初控制水位标高。Before the construction of the external main structure, the anti-floating capacity of the initial anti-floating object is calculated, the initial control water level elevation is determined, and the groundwater level is lowered to no higher than the initial control water level elevation.
进一步地,所述地下水位动态调整的方法包括:Furthermore, the method for dynamically adjusting the groundwater level includes:
在外部主体结构施工阶段,计算阶段抗浮物体的抗浮能力,确定阶段控制水位标高,并将所述地下水位的高度调整至不高于所述阶段控制水位标高。During the external main structure construction phase, the anti-floating capacity of the anti-floating objects is calculated, the stage control water level elevation is determined, and the height of the groundwater level is adjusted to be no higher than the stage control water level elevation.
进一步地,所述防水涂料层组包括水泥基渗透结晶型防水涂料和非固化橡胶沥青防水涂料的任一个或两个。Furthermore, the waterproof coating layer group includes any one or both of a cement-based penetrating crystalline waterproof coating and a non-curing rubber asphalt waterproof coating.
本发明还公开了一种降水井封堵结构,其包括插设于地基上的降水井,还包括依次铺设于所述地基上的垫层、防水层和筏板基础层,所述降水井穿过所述垫层、所述防水层和所述筏板基础层并凸出于所述筏板基础层,所述降水井的外缘与所述垫层接触的位置缠绕有膨胀条。The present invention also discloses a drainage well sealing structure, which includes a drainage well inserted on a foundation, and also includes a cushion layer, a waterproof layer and a raft foundation layer laid in sequence on the foundation, the drainage well passes through the cushion layer, the waterproof layer and the raft foundation layer and protrudes from the raft foundation layer, and an expansion strip is wrapped around the position where the outer edge of the drainage well contacts the cushion layer.
进一步地,还包括第一止水板,所述第一止水板套设于所述降水井的外缘,且所述第一止水板设置在所述降水井与所述筏板基础层连接处。Furthermore, it also includes a first water stop plate, which is sleeved on the outer edge of the precipitation well, and the first water stop plate is arranged at the connection between the precipitation well and the raft foundation layer.
进一步地,所述降水井的上端口设置有封闭板,所述封闭板的外缘固定于所述降水井的内壁上。Furthermore, a closing plate is provided at the upper port of the precipitation well, and the outer edge of the closing plate is fixed to the inner wall of the precipitation well.
进一步地,所述封闭板的数量至少为两个。Furthermore, the number of the closing plates is at least two.
进一步地,还包括将所述降水井的井口封闭的封闭墩盖,且所述封闭墩盖的半径为500mm至750mm,厚度为300mm至500mm的圆柱形墩盖。Furthermore, it also includes a closed pier cover for closing the wellhead of the precipitation well, and the closed pier cover has a radius of 500mm to 750mm and a cylindrical pier cover with a thickness of 300mm to 500mm.
进一步地,所述防水层包括涂覆于所述垫层上的防水涂料层组和铺设在所述防水涂料层组上的防水卷材。Furthermore, the waterproof layer includes a waterproof coating layer group coated on the cushion layer and a waterproof coiled material laid on the waterproof coating layer group.
进一步地,所述防水涂料层组包括水泥基渗透结晶型防水涂料和非固化橡胶沥青防水涂料。Furthermore, the waterproof coating layer group includes a cement-based penetrating crystalline waterproof coating and a non-curing rubber asphalt waterproof coating.
进一步地,所述降水井的外缘与所述防水卷材相接触的位置套设有止水套环。Furthermore, a water-stop ring is provided at a position where the outer edge of the precipitation well contacts the waterproof membrane.
综上所述,本发明的有益效果为:In summary, the beneficial effects of the present invention are:
1、降低地下水位,方便后续的施工进行和更好的实现降水井的封堵。成型垫层,可以起到防水的作用,避免降水井中的水从井管渗出,流到地下室内。筏板基础层对垫层起到了保护的作用,避免垫层损坏,造成地面渗水。封闭板对降水井的井口进行封闭,封闭板的外缘固定于降水井的内壁上,近一步加强了降水井封堵的效果,避免了降水井中的水渗入到建筑物的地下室内。通过设置的和膨胀条防水涂料层,对地下水进行防堵,避免地下水渗入到地下室内,起到了加强防水的作用。膨胀条有遇水膨胀的性质,当有地下水渗出时,膨胀条膨胀,阻塞渗水的缝隙,减缓了渗水量,避免了地下室渗水。第一止水板套设于降水井的外缘,且第一止水板设置在降水井与筏板基础层的接触位置,此种设置,可以对降水井的外壁进行阻塞,避免井水从降水井的外壁渗出。1. Lower the groundwater level to facilitate subsequent construction and better seal the precipitation well. The formed cushion layer can play a waterproof role and prevent the water in the precipitation well from seeping out of the well pipe and flowing into the basement. The raft foundation layer protects the cushion layer to prevent damage to the cushion layer and cause ground seepage. The closing plate closes the wellhead of the precipitation well, and the outer edge of the closing plate is fixed on the inner wall of the precipitation well, which further enhances the sealing effect of the precipitation well and prevents the water in the precipitation well from seeping into the basement of the building. Through the setting of the expansion strip waterproof coating layer, the groundwater is blocked to prevent the groundwater from seeping into the basement, which plays a role in strengthening waterproofing. The expansion strip has the property of expanding when it encounters water. When groundwater seeps out, the expansion strip expands, blocks the gap of water seepage, slows down the amount of water seepage, and prevents water seepage in the basement. The first water stop plate is sleeved on the outer edge of the precipitation well, and the first water stop plate is set at the contact position between the precipitation well and the raft foundation layer. This setting can block the outer wall of the precipitation well to prevent well water from seeping out of the outer wall of the precipitation well.
2、封闭板的数量为至少两个,且封闭板设置在井管的内壁上,通过此种设置,加强了井管的封堵,避免了地下水从井管内渗出。2. There are at least two closing plates, and the closing plates are arranged on the inner wall of the well pipe. This arrangement strengthens the sealing of the well pipe and prevents groundwater from seeping out of the well pipe.
3、通过设置止水套环,且止水套环为橡胶材质,橡胶止水套环起到了防水的作用,避免了地下水从井管的侧壁渗出。3. By setting a water-stop ring made of rubber, the rubber water-stop ring plays a waterproof role and prevents groundwater from seeping out from the side wall of the well pipe.
4、通过设置防水封闭涂料,加强井管的防水性,避免地下水从井管内渗出。通过设置第二止水板,加强井管的防水性。同时第二止水板位于防水封闭涂料的上方,对水防水封闭涂料起到了保护的作用。在后续施工浇筑混凝土时,避免了混凝土直接冲击到防水封闭涂料,造成其损坏。4. By setting the waterproof sealing coating, the waterproof property of the well pipe is enhanced to prevent groundwater from seeping out of the well pipe. By setting the second water stop plate, the waterproof property of the well pipe is enhanced. At the same time, the second water stop plate is located above the waterproof sealing coating, which plays a protective role for the waterproof sealing coating. When pouring concrete in the subsequent construction, it is prevented that the concrete directly impacts the waterproof sealing coating and causes damage to it.
5、从开始地下降水至停止地下降水期间,原本的降水功率保持不变,地下水位一直控制在同一标高。实际上设计往往根据地勘报告中的最高的地下水位计算结构抗浮能力,且计算结果会乘上很大的安全系数,抗浮设计非常保守。随外部主体结构不断施工完成,不变的设计降水要求,使得降水工作做了大量的无用功,造成了不必要的资源浪费。因此,通过对外部主体结构的不同施工阶段,计算阶段抗浮能力,确定阶段控制水位标高,对基坑降水水位动态调整,极大的节约了施工成本及人工维护成本。5. From the beginning of underground water drop to the end of underground water drop, the original water drop power remains unchanged, and the groundwater level is always controlled at the same elevation. In fact, the design often calculates the anti-floating capacity of the structure based on the highest groundwater level in the geological survey report, and the calculation result will be multiplied by a large safety factor, and the anti-floating design is very conservative. With the continuous completion of the external main structure, the unchanged design water drop requirements have made a lot of water drop work useless, resulting in unnecessary waste of resources. Therefore, by calculating the anti-floating capacity of the different construction stages of the external main structure, determining the stage control water level elevation, and dynamically adjusting the foundation pit water drop level, the construction cost and labor maintenance cost are greatly saved.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本发明具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
图1为本发明实施例提供的降水井封堵结构的局部剖视结构示意图;FIG1 is a schematic diagram of a partial cross-sectional structure of a drainage well plugging structure provided by an embodiment of the present invention;
图2为本发明实施例提供的降水井封堵结构的另一局部剖视结构示意图;FIG2 is another partial cross-sectional structural schematic diagram of the precipitation well plugging structure provided by an embodiment of the present invention;
附图标记说明:Description of reference numerals:
1、降水井;11、膨胀条;12、第一止水板;13、封闭板;14、止水套环;15、防水封闭涂料;16、第二止水板;17、封堵材料;2、地基;21、垫层;3、筏板基础层;4、防水层;41、防水涂料层组;411、水泥基渗透结晶型防水涂料;412、非固化橡胶沥青防水涂料;42、防水卷材;43、保护层;5、封闭墩盖。1. Drainage well; 11. Expansion strip; 12. First waterstop; 13. Closing plate; 14. Waterstop collar; 15. Waterproof sealing coating; 16. Second waterstop; 17. Sealing material; 2. Foundation; 21. Cushion; 3. Raft foundation layer; 4. Waterproof layer; 41. Waterproof coating layer group; 411. Cement-based penetrating crystalline waterproof coating; 412. Non-curing rubber asphalt waterproof coating; 42. Waterproof membrane; 43. Protective layer; 5. Closed pier cover.
具体实施方式DETAILED DESCRIPTION
下面将结合附图对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
在本发明的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”等应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
此外,下面所描述的本发明不同实施方式中所涉及的技术特征只要彼此之间未构成冲突就可以相互结合。In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
参照图1和图2,本发明还提供一种基坑降水动态调整及降水井1封堵结构的施工方法,用于实施上述任一条中的降水井1封堵结构,降水井1封堵结构的施工方法,施工步骤如下:1 and 2, the present invention also provides a construction method for dynamic adjustment of foundation pit dewatering and a dewatering well 1 plugging structure, which is used to implement the dewatering well 1 plugging structure in any of the above items. The construction method of the dewatering well 1 plugging structure has the following construction steps:
S1,降低地下水位,在水位降低至预设值时,即在所述降水井1的外缘缠绕膨胀条11;在施工前一个小时,加大降水功率,降低地下水位,然后安装膨胀条11,膨胀条11有遇水膨胀的性质,当有地下水渗出时,膨胀条11膨胀,阻塞渗水的缝隙,减缓了渗水量,避免了地下室渗水。S1, lowering the groundwater level. When the water level drops to a preset value, the expansion strip 11 is wound around the outer edge of the precipitation well 1; one hour before construction, the precipitation power is increased to lower the groundwater level, and then the expansion strip 11 is installed. The expansion strip 11 has the property of expanding when it comes into contact with water. When groundwater seeps out, the expansion strip 11 expands to block the gaps for water seepage, thereby slowing down the amount of water seepage and avoiding water seepage in the basement.
S2,施工成型垫层21,在所述垫层21上铺设防水涂料层组41并铺设防水卷材42,在所述防水卷材42与所述降水井1的接触位置缠绕止水套环14。所述防水涂料层组41包括水泥基渗透结晶型防水涂料411和非固化橡胶沥青防水涂料412的任一个或两个,本实施例中先涂抹水泥基渗透结晶型防水涂料411,然后在水泥基渗透结晶型防水涂料411上涂抹非固化橡胶沥青防水涂料412;橡胶止水套环14起到了防水的作用,避免了地下水从井管的侧壁渗出。S2, construct the formed cushion layer 21, lay the waterproof coating layer group 41 and the waterproof coiled material 42 on the cushion layer 21, and wind the water stop collar 14 around the contact position between the waterproof coiled material 42 and the precipitation well 1. The waterproof coating layer group 41 includes any one or both of the cement-based penetrating crystalline waterproof coating 411 and the non-curing rubber asphalt waterproof coating 412. In this embodiment, the cement-based penetrating crystalline waterproof coating 411 is first applied, and then the non-curing rubber asphalt waterproof coating 412 is applied on the cement-based penetrating crystalline waterproof coating 411; the rubber water stop collar 14 plays a waterproof role, preventing groundwater from seeping out from the side wall of the well pipe.
S3,施工筏板基础层3,在所述防水卷材42上施工成型筏板基础层3,并在所述降水井1和所述筏板基础层3的接触位置设置第一止水板12,所述第一止水板12套设于所述降水井1的外缘;第一止水板12套设于降水井1的外缘,可以对降水井1的外壁进行阻塞,避免井水从降水井1的外壁渗出。S3, construct a raft foundation layer 3, construct a formed raft foundation layer 3 on the waterproof membrane 42, and set a first waterstop plate 12 at the contact position between the precipitation well 1 and the raft foundation layer 3, and the first waterstop plate 12 is sleeved on the outer edge of the precipitation well 1; the first waterstop plate 12 is sleeved on the outer edge of the precipitation well 1, which can block the outer wall of the precipitation well 1 to prevent well water from seeping out from the outer wall of the precipitation well 1.
S4,在所述筏板基础层3靠近顶部的位置涂抹防水封闭涂料15,且所述防水封闭涂料15环绕所述降水井1涂抹。在涂抹所述防水封闭涂料15后,在所述降水井1的外缘位置设置有第二止水板16,所述第二止水板16套设于所述降水井1的外缘,所述第二止水板16位于所述防水封闭涂料15的上方。其中,也可先安装第二止水板16,然后再涂抹防水封闭涂料15,只要保障第二止水板16位于防水封闭涂料15的上方即可,此处不作唯一限定。第二止水板16为钢板,加强了井管的防水性能,同时第二止水板16位于防水封闭涂料15的上方,对防水封闭涂料15起到了保护的作用。S4, apply a waterproof sealing coating 15 near the top of the raft foundation layer 3, and the waterproof sealing coating 15 is applied around the precipitation well 1. After applying the waterproof sealing coating 15, a second water stop plate 16 is provided at the outer edge of the precipitation well 1, and the second water stop plate 16 is sleeved on the outer edge of the precipitation well 1, and the second water stop plate 16 is located above the waterproof sealing coating 15. Among them, the second water stop plate 16 can also be installed first, and then the waterproof sealing coating 15 is applied, as long as the second water stop plate 16 is located above the waterproof sealing coating 15, and this is not the only limitation here. The second water stop plate 16 is a steel plate, which enhances the waterproof performance of the well pipe. At the same time, the second water stop plate 16 is located above the waterproof sealing coating 15, which protects the waterproof sealing coating 15.
S5,设置封闭板13,在所述降水井1的内部设置封闭板13,所述封闭板13的外缘和所述降水井1的内侧壁固定连接。具体的,封闭板13为钢板,数量为两个,且顶部的封闭板13与井管的上端相平。封闭板13封闭井口,避免了降水井1中的水溢出,同时也防止了外部的水进入到降水井1内。S5, a closing plate 13 is provided inside the precipitation well 1, and the outer edge of the closing plate 13 is fixedly connected to the inner wall of the precipitation well 1. Specifically, the closing plates 13 are steel plates, and there are two of them, and the top closing plate 13 is flush with the upper end of the well pipe. The closing plate 13 closes the wellhead, preventing the water in the precipitation well 1 from overflowing, and also preventing the external water from entering the precipitation well 1.
S6,施工封闭墩盖5,在设置所述封闭板13后,在所述降水井1的井口上浇筑封闭墩盖5,所述封闭墩盖5位于所述降水井1的井口上并对所述降水井1的井口进行封闭。所述封闭墩盖5为浇筑的混凝土墩,且所述封闭墩盖5的半径为500mm至750mm,厚度为300mm至500mm厚的圆柱形墩盖,本实施例中封闭墩盖5的半径为600mm,厚度为400mm。封闭墩盖5为设置在降水井1顶端的水泥墩,其为在完工后对降水井1进行封闭的封盖,通过该封盖可以对降水口进行封闭,从而保证水不会从降水井1的顶端进入降水井1的内部,其中封闭墩盖5的形状可以为半径为500mm至750mm,厚度为300mm至500mm的圆柱形墩盖,也可以为方形墩盖或其他形状的墩盖。当然,根据实际情况和具体需求,封闭墩盖5的尺寸可以更大,此处不作唯一限定。S6, construct the closed pier cover 5. After setting the closing plate 13, cast the closed pier cover 5 on the wellhead of the precipitation well 1. The closed pier cover 5 is located on the wellhead of the precipitation well 1 and closes the wellhead of the precipitation well 1. The closed pier cover 5 is a cast concrete pier, and the radius of the closed pier cover 5 is 500mm to 750mm, and the thickness is 300mm to 500mm thick cylindrical pier cover. In this embodiment, the radius of the closed pier cover 5 is 600mm and the thickness is 400mm. The closed pier cover 5 is a cement pier set at the top of the precipitation well 1. It is a cover to close the precipitation well 1 after completion. The precipitation outlet can be closed by the cover, so as to ensure that water will not enter the interior of the precipitation well 1 from the top of the precipitation well 1. The shape of the closed pier cover 5 can be a cylindrical pier cover with a radius of 500mm to 750mm and a thickness of 300mm to 500mm, or a square pier cover or a pier cover of other shapes. Of course, according to actual conditions and specific needs, the size of the closed pier cover 5 can be larger, and this is not the only limitation here.
降低地下水位,方便后续的施工进行和更好的实现降水井1的封堵。成型垫层21,可以起到防水的作用,避免降水井1中的水从井管渗出,流到地下室内。筏板基础层3对垫层21起到了保护的作用,避免垫层21损坏,造成地面渗水。封闭板13对降水井1的井口进行封闭,封闭板13的外缘固定于降水井1的内壁上,近一步加强了降水井1封堵的效果,避免了降水井1中的水渗入到建筑物的地下室内。通过设置膨胀条11和防水涂料层,对地下水进行防堵,避免地下水渗入到地下室内,起到了加强防水的作用。膨胀条11有遇水膨胀的性质,当有地下水渗出时,膨胀条11膨胀,阻塞渗水的缝隙,减缓了渗水量,避免了地下室渗水。第一止水板12套设于降水井1的外缘,且第一止水板12设置在降水井1与筏板基础层3的接触位置,此种设置,可以对降水井1的外壁进行阻塞,避免井水从降水井1的外壁渗出。Lowering the groundwater level facilitates subsequent construction and better plugging of the precipitation well 1. The molded cushion layer 21 can play a waterproof role, preventing the water in the precipitation well 1 from seeping out of the well pipe and flowing into the basement. The raft foundation layer 3 protects the cushion layer 21, preventing the cushion layer 21 from being damaged and causing ground seepage. The closing plate 13 closes the wellhead of the precipitation well 1, and the outer edge of the closing plate 13 is fixed on the inner wall of the precipitation well 1, further strengthening the effect of plugging the precipitation well 1, and preventing the water in the precipitation well 1 from seeping into the basement of the building. By setting the expansion strip 11 and the waterproof coating layer, the groundwater is prevented from being blocked, and the groundwater is prevented from seeping into the basement, which plays a role in strengthening waterproofing. The expansion strip 11 has the property of swelling when it encounters water. When groundwater seeps out, the expansion strip 11 expands, blocks the gap of water seepage, slows down the amount of water seepage, and prevents water seepage in the basement. The first water stop plate 12 is sleeved on the outer edge of the precipitation well 1, and the first water stop plate 12 is set at the contact position between the precipitation well 1 and the raft foundation layer 3. This setting can block the outer wall of the precipitation well 1 to prevent well water from seeping out of the outer wall of the precipitation well 1.
进一步地,作为本发明提供的降水井1封堵结构的施工方法,还包括如下施工步骤:Furthermore, the construction method of the plugging structure of the precipitation well 1 provided by the present invention also includes the following construction steps:
在设置所述封闭板13前,向所述降水井1内填充封堵材料17直至所述封堵材料17的高度距所述降水井1井口的距离为100mm至300mm,本实施例中距所述降水井1井口的距离为200mm。所述封堵材料17包括水泥和抗渗自密实微膨胀细石砼。在向所述降水井1内填充所述封堵材料17时,先向所述降水井1内填充水泥再填充抗渗自密实微膨胀细石砼。Before setting the closing plate 13, the plugging material 17 is filled into the precipitation well 1 until the height of the plugging material 17 is 100 mm to 300 mm away from the wellhead of the precipitation well 1. In this embodiment, the distance from the wellhead of the precipitation well 1 is 200 mm. The plugging material 17 includes cement and impermeable self-compacting micro-expanding fine stone concrete. When the plugging material 17 is filled into the precipitation well 1, cement is first filled into the precipitation well 1 and then the impermeable self-compacting micro-expanding fine stone concrete is filled.
具体的,在填充封堵材料17之前,需将降水井1内的水泵拔出,水泵取出后,将一袋水泥投入降水井1中,然后投入抗渗自密实微膨胀细石砼。当然,根据施工需求,水泥和抗渗自密实微膨胀细石砼也可替换成其他遇水膨胀的建筑材料。Specifically, before filling the plugging material 17, the water pump in the precipitation well 1 needs to be pulled out. After the water pump is taken out, a bag of cement is put into the precipitation well 1, and then the anti-seepage self-compacting micro-expansion fine stone concrete is put in. Of course, according to construction requirements, cement and anti-seepage self-compacting micro-expansion fine stone concrete can also be replaced with other building materials that expand when exposed to water.
进一步地,作为本发明提供的降水井1封堵结构的施工方法,还包括如下施工步骤:Furthermore, the construction method of the plugging structure of the precipitation well 1 provided by the present invention also includes the following construction steps:
在外部主体结构施工前,计算最初抗浮物体的抗浮能力,确定最初控制水位标高,并将所述地下水位降低至不高于所述最初控制水位标高。随后再进行到外部主体结构施工阶段Before the construction of the external main structure, the anti-floating capacity of the initial anti-floating object is calculated, the initial control water level elevation is determined, and the groundwater level is lowered to no higher than the initial control water level elevation. Then the external main structure construction phase is carried out.
在外部主体结构施工阶段,计算阶段抗浮物体的抗浮能力,确定阶段控制水位标高,并将所述地下水位的高度调整至不高于所述阶段控制水位标高。During the external main structure construction phase, the anti-floating capacity of the anti-floating objects is calculated, the stage control water level elevation is determined, and the height of the groundwater level is adjusted to be no higher than the stage control water level elevation.
其中,最初控制水位标高是指筏板基础层3下表面的水位高度,水位降到筏板基础层3以下,就不会对筏板等主体结构产生浮力。阶段控制水位标高是指施工后的主体结构和抗浮物体的抗浮水位标高。在控制地下水位时,通过水泵抽水,把穿设于筏板基础层3的降水井1内的水,排放到筏板基础层3外部的降水井1中,实现了施工时的水位控制,即为通过井点降水的方法实现地下水位的控制。Among them, the initial controlled water level elevation refers to the water level height on the lower surface of the raft foundation layer 3. When the water level drops below the raft foundation layer 3, it will not generate buoyancy on the main structure such as the raft. The stage controlled water level elevation refers to the anti-floating water level elevation of the main structure and anti-floating objects after construction. When controlling the groundwater level, water is pumped out by a water pump to discharge the water in the precipitation well 1 penetrating the raft foundation layer 3 into the precipitation well 1 outside the raft foundation layer 3, thereby realizing water level control during construction, that is, realizing groundwater level control by well point precipitation method.
其中,最初控制水位标高的计算方法如下:首先选取抗浮物体,本实施中的抗浮物为抗浮锚杆,抗浮锚杆的最初控制水位标高的计算方法如下:The calculation method of the initial control water level elevation is as follows: first, an anti-floating object is selected. The anti-floating object in this implementation is an anti-floating anchor rod. The calculation method of the initial control water level elevation of the anti-floating anchor rod is as follows:
计算单元内抗浮锚杆数量为m根,每根锚杆抗拔承载力特征值FkN,其中本技术结构梁重量作为抗浮安全储备不予计算,一个轴网线为一个计算单元,在绘制建筑平面图之前,需要先绘制轴网线,轴网线是由建筑轴线组成的网,是人为地在建筑图纸中为了标示构件的详细尺寸,按照一般的习惯标准虚设的,习惯上标注在对称界面或截面构件的中心线上。The number of anti-floating anchors in the calculation unit is m, and the characteristic value of the pull-out bearing capacity of each anchor is FkN. The weight of the structural beam of this technology is not calculated as an anti-floating safety reserve. An axis grid line is a calculation unit. Before drawing the building plan, it is necessary to draw the axis grid line first. The axis grid line is a network composed of the building axis. It is artificially set up in the building drawings according to general customary standards to indicate the detailed dimensions of the components. It is usually marked on the center line of the symmetrical interface or section component.
所以,普通区域内抗浮锚杆可抗水位高度为h米,故该区域仅在锚杆单独作用下的可抗水位标高为hp1米:Therefore, the water level that the anti-floating anchor can resist in the general area is h meters, so the water level elevation that can be resisted in this area only under the action of the anchor alone is hp1 meter:
hp1为阶段控制水位标高hp1 is the stage control water level elevation
hs为最初控制水位标高hs is the initial controlled water level elevation
此时无论可抗水位标高是多少,降水高度都为基础底板以下,因为此时主体结构还未施工,抗浮锚杆未起作用。At this time, no matter what the water level is, the water level is below the foundation slab, because the main structure has not been constructed yet and the anti-floating anchor rods are not effective.
在外部主体结构施工阶段的阶段控制水位标高计算方法如下:The calculation method of the stage control water level elevation during the external main structure construction stage is as follows:
首先对垫层与基础结构折算:First, the cushion layer and foundation structure are converted:
施工完成阶段,外部主体结构折算:At the construction completion stage, the external main structure is converted into:
所以此时的可抗水位标高为:So the resistible water level at this time is:
普通区域内抗浮锚杆可抗水位高度为h米。故该区域在地下主体结构施工完成时可抗水位标高为hp2米;The anti-floating anchor rod in the general area can resist the water level height of h meters. Therefore, the anti-floating water level elevation of this area is hp2 meters when the underground main structure construction is completed;
故当外部主体结构施工完成后,基坑降水高度由原来的水位不超过hs调整为hp2米。Therefore, when the construction of the external main structure is completed, the foundation pit dewatering height is adjusted from the original water level not exceeding hs to hp2 meters.
随着外部主体结构的施工进行,计算不同施工阶段的阶段水位标高,当阶段水位标高低于相对水位标高,且水位较稳定,此时满足停止降水的条件,即可对降水井停止降水,随后可对降水井进行封堵。As the construction of the external main structure proceeds, the stage water level elevations of different construction stages are calculated. When the stage water level elevation is lower than the relative water level elevation and the water level is relatively stable, the conditions for stopping precipitation are met and precipitation in the precipitation well can be stopped. The precipitation well can then be sealed.
从开始地下降水至停止地下降水期间,原本的降水功率保持不变,地下水位一直控制在同一标高。实际上设计往往根据地勘报告中的最高的地下水位计算结构抗浮能力,且计算结果会乘上很大的安全系数,抗浮设计非常保守。随外部主体结构不断施工完成,不变的设计降水要求,使得降水工作做了大量的无用功,造成了不必要的资源浪费。因此,通过对外部主体结构的不同施工阶段,计算阶段抗浮能力,确定阶段控制水位标高,对基坑降水水位动态调整,极大的节约了施工成本及人工维护成本,也可以使得基坑提前降水。从开始地下降水至停止地下降水期间,原本的降水功率保持不变,地下水位一直控制在同一标高。实际上设计往往根据地勘报告中的最高的地下水位计算结构抗浮能力,且计算结果会乘上很大的安全系数,抗浮设计非常保守。随外部主体结构不断施工完成,不变的设计降水要求,使得降水工作做了大量的无用功,造成了不必要的资源浪费。因此,通过对外部主体结构的不同施工阶段,计算阶段抗浮能力,确定阶段控制水位标高,对基坑降水水位动态调整,极大的节约了施工成本及人工维护成本,也可以使得基坑提前降水。From the beginning of underground watering to the end of underground watering, the original watering power remains unchanged, and the groundwater level is always controlled at the same elevation. In fact, the design often calculates the anti-buoyancy capacity of the structure based on the highest groundwater level in the geological survey report, and the calculation result will be multiplied by a large safety factor, and the anti-buoyancy design is very conservative. With the continuous completion of the external main structure, the unchanged design watering requirements have made a lot of useless work in the watering work, resulting in unnecessary waste of resources. Therefore, by calculating the anti-buoyancy capacity of the stage at different construction stages of the external main structure, determining the stage control water level elevation, and dynamically adjusting the foundation pit watering level, the construction cost and labor maintenance cost are greatly saved, and the foundation pit can also be dewatered in advance. From the beginning of underground watering to the end of underground watering, the original watering power remains unchanged, and the groundwater level is always controlled at the same elevation. In fact, the design often calculates the anti-buoyancy capacity of the structure based on the highest groundwater level in the geological survey report, and the calculation result will be multiplied by a large safety factor, and the anti-buoyancy design is very conservative. With the continuous completion of the external main structure, the unchanged design watering requirements have made a lot of useless work in the watering work, resulting in unnecessary waste of resources. Therefore, by calculating the anti-floating capacity of the different construction stages of the external main structure, determining the stage control water level elevation, and dynamically adjusting the foundation pit dewatering water level, the construction cost and labor maintenance cost are greatly saved, and the foundation pit can also be dewatered in advance.
参照图1和图2,现对本发明提供的降水井1封堵结构进行说明。所述降水井1封堵结构包括插设于地基2上的降水井1和依次铺设于所述地基2上的垫层21、防水层4和筏板基础层3,所述降水井1穿过所述垫层21、所述防水层4和所述筏板基础层并凸出于所述筏板基础层3,所述降水井1的外缘与所述垫层21接触的位置缠绕有膨胀条11中,地基2一般为现有的即铺设的基础件,且降水井1插设于地基2中,垫层21、防水层4和筏板基础层3依次铺设在地基2上,降水井的顶端的高度一般是高于筏板基础层3的高度,膨胀条11环设于垫层21的外侧,且膨胀条11需要在铺设垫层21之前即进行安装,本实施例中的膨胀条11为腻子型膨胀条。膨胀条11水膨胀的性质,当有地下水渗出时,膨胀条11,阻塞渗水的缝隙,减缓了渗水量,避免了地下室渗水。根据实际情况和具体需求,腻子型膨胀条也可替换成其他型号的膨胀条11,例如混凝土密封条,降水井1的顶部也可与筏板基础层3的顶部相平。With reference to Fig. 1 and Fig. 2, the plugging structure of the precipitation well 1 provided by the present invention is now described. The plugging structure of the precipitation well 1 comprises a precipitation well 1 inserted in the foundation 2 and a cushion layer 21, a waterproof layer 4 and a raft foundation layer 3 sequentially laid on the foundation 2, the precipitation well 1 passes through the cushion layer 21, the waterproof layer 4 and the raft foundation layer and protrudes from the raft foundation layer 3, the outer edge of the precipitation well 1 is wound with an expansion strip 11 at the position where the cushion layer 21 contacts the outer edge of the precipitation well 1, the foundation 2 is generally an existing, i.e., laid foundation member, and the precipitation well 1 is inserted in the foundation 2, the cushion layer 21, the waterproof layer 4 and the raft foundation layer 3 are sequentially laid on the foundation 2, the height of the top of the precipitation well is generally higher than the height of the raft foundation layer 3, the expansion strip 11 is arranged around the outside of the cushion layer 21, and the expansion strip 11 needs to be installed before the cushion layer 21 is laid, and the expansion strip 11 in this embodiment is a putty-type expansion strip. The expansion strip 11 has the property of water expansion. When groundwater seeps out, the expansion strip 11 blocks the gap of water seepage, slows down the amount of water seepage, and avoids water seepage in the basement. According to actual conditions and specific needs, the putty-type expansion strip can also be replaced with other types of expansion strips 11, such as concrete sealing strips, and the top of the precipitation well 1 can also be flush with the top of the raft foundation layer 3.
进一步地,作为本发明提供的降水井1封堵结构的一种具体实施方式,所述降井水1的外缘套设有第一止水板12,且所述第一止水板12设置在所述降水井1与所述筏板基础层3的连接处。其中,降水井1与第一止水板12为固定连接,固定连接可以为粘贴、螺栓连接和焊接等方式,第一止水板12设置在降水井1与筏板基础层3的连接处靠近进上方或下方的位置均可,第一止水板12只要位于筏板基础层3内即可满足条件,因此不对第一止水板12的具体位置进行限定。第一止水板12对降水井1的外壁进行阻塞,避免井水从降水井1的外壁渗出,起到了初步止水的作用。Furthermore, as a specific embodiment of the plugging structure of the precipitation well 1 provided by the present invention, the outer edge of the precipitation well 1 is provided with a first water stop plate 12, and the first water stop plate 12 is arranged at the connection between the precipitation well 1 and the raft foundation layer 3. Among them, the precipitation well 1 and the first water stop plate 12 are fixedly connected, and the fixed connection can be by bonding, bolting and welding, etc. The first water stop plate 12 is arranged at the connection between the precipitation well 1 and the raft foundation layer 3, either near the top or below, and the first water stop plate 12 can meet the conditions as long as it is located in the raft foundation layer 3, so the specific position of the first water stop plate 12 is not limited. The first water stop plate 12 blocks the outer wall of the precipitation well 1 to prevent well water from seeping out from the outer wall of the precipitation well 1, and plays a role of preliminary water stopping.
进一步地,作为本发明提供的降水井1封堵结构的一种具体实施方式,所述降水井1的上端口设置有封闭板13,所述封闭板13的外缘固定于所述降水井1的内壁上,所述封闭板13的数量至少为两个,本实施例中封闭板13为钢板,数量为两个,且顶部的封闭板13与井管的上端相平。其中,封闭板13的固定方式可以为粘贴、螺栓连接和焊接等,钢板也可以替换成其他防水材质的板,顶部的封闭板13也可低于井管的上端。封闭板13封闭井口,避免了降水井1的水溢出,同时也防止了外部的水进入到降水井1内。当然,根据实际情况和具体需求,在本发明的其他实施例中,封闭板的数量还可以为一个,此处不作唯一限定。Furthermore, as a specific embodiment of the blocking structure of the precipitation well 1 provided by the present invention, a closing plate 13 is provided at the upper port of the precipitation well 1, and the outer edge of the closing plate 13 is fixed on the inner wall of the precipitation well 1. The number of the closing plates 13 is at least two. In this embodiment, the closing plates 13 are steel plates, and the number is two, and the closing plate 13 at the top is flush with the upper end of the well pipe. Among them, the closing plate 13 can be fixed by pasting, bolting, welding, etc., and the steel plate can also be replaced by a plate of other waterproof materials, and the closing plate 13 at the top can also be lower than the upper end of the well pipe. The closing plate 13 closes the wellhead, preventing the water from overflowing from the precipitation well 1, and also preventing the external water from entering the precipitation well 1. Of course, according to the actual situation and specific needs, in other embodiments of the present invention, the number of the closing plate can also be one, which is not the only limitation here.
进一步地,作为本发明提供的降水井1封堵结构的一种具体实施方式,还包括将所述降水井1的井口封闭的封闭墩盖5,且所述封闭墩盖5的半径为500mm至750mm,厚度为300mm至500mm的圆柱形墩盖,本实施例中封闭墩盖5的半径为600mm,厚度为400mm。封闭墩盖为设置在降水口顶端的水泥墩,其为在完工后对降水井进行封闭的封盖,通过该封盖可以对井口进行封闭,从而保证水不会从降水井1顶端进入降水井1的内部,其中封闭墩盖5形状可以为半径为500mm至750mm,厚度为300mm至500mm的圆柱形墩盖,也可设置成棱柱或其他不规则立方体的形状墩盖,只要满足封闭井口即可。当然,根据实际情况和具体需求,封闭墩盖5的尺寸可以更大,此处不作唯一限定。Furthermore, as a specific embodiment of the blocking structure of the precipitation well 1 provided by the present invention, it also includes a closed pier cover 5 for closing the wellhead of the precipitation well 1, and the closed pier cover 5 has a radius of 500mm to 750mm and a thickness of 300mm to 500mm. In this embodiment, the radius of the closed pier cover 5 is 600mm and the thickness is 400mm. The closed pier cover is a cement pier set at the top of the precipitation outlet. It is a cover for closing the precipitation well after completion. The wellhead can be closed by the cover to ensure that water does not enter the interior of the precipitation well 1 from the top of the precipitation well 1. The closed pier cover 5 can be a cylindrical pier cover with a radius of 500mm to 750mm and a thickness of 300mm to 500mm, or it can be set as a prism or other irregular cube-shaped pier cover, as long as it meets the requirements of closing the wellhead. Of course, according to actual conditions and specific needs, the size of the closed pier cover 5 can be larger, and it is not the only limitation here.
进一步地,作为本发明提供的降水井1封堵结构的一种具体实施方式,所述筏板基础层3靠近顶部的位置涂抹有环绕所述降水井1一周的防水封闭涂料15,本实施例中防水封闭涂料15为水不漏涂料。所述降水井1的外缘位置设置有第二止水板16,所述第二止水板16套设于所述降水井1的外缘,所述第二止水板16位于所述防水封闭涂料15的上方。水不漏涂料是一种防水、防潮材料。它既能高效防潮、防渗、堵漏,又能与多种材料粘结;该材料分为缓凝型和速凝型两种,均为单组份灰色粉料。缓凝型主要用于防潮抗渗;速凝型主要用于抗渗堵漏,其为现有技术。其中,防水封闭涂料15也可替换成例如沥青等其他的防水涂料,降水井1与第二止水板16为固定连接,固定连接可以为粘贴、螺栓连接和焊接等方式。第二止水板16,加强了井管的防水性能。同时第二止水板16位于防水封闭涂料15的上方,对水防水封闭涂料15起到了保护的作用。在后续施工浇筑混凝土时,避免了混凝土直接冲击到防水封闭涂料15,造成其损坏。Further, as a specific embodiment of the plugging structure of the precipitation well 1 provided by the present invention, the raft foundation layer 3 is coated with a waterproof sealing coating 15 surrounding the precipitation well 1 near the top. In this embodiment, the waterproof sealing coating 15 is a water-proof coating. A second water stop plate 16 is provided at the outer edge of the precipitation well 1. The second water stop plate 16 is sleeved on the outer edge of the precipitation well 1. The second water stop plate 16 is located above the waterproof sealing coating 15. Water-proof coating is a waterproof and moisture-proof material. It can not only effectively prevent moisture, seepage, and plug leaks, but also can be bonded with a variety of materials; the material is divided into slow-setting type and quick-setting type, both of which are single-component gray powder. The slow-setting type is mainly used for moisture-proof and anti-seepage; the quick-setting type is mainly used for anti-seepage and plugging leaks, which is a prior art. Among them, the waterproof sealing coating 15 can also be replaced by other waterproof coatings such as asphalt, and the precipitation well 1 is fixedly connected to the second water stop plate 16, and the fixed connection can be in the form of pasting, bolting, and welding. The second water stop plate 16 strengthens the waterproof performance of the well pipe. At the same time, the second water stop plate 16 is located above the waterproof sealing coating 15, which protects the waterproof sealing coating 15. When pouring concrete in subsequent construction, it is avoided that the concrete directly impacts the waterproof sealing coating 15 and causes damage to it.
进一步地,作为本发明提供的降水井1封堵结构的一种具体实施方式,所述防水层4包括涂覆于所述垫层21上的防水涂料层组41、铺设在所述防水涂料层组41上的防水卷材42和铺设在所述防水卷材42上的保护层43。其中,所述防水涂料层组41包括水泥基渗透结晶型防水涂料411和非固化橡胶沥青防水涂料412中的任一个或多个,可以先涂抹水泥基渗透结晶型防水涂料411,然后在水泥基渗透结晶型防水涂料411上涂抹非固化橡胶沥青防水涂料412,还可以仅涂抹水泥基渗透结晶型防水涂料411或非固化橡胶沥青防水涂料412中的一个。其中,防水卷材42可以为沥青防水材料或高聚物改性沥青防水卷材等建筑上常用的防水材料。保护层43可以用混凝土或沙土等原料铺设,对防水卷材42起到保护的作用。Further, as a specific embodiment of the plugging structure of the precipitation well 1 provided by the present invention, the waterproof layer 4 includes a waterproof coating layer group 41 coated on the cushion layer 21, a waterproof coiled material 42 laid on the waterproof coating layer group 41, and a protective layer 43 laid on the waterproof coiled material 42. Among them, the waterproof coating layer group 41 includes any one or more of a cement-based penetrating crystalline waterproof coating 411 and a non-curing rubber asphalt waterproof coating 412. The cement-based penetrating crystalline waterproof coating 411 can be applied first, and then the non-curing rubber asphalt waterproof coating 412 can be applied on the cement-based penetrating crystalline waterproof coating 411. It is also possible to apply only one of the cement-based penetrating crystalline waterproof coating 411 or the non-curing rubber asphalt waterproof coating 412. Among them, the waterproof coiled material 42 can be a commonly used waterproof material in construction, such as an asphalt waterproof material or a polymer-modified asphalt waterproof coiled material. The protective layer 43 can be laid with materials such as concrete or sand, and plays a protective role on the waterproof coiled material 42.
进一步地,作为本发明提供的降水井1封堵结构的一种具体实施方式,所述降水井1的外缘与所述防水卷材42相接触的位置套设有止水套环14,所述止水套环14为橡胶材质。止水套环14为环状结构,其套设于防水卷材42和降水井1的连接处,橡胶材质的止水套环14也可替换成其他的弹性防水材质。Further, as a specific embodiment of the plugging structure of the precipitation well 1 provided by the present invention, a water stop collar 14 is sleeved at the position where the outer edge of the precipitation well 1 contacts the waterproof coiled material 42, and the water stop collar 14 is made of rubber. The water stop collar 14 is an annular structure, which is sleeved at the connection between the waterproof coiled material 42 and the precipitation well 1, and the rubber water stop collar 14 can also be replaced with other elastic waterproof materials.
显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之中。Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the protection scope of the invention.
Claims (13)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910963424.0A CN110863502B (en) | 2019-10-11 | 2019-10-11 | Construction method and plugging structure for dynamic adjustment of foundation pit dewatering and plugging of dewatering wells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910963424.0A CN110863502B (en) | 2019-10-11 | 2019-10-11 | Construction method and plugging structure for dynamic adjustment of foundation pit dewatering and plugging of dewatering wells |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110863502A CN110863502A (en) | 2020-03-06 |
CN110863502B true CN110863502B (en) | 2024-09-06 |
Family
ID=69652417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910963424.0A Active CN110863502B (en) | 2019-10-11 | 2019-10-11 | Construction method and plugging structure for dynamic adjustment of foundation pit dewatering and plugging of dewatering wells |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110863502B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113279420B (en) * | 2021-06-11 | 2024-09-20 | 江苏苏南建筑安装工程有限公司 | Plugging structure of dewatering well and construction method thereof |
CN114150684B (en) * | 2021-12-29 | 2024-10-01 | 广东省基础工程集团有限公司 | Plugging device for dewatering well and construction method |
CN114427233B (en) * | 2022-03-01 | 2024-07-26 | 中国建筑第八工程局有限公司 | Dewatering wellhead plugging device and construction method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103993615A (en) * | 2014-05-20 | 2014-08-20 | 中国建筑第二工程局有限公司 | Large-drawdown pipe well plugging structure and construction method thereof |
CN109898533A (en) * | 2019-03-27 | 2019-06-18 | 中建一局集团第二建筑有限公司 | Raft plate built-in dewatering structure, well sealing structure of dewatering well and well sealing method |
CN209398393U (en) * | 2018-12-24 | 2019-09-17 | 谷崇建 | Drainage well shut-in well casing and drainage well shut-in well structure |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2353243C (en) * | 2001-07-18 | 2009-07-07 | Robert Ralph Robbins | Building levelling system |
-
2019
- 2019-10-11 CN CN201910963424.0A patent/CN110863502B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103993615A (en) * | 2014-05-20 | 2014-08-20 | 中国建筑第二工程局有限公司 | Large-drawdown pipe well plugging structure and construction method thereof |
CN209398393U (en) * | 2018-12-24 | 2019-09-17 | 谷崇建 | Drainage well shut-in well casing and drainage well shut-in well structure |
CN109898533A (en) * | 2019-03-27 | 2019-06-18 | 中建一局集团第二建筑有限公司 | Raft plate built-in dewatering structure, well sealing structure of dewatering well and well sealing method |
Also Published As
Publication number | Publication date |
---|---|
CN110863502A (en) | 2020-03-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112832279B (en) | Waterproof structure and method for dewatering well of underground foundation pit | |
CN110863502B (en) | Construction method and plugging structure for dynamic adjustment of foundation pit dewatering and plugging of dewatering wells | |
CN107059903A (en) | Bottom plate plugging dewatering well construction method is worn in foundation ditch | |
CN105002913A (en) | Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof | |
CN209339169U (en) | A kind of precipitation well in foundation pit plugging device | |
CN104005419A (en) | Box culvert structure and construction method through sedimentation construction | |
CN108331034A (en) | Pier nose formula anti-float anchor rod waterproofing node and its construction method | |
CN104099946B (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN115012452A (en) | Post-casting belt construction technology and basement drainage and pressure relief structure | |
CN107100206A (en) | A kind of prevention and controls of basement leakage | |
CN214245855U (en) | Water-proof pressure-control anti-floating structure | |
CN110159307A (en) | A kind of tunnel multilayer grouting process | |
CN211172024U (en) | A block structure for foundation ditch precipitation well | |
CN204385775U (en) | Underground waterproof engineering water-stopping structure | |
CN215669620U (en) | Plugging structure of dewatering well | |
CN217712488U (en) | Be used for quick shut-in well device of trouble no sand pipe well | |
CN103174154A (en) | A method and auxiliary dewatering device for solidly sealing underground building floor water gushing well pits | |
CN207828994U (en) | It is a kind of draining and recharge constructing structure | |
CN109695248A (en) | Foundation pit backfills construction method under a kind of lid excavation construction cover plate | |
CN214272102U (en) | Waterproof construction of underground foundation ditch precipitation well | |
CN116290044A (en) | Long-term observation and emergency drainage well structure in the middle and shallow layers of the side wall of the basement of the building structure | |
CN204825916U (en) | Highly permeable stratum deep basal pit back cover stagnant water structure | |
CN214832441U (en) | Underwater throwing-filling type isolation dam | |
CN204080861U (en) | Inspection-pit between a kind of Novel top pipeline section | |
CN106567415A (en) | Drain sleeve for preventing basement floating upward and use method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Country or region after: China Address after: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Applicant after: China Construction Science And Industry Co.,Ltd. Address before: Room 2701, 27 / F, Zhongjian steel building, 3331 Zhongxin Road, Yuehai street, Nanshan District, Shenzhen, Guangdong 518040 Applicant before: China Construction Steel Structure Corp.,Ltd. Country or region before: China |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20240628 Address after: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Applicant after: China Construction Science And Industry Co.,Ltd. Country or region after: China Applicant after: China Construction Engineering Group (Tianjin) Co.,Ltd. Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Applicant before: China Construction Science And Industry Co.,Ltd. Country or region before: China |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20200306 Assignee: Beijing Longxiang Construction Engineering Technology Co.,Ltd. Assignor: China Construction Science And Industry Co.,Ltd. Contract record no.: X2024980023410 Denomination of invention: Construction method and sealing structure for dynamic adjustment of foundation pit dewatering and sealing of dewatering wells Granted publication date: 20240906 License type: Common License Record date: 20241114 |
|
EE01 | Entry into force of recordation of patent licensing contract |