CN101694100A - Waterproof construction of basement soleplate and construction method thereof - Google Patents

Waterproof construction of basement soleplate and construction method thereof Download PDF

Info

Publication number
CN101694100A
CN101694100A CN200910139458A CN200910139458A CN101694100A CN 101694100 A CN101694100 A CN 101694100A CN 200910139458 A CN200910139458 A CN 200910139458A CN 200910139458 A CN200910139458 A CN 200910139458A CN 101694100 A CN101694100 A CN 101694100A
Authority
CN
China
Prior art keywords
concrete
waterproof
bottom board
proof structure
water proof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910139458A
Other languages
Chinese (zh)
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200910139458A priority Critical patent/CN101694100A/en
Publication of CN101694100A publication Critical patent/CN101694100A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a waterproof construction of a basement soleplate and a construction method thereof. The waterproof construction of the basement soleplate is characterized in that a layer of plastic film is arranged on a plain concrete cushion layer by a border adhibiting method, and a cold binder is point-bonded between the plastic film and a waterproof rolling material. A seal ring is welded on a pile reinforcing bar, a sleeve pipe is made outside the pile reinforcing bar, hemp threads are stuffed in a gap of the sleeve pipe below the seal ring, and a waterproof sealant is stuffed in the gap above the seal ring, and the gap is sealed. A two-time casting and compacting mode of soleplate concrete is adopted, the pile top extends into the position of the soleplate concrete to cast and compact for the first time, casting and compacting are carried out by adopting UEA concrete, an expansion agent is mixed when the concrete at the position is cast and compacted, and the gradient of a construction joint casted and compacted for the first time is 30-45 degrees. The overlapping position of the sloping segment and the horizontal segment at the construction joint is made into a circular arc angle by plastering chloroprene rubber latex cement mortar. A fine gravel concrete cushion block is bonded and precast on the obliquely laid waterproof rolling material. The waterproof construction of the basement soleplate has good waterproof effect and strong practicability.

Description

A kind of basement bottom board water proof structure and job practices
Technical field
The present invention relates to building field, particularly a kind of basement bottom board water proof structure and job practices.
Background technology
Underground water generally has certain hydraulic pressure, and flexible waterproof layer has a point failure then to cause the inefficacy of whole waterproof system.The high-rise building basement is provided with stake usually, because structure and antidetonation need stake top reinforcing bar can stretch into basement, makes basement and pile foundation be linked to be integral body, so that the horizontal force that horizontal force that pile is passed by upper building comes or earthquake produce.Tradition basement water proof structure is as follows: do concrete cushion with the foundation soil contact position, do waterproofing course then on concrete cushion, do concrete then on waterproofing course.Because the stake reinforcing bar stretches into underplate concrete, waterproofing course if there is not rational water proof structure, will certainly cause basement leakage disconnecting through occurring in the process of pile body.
Summary of the invention
At the deficiencies in the prior art, purpose of the present invention provides a kind of basement bottom board water proof structure and job practices, solves the problem of basement bottom board king-pile reinforcing bar position percolating water.
The object of the present invention is achieved like this:
The present invention is empty shop layer of plastic film on plain concrete cushion layer, the sticking cold cementing agent of point between plastic sheeting and waterproof roll.This structure both can make waterproof roll and plain concrete cushion layer throw off, and can protect waterproof roll again.Make the waterproof roll secure bond on the underplate concrete of top, waterproofing course and bottom plain concrete cushion layer break away from, so waterproof roll is subjected to pulling force and little during structural change, avoids waterproof roll to destroy the basement waterproofing structure was lost efficacy.
The present invention does the welding seal ring on the stake reinforcing bar, the stake reinforcing bar is made sleeve pipe outward, and with the flax silk filling, seal ring is above to be filled in and seal with waterproof sealing cream below seal ring in the gap of sleeve pipe.Because the water capacity easily enters basement along exposed reinforcing bar, can prevent effectively that by above-mentioned measure this phenomenon from taking place.
Underplate concrete adopts and waters the mode of smashing twice among the present invention, stake top is stretched into the underplate concrete position and is carried out watering first time and smash, and disturbing concrete is made trapezoidal shape above stake for the first time, employing UEA casting and compacting of concrete, the admixture expansion agent helped guaranteeing concrete compaction when this located casting and compacting of concrete.Water for the first time and smash the constuction joint gradient and adopt 30~45 degree, do not adopt the right angle, purpose is to make for the first time that disturbing concrete and second time disturbing concrete effectively is connected, and is unlikely the weak part that becomes percolating water.
Oblique section at the constuction joint place of the present invention and horizontal segment lap-joint plaster with the polychloroprene latex cement mortar and make arc chord angle, if oblique section and horizontal segment lap-joint are wedge angles, in the structure sediment process, waterproof roll is cut easily to be split.
The present invention does the waterproof reinforced layer in constuction joint upper horizontal section, and waterproof reinforced layer length is not less than 250mm, loses efficacy even do the measure of welding seal ring on the stake reinforcing bar, can also prevent that by this construction measure basement water from pushing up the chamber base plate that permeates the ground from stake.
The present invention is bonded and precast pea gravel concreten cushion block on the waterproof roll of tiltedly spreading.8mm~12mm small crushed stone of evenly beating in before the underplate concrete initial set, it is dark to make stone imbed concrete 1/3, and this measure purpose is to make the waterproof roll of oblique shop and underplate concrete become integral body, thus waterproof effectively.
Good water-proof effect of the present invention, practical.
Description of drawings
Fig. 1 basement bottom board water proof structure figure
1, waters for the first time the concrete of smashing, 2, water the concrete of smashing for the second time, 3, stake, 4, the stake reinforcing bar, 5, plain concrete cushion layer, 6, flax silk, 7, seal ring, 8, waterproof sealing cream, 9, sleeve pipe, 10, plastic sheeting, 11, waterproof roll, 12, the polychloroprene latex cement mortar
The specific embodiment
Be described in detail below in conjunction with Fig. 1, the present invention's structure comprises plain concrete cushion layer 5, flax silk 6, seal ring 7, waterproof sealing cream 8, sleeve pipe 9, plastic sheeting 10, waterproof roll 11, waters for the first time and water concrete 1, the second time of smashing concrete 2, the polychloroprene latex cement mortar 12 of smashing.
The thick plastic sheeting 10 of empty shop one deck 0.3mm on plain concrete cushion layer, the sticking cold cementing agent of point between plastic sheeting 10 and waterproof roll 11.
Do welding seal ring 7 on the stake reinforcing bar, seal ring 7 diameters are the 3mm stalloy than the big 2~3cm of bar diameter.The stake reinforcing bar is made sleeve pipe 9 outward, and with flax silk 6 fillings, seal ring is filled in and sealed with waterproof sealing cream 8 more than 7 below seal ring in the gap of sleeve pipe 9.Underplate concrete adopts and waters the mode of smashing twice, stake top is stretched into underplate concrete 9 positions and is carried out watering the first time and smash, disturbing concrete is made trapezoidal shape above stake for the first time, adopt the UEA casting and compacting of concrete, admixture expansion agent when this locates casting and compacting of concrete, water for the first time and smash constuction joint gradient employing 30~45 degree, avoid vertical construction joints to cause structure tension performance not good.Water for the first time and smash laying water-proof coiled material 11 behind 8~12h, carry out watering the second time after waterproof roll 11 is laid and finished and smash.
The oblique section in constuction joint place is plastered with polychloroprene latex cement mortar 12 with horizontal segment lap-joint and is made arc chord angle.Constuction joint upper horizontal section is done the waterproof reinforced layer, and waterproof reinforced layer length is not less than 250mm.
Bonded and precast pea gravel concreten cushion block on the waterproof roll 11 of oblique shop, the pea gravel concreten pad thickness is 30mm, end opening is 80mm*80mm, suitable for reading is 70mm*70mm, the iron wire that band is connected with the structural concrete cast on the prefabricated pea gravel concreten cushion block, every square metre of volume pea gravel concreten cushion block piece number is no less than four, is convenient to structural concrete and waterproof roll 11 formation integral body.
8mm~12mm small crushed stone of evenly beating in before the underplate concrete initial set, it is dark to make stone imbed concrete 1/3, in order to avoid the polychloroprene latex cement mortar 12 and underplate concrete delamination on underplate concrete upper strata.Underplate concrete top polychloroprene latex cement mortar 12 thickness are 20cm.

Claims (10)

1. basement bottom board water proof structure and job practices, it is characterized in that stretching on the stake reinforcing bar of underplate concrete and do the welding seal ring, the stake reinforcing bar is made sleeve pipe outward, and with the flax silk filling, seal ring is above to be filled in and seal with waterproof sealing cream below seal ring in the gap of sleeve pipe.Underplate concrete adopts and to water the mode of smashing twice, and the stake top is stretched into the underplate concrete position and carried out watering first time and smash, and adopts the UEA casting and compacting of concrete, and admixture expansion agent during this place casting and compacting of concrete waters and smash the constuction joint gradient and adopt 30~45 to spend for the first time.Water for the first time and smash laying water-proof coiled material waterproofing course behind 8~12h, carry out watering the second time after the waterproof roll waterproofing course is laid and finished and smash.
2. according to described basement bottom board water proof structure of claim 1 and job practices, it is characterized in that empty shop layer of plastic film on plain concrete cushion layer, the sticking cold cementing agent of point between plastic sheeting and coiled material, make the waterproof roll secure bond on the underplate concrete of top, waterproofing course and bottom plain concrete cushion layer break away from.
3. according to claim 1 or described basement bottom board water proof structure of claim 2 and job practices, it is characterized in that the constuction joint place tiltedly section plaster with the polychloroprene latex cement mortar with horizontal segment lap-joint and make arc chord angle.
4. according to claim 1 or described basement bottom board water proof structure of claim 2 and job practices waterproof roll, it is characterized in that constuction joint upper horizontal section does the waterproof reinforced layer, waterproof reinforced layer length is not less than 250mm.
5. according to described basement bottom board water proof structure of claim 3 and job practices waterproof roll, it is characterized in that constuction joint upper horizontal section does the waterproof reinforced layer, waterproof reinforced layer length is not less than 250mm.
6. according to claim 1 or described basement bottom board water proof structure of claim 2 and job practices, it is characterized in that bonded and precast pea gravel concreten cushion block on the oblique waterproof roll waterproofing course of spreading.
7. according to described basement bottom board water proof structure of claim 3 and job practices, it is characterized in that bonded and precast pea gravel concreten cushion block on the oblique waterproof roll waterproofing course of spreading.
8. according to described basement bottom board water proof structure of claim 4 and job practices, it is characterized in that bonded and precast pea gravel concreten cushion block on the oblique waterproof roll waterproofing course of spreading.
9. according to claim 6 or claim 7 or described basement bottom board water proof structure of claim 8 and job practices, it is characterized in that the pea gravel concreten pad thickness is 30mm, end opening is 80mm*80mm, suitable for reading is 70mm*70mm, the iron wire that band is connected with the structural concrete cast on the prefabricated pea gravel concreten cushion block, every square metre of volume pea gravel concreten cushion block piece number is no less than four.
10. according to claim 1 or described basement bottom board water proof structure of claim 2 and job practices, it is characterized in that 8mm~12mm small crushed stone of evenly beating in before the underplate concrete initial set, it is dark to make stone imbed structural concrete 1/3.
CN200910139458A 2009-06-17 2009-06-17 Waterproof construction of basement soleplate and construction method thereof Pending CN101694100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910139458A CN101694100A (en) 2009-06-17 2009-06-17 Waterproof construction of basement soleplate and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910139458A CN101694100A (en) 2009-06-17 2009-06-17 Waterproof construction of basement soleplate and construction method thereof

Publications (1)

Publication Number Publication Date
CN101694100A true CN101694100A (en) 2010-04-14

Family

ID=42093093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910139458A Pending CN101694100A (en) 2009-06-17 2009-06-17 Waterproof construction of basement soleplate and construction method thereof

Country Status (1)

Country Link
CN (1) CN101694100A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031788A (en) * 2010-12-08 2011-04-27 广西建工集团第五建筑工程有限责任公司 Deep well precipitation waterproof construction method of waterproof design-free basement
CN102155071A (en) * 2011-03-15 2011-08-17 郭春未 Rigid-soft-rigid compound waterproof process
CN102444143A (en) * 2011-11-14 2012-05-09 成都新艺防水材料工程有限公司 Construction method for cancelling operation channel for facades of basement
CN102606846A (en) * 2011-12-21 2012-07-25 浙江东发环保工程有限公司 Sealing method for gap between glass steel tube and carbon steel sleeve
CN103556657A (en) * 2013-11-18 2014-02-05 国家电网公司 Mountain calcium precipitate drainage method and device thereof for underground powerhouse
CN104314164A (en) * 2014-10-28 2015-01-28 上海市环境科学研究院 Seepage-proof modification method for sewage storage pools of large-scale livestock and poultry farms
CN107653913A (en) * 2017-09-22 2018-02-02 上海宝冶集团有限公司 A kind of basement construction waterproof technology
CN113006159A (en) * 2021-03-01 2021-06-22 费籁电气(上海)有限公司 Waterproof structure for underground waterproof engineering and construction process thereof
CN114197524A (en) * 2021-11-29 2022-03-18 中国十七冶集团有限公司 Waterproof construction method for civil air defense basement

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102031788A (en) * 2010-12-08 2011-04-27 广西建工集团第五建筑工程有限责任公司 Deep well precipitation waterproof construction method of waterproof design-free basement
CN102031788B (en) * 2010-12-08 2012-08-08 广西建工集团第五建筑工程有限责任公司 Deep well precipitation waterproof construction method of waterproof design-free basement
CN102155071A (en) * 2011-03-15 2011-08-17 郭春未 Rigid-soft-rigid compound waterproof process
CN102444143A (en) * 2011-11-14 2012-05-09 成都新艺防水材料工程有限公司 Construction method for cancelling operation channel for facades of basement
CN102444143B (en) * 2011-11-14 2014-10-08 成都新艺置业有限公司 Construction method for cancelling operation channel for facades of basement
CN102606846A (en) * 2011-12-21 2012-07-25 浙江东发环保工程有限公司 Sealing method for gap between glass steel tube and carbon steel sleeve
CN103556657A (en) * 2013-11-18 2014-02-05 国家电网公司 Mountain calcium precipitate drainage method and device thereof for underground powerhouse
CN103556657B (en) * 2013-11-18 2015-11-18 国家电网公司 Underground power house mountain calcium analyses drainage method and the device thereof of thing
CN104314164A (en) * 2014-10-28 2015-01-28 上海市环境科学研究院 Seepage-proof modification method for sewage storage pools of large-scale livestock and poultry farms
CN107653913A (en) * 2017-09-22 2018-02-02 上海宝冶集团有限公司 A kind of basement construction waterproof technology
CN113006159A (en) * 2021-03-01 2021-06-22 费籁电气(上海)有限公司 Waterproof structure for underground waterproof engineering and construction process thereof
CN114197524A (en) * 2021-11-29 2022-03-18 中国十七冶集团有限公司 Waterproof construction method for civil air defense basement

Similar Documents

Publication Publication Date Title
CN101694100A (en) Waterproof construction of basement soleplate and construction method thereof
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN210315102U (en) Slope protection reinforced roadbed structure of composite ecological decoration panel
CN107574842A (en) Basement post-pouring zone advance water stop construction method
CN209339169U (en) A kind of precipitation well in foundation pit plugging device
CN112832279B (en) Waterproof structure and method for dewatering well of underground foundation pit
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN107542115A (en) Underground project waterproof structure and its construction method
CN109162289B (en) Prefabricated bearing pier structure and construction method thereof
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN111733837B (en) Rock slope filling and sealing protection system and construction method
CN206090638U (en) Underground side wall post -cast strip waterproof construction
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN109252549A (en) A kind of bentonite waterproof blanket and its construction method for man-made lake wetland
CN110374060A (en) A kind of the reservoir seepage-proofing structure and construction method of rock-fill dams dam facing and earth and stone material backfill bottom storehouse
CN207228173U (en) A kind of underground project waterproof structure
CN105756100A (en) Basement post-pouring belt system and making method thereof
CN101586341A (en) Water sealing method for civil engineering groundwork
CN201517218U (en) Basement bottom board water-proof conformation
CN106013143B (en) A kind of construction of underground engineering anti-floating system anchor pole and construction method
CN210315409U (en) Lossless type connection structure of cut-off wall and block concrete
CN114607386A (en) Single-layer well wall with connecting and water stopping structure and grouting system and construction method thereof
CN209924154U (en) Anti-seepage reinforcing structure for embedded pipe
CN113846609A (en) A manger plate gravity dam joint design for covering layer connects basement rock foundation
CN206768731U (en) A kind of armoured type lightweight dock structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100414