CN110158542A - The Lossless connection structure and construction method of cut-pff wall and nut cap concrete - Google Patents

The Lossless connection structure and construction method of cut-pff wall and nut cap concrete Download PDF

Info

Publication number
CN110158542A
CN110158542A CN201910520066.6A CN201910520066A CN110158542A CN 110158542 A CN110158542 A CN 110158542A CN 201910520066 A CN201910520066 A CN 201910520066A CN 110158542 A CN110158542 A CN 110158542A
Authority
CN
China
Prior art keywords
cut
pff wall
guide groove
concrete
nut cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910520066.6A
Other languages
Chinese (zh)
Inventor
王永明
任金明
邓渊
黄雷
范华春
徐建荣
邱亚锋
邬志
朱少华
胡小禹
张志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201910520066.6A priority Critical patent/CN110158542A/en
Publication of CN110158542A publication Critical patent/CN110158542A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to the Lossless connection structures and construction method of a kind of cut-pff wall and nut cap concrete.The Lossless connection structure and construction method of the object of the present invention is to provide a kind of structures cut-pff wall simple, easy for construction and nut cap concrete, it is meant to ensure that cut-off wall and nut cap concrete form closed structure, solves the problems, such as that conventional connection method easily forms concentrated leakage passage.The technical scheme is that the Lossless connection structure of a kind of cut-pff wall and nut cap concrete, it is characterized by: having cofferdam weir body, guide groove is equipped at the top of the body of cofferdam weir, cut-pff wall corresponding with the guide groove of top is equipped in the body of cofferdam weir, it is equipped with fill concrete layer above cut-pff wall, has poured nut cap concrete on the fill concrete layer and guide groove.The present invention carries out the similar engineerings such as high earth rock cofferdam, earth and rockfill dam and the dyke of seepage control of cofferdam foundation suitable for water power hydraulic engineering using cut-pff wall.

Description

The Lossless connection structure and construction method of cut-pff wall and nut cap concrete
Technical field
The present invention relates to the Lossless connection structures and construction method of a kind of cut-pff wall and nut cap concrete.Suitable for water power The similar engineerings such as high earth rock cofferdam, earth and rockfill dam and the dyke of seepage control of cofferdam foundation are carried out in hydraulic engineering using cut-pff wall.
Background technique
With the implementation of China's strategy to develop western regions, earth rock cofferdam height and scale increase year by year, high earth rock cofferdam skill Art difficulty also increases with cofferdam scale and is promoted.Earth rock cofferdam lower part generally need under water throwing formed, many cofferdam are using modeling Property concrete cut carry out the seepage control of cofferdam foundation of throwing part and alluvial deposit foundation part, it is more than cut-pff wall anti-using geomembrane It seeps.Nut cap concrete is poured again after needing to excavate surface layer defective material concrete after cut-off wall grooving pours, by nut cap concrete Undertake the fade function between cut-pff wall and geomembrane.Therefore, the connection of nut cap concrete and cut-pff wall itself and closure pole To be important, it need to ensure that the interstructural mechanics of unlike material, antiseepage smoothly transit.
Nut cap concrete with poured cut-pff wall material, construction technology is all different, due to water pressure, weir body filler be self-possessed And squeezing action caused by poisson effect, nut cap concrete are often in eccentric force state, nut cap concrete and antiseepage wall joint Place easily occurs to stretch disengagement or shearing slip forms concentrated leakage passage.If guarantee nut cap concrete and cut-pff wall wall top it Between leakproofness and use conventional rubber water-proof, then anchor slot need to be dug at the top of cut-pff wall, anchor slot forming process is easily right Penetrating crack damage is generated at the top of cut-pff wall (the especially lower plastic concrete cut-off wall of intensity), so as to cause cut-pff wall Leakage is serious.
Summary of the invention
The technical problem to be solved by the present invention is in view of the above problems, it is simple, easy for construction to provide a kind of structure Cut-pff wall and nut cap concrete Lossless connection structure and construction method, it is intended to guarantee cut-off wall and nut cap concrete Closed structure is formed, solves the problems, such as that conventional connection method easily forms concentrated leakage passage.
The technical scheme adopted by the invention is that: a kind of Lossless connection structure of cut-pff wall and nut cap concrete, it is special Sign is: having cofferdam weir body, guide groove is equipped at the top of the body of cofferdam weir, is equipped in the body of cofferdam weir corresponding with the guide groove of top Cut-pff wall, cut-pff wall top are equipped with fill concrete layer, have poured nut cap concrete on the fill concrete layer and guide groove;
Be embedded in the cut-pff wall it is several extend at the top of the cut-pff wall cut-pff wall bottom, for being carried out to wall base rock Grout curtain simultaneously fills real anti-shearing grouting steel pipe using concrete after the completion of grouting;
Water expandable waterstop, the water-swellable are equipped at the top of the cut-pff wall between the fill concrete layer above it Sealing rod is set to the two sides of cut-pff wall axis and along the elongated arrangement of cut-pff wall axis;
It is fixed with composite geo-membrane through bolt at the top of the fill concrete layer, which extends to the guiding Slot is outer and is connected with weir bluk recombination geomembrane anti-seepage system.
The laitance defective material concrete layer at the top of it has been cut at the top of the cut-pff wall.
Fill concrete layer top surface is higher than the guiding groove bottom.
The nut cap concrete crest level is higher by the guide groove crest level more than or equal to 100cm.
The water expandable waterstop uses strip BW type water expandable waterstop.
A kind of construction method of cut-pff wall and the Lossless connection structure of nut cap concrete, which is characterized in that steps are as follows:
A, cofferdam weir body is set;
B, the construction guidance slot at the top of the body of cofferdam weir;
C, it using guide groove as operation platform, is excavated in the cofferdam weir body below guide groove and forms use corresponding with guide groove Slot is poured in pour cut-pff wall;
D, it pours in slot and buries anti-shearing grouting steel pipe, steel pipe is divided into slot bottom, and grouting steel pipe crest level is guiding groove top Elevation;
E, it pours in slot and pours to form cut-pff wall;
F, by pre-buried anti-shearing grouting steel pipe, the grout curtain of wall bottom is carried out using orifice closing method or segmentation blocking method To design baseline;
G, the laitance defective material concrete layer at the top of cut-pff wall is cut until the higher concrete stabilized zone of compactness;
H, anti-shearing grouting steel pipe 30~50cm of the cut-pff wall top surface after cutting or more is truncated to as subsequent nut cap to resist Miniature tubular pole is cut, is filled in fact in steel pipe using neat slurry;
I, water expandable waterstop is laid in cut-pff wall top surface, cut-pff wall axis two sides;
J, the laitance defective material concrete layer at the top of cut-pff wall cuts region concrete time and pours, and forms fill concrete layer;
K, composite geo-membrane is fixed at the top of fill concrete layer using bolt and composite geo-membrane is extended into guiding Slot is outer to be connected with weir bluk recombination geomembrane anti-seepage body, and the fill concrete layer by no geomembrane without the area of coverage and guide groove side Dabbing;
L, formwork erection pours nut cap concrete above fill concrete layer and guide groove.
Step e pours the antiseepage wall crest elevation to be formed and is more than or equal to 0.5m more than guide groove bottom elevation.
Step i water expandable waterstop is fixed at the top of the cut-pff wall using cement steel nail.
When water expandable waterstop laying need to overlap in step i, connector uses horizontally overlapping method, and the lap of splice needs to control System is in 5cm or more.
The nut cap concrete pours elevation eventually and is more than or equal to 100cm beyond the guide groove crest level.
The beneficial effects of the present invention are: the present invention is by being arranged water expandable waterstop, Yi Ji at the top of setting cut-pff wall Anti-shearing grouting steel pipe is reserved in cut-pff wall, excessive extrusion shearing occurs for the joint for improving cut-pff wall wall top and nut cap concrete It deforms there is a situation where concentrative seepage, no longer needs to setting rubber water-proof item of individually slotting, avoid damage to cut-pff wall.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment.
Fig. 2 is the enlarged diagram in the portion A in Fig. 1.
Specific embodiment
As shown in Figure 1, the present embodiment is the Lossless connection structure of a kind of cut-pff wall and nut cap concrete, there is cofferdam weir Body, cofferdam weir body top are equipped with guide groove 4, are equipped with cut-pff wall 5 corresponding with the guide groove 4 of top, cut-pff wall 5 in the body of cofferdam weir Top is equipped with fill concrete layer 7, has poured nut cap concrete 9 on fill concrete layer 7 and guide groove 4.
Several anti-shearing fillings that 5 bottom of cut-pff wall is extended at the top of cut-pff wall 5 are embedded in the present embodiment in cut-pff wall 5 Steel pipe 6 is starched, anti-shearing grouting steel pipe 6 is used to be in the milk to the wall bottom curtain of 5 lower section of cut-pff wall, and uses after the completion of grouting Concrete fills real.
Water expandable waterstop 8, the chance are equipped between 5 top of cut-pff wall and the fill concrete layer 7 above it in this example Water expansion sealing strip is set to the two sides of 5 axis of cut-pff wall and along the elongated arrangement of 5 axis of cut-pff wall.
It is fixed with composite geo-membrane 10 through M16 bolt at the top of fill concrete layer in the present embodiment, which prolongs It extends to outside guide groove 4 and is connected with weir bluk recombination geomembrane anti-seepage system.
Water expandable waterstop 8 is adopted as strip BW type water expandable waterstop in the present embodiment, and expansion rate 150%~ 180% (no leachable), elongation percentage be greater than 450%, erosive wear resistance is good, tensile strength be greater than 70kPa, 80 DEG C of high temperature resistant (appearance is glossy, and any bending is soft, flawless), it is low temperature resistant -20 DEG C, flexible good, there is no wrinkle breach.
The concrete construction method of this example is as follows:
A, body filler in cofferdam weir is arranged: forming 5 supporter of cut-pff wall, microlith slag using the underwater throwing microlith slag 1 of method of attacking and occupying Expect that 1 crest level need to be beyond the construction of cut-pff wall 5 period water level 2m;Thickness is trained rapidly and increases bedding material 2, rubble slag charge 3 in 1 two sides of microlith slag To 4 bottom elevation of concrete guide groove.
B, concrete guide groove is arranged: at 1 top of microlith slag charge, building concrete guiding by foundation of microlith slag charge Slot 4, as 5 operation platform of cut-pff wall and axis guide wall.
C, the slot that pours of cut-pff wall 5 is arranged: using guide groove as operation platform, excavating in the microlith slag charge below guide groove Formed it is corresponding with guide groove be used to pour cut-pff wall pour slot.
D, pre-buried anti-shearing grouting steel pipe: the anti-shearing grouting steel pipe 6 of 91~110mm of caliber is divided into after pouring slot grooving To slot bottom, anti-shearing 6 elevation of grouting steel pipe is guide groove crest level, and the general spacing of steel pipe is 1.0~1.5m.
E, cut-pff wall 5 is arranged: pouring pouring construction cut-pff wall 5 in slot using method of kicking off, 5 crest level of cut-pff wall is more than to lead To slot bottom elevation 50cm.
F, the grout curtain of wall bottom is arranged: being carried out by anti-shearing grouting steel pipe 6 using orifice closing method or segmentation blocking method The grout curtain of wall bottom is to designing baseline.
G, laitance defective material concrete layer is cut: manually successively cutting 5 top of cut-pff wall using light-duty equipments such as hand-held pneumatic picks The laitance defective material concrete layer of 50cm~100cm thickness is until the higher concrete stabilized zone of compactness.
H, anti-shearing grouting steel pipe truncates: anti-shearing grouting steel pipe 6 being truncated to chisel using hacksaw or high-temperature machining technology Except more than the cut-pff wall top surface after laitance defective material concrete layer 30~50cm is as the subsequent miniature tubular pole of nut cap shearing resistance, adopted in steel pipe Fill real with neat slurry.
I, Lossless sealing is arranged: 5 top surface of cut-pff wall after cutting laitance defective material concrete layer, from cut-pff wall axis two Water expandable waterstop 8 is laid with using mounting method at the 20cm of side, interval appropriately distance can be fixed with cement steel nail, prevent from pouring There is the phenomenon that sealing rod displacement during building, water expandable waterstop 8 is along the elongated arrangement of 5 axis of antiseepage wall top.Such as Fig. 2 institute Show, when the laying of water expandable waterstop 8 need to overlap, it is necessary to there are enough laps of splice, forbid the method using docking, connector must It must need to be controlled using the method for horizontally overlapping (lateral overlap joint), the lap of splice in 5cm or more.
J, laitance defective material concrete layer cuts region concrete time and pours: backfilling laitance defective material concrete using normal concrete Layer cuts region, forms fill concrete layer.
K, composite geo-membrane anchoring setting: composite geo-membrane 10 is fixed at the top of fill concrete layer using M16 bolt And composite geo-membrane 10 is extended and is connected outside guide groove with weir bluk recombination geomembrane anti-seepage body.It will be returned without geomembrane without the area of coverage Fill out concrete layer and guide groove side dabbing.
L, nut cap concrete is arranged: formwork erection pours nut cap concrete 9, and nut cap concrete 9 pours elevation beyond guiding groove top eventually Elevation is not less than 100cm.
In the present embodiment, water expandable waterstop 8 should carry out seepage control measure after the completion of being laid with, right before concreting The exposed sealing rod in concrete interface need to cover layer of plastic film in time, prevent sealing rod water-swellable, to nut cap coagulation When soil pours, then throw off plastic film.

Claims (10)

1. the Lossless connection structure of a kind of cut-pff wall and nut cap concrete, it is characterised in that: have cofferdam weir body, cofferdam weir body Top is equipped with guide groove (4), is equipped with cut-pff wall (5) corresponding with guide groove (4) of top in the body of cofferdam weir, on cut-pff wall (5) Side is equipped with fill concrete layer (7), has poured nut cap concrete (9) on the fill concrete layer (7) and guide groove (4);
Be embedded in the cut-pff wall (5) it is several extended at the top of cut-pff wall (5) cut-pff wall (5) bottom, for wall base Rock carries out grout curtain and fills real anti-shearing grouting steel pipe (6) using concrete after the completion of grouting;
Water expandable waterstop (8) are equipped between the fill concrete layer (7) above it at the top of the cut-pff wall (5), the chance Water expansion sealing strip is set to the two sides of cut-pff wall (5) axis and along the elongated arrangement of cut-pff wall (5) axis;
It is fixed with composite geo-membrane (10) at the top of the fill concrete layer (7) through bolt, which extends to described Guide groove (4) is connected outside and with weir bluk recombination geomembrane (10) seepage prevention system.
2. the Lossless connection structure of cut-pff wall according to claim 1 and nut cap concrete, it is characterised in that: described anti- Seep the laitance defective material concrete layer cut at the top of it at the top of wall (5).
3. the Lossless connection structure of cut-pff wall according to claim 1 or 2 and nut cap concrete, it is characterised in that: institute Fill concrete layer (7) top surface is stated higher than the guide groove (4) bottom surface.
4. the Lossless connection structure of cut-pff wall according to claim 1 and nut cap concrete, it is characterised in that: the lid Cap concrete (9) crest level is higher by the guide groove (4) crest level more than or equal to 100cm.
5. the Lossless connection structure of cut-pff wall according to claim 1 and nut cap concrete, it is characterised in that: the chance Water expansion sealing strip (8) uses strip BW type water expandable waterstop (8).
6. the construction party of the Lossless connection structure of cut-pff wall described in a kind of Claims 1 to 5 any one and nut cap concrete Method, which is characterized in that steps are as follows:
A, cofferdam weir body is set;
B, the construction guidance slot (4) at the top of the body of cofferdam weir;
C, it is right with guide groove (4) that formation is excavated with guide groove (4) for operation platform, in the cofferdam weir body below guide groove (4) That answers pours slot for pour cut-pff wall (5);
D, it pours in slot and buries anti-shearing grouting steel pipe (6), steel pipe is divided into slot bottom, and grouting steel pipe crest level is guide groove (4) Crest level;
E, it pours in slot and pours to form cut-pff wall (5);
F, by pre-buried anti-shearing grouting steel pipe (6), the grout curtain of wall bottom is carried out using orifice closing method or segmentation blocking method To design baseline;
G, the laitance defective material concrete layer at the top of cut-pff wall (5) is cut until the higher concrete stabilized zone of compactness;
H, anti-shearing grouting steel pipe (6) is truncated to 30~50cm of the cut-pff wall after cutting (5) top surface or more as subsequent nut cap The miniature tubular pole of shearing resistance, steel pipe is interior to fill real using neat slurry;
I, water expandable waterstop (8) are laid in cut-pff wall (5) top surface, cut-pff wall (5) axis two sides;
J, the laitance defective material concrete layer at the top of cut-pff wall (5) cuts region concrete time and pours, and is formed fill concrete layer (7);
K, composite geo-membrane (10) is fixed at the top of fill concrete layer (7) using bolt and extends composite geo-membrane (10) Guide groove (4) is connected with weir bluk recombination geomembrane (10) impervious body outside out, and the fill concrete by no geomembrane without the area of coverage Layer (7) and guide groove (4) side dabbing;
L, formwork erection pours nut cap concrete (9) above fill concrete layer (7) and guide groove (4).
7. construction method according to claim 6, it is characterised in that: it is super that step e pours the cut-pff wall to be formed (5) crest level The guide groove (4) bottom elevation is crossed more than or equal to 0.5m.
8. construction method according to claim 6, it is characterised in that: step i water expandable waterstop (8) uses cement steel Nail is fixed at the top of the cut-pff wall (5).
9. construction method according to claim 6, it is characterised in that: water expandable waterstop (8) laying need to take in step i When connecing, connector uses horizontally overlapping method, and the lap of splice need to be controlled in 5cm or more.
10. construction method according to claim 6, it is characterised in that: the nut cap concrete (9) pours elevation beyond institute eventually Guide groove (4) crest level is stated more than or equal to 100cm.
CN201910520066.6A 2019-06-17 2019-06-17 The Lossless connection structure and construction method of cut-pff wall and nut cap concrete Pending CN110158542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910520066.6A CN110158542A (en) 2019-06-17 2019-06-17 The Lossless connection structure and construction method of cut-pff wall and nut cap concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910520066.6A CN110158542A (en) 2019-06-17 2019-06-17 The Lossless connection structure and construction method of cut-pff wall and nut cap concrete

Publications (1)

Publication Number Publication Date
CN110158542A true CN110158542A (en) 2019-08-23

Family

ID=67625815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910520066.6A Pending CN110158542A (en) 2019-06-17 2019-06-17 The Lossless connection structure and construction method of cut-pff wall and nut cap concrete

Country Status (1)

Country Link
CN (1) CN110158542A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897984A (en) * 2021-09-29 2022-01-07 浙江华东工程建设管理有限公司 Connection type of impervious wall concrete cap and geomembrane and construction method thereof
CN114855840A (en) * 2022-06-01 2022-08-05 中国水利水电第八工程局有限公司 Earth-rock cofferdam and concrete cofferdam connecting structure and construction method thereof
CN115030203A (en) * 2022-07-18 2022-09-09 南京宇正建设工程有限公司 Construction structure and construction method of high-pressure jet grouting impervious wall

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009174137A (en) * 2008-01-22 2009-08-06 Seibu Polymer Corp Joint structure for caisson split into upper and lower portions, and its construction method
CN103835379A (en) * 2014-03-24 2014-06-04 中国化学工程第三建设有限公司 Combined water stop system of waterproof concrete wall
CN105464048A (en) * 2016-01-08 2016-04-06 中国电建集团华东勘测设计研究院有限公司 Composite geomembrane anti-seepage structure capable of automatically adapting to weir body deformation and construction method
CN105951857A (en) * 2016-06-27 2016-09-21 中国电建集团成都勘测设计研究院有限公司 Composite anti-seepage wall used in hydraulic cofferdam engineering and construction method thereof
CN107143046A (en) * 2017-06-09 2017-09-08 王军 A kind of water expandable waterstop, glue combination constructing method thereof
CN108166457A (en) * 2018-01-12 2018-06-15 中国电建集团华东勘测设计研究院有限公司 The anti-seepage linkage of the deep covering layer dam foundation and calculous soil core-wall
CN208219568U (en) * 2018-04-20 2018-12-11 中国电建集团贵阳勘测设计研究院有限公司 Surface water stopping structure for concrete panel rock-fill dam
CN210315409U (en) * 2019-06-17 2020-04-14 中国电建集团华东勘测设计研究院有限公司 Lossless type connection structure of cut-off wall and block concrete

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009174137A (en) * 2008-01-22 2009-08-06 Seibu Polymer Corp Joint structure for caisson split into upper and lower portions, and its construction method
CN103835379A (en) * 2014-03-24 2014-06-04 中国化学工程第三建设有限公司 Combined water stop system of waterproof concrete wall
CN105464048A (en) * 2016-01-08 2016-04-06 中国电建集团华东勘测设计研究院有限公司 Composite geomembrane anti-seepage structure capable of automatically adapting to weir body deformation and construction method
CN105951857A (en) * 2016-06-27 2016-09-21 中国电建集团成都勘测设计研究院有限公司 Composite anti-seepage wall used in hydraulic cofferdam engineering and construction method thereof
CN107143046A (en) * 2017-06-09 2017-09-08 王军 A kind of water expandable waterstop, glue combination constructing method thereof
CN108166457A (en) * 2018-01-12 2018-06-15 中国电建集团华东勘测设计研究院有限公司 The anti-seepage linkage of the deep covering layer dam foundation and calculous soil core-wall
CN208219568U (en) * 2018-04-20 2018-12-11 中国电建集团贵阳勘测设计研究院有限公司 Surface water stopping structure for concrete panel rock-fill dam
CN210315409U (en) * 2019-06-17 2020-04-14 中国电建集团华东勘测设计研究院有限公司 Lossless type connection structure of cut-off wall and block concrete

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897984A (en) * 2021-09-29 2022-01-07 浙江华东工程建设管理有限公司 Connection type of impervious wall concrete cap and geomembrane and construction method thereof
CN114855840A (en) * 2022-06-01 2022-08-05 中国水利水电第八工程局有限公司 Earth-rock cofferdam and concrete cofferdam connecting structure and construction method thereof
CN115030203A (en) * 2022-07-18 2022-09-09 南京宇正建设工程有限公司 Construction structure and construction method of high-pressure jet grouting impervious wall
CN115030203B (en) * 2022-07-18 2024-01-05 南京宇正建设工程有限公司 Construction structure of high-pressure rotary spraying impervious wall and construction method thereof

Similar Documents

Publication Publication Date Title
WO2021223573A1 (en) Construction structure for communication and connection between newly added mined channel and existing station hall layer
CN110094213B (en) Space combined supporting structure and supporting method for water-rich broken stratum tunnel
CN205742213U (en) Foundation pit supporting construction
CN110158542A (en) The Lossless connection structure and construction method of cut-pff wall and nut cap concrete
CN103741714A (en) Full-cover excavation top-down construction method for underground engineering
CN105297685B (en) Base concrete panel rock-fill dam and construction method thereof
CN105862930A (en) Protection structure on existing tunnel below new underground engineering
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN107503754A (en) A kind of construction method of VI grade of country rock rich water Shallow tunnel with large cross-section
CN110159298A (en) A kind of first branch button arch construction method of Underground Subway Station
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN110374060A (en) A kind of the reservoir seepage-proofing structure and construction method of rock-fill dams dam facing and earth and stone material backfill bottom storehouse
CN108951641A (en) It is a kind of for the compound support method of ultra-deep pipe gallery foundation trench in water river
CN107044107A (en) Side slope geotechnical fabric bag slope protection construction method and device
CN105672205B (en) A kind of rock leakage preventing structure
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN104314089A (en) Method for composite geo-membrane sloping core cofferdam
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN111962525A (en) Supporting system without inner support for ultra-large-specification foundation pit in soft soil area and construction method thereof
CN205475098U (en) Panel rock -fill dam seepage prevention structure
CN209114423U (en) A kind of leakage preventing structure for dykes and dams
CN102296620B (en) Curtain water-stop slope wall and construction method thereof
CN104480905B (en) Upstream face structure of concrete panel dam for preventing panel from being hollow and construction method
CN105970882A (en) Structure solving reverse osmosis water problem of dam body in construction process of concrete-faced rockfill dam and construction method thereof
CN210315409U (en) Lossless type connection structure of cut-off wall and block concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination