CN206929435U - Co-layer draining through-flooring antiseep riser connecting piece - Google Patents

Co-layer draining through-flooring antiseep riser connecting piece Download PDF

Info

Publication number
CN206929435U
CN206929435U CN201720353312.XU CN201720353312U CN206929435U CN 206929435 U CN206929435 U CN 206929435U CN 201720353312 U CN201720353312 U CN 201720353312U CN 206929435 U CN206929435 U CN 206929435U
Authority
CN
China
Prior art keywords
charge
flooring
standpipe
antiseep
remittance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720353312.XU
Other languages
Chinese (zh)
Inventor
杜建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720353312.XU priority Critical patent/CN206929435U/en
Application granted granted Critical
Publication of CN206929435U publication Critical patent/CN206929435U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

A kind of co-layer draining through-flooring antiseep riser connecting piece, including charge for remittance bucket and standpipe connecting tube;Standpipe connecting tube is tightly connected through charge for remittance bottom sheet and with the bottom plate;Discharge opening is offered on the pipeline section that standpipe connecting tube is in charge for remittance bucket, the discharge opening is secondary drainage mouth.The waterproof layer at its structure floor can be extended into charge for remittance bucket using the toilet of the connector, can be drained so as to penetrate into the water of toilet Jiang Ban back filled regions by discharge opening, and then avoid drop plate back filled region that seepage occurs because of ponding.Above-mentioned water-proofing treatment mode had both been not necessary to turn on waterproof layer or need not set the water proof structures such as water blocking ring, the distance between the threeway being connected with connector or the joint being connected in multi-way pipe fitting with transverse drainage branch pipe and flooring are in above standpipe through-flooring connector so as to reduce, and then needs to make full use of space creation condition by devices such as the water tanks of flow by gravity emptying to be embedded in drop plate back filled region.The connector integrated level is high, small, practical.

Description

Co-layer draining through-flooring antiseep riser connecting piece
Technical field
Construction drainage field is the utility model is related to, especially a kind of co-layer draining through-flooring antiseep riser connecting piece.
Background technology
The drop plate back filled region of subsided rest room often because ground sweat and/or be embedded in drainpipe seepage therein and Ponding is produced, if ponding cannot exclude to be possible to that seepage occurs in time, so as to influence the life of resident family of lower floor;For above-mentioned The problem of dropping plate back filled region ponding, generally use set the mode of secondary drainage mouth to solve.
Existing building drainage system is general all to set threeway or more logical at adjacent floor above standpipe through-flooring connector Pipe fitting is to connect the transverse drainage branch pipe in This floor, still, for buildings waterproof in terms of consideration, often need to be in standpipe through-flooring The standpipe connecting tube of connector and the joint portion of floor use turns over and sets the modes such as water blocking ring to carry out water-proofing treatment on waterproof layer, Which results in the joint being connected in the threeway or multi-way pipe fitting with the transverse drainage branch pipe and flooring (building herein The techonosphere such as sloping layer, screed-coat, the waterproof layer and protective layer construction that face refers to drop above plate plot structure floor is completed but not Floor when being backfilled to Jiang Ban areas) between when needing the installation space of reserved buildings waterproof construction and the water proof structure to construct Operating space, so as to cause the joint being connected in the threeway or multi-way pipe fitting after being installed in place with the transverse drainage branch pipe A certain distance between flooring be present;At the same time, real-life many application scenarios require the threeway or more Its joint being connected with the transverse drainage branch pipe, which should try one's best, when way pipe fitting is set reduces the distance between flooring, or even requires The joint is close to flooring setting;One typical example:(co-layer draining water-saving system refers to existing co-layer draining water-saving system The waste water for the slight pollution discharged in life, particularly shower, the gray water washed one's hands and face, discharged in laundry processes are collected, so Reclaimed water is reached with PROCESS FOR TREATMENTs such as precipitation, filtering, sterilizations to the raw water being collected into afterwards and uses standard, and reclaimed water is used to rush The waste water reuse system that lavatory and life are used mixedly;The row of dirty useless shunting need to typically be used by installing the toilet of co-layer draining water-saving system Water mode) water tank be typically all embedded in the drop plate back filled region of toilet, for ensure water tank in water can rely on flow by gravity Emptying, it is equal with the interface of the joint or its bottom plate is higher than the interface of the joint just water tank must to be arranged on its bottom plate Position;If the joint can not be utilized with the larger more space in drop plate back filled region that may result in of building distance between the surface;If energy The distance between the joint and flooring are effectively reduced, or even the distance was reduced to for zero (i.e. described joint is close to flooring and set) The utilization ratio in drop this extremely limited space of plate back filled region can be improved.
The content of the invention
To solve the above problems, the utility model provides a kind of co-layer draining through-flooring antiseep riser connecting piece, its Including charge for remittance bucket and standpipe connecting tube;Standpipe connecting tube is tightly connected through charge for remittance bottom sheet and with the bottom plate;Standpipe connecting tube Discharge opening is offered on the pipeline section in charge for remittance bucket (discharge opening is secondary drainage mouth).
Preferably, the pipeline section that the standpipe connecting tube is located above the charge for remittance bottom sheet is completely in charge for remittance bucket.
Preferably, opening up the tube wall evagination of the standpipe connecting tube of the discharge opening, (i.e. described discharge opening is opened in On the tube wall of outwardly standpipe connecting tube);Lowest part of the lowest part of the discharge opening higher than the tube wall of the evagination;Such as This, just The book of Changes discharge opening does not enter in charge for remittance bucket the water discharged by standpipe connecting tube.
Further, the discharge opening is opened in the position more than middle part or middle part of the tube wall of the evagination.
Preferably, the bottom plate that the discharge opening is close to the charge for remittance bucket opens up;In this way, just it is not easy ponding in charge for remittance bucket.
Preferably, the discharge opening is in integrally to be provided with screen pack in sieve-like or the discharge opening, so as to avoid Larger impurity is entered in the standpipe connecting tube in the charge for remittance bucket.
Preferably, the charge for remittance bucket is square or infundibulate.
Preferably, the co-layer draining through-flooring antiseep riser connecting piece also includes threeway or multi-way pipe fitting, this three Logical or multi-way pipe fitting is down stream tee joint or how logical or be skew T or tiltedly more logical, and it is in the charge for remittance with the standpipe connecting tube Pipeline section above bottom sheet is connected and connected;In this way, just not easily pass through three using the water in the soil stack of connector connection Logical or multi-way pipe fitting horizontal branch pipe connection is entered in horizontal branch pipe.
Can be by the waterproof layer at toilet structure floor during the co-layer draining through-flooring antiseep riser connecting piece application Extending into charge for remittance bucket (during installation, should select the gap between the standpipe connecting tube in charge for remittance bucket and charge for remittance bucket inwall to be more than or equal to The co-layer draining through-flooring antiseep riser connecting piece of toilet warterproof thickness degree by waterproof layer to extend into charge for remittance bucket);Such as This, the water leaked from the piping failure that accomodation ground penetrates into the water of drop plate back filled region and is embedded in drop plate back filled region is equal It is pooled in charge for remittance bucket and uniform effluent is carried out by discharge opening.Above-mentioned water-proofing treatment mode is not only simple to operate but also reliability It is good, and water-proofing treatment is carried out using which and had both been not necessary to turn on waterproof layer or the water proof structures such as water blocking ring need not be set, this Sample just creates to reduce in the threeway or multi-way pipe fitting with the distance between the joint that transverse drainage branch pipe is connected and flooring Condition., should be according to the predetermined of the threeway or multi-way pipe fitting during co-layer draining through-flooring antiseep riser connecting piece installation Setting height(from bottom) determines the installation site of connector, and (i.e. the determination of connector installation site should be with without prejudice to the threeway or more siphunculus It is principle that part, which is installed to its predetermined setting height(from bottom));In this way, the threeway or multi-way pipe fitting just may be mounted to its predetermined altitude (root According to being actually needed, the threeway or multi-way pipe fitting even may be mounted to it and be close to the joint that transverse drainage branch pipe is connected with flooring Position).When the pipeline section above standpipe connecting tube is located at charge for remittance bottom sheet is completely in charge for remittance bucket, charge for remittance bucket can be installed It is suitable for reading closer in the position of toilet floor at its, so as to reduce the length that toilet warterproof layer extends downwardly, i.e. waterproof Only less length need to be extended downwardly can meet its requirement with the charge for remittance bucket inwall lap of splice to layer.
The co-layer draining antiseep riser connecting piece is simple in construction, beneficial to manufacturing, being easily installed, and the connector also has The characteristics of integrated level is high, small, practical.
Brief description of the drawings
The Figure of description for forming the part of the application is used for providing further understanding to of the present utility model, this practicality New schematic description and description is used to explain the utility model, does not form to improper restriction of the present utility model. In the accompanying drawings:
Fig. 1 is the dimensional structure diagram of embodiment 1
Fig. 2 is the cross section structure diagram of embodiment 1
Fig. 3 uses schematic diagram for embodiment 1
Fig. 4 is the dimensional structure diagram of embodiment 2
Fig. 5 is the cross section structure diagram of embodiment 2
Fig. 6 is the cross section structure diagram of embodiment 3
Fig. 7 uses schematic diagram for embodiment 3
Description of reference numerals:11. charge for remittance bucket, 12. standpipe connecting tubes, 121. discharge openings, 13. straight tubes, 14. four-ways, 141. Waste water pipe joint, 142. connector for sewage pipe, 100. waterproof layers, 221. discharge openings, 31. charge for remittance buckets, 32. standpipes connection pipe fluid row Go out section, 33. standpipes connection pipe fluid approach section, 331. discharge openings
Embodiment
Preferred embodiment of the present utility model is elaborated below in conjunction with the accompanying drawings, each embodiment is with the utility model Premised on technical scheme, detailed embodiment and specific operating process are given, but the scope of protection of the utility model is not It is limited to following embodiments.
Embodiment 1
As shown in FIG. 1 to 3, the co-layer draining through-flooring antiseep riser connecting piece shown in the present embodiment, its part bag Include:Charge for remittance bucket 11, standpipe connecting tube 12.
Charge for remittance bucket 11 is square and half-headed bucket.The upper end of standpipe connecting tube 12 is bellmouth, lower end is socket, and it is perpendicular Direct puncture is crossed the bottom plate of charge for remittance bucket 11 and is integrally formed with bottom plate;The pipeline section that standpipe connecting tube 12 is located above the bottom plate of charge for remittance bucket 11 is complete Portion is in charge for remittance bucket 11;The position that the pipeline section that standpipe connecting tube 12 is in charge for remittance bucket 11 is close to the bottom plate of charge for remittance bucket 11 offers Discharge opening 121;It is in sieve-like that discharge opening 121 is overall.
Co-layer draining through-flooring antiseep riser connecting piece shown in the present embodiment (can be waited to pacify when installing using following flow The hole to match with the size of charge for remittance bucket 11 should be reserved with by filling the toilet of the connector):First, charge for remittance bucket 11 is positioned over pre- In box out mouth and make the lower section of the waterproof layer 100 suitable for reading at the toilet structure floor of charge for remittance bucket 11;Next, use microlith Concrete is closely knit by the gap embedding between charge for remittance bucket 11 and hole;Then, screed-coat and sloping layer are done and makes whole toilet Minimum point be at reserved opening;Next, do the waterproof layer 100 of toilet and waterproof layer 100 is extended into charge for remittance bucket 11 Within, the waterproof layer 100 extended within charge for remittance bucket 11 should be reliably combined with the inwall of charge for remittance bucket 11 so that water can not be from two Exosmosed at the faying face of person;Then, water experiment is closed, after closing hydration lattice, then by straight tube 13 by standpipe connecting tube 12 and four-way 14 connect and connect that (straight tube 13 has suitable length so that four-way 14 is arranged on its waste water pipe joint 141 and is close to flooring Position);Finally, the lower mouth of the suitable for reading and standpipe connecting tube 12 of lower floor's standpipe is tightly connected, that is, completes installation.
Using the toilet of the co-layer draining through-flooring antiseep riser connecting piece shown in the present embodiment, it drops plate back filled region Water standpipe connecting tube 12 is directly discharged into by discharge opening 121, so as to avoid dropping plate back filled region ponding;At the same time, waste water Pipe joint 141 is close to flooring installation, and this just reduces the distance between flooring for the water tank and creates condition.
Embodiment 2
As shown in Figure 4, Figure 5, the present embodiment is substantially the same manner as Example 1, and difference from Example 1 is only that:This reality Apply the discharge opening 221 in example be opened on the tube wall of outwardly standpipe connecting tube (open up discharge opening 221 standpipe connection The tube wall evagination of pipe), and the lowest part of discharge opening 221 is higher than the lowest part of the tube wall of the evagination;In this way, connected by standpipe Take over discharge water just not The book of Changes discharge opening and enter in charge for remittance bucket.
Embodiment 3
As shown in Figure 6, Figure 7, the co-layer draining through-flooring antiseep riser connecting piece shown in the present embodiment, its part bag Include:Charge for remittance bucket 31, standpipe connection pipe fluid discharge section 32, standpipe connection pipe fluid approach section 33.
Charge for remittance bucket 31 is square and half-headed bucket.The upper end of standpipe connection pipe fluid discharge section 32 is bellmouth, lower end For socket, it passes vertically through the bottom plate of charge for remittance bucket 31 and is integrally formed with bottom plate;Standpipe connection pipe fluid approach section 33 is straight tube, The overall discharge opening 331 in sieve-like is offered on the tube wall of its bottom;Standpipe connection pipe fluid approach section 33 is bonded by socket joint The mode of connection is connected pipe fluid discharge section 32 with standpipe and connected;Standpipe connection pipe fluid approach section 33 is connected pipe fluid with standpipe Discharge section 32 collectively constitutes standpipe connecting tube.(in the present embodiment, charge for remittance bucket 31, standpipe connection pipe fluid discharge section 32, standpipe connect The size of adapter fluid approach section 33 be mutually matched so that discharge opening 331 be completely in charge for remittance bucket 31 and discharge opening 331 not Blocked by the bellmouth of standpipe connection pipe fluid discharge section 32 upper end)
Co-layer draining through-flooring antiseep riser connecting piece shown in the present embodiment, its installation procedure and embodiment 1 are basic It is identical, it the difference is that only:Standpipe connection pipe fluid approach section 33 in the present embodiment directly be connected with four-way, general during installation Standpipe connection pipe fluid approach section 33 is sheared to suitable length so that four-way is arranged on what its waste water pipe joint was close to flooring Position.
In other embodiments, the co-layer draining through-flooring antiseep riser connecting piece may also include threeway or more siphunculus Part;And the threeway or multi-way pipe fitting are down stream tee joint or more logical or be skew T or tiltedly more logical, it is connected with the standpipe Pipeline section of the pipe above the charge for remittance bottom sheet is connected and connected.
Embodiment described above is only preferred embodiment of the present utility model, is not limited to the utility model, For those skilled in the art, the utility model can have various modifications and variations.It is all in spirit of the present utility model Within principle, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.

Claims (8)

1. co-layer draining through-flooring antiseep riser connecting piece, it is characterised in that:Including charge for remittance bucket and standpipe connecting tube;Standpipe connects Adapter is tightly connected through charge for remittance bottom sheet and with the bottom plate;Sluicing is offered on the pipeline section that standpipe connecting tube is in charge for remittance bucket Mouthful.
2. co-layer draining through-flooring antiseep riser connecting piece according to claim 1, it is characterized in that:The standpipe connection Pipeline section of the pipe above the charge for remittance bottom sheet is completely in charge for remittance bucket.
3. co-layer draining through-flooring antiseep riser connecting piece according to claim 1, it is characterized in that:Open up the sluicing The tube wall evagination of the standpipe connecting tube of mouth;Lowest part of the lowest part of the discharge opening higher than the tube wall of the evagination.
4. co-layer draining through-flooring antiseep riser connecting piece according to claim 3, it is characterized in that:The discharge opening is opened The position being located at more than the middle part or middle part of the tube wall of the evagination.
5. co-layer draining through-flooring antiseep riser connecting piece according to claim 1, it is characterized in that:The sluicing is tight-lipped The bottom plate for pasting the charge for remittance bucket opens up.
6. co-layer draining through-flooring antiseep riser connecting piece according to claim 1, it is characterized in that:The discharge opening is whole Body is in be provided with screen pack in sieve-like or the discharge opening.
7. co-layer draining through-flooring antiseep riser connecting piece according to claim 1, it is characterized in that:The charge for remittance bucket is Square or infundibulate.
8. co-layer draining through-flooring antiseep riser connecting piece according to any one of claim 1 to 7, it is characterized in that: Also include threeway or multi-way pipe fitting, the threeway or multi-way pipe fitting are down stream tee joint or how logical or be skew T or tiltedly more logical, it with The pipeline section that the standpipe connecting tube is in above the charge for remittance bottom sheet is connected and connected.
CN201720353312.XU 2017-04-06 2017-04-06 Co-layer draining through-flooring antiseep riser connecting piece Expired - Fee Related CN206929435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720353312.XU CN206929435U (en) 2017-04-06 2017-04-06 Co-layer draining through-flooring antiseep riser connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720353312.XU CN206929435U (en) 2017-04-06 2017-04-06 Co-layer draining through-flooring antiseep riser connecting piece

Publications (1)

Publication Number Publication Date
CN206929435U true CN206929435U (en) 2018-01-26

Family

ID=61349799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720353312.XU Expired - Fee Related CN206929435U (en) 2017-04-06 2017-04-06 Co-layer draining through-flooring antiseep riser connecting piece

Country Status (1)

Country Link
CN (1) CN206929435U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589884A (en) * 2018-07-23 2018-09-28 湖南大禹止水建筑材料有限公司 Drainage pipeline fastener inserts device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589884A (en) * 2018-07-23 2018-09-28 湖南大禹止水建筑材料有限公司 Drainage pipeline fastener inserts device

Similar Documents

Publication Publication Date Title
CN208501802U (en) A kind of bathroom caisson internal drainage construction
CN106836516B (en) A kind of integrated water-proof chassis of toilet pipeline
CN102418347A (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN103046565A (en) Draining method for ultra-deep batholith deep foundation pit
CN103572808A (en) Building toilet caisson waterproof device and construction method
CN208009524U (en) Water water storage, treatment for reuse and exhaust system in a kind of side-stand type for toilet
CN207268004U (en) Toilet leakage protective system
CN208718112U (en) Novel anti-ponding structure based on toilet geothermal heating ground surface finishing
CN206929435U (en) Co-layer draining through-flooring antiseep riser connecting piece
CN103410318B (en) Washroom pipe well water-leakage construction method
CN104196046B (en) Reduce the water proof drainage system of underground hydrostatic water table
CN201195867Y (en) Water seepage prevention floor drain
CN209603202U (en) Basement anti-floating discharge structure
CN207419877U (en) A kind of integrated discharge structure of decoration
CN103556841B (en) A kind of hollow type residence toilet substructure
CN108692111A (en) Co-layer draining through-flooring antiseep riser connecting piece
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN206570892U (en) Seeper discharge device
CN212452933U (en) Same-floor drain pipe
CN207295866U (en) Caisson of toilet secondary drainage system
CN207812619U (en) Drainpipe secondary protection structure
CN113323099A (en) Water-proof and drainage integrated system and construction process thereof
CN206090736U (en) Secondary drainage structures is maked somebody a mere figurehead to bathroom
CN112196027A (en) Drainage device and drainage system for stand pipe
CN206545284U (en) A kind of subsided rest room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 400700 Jinhua Road 4, 2-3 Jinhua Road, Beibei District, Chongqing, 2-3, 2-3

Patentee after: Du Jianbo

Address before: 3 unit, No. 118 Jinhua Road, North Hot Spring Street, Beibei District, Chongqing, China 10-2

Patentee before: Du Jianbo

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180126

Termination date: 20210406

CF01 Termination of patent right due to non-payment of annual fee