CN206929429U - Electromechanical pipeline no-welding hanger system below a kind of girder steel - Google Patents
Electromechanical pipeline no-welding hanger system below a kind of girder steel Download PDFInfo
- Publication number
- CN206929429U CN206929429U CN201720852541.6U CN201720852541U CN206929429U CN 206929429 U CN206929429 U CN 206929429U CN 201720852541 U CN201720852541 U CN 201720852541U CN 206929429 U CN206929429 U CN 206929429U
- Authority
- CN
- China
- Prior art keywords
- bolt
- steel
- hanger system
- system below
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses electromechanical pipeline no-welding hanger system below a kind of girder steel, including cross-arm, vertical bar, suspension rod;The cross-arm both ends are supported by the vertical bar, are fixed at support by U-bolt fixing device and raw steel girder construction, and the cross-arm bottom is provided with some groups of mounting holes, and the suspension rod top is fixed at mounting hole, bottom is connected with suspension rod bottom fixing device;The U-bolt fixing device includes two U-bolts, matching nuts, fixed plate, and U-bolt is socketed the cross-arm, is connected by fixed plate at the screw rod of two U-bolts and locked by matching nut.The utility model realizes that no-welding is fixed using U-bolt fixing device with raw steel girder construction, it need not be welded, be cut and perforate operation on original structure girder steel, avoid damage to original steel structure fireproofing coating layer and structural stability, improve efficiency of construction, reduce operation intensity and danger coefficient, significant effect.
Description
Technical field
Electromechanical pipeline no-welding hanger system below a kind of girder steel is the utility model is related to, belongs to electromechanical installation skill
Art field.
Background technology
With Chinese society expanding economy, it is related to the spring after the large quantities of social public buildings and infrastructure such as rain of the people's livelihood
Show as bamboo shoot.Particularly recent years, metropolitan track traffic infrastructure construction amount increase notable, large-scale public venue
The amount of putting into operation is also growing day by day.The installation quality and effect of electromechanical installation in track traffic and large-scale public venue construction
Can the later stage facility be directly affected reach the ring of key one of design object.In electromechanical installation design strong and weak electricity, plumbing,
Air conditioner, fire-fighting and intelligent all multi-specialized, how in limited space reasonable installation be related to it is above-mentioned professional electromechanical comprehensive
Closing pipeline just turns into emphasis, wants to realize that electromechanical pipeline rationally arrangement just must carry out rational optimization design to pipeline suspension and support
And installation.
Under normal circumstances, workmen carries out the field fabrication of hanger system, use and steel according to on-site actual situations
The mode of beam welding solves the problems, such as that suspension and support is taken root, but is welded in original structural steel beam, perforate and cutting operation
Operating area stress concentration can be caused, destroys the stability of original structural steel beam, while destroys the fire atlas of raw steel body structure surface
Layer, increase later stage potential safety hazard.
The content of the invention
Goal of the invention:The utility model purpose is in view of the shortcomings of the prior art, there is provided electromechanical tube below a kind of girder steel
Line no-welding hanger system, realize that no-welding is fixed using U-bolt fixing device and raw steel girder construction, it is not necessary to tie in original
Welded, cut and perforate operation on structure girder steel, avoided damage to original steel structure fireproofing coating layer and structural stability, carry
High efficiency of construction, reduces operation intensity and danger coefficient, significant effect.
Technical scheme:Electromechanical pipeline no-welding hanger system below girder steel described in the utility model, including it is cross-arm, perpendicular
To bar, suspension rod;The cross-arm both ends are supported by the vertical bar, pass through U-bolt fixing device and raw steel beam knot at support
Structure is fixed, and the cross-arm bottom is provided with some groups of mounting holes, and the suspension rod top is fixed at mounting hole, bottom is connected with suspension rod
Bottom fixing device;Be M18 strengthening studs at the screw rod of the U-bolt, the length of every M18 strengthening stud for 300mm ~
400mm;The fixed plate uses 250mm*400mm 10# steel plates, and 4 bolt mounting holes are opened up in steel plate relevant position.Cross-arm
By setting U-bolt fixing device to realize that no-welding is fixed with raw steel girder construction, the installation hole number of cross-arm bottom is according to tool
Body pipe laying situation determines that cross-arm length adjusts according to two groups of parallel girder steels of steel construction.
Above-mentioned technical proposal is further improved, is provided with triangular support bracket on the outside of the vertical bar, triangular support bracket is right angle
Shape, the short brink of square are by bolt with being connected on the outside of vertical bar.
Further, the triangular support bracket uses angle steel or channel-section steel material, and angle steel specification is 30*30*3mm.
Further, the U-bolt fixing device includes two U-bolts, matching nuts, fixed plate, U-bolt set
The cross-arm is connect, is connected by fixed plate at the screw rod of two U-bolts and is locked by matching nut.
Further, the cross-arm uses 1.5m, specification interlude is provided with three groups of bolts for 125*125mm H profile steel
Mounting hole.
Further, the vertical bar top is welded with connecting plate, connecting plate is connected by bolt with the cross-arm.
Further, the H profile steel that vertical bar is 1.5m length, specification is 100*100mm.
Further, the suspension rod bottom fixing device includes being used to connect the connecting portion of suspension rod, located at connecting portion bottom
Square clip, upper semi-circle pipe clamp, lower half circle pipe clamp, square clip is fixed with square steel by Fixed latches, upper semi-circle pipe clamp with
Square clip bottom is connected, and lower half circle pipe clamp both ends are connected by bolt with the docking of upper semi-circle pipe clamp.
Further, the suspension rod is length 1000mm two M16 threaded rods.
Further, the connecting portion is the M16 nuts for being welded on square clip top.
Beneficial effect:Electromechanical pipeline no-welding hanger system below girder steel provided by the utility model, can be pre- in factory
Type is made, Assembling forms, it is not necessary to fire operation;No-welding is realized using U-bolt fixing device and raw steel girder construction
It is fixed, it is not necessary to be welded, cut and perforate operation on original structure girder steel, avoid damage to original steel structure fireproofing coating
Layer and structural stability, improve efficiency of construction, reduce operation intensity and danger coefficient, significant effect;Cross-arm bottom connects
There is suspension rod, the suspension rod bottom fixing device of boom foot realizes electromechanical pipeline below girder steel using modes such as bolt and clips
Installation in good order is in place.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of pipeline fixing device.
In figure:1st, fixed plate;2nd, U-bolt;3rd, original structure girder steel;4th, cross-arm;5th, triangular support bracket;6th, vertical bar;7、
Suspension rod;8th, M16 nuts;9th, square clip;10th, square steel;11st, Fixed latches;13rd, by fixed pipeline;14th, bolt.
Embodiment
Technical solutions of the utility model are described in detail below by accompanying drawing, but the scope of protection of the utility model
It is not limited to the embodiment.
Embodiment 1:Electromechanical pipeline no-welding hanger system below girder steel as shown in Figure 1 and Figure 2, including it is cross-arm 4, perpendicular
To bar 6, triangular support bracket 5, suspension rod 7, square steel 10;Cross-arm 4 uses length to be made for 1.5m 125*125mm H profile steels,
Interlude uniformly opens up the 3 groups of a diameter of 16mm installation bolt hole of suspension rod 7;100* of the vertical bar 6 by length for 1.5m
100mmH section steel manufactures form, and side offers the mounting hole of triangular support bracket 5, and the top of vertical bar 6 is welded to connect plate;Gusseted
Frame 5 uses 30*30*3mm angle steel;Suspension rod 7 uses two M16 threaded rod of the length for 1000mm.
The both sides of cross-arm 4 are supported by vertical bar 6, and the connecting plate of vertical bar 6 is connected by bolt with cross-arm 4, junction leads to
Cross U-bolt fixing device and realize that no-welding is fixed with raw steel structural steel beam 3, U-bolt fixing device by 2 single u-shaped bolts and
Matching nut, fixed plate 1 are formed, and U-bolt is attached holding, the length of every M18 strengthening stud using M18 strengthening stud
Spend and 4 bolt installations are opened up in steel plate relevant position using 250mm*400mm 10# steel plates for 350mm or so, fixed plate 1
Hole.
The outside of vertical bar 6 is provided with two triangular support brackets 5, and the short brink of triangular support bracket 5 passes through bolt and vertical bar 6
Connection;The one end of suspension rod 7 is fixed through the installation of cross-arm 4 with bolt hole and using bolt, and the other end connects with the bottom fixing device of suspension rod 7
Connect;The bottom fixing device of suspension rod 7 is the square clip 9 for being welded with M16 nuts 8 above, and square clip 9 is by M16 nuts 8 with hanging
Bar 7 connects, and square clip 9 is by carrying Fixed latches 11 by the fixation of square steel 10;The square bottom of clip 9 is connected with upper semi-circle
Pipe clamp, upper semi-circle pipe clamp docks to be connected to form by bolt 14 with lower semicircle pipe cartoon both ends to be consolidated by the pipeline of fixed pipeline 13
Determine device.
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, but it must not
It is construed to the limitation to the utility model itself.In the spirit and scope of the present utility model for not departing from appended claims and defining
Under the premise of, can various changes can be made in the form and details to it.
Claims (10)
- A kind of 1. electromechanical pipeline no-welding hanger system below girder steel, it is characterised in that:Including cross-arm, vertical bar, suspension rod;Institute State cross-arm both sides to support by the vertical bar, fixed at support by U-bolt fixing device and raw steel girder construction, the horizontal stroke Load bottom is provided with some groups of mounting holes, and the suspension rod top is fixed at mounting hole, bottom is connected with suspension rod bottom fixing device; The U-bolt fixing device includes two U-bolts, matching nuts, fixed plate, and U-bolt is socketed the cross-arm, two U Connected by fixed plate at the screw rod of type bolt and locked by matching nut.
- 2. electromechanical pipeline no-welding hanger system below girder steel according to claim 1, it is characterised in that:It is described vertical Triangular support bracket is provided with the outside of bar, triangular support bracket is square, the short brink of square passes through bolt and phase on the outside of vertical bar Even.
- 3. electromechanical pipeline no-welding hanger system below girder steel according to claim 2, it is characterised in that:The triangle Support frame uses angle steel or channel-section steel material, and angle steel specification is 30*30*3mm.
- 4. electromechanical pipeline no-welding hanger system below girder steel according to claim 1, it is characterised in that:It is described U-shaped It is M18 strengthening studs at the screw rod of bolt, the length of every M18 strengthening stud is 300mm ~ 400mm;The fixed plate uses 250mm*400mm 10# steel plates, 4 bolt mounting holes are opened up in steel plate relevant position.
- 5. electromechanical pipeline no-welding hanger system below girder steel according to claim 1, it is characterised in that:The cross-arm Using 1.5m, specification, interlude is provided with three groups of bolt mounting holes for 125*125mm H profile steel.
- 6. electromechanical pipeline no-welding hanger system below girder steel according to claim 1, it is characterised in that:It is described vertical Bar top is welded with connecting plate, and connecting plate is connected by bolt with the cross-arm.
- 7. electromechanical pipeline no-welding hanger system below the girder steel according to claim 1 or 6, it is characterised in that:It is described The H profile steel that vertical bar is 1.5m length, specification is 100*100mm.
- 8. electromechanical pipeline no-welding hanger system below girder steel according to claim 1, it is characterised in that:The suspension rod Bottom fixing device includes being used to connect the connecting portion of suspension rod, square clip, upper semi-circle pipe clamp, lower half located at connecting portion bottom Pipe card, square clip are fixed with square steel by Fixed latches, and upper semi-circle pipe clamp is connected with square clip bottom, lower half circle pipe clamp Both ends are connected by bolt with the docking of upper semi-circle pipe clamp.
- 9. electromechanical pipeline no-welding hanger system below the girder steel according to claim 1 or 8, it is characterised in that:It is described Suspension rod is length 1000mm two M16 threaded rods.
- 10. electromechanical pipeline no-welding hanger system below girder steel according to claim 8, it is characterised in that:The company Socket part is to be welded on the M16 nuts on square clip top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720852541.6U CN206929429U (en) | 2017-07-14 | 2017-07-14 | Electromechanical pipeline no-welding hanger system below a kind of girder steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720852541.6U CN206929429U (en) | 2017-07-14 | 2017-07-14 | Electromechanical pipeline no-welding hanger system below a kind of girder steel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206929429U true CN206929429U (en) | 2018-01-26 |
Family
ID=61354780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720852541.6U Active CN206929429U (en) | 2017-07-14 | 2017-07-14 | Electromechanical pipeline no-welding hanger system below a kind of girder steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206929429U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115045505A (en) * | 2022-06-01 | 2022-09-13 | 中冶天工集团有限公司 | Device for pouring concrete platform on steel structure frame and construction method |
-
2017
- 2017-07-14 CN CN201720852541.6U patent/CN206929429U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115045505A (en) * | 2022-06-01 | 2022-09-13 | 中冶天工集团有限公司 | Device for pouring concrete platform on steel structure frame and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201496669U (en) | Pipeline supporting and hanging frame | |
CN203640309U (en) | Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame | |
CN205639870U (en) | A pipeline gallows is synthesized in heavy construction | |
CN206458903U (en) | A kind of limiting shock resistant support for being easy to adjust | |
CN206929429U (en) | Electromechanical pipeline no-welding hanger system below a kind of girder steel | |
CN207093932U (en) | Construction spring hanger | |
CN204418510U (en) | Floor support plate steel bar girder structure | |
CN202248820U (en) | Combined overhanging scaffold | |
CN103362315B (en) | Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket | |
CN102864935A (en) | Novel purline mounting method | |
CN203499259U (en) | Tool type cantilevered unloading platform | |
CN110848467B (en) | Construction method for mounting multi-split equipment and pipeline in steel structure building | |
CN102777703A (en) | Assembly type light pipeline hanger | |
CN204554076U (en) | Rod-cable support hanger structure | |
CN202055146U (en) | Connecting structure for screed board accessories | |
CN206987410U (en) | A kind of adjustable guard rail fixed mount | |
CN2533360Y (en) | Grate type electric cable bridge support | |
CN206784368U (en) | A kind of steel-structured circular tubing string | |
CN206829751U (en) | A kind of energy-saving structure steel pipe pole | |
CN219508956U (en) | Suspended ceiling reverse supporting structure | |
CN205822498U (en) | A kind of antidetonation body of wall | |
CN204754225U (en) | Can have enough to meet need a support | |
CN109469338A (en) | A kind of tall and big workshop self-control grid platform and its construction method as electromechanical pipeline | |
CN219263853U (en) | Heavy equipment hanging bracket suitable for store rapid transformation | |
CN219606241U (en) | Steel construction building pipeline gallows |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 210023 No. 6 Wenlan Road, Xianlin University City, Nanjing, Jiangsu Province Patentee after: China Construction Installation Group Co., Ltd. Address before: 210023 No. 6 Wenlan Road, Xianlin University City, Nanjing, Jiangsu Province Patentee before: China Construction Industrial Equipment Installation Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder |