CN204554076U CN201520219653.9U CN201520219653U CN204554076U CN 204554076 U CN204554076 U CN 204554076U CN 201520219653 U CN201520219653 U CN 201520219653U CN 204554076 U CN204554076 U CN 204554076U
Authority
CN
China
Prior art keywords
spacing
montant
top boom
rod
support hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520219653.9U
Other languages
Chinese (zh)
Inventor
杜崇涛
李�浩
李元飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Hong Ju Structural Hardware Co Ltd
Original Assignee
Shenyang Hong Ju Structural Hardware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Hong Ju Structural Hardware Co Ltd filed Critical Shenyang Hong Ju Structural Hardware Co Ltd
Priority to CN201520219653.9U priority Critical patent/CN204554076U/en
Application granted granted Critical
Publication of CN204554076U publication Critical patent/CN204554076U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of rod-cable support hanger structure, comprise wall stud, the fixed beam be fixed on wall stud, spacing frame structure on fixed beam, its technological points is: described frame structure comprises some spacing top boom, some spacing montant I, some spacing beam column, some spacing jump stay, some spacing suspension cable assemblies between montant I and top boom between montant I between top boom or between montant I bottom top boom on fixed beam.It has structure simple, cheap, be easy to the advantages such as installation and maintenance.

Description

Rod-cable support hanger structure
Technical field
The utility model relates to supporting structure, specifically a kind of rod-cable support hanger structure, mainly be applicable to the collecting more than ground of pipeline, crane span structure and support, as industrial premises (railway storehouse, automobile making factory building, tobacco manufacturing plant room etc.), underpass (as subway), upper channel (as the tunnel) pipeline more than ground and the support of crane span structure, with the conduit shaft of alternative below ground.
Background technique
Existing industrial premises, upper channel, underpass pipeline collecting and support the conduit shaft of main below ground or more than ground, be connected into sub-truss with heavy wall steel welding come, crane span structure is also connected into support or truss with heavy wall steel welding more than ground, and to support deadweight larger.Conduit shaft needs to occupy larger below ground space and there is inconvenience to the making and installation of pipeline and maintenance simultaneously in building; The support that heavy wall steel welding is connected into or truss deadweight are not only wasted steel but also add the load of existing building, due to major part need welding processing at the scene both needed larger construction site simultaneously the process-cycle also long.
Model utility content
The purpose of this utility model is to provide a kind of rod-cable support hanger structure, fundamentally solves the problems referred to above.It has structure simple, cheap, be easy to the advantages such as installation and maintenance.
The purpose of this utility model is achieved in that this rod-cable support hanger structure comprises wall stud, the fixed beam be fixed on wall stud, spacing frame structure on fixed beam, it is characterized in that: described frame structure comprises some spacing top boom, some spacing montant I, some spacing beam column, some spacing jump stay, some spacing suspension cable assemblies between montant I and top boom between montant I between top boom or between montant I bottom top boom on fixed beam.
Described suspension cable assembly comprises convergence piece and is threaded in the suspension cable pull bar at convergence piece two ends, and suspension cable pull bar is coaxially installed.
Be socketed with corner connector bottom described montant I, corner connector one end and suspension cable member hinges, the other end and jump stay hinged.
Described top boom is socketed with adaptor, and one end of suspension cable assembly is hinged on adaptor.
Described top boom is spacing on fixed beam by banking stop, bolt.
Be provided with some spacing beams by banking stop, bolt bottom described fixed beam, be socketed with montant II bottom spacing beam by T-piece, spacing between montant II have beam column, and montant II is by the locating piece Horizontal limiting of both sides.
Described beam column is the C shape structural member that single C shape structural member or two closed ends are relative, spacing limited location block in beam column, beam column by fastener, limiting stopper, be bolted on top boom, montant I by T-piece, limiting stopper, be bolted to bottom top boom.
The advantage that the utility model has and positive technique effect are: the rope bar stress system that main bearing member is downhaul, shaped steel bar and node are formed, this structure can give full play to the performance of various material, still high support effect can be played, to inhering architecture almost without additional load when conducting oneself with dignity lighter.Can accommodate cable, bus, crane span structure and various pipeline, collecting quantity can bear greatly again the load attached by cable, bus, crane span structure and pipeline simultaneously.The problem of pipe laying, still can select mounting point arbitrarily in less space range.The installation of cable, bus, crane span structure and pipeline, dismounting, maintenance are very simple and convenient.Process and install all with bolts without the need to Site Welding, therefore construction period is very short, and construction site takies little, without the need to power supply, does not pollute indoor environment.
Accompanying drawing explanation
Fig. 1 is plan structure schematic diagram of the present utility model;
Fig. 2 is the sectional structure schematic diagram of Fig. 1 along A-A line;
Fig. 3 is the sectional structure schematic diagram of Fig. 1 along B-B line;
Fig. 4 is the structural representation of the utility model using state.
Description of reference numerals: 1 fixed beam, 2 wall studs, 3 top booms, 4T shape part, 5 beam columns, 6 fasteners, 7 montant I, 8 jump stays, 9 corner connectors, 10 convergence pieces, 11 suspension cable assemblies, 12 montant II, 13 locating pieces, 14 adaptors, 15 banking stops, 16 spacing beams, 17 angle-shaped pieces, 18 limiting stoppers, 19 cables, 20 fire hydrants, 21 heat radiation pipeline, 22 exhaust ducts.
Embodiment
Below in conjunction with Fig. 1 ~ 4, describe content of the present utility model in detail by specific embodiment.In Fig. 1, Fig. 2, the clipped of opposite side is mirror-image structure, expresses and omit for convenience of view.Rod-cable support hanger structure of the prior art mainly comprises wall stud 2, the fixed beam 1 be fixed on wall stud, spacing frame structure on fixed beam 1.Wherein, the utility model improves for frame structure, and it mainly comprises some spacing top boom 3, some spacing montant I 7, some spacing beam column 5, some spacing jump stay 8, some spacing suspension cable assemblies 11 between montant I 7 and top boom 3 between montant I 7 between top boom 3 or between montant I 7 bottom top boom 3 on fixed beam 1.Suspension cable assembly both can adopt single rod member, also can adopt the modular construction comprising suspension cable pull bar that convergence piece and coaxial threaded be connected to convergence piece two ends and form.Oblique pull lock set 11 effectively can carry the weight that pipeline is established on beam column upper berth, effectively eliminates montant I 7 and rocks brought moment of torsion deformation, thus improve the stability of hanger structure.Bottom montant I 7 socket corner connector 9 is installed, corner connector 9 one end and suspension cable member hinges, the other end and jump stay 8 hinged.Top boom 3 is socketed with adaptor 14, one end of suspension cable assembly 11 is hinged on adaptor 14.Top boom 3 is spacing on fixed beam 1 by banking stop 15, bolt.By banking stop 15, bolt, some spacing beams 16 are installed bottom fixed beam 1, montant II 12 is socketed with by T-piece 4 bottom spacing beam 16, spacing between montant II 12 have beam column 5, montant II 12 is by locating piece 13 Horizontal limiting of both sides, locating piece 13 is fixed on body of wall or wall stud, effectively prevents rocking of montant II 12.Fixed by angle-shaped piece 17 between montant I, II and beam column.Beam column 5 between montant II 12, as laying the supplemental support of pipeline, is avoided the beam column interval between adjacent suspension bracket excessive, is caused pipeline, electric wire subsides downwards.Beam column 5 is that (top and bottom arrange two C shape components to the C shape structural member that single C shape structural member or two closed ends are relative usually, middle part arranges single C shape component usually), spacing limited location block 18 in beam column 5, beam column by fastener 6, limiting stopper 18, be bolted on top boom 3, montant I 7 by T-piece 4, limiting stopper 18, be bolted to bottom top boom 3.In above-mentioned situation, limiting stopper 18 is equivalent to spacing nut in C shape rod member, but nut is difficult to be engaged in completely in the dead slot of C shape rod member, easily causes bolt to rotate.
During use, suspension bracket forms inverted trapezium structure on plan view, brace assembly on top boom 3 is hinged on as drawing piece by one section, montant I, II and beam column are as stressed member, fixed beam is supporting part, fixedly makes framework overall as carrying framework by the hinged of link and bolt.Cable 19, fire hydrant 20, parts such as heat radiation pipeline 21, exhaust duct 22 etc. are laid on beam column.

Claims (7)

1. a rod-cable support hanger structure, comprise wall stud, the fixed beam be fixed on wall stud, spacing frame structure on fixed beam, it is characterized in that: described frame structure comprises some spacing top boom, some spacing montant I, some spacing beam column, some spacing jump stay, some spacing suspension cable assemblies between montant I and top boom between montant I between top boom or between montant I bottom top boom on fixed beam.
2. rod-cable support hanger structure according to claim 1, is characterized in that: described suspension cable assembly comprises convergence piece and is threaded in the suspension cable pull bar at convergence piece two ends, and suspension cable pull bar is coaxially installed.
3. rod-cable support hanger structure according to claim 1, is characterized in that: be socketed with corner connector bottom described montant I, corner connector one end and suspension cable member hinges, the other end and jump stay hinged.
4. rod-cable support hanger structure according to claim 1, it is characterized in that: described top boom is socketed with adaptor, one end of suspension cable assembly is hinged on adaptor.
5. the rod-cable support hanger structure according to any one of Claims 1-4, is characterized in that: spacing bottom described fixed beam have montant II, and montant II is by the locating piece Horizontal limiting of both sides.
6. the rod-cable support hanger structure according to any one of Claims 1-4, it is characterized in that: bottom described fixed beam, by banking stop, bolt, some spacing beams are installed, montant II is socketed with by T-piece bottom spacing beam, spacing between montant II have beam column, and montant II is by the locating piece Horizontal limiting of both sides.
7. the rod-cable support hanger structure according to any one of Claims 1-4, it is characterized in that: described beam column is the C shape structural member that single C shape structural member or two closed ends are relative, spacing limited location block in beam column, beam column by fastener, limiting stopper, be bolted on top boom, montant I by T-piece, limiting stopper, be bolted to bottom top boom.
CN201520219653.9U 2015-04-14 2015-04-14 Rod-cable support hanger structure Active CN204554076U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520219653.9U CN204554076U (en) 2015-04-14 2015-04-14 Rod-cable support hanger structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520219653.9U CN204554076U (en) 2015-04-14 2015-04-14 Rod-cable support hanger structure

Publications (1)

Publication Number Publication Date
CN204554076U true CN204554076U (en) 2015-08-12

Family

ID=53829187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520219653.9U Active CN204554076U (en) 2015-04-14 2015-04-14 Rod-cable support hanger structure

Country Status (1)

Country Link
CN (1) CN204554076U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764048A (en) * 2016-11-23 2017-05-31 中国冶集团有限公司 The method that airduct installation is carried out using self-locking type wind pipe suspension bracket
CN109140049A (en) * 2018-08-31 2019-01-04 中交建研(北京)设计咨询有限公司 Antidetonation suspension and support and building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764048A (en) * 2016-11-23 2017-05-31 中国冶集团有限公司 The method that airduct installation is carried out using self-locking type wind pipe suspension bracket
CN106764048B (en) * 2016-11-23 2018-10-23 中国一冶集团有限公司 The method that air hose installation is carried out using self-locking type wind pipe hanger
CN109140049A (en) * 2018-08-31 2019-01-04 中交建研(北京)设计咨询有限公司 Antidetonation suspension and support and building
CN109140049B (en) * 2018-08-31 2019-07-23 中交建研(北京)设计咨询有限公司 Antidetonation suspension and support and building

Similar Documents

Publication Publication Date Title
CN201850795U (en) Hinge center support frame steel structure
CN106594395A (en) Anti-seismic support-hanger
CN106969208A (en) A kind of gate antidetonation suspension and support
CN104481178B (en) Composite material substation structure
CN206555567U (en) A kind of antidetonation suspension and support
CN205639870U (en) A pipeline gallows is synthesized in heavy construction
CN204554076U (en) Rod-cable support hanger structure
CN110670937B (en) Interval reinforcing device and method for service power transmission tower
CN206319631U (en) A kind of shear wall vertical adjustment mechanism
CN205296831U (en) Supporting type that bears joist that uses of support is buckled to socket joint type dish
CN103422699A (en) Electric transmission line tower made of composite materials
CN102767644A (en) Assembly type heavy pipeline hanger
CN202466923U (en) Suspended ceiling counter support
CN204006613U (en) A kind of collector lifting fixed support
CN203878845U (en) Conversion layer hung ceiling structure
CN201258599Y (en) Lattice type steel angle structure full-combined frame work
CN204311794U (en) A kind of composite material transformer substation framework
CN204282921U (en) A kind of direct burial single-pipe tower
CN102777703A (en) Assembly type light pipeline hanger
CN203878779U (en) Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint
CN203656365U (en) Combination-type transition cable leading cage based on cable leading towards lower bridge surface
CN203160794U (en) Novel electric transmission line tower
CN207777783U (en) A kind of comprehensive wiring system for fitting-out work
CN2533360Y (en) Grate type electric cable bridge support
CN104818872A (en) Anti-seismic combined construction type communication supporting frame structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant