CN206847017U - A kind of multi-connected machine copper pipe bridge device - Google Patents
A kind of multi-connected machine copper pipe bridge device Download PDFInfo
- Publication number
- CN206847017U CN206847017U CN201720381181.6U CN201720381181U CN206847017U CN 206847017 U CN206847017 U CN 206847017U CN 201720381181 U CN201720381181 U CN 201720381181U CN 206847017 U CN206847017 U CN 206847017U
- Authority
- CN
- China
- Prior art keywords
- copper pipe
- trailing arm
- pipeline
- connected machine
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of multi-connected machine copper pipe bridge device, including support, trailing arm and installation annex;Wherein trailing arm takes the shape of the letter U, and the pipeline that cloth is placed in trailing arm takes copper pipe fixing card or geometrical clamp to be fixed in bolt on the inwall of crane span structure, and keeps leaving certain spacing between pipeline and pipeline.The utility model can improve the space layout of multi-connected machine copper pipe, using the optimization design of science, strengthen bearing capacity, decompose the load that copper pipe suspension and support is born in itself, reduce the use of copper pipe support and clean and tidy appearance brief, elegant in appearance can be realized, so as to lift building decoration quality.The support bracket fastened use of conventional pipelines can be reduced with saving steel usage amount.During later stage engineering interior trim, the color layout that can mutually be coordinated this Novel bridge frame device brushing with interior trim according to project on-site actual situations, so as to improve the integral layout of construction project.
Description
Technical field
Air conditioner mounting technique field is the utility model is related to, specially a kind of multi-connected machine copper pipe bridge device.
Background technology
After the laying of air conditioning multi-couple machine copper pipe is laid according to current technology standard, can seem pipeline redundancy, especially without furred ceiling
In the case of bright dress, the redundancy of pipeline can make it that space is close, very unsightly and hidden in the presence of safety in the case of bright dress
Suffer from, it would be highly desirable to improve.
Utility model content
The purpose of this utility model is to provide a kind of multi-connected machine copper pipe bridge device, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the utility model provides following technical scheme:
A kind of multi-connected machine copper pipe bridge device, including support, trailing arm and installation annex;Wherein trailing arm takes the shape of the letter U, and cloth is placed on support
Pipeline in arm takes copper pipe fixing card or geometrical clamp to be fixed in bolt on the inwall of crane span structure, and keeps pipeline and pipeline
Between leave certain spacing.
As the further technical scheme of the utility model, trailing arm is lifted along beam bottom or pacified by wall bracket at without furred ceiling
Dress, lift in furred ceiling or installed by wall bracket at furred ceiling having.
As the further technical scheme of the utility model, the support and trailing arm use aluminum alloy material.
As the further technical scheme of the utility model, the top layer of the support and trailing arm is equipped with galvanizing coating.
As the further technical scheme of the utility model, trailing arm upper end is provided with the cover plate being adapted with trailing arm opening.
Compared with prior art, the utility model can improve the space layout of multi-connected machine copper pipe, using the optimization of science
Design, strengthen bearing capacity, decompose the load that copper pipe suspension and support is born in itself, reduce the use of copper pipe support and can realize clean and tidy
Appearance brief, elegant in appearance, so as to lift building decoration quality.Conventional tube can be reduced with saving steel usage amount
The support bracket fastened use in road., can be according to project on-site actual situations by this Novel bridge frame device during later stage engineering interior trim
The color layout mutually coordinated with interior trim is brushed, so as to improve the integral layout of construction project.Moreover, using this New-support
Ore resource, steel-making coal or oily equal energy source and the logistics energy can directly or indirectly be saved.
Brief description of the drawings
Fig. 1 is a kind of structural representation of multi-connected machine copper pipe bridge device of the utility model.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
Referring to Fig. 1, a kind of multi-connected machine copper pipe bridge device, including support 1, trailing arm 2 and installation annex;Wherein trailing arm 2
Take the shape of the letter U, the pipeline 3 that cloth is placed in trailing arm 2 takes copper pipe fixing card 4 or geometrical clamp to be fixed in the inwall of crane span structure with bolt
On, and keep leaving certain spacing between pipeline and pipeline;Trailing arm 2 is lifted along beam bottom or pacified by wall bracket at without furred ceiling
Dress, lift in furred ceiling or installed by wall bracket at furred ceiling having.In the public place integrated structure component without furred ceiling and consider
It is convenient to build attractive in appearance and maintenance, using by being installed on wall, column holder installation or roof truss lower chord member.Support mounted against a wall is fixed and adopted
Fixed with expansion bolt.
Bridge device in building can independently be set up, and can also be attached to various buildings or structures and piping lane supports
On, should embody it is simple in construction, it is handsome in appearance, configuration it is flexible and easy to maintenance the features such as, whole parts be both needed to carry out zinc-plated processing,
The outdoor crane span structure outside building, if in neighbouring seashore or belong to corrosion region, then material there must be anti-corrosion, moisture resistance
Gas, adhesive force are good, the high physical property feature of impact strength.Aluminum cable tray, its appearance and size, lotus can be used in order to mitigate weight
Carry characteristic it is substantially close with steel crane span structure, and aluminum cable tray have the advantages that it is attractive in appearance, in light weight, easy for installation.
1st, the utility model a kind of design and installation requirement of multi-connected machine copper pipe bridge device
(1)Determine direction:According to horizontal planning of building figure, with reference to air conditioning piping facilities, convenient maintenance, Yi Jiguan
The density on road determines the Optimization route of crane span structure.Indoors, set up as far as possible along the wall of building, post, beam and floor, it is so sharp
, then should be in the parallel erection in pipeline side or top when being set up with pipe gallery, and consider that downlead and branch line avoid handing over as far as possible
Fork, such as borrowed without other pipe supports, then need to set up (branch) post certainly.
(2)Load calculates:Calculate the pipeline weight of unit length on crane span structure backbone vertical section.
(3)Determine the width of crane span structure:Pipeline crane span structure is determined according to the spacing for laying pipeline bar number, pipeline diameter and pipeline
Model, specification, the length of trailing arm, length, the spacing of pillar, the width and the number of plies of crane span structure.
(4)Determine mounting means:The fixed form of crane span structure is determined according to the setting condition at scene, selects suspension type, upright
Formula, lateral wall type or hybrid, connector and fastener are usually what is provided together, in addition, being selected according to portal structure corresponding
Cover plate.
2. size and installation site requirement
(1) when crane span structure is entered in building by outdoor, the outside gradient of crane span structure cannot be less than 1/100.Two groups of crane span structures are same
During one height parallel lay-up, clear distance is not less than 0.6m therebetween.
(2) route of crane span structure is drawn on parallel figure, to indicate crane span structure starting point, terminal, turn point, branch point and lifting
The coordinate or location dimension, absolute altitude of point, if draw crane span structure laying shaft side figure, then will be more accurate to Material Takeoff.Straightway:Note
Bright total length, the crane span structure number of plies, absolute altitude, model and specification.Turn round point and branch point:Indicate the model and specification of turning fishplate bar used.
Dropping section:Indicate absolute altitude change, it is also possible to which local drawing or profile represent.
(3)The crane span structure strong point, such as column, trailing arm or non-standard branch, the spacing of framework, mounting means, model specification, mark
Height, it can agree to tabulate in the plane, also sectional marks is represented with different profiles, line chart or drawing.
(4) preferably more than 2.2 meters above ground level of crane span structure, gantry top is no less than 0.3 meter away from ceiling or other barriers,
In crane span structure during cable vertical run, in the upper end of cable and at interval of 1.5 meters at should be fixed on the support of crane span structure, horizontal laying
When, initial and end in cable, turn and at interval of being fixed at 3 ~ 5 meters.During crane span structure horizontal laying, branch tie distance is generally
1.5-3m, the spacing being fixed on building structure body during vertical run are preferably less than 2m.
3rd, crane span structure is installed
A. for special shape crane span structure, the size of in-site measurement is met at into material supplier, by supplier according to size system
Make, reduce scene processing.Crane span structure material, model, thickness and annex meet design requirement.
B. before crane span structure installation, it is necessary to each profession coordination, avoid and heavy caliber extinguishing pipe, shower, hot water pipe, draining
Pipe and air-conditioning, exhaust equipment conflict.
C. crane span structure is given rise into precalculated position, fixed with support using bolt, size, crane span structure need to be carefully checked at turning
It is preferably consistent with the building gradient, it is preferably consistent with building in the crane span structure of circular arc building walls, its circular arc.Crane span structure and crane span structure it
Between connected with connecting plate, connecting bolt uses button-headed bolt, and cup head is on the inside of crane span structure.Gap must reach design between crane span structure
It is required that, it is ensured that the crane span structure of a system is connected.
D. should be by company standard across the crane span structure of building deformation seam《Steel cable bridge mounting process》Carry out expansion joint
Processing, when steel crane span structure straightway is more than 30m, should set compensation device of expanding with heat and contract with cold.
E. crane span structure installs smooth vertical and horizontal, neat appearance, distance is consistent, is connected firmly, levelness deviation in same level
No more than 5mm/m, linearity deviation is no more than 5mm/m.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party
Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge
Various changes can be made.
Claims (5)
1. a kind of multi-connected machine copper pipe bridge device, it is characterised in that including support, trailing arm and installation annex;Wherein trailing arm is in U
Shape, the pipeline that cloth is placed in trailing arm takes copper pipe fixing card or geometrical clamp to be fixed in bolt on the inwall of crane span structure, and protects
Hold and certain spacing is left between pipeline and pipeline.
2. a kind of multi-connected machine copper pipe bridge device according to claim 1, it is characterised in that trailing arm is at without furred ceiling along beam
Bottom lifts or installed by wall bracket, lifts in furred ceiling or is installed by wall bracket at furred ceiling having.
3. a kind of multi-connected machine copper pipe bridge device according to claim 1, it is characterised in that the support and trailing arm are adopted
Use aluminum alloy material.
A kind of 4. multi-connected machine copper pipe bridge device according to claim 1, it is characterised in that the table of the support and trailing arm
Layer is equipped with galvanizing coating.
5. a kind of multi-connected machine copper pipe bridge device according to claim 1, it is characterised in that trailing arm upper end is provided with and trailing arm
Be open the cover plate being adapted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720381181.6U CN206847017U (en) | 2017-04-12 | 2017-04-12 | A kind of multi-connected machine copper pipe bridge device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720381181.6U CN206847017U (en) | 2017-04-12 | 2017-04-12 | A kind of multi-connected machine copper pipe bridge device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206847017U true CN206847017U (en) | 2018-01-05 |
Family
ID=60792172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720381181.6U Expired - Fee Related CN206847017U (en) | 2017-04-12 | 2017-04-12 | A kind of multi-connected machine copper pipe bridge device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206847017U (en) |
-
2017
- 2017-04-12 CN CN201720381181.6U patent/CN206847017U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109614723B (en) | Comprehensive construction method based on BIM technology | |
CN202469251U (en) | Combined support hanger | |
CN110440429B (en) | Subway arched roof ventilating pipeline assembling construction method | |
CN103123016B (en) | Construction method for laying gas pipelines along bridge | |
CN203962591U (en) | Multi-angle pipe fixing holder | |
CN204728554U (en) | The integral structure of channel and double-deck operation platform | |
CN206847017U (en) | A kind of multi-connected machine copper pipe bridge device | |
CN202064501U (en) | Equipment belt suspended ceiling adopting glassfibre sound panel | |
CN102777037A (en) | Simple and practical hoisting construction method of long-span steel girder | |
CN110645696A (en) | Heating and ventilation static pressure box structure and construction method thereof | |
CN204590361U (en) | A kind of large span assembled integral hollow sandwich panel ceiling for storied building | |
CN104533114B (en) | A kind of seashore flexible direct current converter station valve Room joint architectural structure system | |
CN205637282U (en) | Wave metal sheet furred ceiling | |
CN104060838A (en) | Grouping and air-pairing installation method for corridor | |
CN210658907U (en) | Large-span aluminium system furred ceiling structure | |
CN210067191U (en) | Assembled aluminum plate wall | |
CN111895184A (en) | Comprehensive pipeline supporting and hanging frame in limited space | |
CN112081237A (en) | Construction method of composite support and hanger of comprehensive overhead pipe gallery based on BIM technology | |
CN109469338A (en) | A kind of tall and big workshop self-control grid platform and its construction method as electromechanical pipeline | |
CN201695689U (en) | One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline | |
CN106703266A (en) | H-shaped rotating arm fastener type curtain wall installation method | |
CN103498543A (en) | Construction method for caulking-free outer wall stone dry hanging | |
CN211257631U (en) | Aluminum plate connecting structure | |
CN219283611U (en) | Suspension air collecting box for multiple air conditioning units | |
CN220341980U (en) | Fixing structure for electromechanical pipeline of high-low difference floor roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180105 |