CN206847017U - A kind of multi-connected machine copper pipe bridge device - Google Patents

A kind of multi-connected machine copper pipe bridge device Download PDF

Info

Publication number
CN206847017U
CN206847017U CN201720381181.6U CN201720381181U CN206847017U CN 206847017 U CN206847017 U CN 206847017U CN 201720381181 U CN201720381181 U CN 201720381181U CN 206847017 U CN206847017 U CN 206847017U
Authority
CN
China
Prior art keywords
copper pipe
trailing arm
pipeline
connected machine
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720381181.6U
Other languages
Chinese (zh)
Inventor
徐向东
马小宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Noveland Machine Project Technology Co Ltd
Original Assignee
Noveland Machine Project Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Noveland Machine Project Technology Co Ltd filed Critical Noveland Machine Project Technology Co Ltd
Priority to CN201720381181.6U priority Critical patent/CN206847017U/en
Application granted granted Critical
Publication of CN206847017U publication Critical patent/CN206847017U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of multi-connected machine copper pipe bridge device, including support, trailing arm and installation annex;Wherein trailing arm takes the shape of the letter U, and the pipeline that cloth is placed in trailing arm takes copper pipe fixing card or geometrical clamp to be fixed in bolt on the inwall of crane span structure, and keeps leaving certain spacing between pipeline and pipeline.The utility model can improve the space layout of multi-connected machine copper pipe, using the optimization design of science, strengthen bearing capacity, decompose the load that copper pipe suspension and support is born in itself, reduce the use of copper pipe support and clean and tidy appearance brief, elegant in appearance can be realized, so as to lift building decoration quality.The support bracket fastened use of conventional pipelines can be reduced with saving steel usage amount.During later stage engineering interior trim, the color layout that can mutually be coordinated this Novel bridge frame device brushing with interior trim according to project on-site actual situations, so as to improve the integral layout of construction project.

Description

A kind of multi-connected machine copper pipe bridge device
Technical field
Air conditioner mounting technique field is the utility model is related to, specially a kind of multi-connected machine copper pipe bridge device.
Background technology
After the laying of air conditioning multi-couple machine copper pipe is laid according to current technology standard, can seem pipeline redundancy, especially without furred ceiling In the case of bright dress, the redundancy of pipeline can make it that space is close, very unsightly and hidden in the presence of safety in the case of bright dress Suffer from, it would be highly desirable to improve.
Utility model content
The purpose of this utility model is to provide a kind of multi-connected machine copper pipe bridge device, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides following technical scheme:
A kind of multi-connected machine copper pipe bridge device, including support, trailing arm and installation annex;Wherein trailing arm takes the shape of the letter U, and cloth is placed on support Pipeline in arm takes copper pipe fixing card or geometrical clamp to be fixed in bolt on the inwall of crane span structure, and keeps pipeline and pipeline Between leave certain spacing.
As the further technical scheme of the utility model, trailing arm is lifted along beam bottom or pacified by wall bracket at without furred ceiling Dress, lift in furred ceiling or installed by wall bracket at furred ceiling having.
As the further technical scheme of the utility model, the support and trailing arm use aluminum alloy material.
As the further technical scheme of the utility model, the top layer of the support and trailing arm is equipped with galvanizing coating.
As the further technical scheme of the utility model, trailing arm upper end is provided with the cover plate being adapted with trailing arm opening.
Compared with prior art, the utility model can improve the space layout of multi-connected machine copper pipe, using the optimization of science Design, strengthen bearing capacity, decompose the load that copper pipe suspension and support is born in itself, reduce the use of copper pipe support and can realize clean and tidy Appearance brief, elegant in appearance, so as to lift building decoration quality.Conventional tube can be reduced with saving steel usage amount The support bracket fastened use in road., can be according to project on-site actual situations by this Novel bridge frame device during later stage engineering interior trim The color layout mutually coordinated with interior trim is brushed, so as to improve the integral layout of construction project.Moreover, using this New-support Ore resource, steel-making coal or oily equal energy source and the logistics energy can directly or indirectly be saved.
Brief description of the drawings
Fig. 1 is a kind of structural representation of multi-connected machine copper pipe bridge device of the utility model.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
Referring to Fig. 1, a kind of multi-connected machine copper pipe bridge device, including support 1, trailing arm 2 and installation annex;Wherein trailing arm 2 Take the shape of the letter U, the pipeline 3 that cloth is placed in trailing arm 2 takes copper pipe fixing card 4 or geometrical clamp to be fixed in the inwall of crane span structure with bolt On, and keep leaving certain spacing between pipeline and pipeline;Trailing arm 2 is lifted along beam bottom or pacified by wall bracket at without furred ceiling Dress, lift in furred ceiling or installed by wall bracket at furred ceiling having.In the public place integrated structure component without furred ceiling and consider It is convenient to build attractive in appearance and maintenance, using by being installed on wall, column holder installation or roof truss lower chord member.Support mounted against a wall is fixed and adopted Fixed with expansion bolt.
Bridge device in building can independently be set up, and can also be attached to various buildings or structures and piping lane supports On, should embody it is simple in construction, it is handsome in appearance, configuration it is flexible and easy to maintenance the features such as, whole parts be both needed to carry out zinc-plated processing, The outdoor crane span structure outside building, if in neighbouring seashore or belong to corrosion region, then material there must be anti-corrosion, moisture resistance Gas, adhesive force are good, the high physical property feature of impact strength.Aluminum cable tray, its appearance and size, lotus can be used in order to mitigate weight Carry characteristic it is substantially close with steel crane span structure, and aluminum cable tray have the advantages that it is attractive in appearance, in light weight, easy for installation.
1st, the utility model a kind of design and installation requirement of multi-connected machine copper pipe bridge device
(1)Determine direction:According to horizontal planning of building figure, with reference to air conditioning piping facilities, convenient maintenance, Yi Jiguan The density on road determines the Optimization route of crane span structure.Indoors, set up as far as possible along the wall of building, post, beam and floor, it is so sharp , then should be in the parallel erection in pipeline side or top when being set up with pipe gallery, and consider that downlead and branch line avoid handing over as far as possible Fork, such as borrowed without other pipe supports, then need to set up (branch) post certainly.
(2)Load calculates:Calculate the pipeline weight of unit length on crane span structure backbone vertical section.
(3)Determine the width of crane span structure:Pipeline crane span structure is determined according to the spacing for laying pipeline bar number, pipeline diameter and pipeline Model, specification, the length of trailing arm, length, the spacing of pillar, the width and the number of plies of crane span structure.
(4)Determine mounting means:The fixed form of crane span structure is determined according to the setting condition at scene, selects suspension type, upright Formula, lateral wall type or hybrid, connector and fastener are usually what is provided together, in addition, being selected according to portal structure corresponding Cover plate.
2. size and installation site requirement
(1) when crane span structure is entered in building by outdoor, the outside gradient of crane span structure cannot be less than 1/100.Two groups of crane span structures are same During one height parallel lay-up, clear distance is not less than 0.6m therebetween.
(2) route of crane span structure is drawn on parallel figure, to indicate crane span structure starting point, terminal, turn point, branch point and lifting The coordinate or location dimension, absolute altitude of point, if draw crane span structure laying shaft side figure, then will be more accurate to Material Takeoff.Straightway:Note Bright total length, the crane span structure number of plies, absolute altitude, model and specification.Turn round point and branch point:Indicate the model and specification of turning fishplate bar used. Dropping section:Indicate absolute altitude change, it is also possible to which local drawing or profile represent.
(3)The crane span structure strong point, such as column, trailing arm or non-standard branch, the spacing of framework, mounting means, model specification, mark Height, it can agree to tabulate in the plane, also sectional marks is represented with different profiles, line chart or drawing.
(4) preferably more than 2.2 meters above ground level of crane span structure, gantry top is no less than 0.3 meter away from ceiling or other barriers, In crane span structure during cable vertical run, in the upper end of cable and at interval of 1.5 meters at should be fixed on the support of crane span structure, horizontal laying When, initial and end in cable, turn and at interval of being fixed at 3 ~ 5 meters.During crane span structure horizontal laying, branch tie distance is generally 1.5-3m, the spacing being fixed on building structure body during vertical run are preferably less than 2m.
3rd, crane span structure is installed
A. for special shape crane span structure, the size of in-site measurement is met at into material supplier, by supplier according to size system Make, reduce scene processing.Crane span structure material, model, thickness and annex meet design requirement.
B. before crane span structure installation, it is necessary to each profession coordination, avoid and heavy caliber extinguishing pipe, shower, hot water pipe, draining Pipe and air-conditioning, exhaust equipment conflict.
C. crane span structure is given rise into precalculated position, fixed with support using bolt, size, crane span structure need to be carefully checked at turning It is preferably consistent with the building gradient, it is preferably consistent with building in the crane span structure of circular arc building walls, its circular arc.Crane span structure and crane span structure it Between connected with connecting plate, connecting bolt uses button-headed bolt, and cup head is on the inside of crane span structure.Gap must reach design between crane span structure It is required that, it is ensured that the crane span structure of a system is connected.
D. should be by company standard across the crane span structure of building deformation seam《Steel cable bridge mounting process》Carry out expansion joint Processing, when steel crane span structure straightway is more than 30m, should set compensation device of expanding with heat and contract with cold.
E. crane span structure installs smooth vertical and horizontal, neat appearance, distance is consistent, is connected firmly, levelness deviation in same level No more than 5mm/m, linearity deviation is no more than 5mm/m.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge Various changes can be made.

Claims (5)

1. a kind of multi-connected machine copper pipe bridge device, it is characterised in that including support, trailing arm and installation annex;Wherein trailing arm is in U Shape, the pipeline that cloth is placed in trailing arm takes copper pipe fixing card or geometrical clamp to be fixed in bolt on the inwall of crane span structure, and protects Hold and certain spacing is left between pipeline and pipeline.
2. a kind of multi-connected machine copper pipe bridge device according to claim 1, it is characterised in that trailing arm is at without furred ceiling along beam Bottom lifts or installed by wall bracket, lifts in furred ceiling or is installed by wall bracket at furred ceiling having.
3. a kind of multi-connected machine copper pipe bridge device according to claim 1, it is characterised in that the support and trailing arm are adopted Use aluminum alloy material.
A kind of 4. multi-connected machine copper pipe bridge device according to claim 1, it is characterised in that the table of the support and trailing arm Layer is equipped with galvanizing coating.
5. a kind of multi-connected machine copper pipe bridge device according to claim 1, it is characterised in that trailing arm upper end is provided with and trailing arm Be open the cover plate being adapted.
CN201720381181.6U 2017-04-12 2017-04-12 A kind of multi-connected machine copper pipe bridge device Expired - Fee Related CN206847017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720381181.6U CN206847017U (en) 2017-04-12 2017-04-12 A kind of multi-connected machine copper pipe bridge device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720381181.6U CN206847017U (en) 2017-04-12 2017-04-12 A kind of multi-connected machine copper pipe bridge device

Publications (1)

Publication Number Publication Date
CN206847017U true CN206847017U (en) 2018-01-05

Family

ID=60792172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720381181.6U Expired - Fee Related CN206847017U (en) 2017-04-12 2017-04-12 A kind of multi-connected machine copper pipe bridge device

Country Status (1)

Country Link
CN (1) CN206847017U (en)

Similar Documents

Publication Publication Date Title
CN109614723B (en) Comprehensive construction method based on BIM technology
CN202469251U (en) Combined support hanger
CN110440429B (en) Subway arched roof ventilating pipeline assembling construction method
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN203962591U (en) Multi-angle pipe fixing holder
CN204728554U (en) The integral structure of channel and double-deck operation platform
CN206847017U (en) A kind of multi-connected machine copper pipe bridge device
CN202064501U (en) Equipment belt suspended ceiling adopting glassfibre sound panel
CN102777037A (en) Simple and practical hoisting construction method of long-span steel girder
CN110645696A (en) Heating and ventilation static pressure box structure and construction method thereof
CN204590361U (en) A kind of large span assembled integral hollow sandwich panel ceiling for storied building
CN104533114B (en) A kind of seashore flexible direct current converter station valve Room joint architectural structure system
CN205637282U (en) Wave metal sheet furred ceiling
CN104060838A (en) Grouping and air-pairing installation method for corridor
CN210658907U (en) Large-span aluminium system furred ceiling structure
CN210067191U (en) Assembled aluminum plate wall
CN111895184A (en) Comprehensive pipeline supporting and hanging frame in limited space
CN112081237A (en) Construction method of composite support and hanger of comprehensive overhead pipe gallery based on BIM technology
CN109469338A (en) A kind of tall and big workshop self-control grid platform and its construction method as electromechanical pipeline
CN201695689U (en) One-step forming system of shear wall of high apartment building hidden with air conditioning condensed water pipeline
CN106703266A (en) H-shaped rotating arm fastener type curtain wall installation method
CN103498543A (en) Construction method for caulking-free outer wall stone dry hanging
CN211257631U (en) Aluminum plate connecting structure
CN219283611U (en) Suspension air collecting box for multiple air conditioning units
CN220341980U (en) Fixing structure for electromechanical pipeline of high-low difference floor roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180105