CN106703266A - H-shaped rotating arm fastener type curtain wall installation method - Google Patents

H-shaped rotating arm fastener type curtain wall installation method Download PDF

Info

Publication number
CN106703266A
CN106703266A CN201710054424.XA CN201710054424A CN106703266A CN 106703266 A CN106703266 A CN 106703266A CN 201710054424 A CN201710054424 A CN 201710054424A CN 106703266 A CN106703266 A CN 106703266A
Authority
CN
China
Prior art keywords
fastener type
arm fastener
transition arm
types
pottery clay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710054424.XA
Other languages
Chinese (zh)
Inventor
晏金洲
陈耀钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongnan Construction Industry Group Co Ltd
Original Assignee
Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongnan Construction Industry Group Co Ltd filed Critical Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority to CN201710054424.XA priority Critical patent/CN106703266A/en
Publication of CN106703266A publication Critical patent/CN106703266A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses an H-shaped rotating arm fastener type curtain wall installation method. The method is characterized by comprising the following steps of 1 construction preparation, 2 surveying and setting out, 3 corner brace installation, 4 stand column installation, 5 interlayer water flashing layer installation, 6 rotating arm installation, 7 H-shaped rotating arm fastener-type argil plate installation and 8 cleaning. The H-shaped rotating arm fastener type argil plate adopts an opening-type structure, the opening-type structure is spliced and designed on the basis of the isobaric rain curtain principle, and drainage structure installation measures are adopted. The H-shaped rotating arm fastener type curtain wall installation method has the advantages that no radiation or pollution is caused during the H-shaped rotating arm fastener-type argil plate curtain wall construction, and 100% of the H-shaped rotating arm fastener-type argil plate can be recycled; the self-cleaning performance is good, and the using and maintenance cost is saved; the H-shaped rotating arm fastener-type argil plate is low in dead-weight, the fastener-type construction technology is adopted, construction is easy and convenient, and maintenance is convenient; the H-shaped rotating arm fastener-type argil plate is provided with an inner cavity, sound insulation and noise reduction are achieved, the heat insulation performance is good, and the H-shaped rotating arm fastener-type argil plate curtain wall system meets the requirement for building energy conservation.

Description

A kind of H types transition arm fastener type curtain wall installation method
Technical field
The present invention relates to a kind of H types transition arm fastener type curtain wall installation method, belong to technical field of building construction.
Background technology
Traditional clay plate curtain wall mounting process is complicated, and relatively costly, recovery utilization rate is low.Traditional type pottery clay plates weight is big, Sound insulation and noise reduction effect is poor, heat preservation and heat insulation performance is poor.Using fastener type construction technology, cumbersome simplicity of constructing, maintenance is inconvenient.
The content of the invention
The technical problems to be solved by the invention are the defects for overcoming prior art, there is provided a kind of more specification, convenience, reliable H types transition arm fastener type curtain wall installation method.
In order to solve the above technical problems, the present invention provides a kind of H types transition arm fastener type curtain wall installation method, its feature It is to comprise the following steps:
1)Preparation of construction;2)Surveying setting-out;3)Corner brace is installed;4)Column is installed;5) interlayer drapes over one's shoulders water layer installation;6)Short arm is pacified Dress;7)H types transition arm fastener type pottery clay plates are installed;8)Cleaning;
The H types transition arm fastener type pottery clay plates use Open architecture, the Open architecture to be entered according to isobaric rain screen principle Row splicing design, installs drain structure measure.
Further, the preparation of construction, first works out special construction plan, carries out pre-job training to operating personnel, and do Good safe practice is told somebody what one's real intentions are work;Typesetting design is carried out further according to architectural design decoration figure, typesetting figure is drawn;Last External Wall keel Built-in fitting position checked.
Further, the surveying setting-out, first checks the datum line that civil engineering is transferred, and rechecks each layer of indoor mark of civil engineering Height, external wall construction face is moved to by indoor elevation line, and carries out deviation measurement to building appearance and size, determines that cladding H types turn The normal line of arm fastener type pottery clay plates, finally on the basis of normal line, puts on the wall frame bar according to typesetting figure, and carry out Mark.
Further, the corner brace is installed, and first respectively hangs two at the two ends of single width curtain wall with the steel wire of the ㎜ of Φ 0.5~1.2 Control line is installed, corner brace adjustment notch is determined further according to column installation site;When corner brace is welded, the position of corner brace should be with the line of ink marker pair Standard, and by the corner brace tack weld of same level position both sides, and checked, then by the middle angle bracket of same root post, Check the perpendicularity of the same root post corner brace of adjustment, it is qualified after, carry out the full weld of corner brace and built-in fitting, after the completion of weld seam is carried out Antirust treatment.
Further, the column is installed, and column successively installs in place from below to up, and column is fixed on angle by blending bolt On code, distance of the column away from main body metope is determined by metope end line, adjusts the perpendicularity of centre position column, it is qualified after, will Pad, nut and bolt spot welding, welding position uses preservative treatment.
Further, the interlayer drapes over one's shoulders water layer installation, by design drawing requirement, first fixes galvanized steel plain sheet, then uniform paving Set up defences guncotton, galvanized steel plain sheet is closed with the gap of structure with fireproof gum;Drape over one's shoulders water iron sheet and find the line put according to drawing, noted Controlled in journey, being fixedly connected to meet the requirements.
Further, the short arm is installed, and snap the line is answered when mounted, and ensures that column is connected firmly with short arm, its Spacing should be consistent with the height of H types transition arm fastener type pottery clay plates, and keel are fixed on pre-buried adaptor, and transition arm is fixed on dragon On bone;Short arm answers snap the line when installing, and ensures that column is connected firmly with short arm, and its spacing should be with H types transition arm fastener type The height of pottery clay plates is consistent.(Paying special attention to three nails should not be in straight line).
Further, the H types transition arm fastener type pottery clay plates are installed,
1st, steel wire plumb line fixed up and down is made at a width curtain wall corner, and steel wire vertical line is set every 3-4 meters in centre, applied Work team's group is that foundation is successively installed with vertical line, consistent with perps size with the perpendicularity for ensureing curtain wall plate face;
2nd, H types transition arm fastener type pottery clay plates are successively installed from bottom to top, H types transition arm fastener type pottery at every layer of first installing angle Native plate, then middle H types transition arm fastener type pottery clay plates are installed, in the row H types of bottom one transition arm fastener type pottery clay plates installation process In, progressively guiding gutter is clipped between two pieces of H types transition arm fastener type pottery clay plates perps;
3rd, when H types transition arm fastener type pottery clay plates are installed, bottom fastener is arranged on crossbeam first, every piece of H types transition arm is buckled Part formula pottery clay plates at least need two fasteners, first row H types transition arm fastener type pottery clay plates are placed on the fastener of bottom, guiding gutter It is clipped between two pieces of H types transition arm fastener type pottery clay plates;
4th, intermediate fastening is arranged on crossbeam, on the one hand fixed ground floor H types transition arm fastener type pottery clay plates, under being on the other hand One layer of H types transition arm fastener type pottery clay plates are installed and provide support, in construction below, repeat above-mentioned installation process, are finally pacified Dress top closing panel.
Further, the connected mode of the curtain wall panel of the H types transition arm fastener type pottery clay plates, is connected using following several classes Connect mode:
1st, in H types transition arm fastener type pottery clay plates edge otch, connected with metal hanger;
2nd, in H types transition arm fastener type pottery clay plates panel behind, perforate or fluting, are connected with back of the body bolt, back-trough or back card;
3rd, in the gluing knot aluminium section bar auxiliary frame of edge knotting structure of H types transition arm fastener type pottery clay plates panel, by auxiliary frame and crossbeam, Column links, and auxiliary frame should be with hook fixing stone panel.
Further, before the keel construction of the H types transition arm fastener type pottery clay plates, what a first unwrapping wire positioning determines Horizontal plane and perpendicularity, determine keel finished surface on one face, after transition arm is fixed, using self-control before dress ceramic plate Correction modulator mix up levelness, then carry out hanging plate operation.
The beneficial effect that the present invention is reached:
1)H types transition arm fastener type clay plate curtain wall construction of the invention is radiationless, pollution-free, can 100% recovery;Self-cleaning property It is good, save use and maintenance cost;
2)H types make the transition arm fastener type pottery clay plates from heavy and light, and using fastener type construction technology, easy construction is easy to maintenance;
3)H types transition arm fastener type pottery clay plates color and luster, dimensionally stable, do not fade, and effect is luxurious, beautiful, generous;
4)H types transition arm fastener type pottery clay plates with inner chamber, sound insulation and noise reduction, thermal and insulating performance is good, H types transition arm fastener type pottery Native plate curtain wall system meets building energy conservation requirement;
5)Humanities and art breath specific to other H types transition arm fastener type pottery clay plates, natural color, the material of environmental protection and The advantage of energy-conservation noise control, for interior decoration, embodiment decoration is pressed close to the Nature, makes work, life of people etc. living It is dynamic to be among a comfortable environment.
Brief description of the drawings
Fig. 1 is flow chart of the invention;
Fig. 2 is open node of the invention;
Node when Fig. 3 is closure.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following examples are only used for clearly illustrating the present invention Technical scheme, and can not be limited the scope of the invention with this.
As shown in figure 1, a kind of H types transition arm fastener type curtain wall installation method, it is characterized in that, comprise the following steps:
1)Preparation of construction;2)Surveying setting-out;3)Corner brace is installed;4)Column is installed;5) interlayer drapes over one's shoulders water layer installation;6)Transition arm peace Dress;7)H types transition arm fastener type pottery clay plates are installed;8)Cleaning;
As shown in Figures 2 and 3, H types transition arm fastener type pottery clay plates have two kinds of optional schemes, are divided into open and closed, institute State H types transition arm fastener type pottery clay plates and use Open architecture, open for closed, specific advantage is as follows:According to etc. Pressure rain screen principle carries out splicing design, installs drain structure measure, and curtain wall can be made to possess water-proof function, is not applied in seam crossing close Sealing, can avoid exterior finish from polluting influence appearance, carry on the back ventilation function, and the moisture of building can be by air flow band Walk, it is to avoid produce condensed water, external wall is kept drying.
In the present embodiment, special construction plan is first worked out in the preparation of construction, and operating personnel are carried out with pre-job training, and Safe practice is carried out to tell somebody what one's real intentions are work;Typesetting design is carried out further according to architectural design decoration figure, typesetting figure is drawn;Last External Wall dragon The built-in fitting position of bone is checked.
In the present embodiment, the surveying setting-out first checks the datum line that civil engineering is transferred, and rechecks each layer of interior of civil engineering Absolute altitude, external wall construction face is moved to by indoor elevation line, and carries out deviation measurement to building appearance and size, determines cladding H types The normal line of transition arm fastener type pottery clay plates, finally on the basis of normal line, puts on the wall frame bar according to typesetting figure, and do Good mark.
In the present embodiment, the corner brace is installed, and first respectively hangs two at the two ends of single width curtain wall with the steel wire of the ㎜ of Φ 0.5~1.2 Root installs control line, and corner brace adjustment notch is determined further according to column installation site;When corner brace is welded, the position of corner brace should be with the line of ink marker Alignment, and by the corner brace tack weld of same level position both sides, and is checked, then by the intermediate angle code-point of same root post Weldering, checks the perpendicularity of the same root post corner brace of adjustment, it is qualified after, carry out the full weld of corner brace and built-in fitting, after the completion of to weld seam Carry out antirust treatment.
In the present embodiment, the column is installed, and column successively installs in place from below to up, and be fixed on for column by blending bolt In corner brace, distance of the column away from main body metope is determined by metope end line, adjusts the perpendicularity of centre position column, it is qualified after, By pad, nut and bolt spot welding, welding position uses preservative treatment.
In the present embodiment, the interlayer drapes over one's shoulders water layer installation, by design drawing requirement, first fixes galvanized steel plain sheet, then uniformly Anti- guncotton is laid, galvanized steel plain sheet is closed with the gap of structure with fireproof gum;Drape over one's shoulders water iron sheet and find the line put according to drawing, note During control, being fixedly connected to meet the requirements.
In the present embodiment, the transition arm is installed, and snap the line is answered when mounted, and ensure that column is connected with transition arm short arm Firmly, its spacing should be consistent with the height of H types transition arm fastener type pottery clay plates, and keel are fixed on pre-buried adaptor, and make the transition arm It is fixed on keel.
In the present embodiment, the H types transition arm fastener type pottery clay plates are installed,
1st, steel wire plumb line fixed up and down is made at a width curtain wall corner, and steel wire vertical line is set every 3-4 meters in centre, applied Work team's group is that foundation is successively installed with vertical line, consistent with perps size with the perpendicularity for ensureing curtain wall plate face;
2nd, H types transition arm fastener type pottery clay plates are successively installed from bottom to top, H types transition arm fastener type pottery at every layer of first installing angle Native plate, then middle H types transition arm fastener type pottery clay plates are installed, in the row H types of bottom one transition arm fastener type pottery clay plates installation process In, progressively guiding gutter is clipped between two pieces of H types transition arm fastener type pottery clay plates perps;
3rd, when H types transition arm fastener type pottery clay plates are installed, bottom fastener is arranged on crossbeam first, every piece of H types transition arm is buckled Part formula pottery clay plates at least need two fasteners, first row H types transition arm fastener type pottery clay plates are placed on the fastener of bottom, guiding gutter It is clipped between two pieces of H types transition arm fastener type pottery clay plates;
4th, intermediate fastening is arranged on crossbeam, on the one hand fixed ground floor H types transition arm fastener type pottery clay plates, under being on the other hand One layer of H types transition arm fastener type pottery clay plates are installed and provide support, in construction below, repeat above-mentioned installation process, are finally pacified Dress top closing panel.
In the present embodiment, the connected mode of the curtain wall panel of the H types transition arm fastener type pottery clay plates, using following several classes Connected mode:
1st, in H types transition arm fastener type pottery clay plates edge otch, connected with metal hanger;
2nd, in H types transition arm fastener type pottery clay plates panel behind, perforate or fluting, are connected with back of the body bolt, back-trough or back card;
3rd, in the gluing knot aluminium section bar auxiliary frame of edge knotting structure of H types transition arm fastener type pottery clay plates panel, by auxiliary frame and crossbeam, Column links, and auxiliary frame should be with hook fixing stone panel.
In the present embodiment, before the keel construction of the H types transition arm fastener type pottery clay plates, first unwrapping wire positioning sets one Individual horizontal plane and perpendicularity, determine keel finished surface on one face, after transition arm is fixed, using certainly before dress ceramic plate The correction modulator of system mixes up levelness, then carries out hanging plate operation.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, on the premise of the technology of the present invention principle is not departed from, some improvement and deformation can also be made, these improve and deform Also should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of H types transition arm fastener type curtain wall installation method, it is characterized in that, comprise the following steps:
1)Preparation of construction;2)Surveying setting-out;3)Corner brace is installed;4)Column is installed;5) interlayer drapes over one's shoulders water layer installation;6)Short arm is pacified Dress;7)H types transition arm fastener type pottery clay plates are installed;8)Cleaning;
The pottery clay plates are provided with inner chamber, and sound insulation and noise reduction, thermal and insulating performance is good;
The H types transition arm fastener type pottery clay plates use Open architecture, the Open architecture to be entered according to isobaric rain screen principle Row splicing design, installs drain structure measure.
2. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that, the construction is accurate It is standby, special construction plan is first worked out, operating personnel are carried out with pre-job training, and carry out safe practice to tell somebody what one's real intentions are work;Further according to building Building decoration design figure carries out typesetting design, draws typesetting figure;The built-in fitting position of last External Wall keel is checked.
3. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that, the measurement is put Line, first checks the datum line that civil engineering is transferred, and rechecks each layer of indoor absolute altitude of civil engineering, and indoor elevation line is moved into external wall construction Face, and deviation measurement is carried out to building appearance and size, the normal line of cladding H types transition arm fastener type pottery clay plates is determined, most Afterwards on the basis of normal line, frame bar is put on the wall according to typesetting figure, and carry out mark.
4. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that, the corner brace peace Dress, first respectively hangs two installation control lines, further according to column installation position with the steel wire of the ㎜ of Φ 0.5~1.2 at the two ends of single width curtain wall Put determination corner brace adjustment notch;When corner brace is welded, the position of corner brace should be aligned with the line of ink marker, and by the corner brace of same level position both sides Tack weld, and checked, then by the middle angle bracket of same root post, check the vertical of the same root post corner brace of adjustment Degree, it is qualified after, carry out the full weld of corner brace and built-in fitting, after the completion of antirust treatment is carried out to weld seam.
5. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that, the column peace Dress, column successively installs in place from below to up, and be fixed on column in corner brace by blending bolt, by metope end line determine column away from The distance of main body metope, adjust centre position column perpendicularity, it is qualified after, by pad, nut and bolt spot welding, welding position Using preservative treatment.
6. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that, the interlayer is draped over one's shoulders Water layer is installed, and by design drawing requirement, is first fixed galvanized steel plain sheet, then uniformly lays anti-guncotton, the sky of galvanized steel plain sheet and structure Closed with fireproof gum at gap;Drape over one's shoulders water iron sheet and find the line put according to drawing, controlled during noting, being fixedly connected to conform to Ask.
7. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that,
The short arm is installed, and snap the line is answered when mounted, and ensures that column is connected firmly with short arm, and its spacing should turn with H types The height of arm fastener type pottery clay plates is consistent, and keel are fixed on pre-buried adaptor, and transition arm is fixed on keel;Short arm is pacified Snap the line is answered during dress, and ensures that column is connected firmly with short arm, its spacing should be with the height phase of H types transition arm fastener type pottery clay plates Symbol.
8. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that, the H types transition Arm fastener type pottery clay plates are installed,
1st, steel wire plumb line fixed up and down is made at a width curtain wall corner, and steel wire vertical line is set every 3-4 meters in centre, applied Work team's group is that foundation is successively installed with vertical line, consistent with perps size with the perpendicularity for ensureing curtain wall plate face;
2nd, H types transition arm fastener type pottery clay plates are successively installed from bottom to top, H types transition arm fastener type pottery at every layer of first installing angle Native plate, then middle H types transition arm fastener type pottery clay plates are installed, in the row H types of bottom one transition arm fastener type pottery clay plates installation process In, progressively guiding gutter is clipped between two pieces of H types transition arm fastener type pottery clay plates perps;
3rd, when H types transition arm fastener type pottery clay plates are installed, bottom fastener is arranged on crossbeam first, every piece of H types transition arm is buckled Part formula pottery clay plates at least need two fasteners, first row H types transition arm fastener type pottery clay plates are placed on the fastener of bottom, guiding gutter It is clipped between two pieces of H types transition arm fastener type pottery clay plates;
4th, intermediate fastening is arranged on crossbeam, on the one hand fixed ground floor H types transition arm fastener type pottery clay plates, under being on the other hand One layer of H types transition arm fastener type pottery clay plates are installed and provide support, in construction below, repeat above-mentioned installation process, are finally pacified Dress top closing panel.
9. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that, the H types transition The connected mode of the curtain wall panel of arm fastener type pottery clay plates, using following a few class connected modes:
1st, in H types transition arm fastener type pottery clay plates edge otch, connected with metal hanger;
2nd, in H types transition arm fastener type pottery clay plates panel behind, perforate or fluting, are connected with back of the body bolt, back-trough or back card;
3rd, in the gluing knot aluminium section bar auxiliary frame of edge knotting structure of H types transition arm fastener type pottery clay plates panel, by auxiliary frame and crossbeam, Column links, and auxiliary frame should be with hook fixing stone panel.
10. a kind of H types transition arm fastener type curtain wall installation method according to claim 1, it is characterized in that, the H types turn Before the keel construction of arm fastener type pottery clay plates, first unwrapping wire positioning, fixed what a horizontal plane and perpendicularity determine that keel are completed Face on one face, after transition arm is fixed, mixes up levelness, then enter before dress ceramic plate using homemade correction modulator Row hanging plate operation.
CN201710054424.XA 2017-01-24 2017-01-24 H-shaped rotating arm fastener type curtain wall installation method Pending CN106703266A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710054424.XA CN106703266A (en) 2017-01-24 2017-01-24 H-shaped rotating arm fastener type curtain wall installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710054424.XA CN106703266A (en) 2017-01-24 2017-01-24 H-shaped rotating arm fastener type curtain wall installation method

Publications (1)

Publication Number Publication Date
CN106703266A true CN106703266A (en) 2017-05-24

Family

ID=58909537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710054424.XA Pending CN106703266A (en) 2017-01-24 2017-01-24 H-shaped rotating arm fastener type curtain wall installation method

Country Status (1)

Country Link
CN (1) CN106703266A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112110330A (en) * 2020-09-21 2020-12-22 中建二局第一建筑工程有限公司 Curtain wall unit body rail hoisting system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2186966B1 (en) * 2008-11-13 2014-03-05 Moeding Keramikfassaden GmbH Facade construction
CN203821764U (en) * 2014-03-27 2014-09-10 广州江河幕墙系统工程有限公司 Hollow argil plate hitching system
CN104831848A (en) * 2015-05-18 2015-08-12 东亚装饰股份有限公司 Vertical hanging type ceramic plate curtain all installing structure
CN106193396A (en) * 2016-07-22 2016-12-07 南通八建集团有限公司 H type arm clay plate curtain wall construction method transition

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2186966B1 (en) * 2008-11-13 2014-03-05 Moeding Keramikfassaden GmbH Facade construction
CN203821764U (en) * 2014-03-27 2014-09-10 广州江河幕墙系统工程有限公司 Hollow argil plate hitching system
CN104831848A (en) * 2015-05-18 2015-08-12 东亚装饰股份有限公司 Vertical hanging type ceramic plate curtain all installing structure
CN106193396A (en) * 2016-07-22 2016-12-07 南通八建集团有限公司 H type arm clay plate curtain wall construction method transition

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112110330A (en) * 2020-09-21 2020-12-22 中建二局第一建筑工程有限公司 Curtain wall unit body rail hoisting system and method
CN112110330B (en) * 2020-09-21 2023-03-14 中建二局第一建筑工程有限公司 Curtain wall unit body rail hoisting system and method

Similar Documents

Publication Publication Date Title
CN103711262B (en) A kind of curved surface aluminum-magnesium-manganese alloy roof plate system construction method
CN109322489B (en) Construction process and device for 360-degree vertical overlock profiled steel sheet
CN106049766B (en) The combination eaves system and its construction method of large span steel structure and sets of brackets on top of the columns timber structure
CN112031186A (en) Construction process of graphite modified cement-based insulation board external wall external insulation thin plastering system
CN106284857A (en) A kind of construction technology of aluminium sheet roofing standing-seam system
CN107447939A (en) A kind of construction method of exterior-wall heat insulation stone decoration integrated board architectural surface
CN107905536A (en) Glass curtain wall construction method
CN210857707U (en) Purify regional two glass magnesium rock wool color plate rooms
CN209686857U (en) Deep basal pit outer wall of basement shape steel bracket diagonal brace single side formwork system
CN106703266A (en) H-shaped rotating arm fastener type curtain wall installation method
CN207988159U (en) A kind of assembled watertight building
CN108915136A (en) A kind of construction method of open stone curtain wall
CN205475825U (en) Keep warm and decorate wall body
CN111119368A (en) Construction method for externally-hung metal rock wool sandwich board of autoclaved sand aerated concrete wallboard
CN208168068U (en) Take upright lockrand metal sheet waterproof system's imitative rammed soil concrete curtain
CN207092318U (en) A kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones
CN109989538A (en) A kind of ancient architecture flying-rafter structure and its construction method constructed with metal plate
CN106193396A (en) H type arm clay plate curtain wall construction method transition
CN215167057U (en) Large-span huge underground workshop arch-type steel-concrete combined ceiling structure
CN108625549A (en) The outer eaves abnormity cosmetic sheet Wind-Pressure Resistance construction system of building and construction method
CN208618680U (en) It builds outer eaves abnormity cosmetic sheet Wind-Pressure Resistance and constructs system
CN112746704A (en) Arch type steel-concrete combined ceiling structure of large-span giant underground workshop and construction method
CN206987720U (en) A kind of double shield cage cat ladders
CN206495239U (en) A kind of basement bottom board construction joint anticracking water proof structure
CN113006324B (en) Sandwich plate installation method for steel structure factory building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170524

RJ01 Rejection of invention patent application after publication