CN202469251U - Combined support hanger - Google Patents
Combined support hanger Download PDFInfo
- Publication number
- CN202469251U CN202469251U CN2011205583234U CN201120558323U CN202469251U CN 202469251 U CN202469251 U CN 202469251U CN 2011205583234 U CN2011205583234 U CN 2011205583234U CN 201120558323 U CN201120558323 U CN 201120558323U CN 202469251 U CN202469251 U CN 202469251U
- Authority
- CN
- China
- Prior art keywords
- support
- crossbeam
- combined type
- type suspension
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a pipeline installation system in a floor, in particular to a combined support hanger for supporting and fixing a pipeline. The combined support hanger comprises two vertical columns (1) and a crossbeam (2); the crossbeam (2) is horizontally arranged between the two vertical columns (1); both ends of the crossbeam (2) are respectively connected to the lower ends of the two vertical columns (1) detachably and fixedly; and the upper ends of the vertical columns (1) are respectively connected to structural floor slabs (6) detachably and fixedly. The combined support hanger can realize the hoisting of a plurality of pipelines, and is convenient to install and detach. Meanwhile, the combined support hanger has the advantages of standardized production, simple installation, safe construction, energy saving, cost saving, environmental friendliness, firmness and attractive effect after installation.
Description
Technical field
The utility model relates to floor interior conduit installation system, relates in particular to a kind of combined type suspension and support that is used to support with fixing tube.
Background technique
At present, along with the development of Chinese national economy, during the quickening of urbanization process, particularly " 12 ", country further increases the total investment to building field, and these all will bring new opportunity for the development of construction and installation industry; On the other hand, China is just vigorously implementing the transformation of economic development mode, actively advocates " energy-saving and emission-reduction ", " safety and environmental protection ", also must reach the target of " energy saving building ", " the green installation " as the construction and installation industry.
China's construction and installation suspension and support industry is just strengthening autonomous scientific and technical innovation dynamics; Make the transition to fine-grained management with extensive style, make the transition to procedure, replace tratitional technology with autonomous innovation science and technology with empirical; The implementation batch production is prefabricated; With the innovative product uniform technical standards, to realize assembled in situization, again with mounting technique and the perfect fusion of good service; Thereby formed perfect novel combination type and propped up crane system, realized already that for construction and installation targets such as " energy saving building ", " the green installation " play basic supporting effect.
At present; Suspension and support on the market is used for the support of single pipeline more; And be applicable to more pipeline, comprise water pipe, airduct, fire hose reel etc., and the suspension and support of the various furred ceiling interior conduit installing engineering of caliber is then few; Therefore, how providing a kind of is the technical problem that related domain needs to be resolved hurrily satisfying under the multitube road fixed support strength condition the novel suspension and support of can energy-conserving and environment-protective, practicing thrift cost.
The model utility content
The purpose of the utility model is to provide a kind of combined type suspension and support, to solve the problem that existing suspension and support can only satisfy single pipeline fixed support.
For solving the problems of the technologies described above; The utility model provides a kind of combined type suspension and support; Be used for pipeline is lifted structure floor, comprise: two root posts and a crossbeam that is used to place many pipelines, said crossbeam are horizontally placed between said two root posts; And the detachable respectively lower end that is fixedly connected on said two root posts, said crossbeam two ends, the upper end of said column is detachable respectively to be fixedly connected on said structure floor.
Optional, said combined type suspension and support also comprises two bases, the upper end of said column is fixedly connected on the said structure floor through said base is detachable respectively.
Optional, said base is detachable to be fixedly connected on the horizontal plane of said structure floor.
Optional, the upper end of said column is respectively through the detachable vertical plane that is fixedly connected on said structure floor of link.
Optional, said combined type suspension and support also comprises the plurality of conduits fixed component, and many said pipelines are installed on the said crossbeam through pipeline fixed component separately.Said pipeline fixed component is the steel pipe folder, and said column and said crossbeam adopt the bolt assembly Two bors d's oeuveres to connect to form by two shaped steel respectively, and said crossbeam two ends are respectively through the detachable lower end that is fixedly connected on said two root posts of angle steel.Thus, the utility model is made up of the series of standards member, and all members all can adopt standardized production technology, has versatility and interchangeability.
Optional, said column and said crossbeam adopt light-duty C shaped steel.Therefore, guaranteeing under the prerequisite of its bearing capacity that material such as the used C shaped steel weight channel-section steel used with respect to traditional suspension and support, angle steel can alleviate 15%~20%, has obviously reduced the steel use amount, thereby has practiced thrift energy consumption.
Optional, base, column, crossbeam and connected element all adopt hot galvanizing to handle.Thereby, make the steel component surface adhere to the zinc layer, thereby play the corrosion-resistant purpose
The combined type suspension and support that the utility model provides; Comprise two root posts and a crossbeam that is used to place many pipelines, said crossbeam is horizontally placed between said two root posts, and the detachable respectively lower end that is fixedly connected on said two root posts, said crossbeam two ends; The upper end of said column is detachable respectively to be fixedly connected on said structure floor; So, can reach the lifting of many pipelines, and convenient the installation and dismounting.Simultaneously, this combined type suspension and support also has standardized production, simple and easy installation, and construction safety, energy saving is practiced thrift cost, protection environment, sturdy and durable and installation back effect advantage attractive in appearance.
Description of drawings
Fig. 1 is the structural representation of the utility model combined type suspension and support (top dress);
Fig. 2 is the structural representation of the utility model combined type suspension and support (side dress).
Embodiment
For above-mentioned purpose, the feature and advantage that make the utility model can be more obviously understandable, the embodiment of the utility model is done detailed explanation below in conjunction with accompanying drawing.
As shown in Figure 1; This combined type suspension and support; Be used for pipe laying 6, comprise: two root posts 1 and a crossbeam 2 that is used to place many pipelines, said crossbeam 2 are horizontally placed between said two root posts 1; And said crossbeam 2 two ends are respectively through the angle steel 3 detachable lower ends that are fixedly connected on said two root posts 1, and the upper end of said column 1 is detachable to be fixedly connected on the said structure floor (not signal among Fig. 1).Particularly, said combined type suspension and support also comprises two bases 4, and the upper end of said column 1 is respectively through on the detachable horizontal plane that is fixedly connected on said structure floor of said base 4.Said combined type suspension and support also comprises plurality of conduits fixed component 5; Preferable, pipeline fixed component 5 is selected the steel pipe folder for use, and many pipelines 6 are installed on the said crossbeam 2 through steel pipe folder separately; Can reach the fixed support of many pipelines 6, and convenient the installation and dismounting.Particularly, bolt is all adopted in detachable fixed connection.
Preferable; Said column 1 adopts the bolt Two bors d's oeuveres to be formed by connecting 2 QC41*22*2.0, and said crossbeam 2 adopts the bolt Two bors d's oeuveres to be formed by connecting 2 QC41*62*2.0, and said angle steel 3 is made by the QC-L3 angle steel; Like this; Make whole combined type suspension and support be made up of the series of standards member, all members all adopt standardized production technology, have versatility and interchangeability.
Preferable, said column 1 adopts light-duty C shaped steel with said crossbeam 2 and base 4.Main material is selected the light-duty C shaped steel that meets international standard for use; Guaranteeing under the prerequisite of its bearing capacity; Materials such as the used C shaped steel weight channel-section steel used with respect to traditional suspension and support, angle steel can alleviate 15%~20%, obviously reduce the steel use amount, thus energy saving consumption.
Preferable, in the present embodiment, column 1 all adopts hot galvanizing to handle with crossbeam 2 and base 4 etc., makes the steel component surface adhere to the zinc layer, thereby plays the corrosion-resistant effect.
As shown in Figure 2, present embodiment and embodiment's 1 difference is: the upper end of said column 1 is fixedly connected on the vertical plane (not signal among Fig. 2) of said structure floor respectively through connected element 6 releasables.That is to say, make the direction that locks of bolt become substantially horizontal, satisfy installation and combination formula suspension and support on the sidewall, thereby satisfy different lifting demands.
The combined type suspension and support that the utility model provides can be realized the lifting in multitube road, and assembling and disassembling is convenient, and it has standardized production simultaneously; Simple and easy installation, construction safety, energy saving; Advantages such as the saving cost is protected environment, and sturdy and durable and installation effect is attractive in appearance.
Obviously, those skilled in the art can carry out various changes and modification to the utility model and not break away from the spirit and the scope of the utility model.Like this, belong within the scope of the utility model claim and equivalent technologies thereof if these of the utility model are revised with modification, then the utility model also is intended to comprise these changes and modification interior.
Claims (10)
1. combined type suspension and support; Be used for pipeline is lifted structure floor; It is characterized in that, comprising: two root posts and a crossbeam that is used to place many pipelines, said crossbeam are horizontally placed between said two root posts; And the detachable respectively lower end that is fixedly connected on said two root posts, said crossbeam two ends, the upper end of said column is detachable respectively to be fixedly connected on said structure floor.
2. combined type suspension and support as claimed in claim 1 is characterized in that, said combined type suspension and support also comprises two bases, and the upper end of said column is fixedly connected on the said structure floor through said base is detachable respectively.
3. combined type suspension and support as claimed in claim 2 is characterized in that, said base is detachable to be fixedly connected on the horizontal plane of said structure floor.
4. combined type suspension and support as claimed in claim 1 is characterized in that, the upper end of said column is respectively through the detachable vertical plane that is fixedly connected on said structure floor of link.
5. combined type suspension and support as claimed in claim 1 is characterized in that, said combined type suspension and support also comprises the plurality of conduits fixed component, and a plurality of said pipelines are installed on the said crossbeam through pipeline fixed component separately.
6. combined type suspension and support as claimed in claim 5 is characterized in that, said pipeline fixed component is the steel pipe folder.
7. combined type suspension and support as claimed in claim 1 is characterized in that, said column and said crossbeam adopt the bolt assembly Two bors d's oeuveres to connect to form by two shaped steel respectively.
8. combined type suspension and support as claimed in claim 1 is characterized in that, said crossbeam two ends are respectively through the detachable lower end that is fixedly connected on said two root posts of angle steel.
9. like any described combined type suspension and support in the claim 1~8, it is characterized in that said column and said crossbeam adopt light-duty C shaped steel.
10. like any described combined type suspension and support in the claim 1~8, it is characterized in that said column and crossbeam all adopt hot galvanizing to handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205583234U CN202469251U (en) | 2011-12-27 | 2011-12-27 | Combined support hanger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205583234U CN202469251U (en) | 2011-12-27 | 2011-12-27 | Combined support hanger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202469251U true CN202469251U (en) | 2012-10-03 |
Family
ID=46917410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205583234U Expired - Lifetime CN202469251U (en) | 2011-12-27 | 2011-12-27 | Combined support hanger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202469251U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102963661A (en) * | 2012-12-10 | 2013-03-13 | 常熟建工建设集团有限公司苏州分公司 | Layered putting bracket for pipelines |
CN103234080A (en) * | 2013-05-08 | 2013-08-07 | 内蒙古兴泰建筑有限责任公司 | Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes |
CN104315249A (en) * | 2014-10-13 | 2015-01-28 | 马记 | Industrial pipeline mounting method |
CN104344093A (en) * | 2014-10-21 | 2015-02-11 | 成都市第三建筑工程公司 | Pipeline fixing device |
CN106764075A (en) * | 2016-12-14 | 2017-05-31 | 上海市安装工程集团有限公司 | For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed |
CN107166099A (en) * | 2017-06-02 | 2017-09-15 | 安徽奥睿德科技发展有限公司 | A kind of Pipe installing mechanism for I-steel |
CN107178661A (en) * | 2017-06-02 | 2017-09-19 | 安徽奥睿德科技发展有限公司 | A kind of adjustable pipeline hoisting structure |
CN107575646A (en) * | 2016-07-04 | 2018-01-12 | 江苏奇佩建筑装配科技有限公司 | New suspension and support for large-scale pipeline |
CN113418057A (en) * | 2021-05-27 | 2021-09-21 | 上海尚孚装备机械有限公司 | Shock-proof support with joint ball bearing as joint |
-
2011
- 2011-12-27 CN CN2011205583234U patent/CN202469251U/en not_active Expired - Lifetime
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102963661A (en) * | 2012-12-10 | 2013-03-13 | 常熟建工建设集团有限公司苏州分公司 | Layered putting bracket for pipelines |
CN103234080A (en) * | 2013-05-08 | 2013-08-07 | 内蒙古兴泰建筑有限责任公司 | Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes |
CN104315249A (en) * | 2014-10-13 | 2015-01-28 | 马记 | Industrial pipeline mounting method |
CN104315249B (en) * | 2014-10-13 | 2016-05-11 | 马记 | Pipeline industry installation method |
CN104344093A (en) * | 2014-10-21 | 2015-02-11 | 成都市第三建筑工程公司 | Pipeline fixing device |
CN104344093B (en) * | 2014-10-21 | 2017-03-15 | 成都市第三建筑工程公司 | Pipeline fixing device |
CN107575646A (en) * | 2016-07-04 | 2018-01-12 | 江苏奇佩建筑装配科技有限公司 | New suspension and support for large-scale pipeline |
CN106764075A (en) * | 2016-12-14 | 2017-05-31 | 上海市安装工程集团有限公司 | For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed |
CN107166099A (en) * | 2017-06-02 | 2017-09-15 | 安徽奥睿德科技发展有限公司 | A kind of Pipe installing mechanism for I-steel |
CN107178661A (en) * | 2017-06-02 | 2017-09-19 | 安徽奥睿德科技发展有限公司 | A kind of adjustable pipeline hoisting structure |
CN113418057A (en) * | 2021-05-27 | 2021-09-21 | 上海尚孚装备机械有限公司 | Shock-proof support with joint ball bearing as joint |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202469251U (en) | Combined support hanger | |
CN202899395U (en) | Suspension type detachable aluminum honeycomb composite stone plate ceiling installation structure | |
CN203716302U (en) | Connecting structure of novel quick-assembled integrated house | |
CN206337811U (en) | A kind of skyscraper aluminum alloy pattern plate structure | |
CN202530571U (en) | Box type house convenient to dismount and mount | |
CN107366393A (en) | A kind of food stuff refrigerated storage roofing colored steel Alley Oop formula hanging method | |
CN201574507U (en) | Soft film ceiling mounting structure | |
CN202483154U (en) | High bearing capacity suspending scaffold | |
CN201610978U (en) | Pipe rack convenient for installing and repairing multilayer pipeline | |
CN102304945B (en) | Adapting piece of ultrathin wall steel structure stand column and horizontal beam and connection structure thereof | |
CN203871761U (en) | Cable support | |
CN203346950U (en) | Hidden laying structure for temporary water supply pipes of high-rise building | |
CN202519840U (en) | Open type GRC (Glass-fiber Reinforced Composite) plate hanging and connecting structure for curtain wall | |
CN205224420U (en) | Anticorrosive industry factory building precast concrete stand | |
CN210658449U (en) | Remove aluminum alloy template structure | |
CN107514092A (en) | A kind of light steel skeleton prefabricated thermal insulation floor and construction method | |
CN202187456U (en) | Counteracting bearing suspended-ceiling suspension device | |
CN204056256U (en) | A kind of boats and ships and ocean engineering structure close up uses scaffold | |
CN203878957U (en) | Protective screen module unit | |
CN103243888B (en) | Stone-like aluminum alloy light grid component and construction method of decorative outer wall made of stone-like aluminum alloy light grid components | |
CN202194246U (en) | Connection piece of an ultrathin wall pillar in steel structure and a horizontal beam and its connection structure | |
CN202055496U (en) | Easy-to-adjust moving operation platform | |
CN201128959Y (en) | Novel building top structure | |
CN204001354U (en) | Triangular form main joist hoisting structure | |
CN203654536U (en) | Installation fixture connecting piece of full glass curtain wall large-size glass panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20121003 |
|
CX01 | Expiry of patent term |