CN201610978U - Pipe rack convenient for installing and repairing multilayer pipeline - Google Patents

Pipe rack convenient for installing and repairing multilayer pipeline Download PDF

Info

Publication number
CN201610978U
CN201610978U CN2009203186774U CN200920318677U CN201610978U CN 201610978 U CN201610978 U CN 201610978U CN 2009203186774 U CN2009203186774 U CN 2009203186774U CN 200920318677 U CN200920318677 U CN 200920318677U CN 201610978 U CN201610978 U CN 201610978U
Authority
CN
China
Prior art keywords
pipe rack
pipe support
pipeline
crossbeam
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009203186774U
Other languages
Chinese (zh)
Inventor
王茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongse No.12 Metallurgy Construction Co., Ltd.
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2009203186774U priority Critical patent/CN201610978U/en
Application granted granted Critical
Publication of CN201610978U publication Critical patent/CN201610978U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipe rack convenient for installing and repairing a multilayer pipeline, comprising a pipe rack base (1) on which a pipe rack pillar (2) is fixed, a lower fixed pipe rack crossbeam (3) for supporting a pipe (6) is arranged on the pipe rack pillar (2), the upper end of the pipe rack pillar (2) is connected with an upper movable pipe rack crossbeam (4) for supporting the pipe (6) by a fixed anchor bolt (5). According to the utility model, the pipe rack beam at the upper end of the pipe rack pillar is arranged to form a movable upper movable pipe rack crossbeam structure, when the lower pipeline is needed to be maintained, only the upper movable pipe rack crossbeam is moved off, the lower pipeline is maintained, therefore, the space of installing the lower pipeline is greatly saved, and the installation, use and maintenance of the lower pipeline are not influenced. The utility model has the advantages of simple structure, less occupation space, convenient pipeline maintenance, low cost, lower integral pipe rack height and easy maintenance and installation.

Description

A kind of pipe support of being convenient to install the maintenance multi-layer piping
Technical field
The utility model and a kind of pipe support of being convenient to install the maintenance multi-layer piping belong to multi-layer piping and support the pipe support technical field.
Background technique
In the design process of support of pipelines, often run into the situation that needs to arrange several pipelines, limited by the place, pipe support width deficiency, pipeline can not tile, can only be along vertical layered layout, if agent structure has limited the interfloor height of pipe support,, can not satisfy the spatial requirement of piping erection construction and maintenance though at this moment can satisfy the own intensity of pipe support width, height and structure, the needed size of rigidity that agent structure requires as far as possible.Therefore, the pipe support structure of existing multi-layer piping still is not ideal enough.
The model utility content
The purpose of this utility model is: provide a kind of simple in structure, pipe support less, that service conduits is convenient to install the maintenance multi-layer piping easily that takes up room, to overcome the deficiencies in the prior art.
The utility model is achieved in that a kind of pipe support of being convenient to install the maintenance multi-layer piping of the present utility model comprises the pipe support basis, on the pipe support basis, be fixed with the pipe support pillar, on the pipe support pillar, be provided with the fixing pipe support crossbeam of lower floor that is used to support pipeline, tie by mooring anchor in the upper end of pipe support pillar and be connected to the movable pipe support crossbeam in upper strata that is used to support pipeline.
The movable pipe support crossbeam in above-mentioned upper strata is precast reinforced concrete beam structure or steel beam structure.
Owing to adopted technique scheme, the utility model is arranged to the pipe support beam of pipe support pillar upper end the structure of the movable pipe support crossbeam in upper strata that can be movable, when needing repairing lower floor's pipeline, only need the movable pipe support crossbeam in upper strata is moved out, can keep in repair lower floor's pipeline, therefore under the situation of saving lower floor piping erection space greatly, do not influence installing and using and keeping in repair again to lower floor's pipeline.So, the utility model compared with prior art, that the utility model not only has is simple in structure, occupy little space, service conduits advantage easily, but also have that whole height cheap, pipe support is lower, piping erection and maintenance advantage easily all.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Embodiment
Below in conjunction with drawings and Examples the utility model is done further to say in detail.
Embodiment of the present utility model: structure of the present utility model as shown in Figure 1, during making, produce pipe support basis 1 routinely, and fixing pipe support pillar 2 on the pipe support basis 1, the lower floor that is used to support pipeline 6 on fixing on the pipe support pillar 2 is pipe support crossbeam 3 fixedly, and connect the movable pipe support crossbeam 4 in upper strata that is used to support pipeline 6 by fixing crab-bolt 5 in the upper end of pipe support pillar 2, fixedly crab-bolt 5 can adopt traditional bolt arrangement, and upper strata movable pipe support crossbeam 4 is made into precast reinforced concrete beam structure or steel beam structure.

Claims (2)

1. be convenient to install the pipe support that overhauls multi-layer piping for one kind, comprise pipe support basis (1), it is characterized in that, on pipe support basis (1), be fixed with pipe support pillar (2), on pipe support pillar (2), be provided with the fixing pipe support crossbeam (3) of lower floor that is used to support pipeline (6), be connected with the movable pipe support crossbeam (4) in upper strata that is used to support pipeline (6) by fixing crab-bolt (5) in the upper end of pipe support pillar (2).
2. the pipe support of being convenient to install the maintenance multi-layer piping according to claim 1 is characterized in that: the movable pipe support crossbeam in upper strata (4) is precast reinforced concrete beam structure or steel beam structure.
CN2009203186774U 2009-12-28 2009-12-28 Pipe rack convenient for installing and repairing multilayer pipeline Expired - Lifetime CN201610978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203186774U CN201610978U (en) 2009-12-28 2009-12-28 Pipe rack convenient for installing and repairing multilayer pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203186774U CN201610978U (en) 2009-12-28 2009-12-28 Pipe rack convenient for installing and repairing multilayer pipeline

Publications (1)

Publication Number Publication Date
CN201610978U true CN201610978U (en) 2010-10-20

Family

ID=42961612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203186774U Expired - Lifetime CN201610978U (en) 2009-12-28 2009-12-28 Pipe rack convenient for installing and repairing multilayer pipeline

Country Status (1)

Country Link
CN (1) CN201610978U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477805A (en) * 2010-11-30 2012-05-30 沈阳铝镁设计研究院有限公司 Double-layer gas cleaning piping support structure in electrolytic plant
CN106545704A (en) * 2015-09-23 2017-03-29 中煤第建设有限公司 Fully-mechanized mining working assembles and disassembles pipeline support soon
CN108591615A (en) * 2018-05-11 2018-09-28 中国十七冶集团有限公司 Pipeline rotating compensator mounting structure and its construction method on a kind of water field of big area
CN108644471A (en) * 2018-04-18 2018-10-12 中国十七冶集团有限公司 A kind of pipeline slip transportation structural system on water field of big area and its construction method
CN111005320A (en) * 2019-12-21 2020-04-14 烟台仁晟工程设备有限公司 Pipeline laying method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477805A (en) * 2010-11-30 2012-05-30 沈阳铝镁设计研究院有限公司 Double-layer gas cleaning piping support structure in electrolytic plant
CN106545704A (en) * 2015-09-23 2017-03-29 中煤第建设有限公司 Fully-mechanized mining working assembles and disassembles pipeline support soon
CN108644471A (en) * 2018-04-18 2018-10-12 中国十七冶集团有限公司 A kind of pipeline slip transportation structural system on water field of big area and its construction method
CN108644471B (en) * 2018-04-18 2020-06-05 中国十七冶集团有限公司 Pipeline sliding transportation structure system on large-area water area and construction method thereof
CN108591615A (en) * 2018-05-11 2018-09-28 中国十七冶集团有限公司 Pipeline rotating compensator mounting structure and its construction method on a kind of water field of big area
CN111005320A (en) * 2019-12-21 2020-04-14 烟台仁晟工程设备有限公司 Pipeline laying method

Similar Documents

Publication Publication Date Title
CN201610978U (en) Pipe rack convenient for installing and repairing multilayer pipeline
CN202074119U (en) Circular pipe rack support and circular pipe rack
CN201417657Y (en) Installation device of indoor transformer
CN202324346U (en) Concrete pumping and lifting construction device in concrete column pipe of steel pipe
CN202194159U (en) Square pipe gallery bracket and square pipe gallery
CN203473214U (en) Bathroom unit of cabin unit
CN205742250U (en) Railway bridge contact net basic off normal device
CN202969897U (en) Ringlock type scaffold joist system
CN201442646U (en) Scaffold erection tool for special coating of finished-oil shipload tank
CN203780735U (en) Pipeline and floor support in ship and pipeline and floor connecting structure
CN202513536U (en) Cable support for power tunnel
CN206319628U (en) One kind building assembled wallboard fitting machine
CN205296213U (en) Utility tunnel lining cutting platform truck
CN103452371B (en) Integral sleeve suspension chimney
CN102352607A (en) Full water stopping side wall template system
CN202117390U (en) Segmentally spliced water tank tower
CN201151930Y (en) Fire-hydrant mounting structure
CN201605806U (en) Supporting device used for placing concrete of reserved holes of vertical pipes or sleeves
CN102734559A (en) Device for supporting telescopic cable arc
CN201246563Y (en) Water supplying and discharging connection elbow
CN204464920U (en) PCCP electric power piping lane inwall swelled ring support base
CN201992193U (en) Support device used in cable expansion arc
CN202500221U (en) Connection system of combined floor board and side face of concrete wall
CN220578785U (en) Large-scale roofing of existing building transformation engineering hangs
CN103758247B (en) A kind of combined body of wall and the attachment structure of girder steel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110609

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO. 2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110609

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

ASS Succession or assignment of patent right

Owner name: ZHONGSE NO.12 METALLURGY CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE CO., LTD.

Effective date: 20120301

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550081 GUIYANG, GUIZHOU PROVINCE TO: 043304 YUNCHENG, SHAANXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120301

Address after: 043304 middle section, No.1 aluminium base, Hejin, Shanxi

Patentee after: Zhongse No.12 Metallurgy Construction Co., Ltd.

Address before: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee before: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20101020

CX01 Expiry of patent term